System Storage DS3950 Quick Start Guide

Similar documents
System Storage EXP3000 Rack Installation Instructions

IBM System Storage DCS3860 Quick Start Guide

Rack Installation Instructions

GB of cache memory per controller to DS4800 controllers with 8 GB of cache memory per controller.

Rack Installation Instructions

IBM System Storage DS4700 Express Storage Subsystem Fibre Channel Cabling Guide

IBM. Rack Installation Instructions

Rack Installation Instructions

IBM TotalStorage DS4500 Fibre Channel Storage Subsystem Cabling Guide

Rack Installation Instructions

EXN4000 Storage Expansion Unit Installation and Setup Instructions

4-Post and Universal Telco Frame (UTF) Rack Mount Kit Installation Instructions

N3220 Installation and Setup Instructions

N3240 Installation and Setup Instructions

1 Getting Started Installing & Configuring

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Trays. Apply Power. Connect Data Hosts. Choose Management Method

N3150 Installation and Setup Instructions

Rack Installation Guide

Before you begin. Unpack & Prepare. Install Hardware. Connect Hardware. Apply Power. Choose Management Method. Install & Use SANtricity Software

IBM TotalStorage NAS 200 Model 25T. Quick Start Instructions

Before you begin. Installation and Setup Instructions for E-Series 60-Drive Trays. Unpack & Prepare. Install Hardware. Connect Hardware.

EXN3000 Storage Expansion Unit Installation and Setup Instructions

LSI CTS2600 Controller-Drive Tray

Quick Installation Guide

IBM TotalStorage NAS Gateway 300 Model G27. Quick Start Instructions

N6000 Series Filer Installation and Setup Instructions

Hardware Replacement Guide Types 8099, 8116, 8155, 8156 Types 8157, 8158, 8159, 8160 Types 8215, 9210, 9211

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables

Dell SC5020 and SC5020F Storage Systems Getting Started Guide

Dell SCv3000 and SCv3020 Storage System Getting Started Guide

SGI InfiniteStorage 120

IBM System Storage DCS3700 with Gen2 Controllers. Installation, User's, and Maintenance Guide IBM GA

Dell SC7020 Storage Controller Getting Started Guide

2U STORAGE ENCLOSURE QUICK INSTALL GUIDE FS4100, FS4500, SC4100, AND FC4100

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables

apple Service Source Xserve RAID Xserve RAID and Xserve RAID (SFP) Updated: 25 May Apple Computer, Inc. All rights reserved.

Installing the Cisco MDS 9020 Fabric Switch

apple Service Source Xserve RAID 17 March Apple Computer, Inc. All rights reserved.

Oracle <Insert Picture Here>

Dell Storage Center. Getting Started Guide. SCv2000 and SCv2020 Storage System. Regulatory Model: E09J, E10J Regulatory Type: E09J001, E10J001

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

Quick start guide for p5 520 ( )

6540 Controller Tray. Initial Setup Guide. EC E1, First Edition

Quick start guide for i5 520 ( or )

IBM Systems. Quick start guide for IBM System p5 505 ( )

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

Dell EMC PowerVault MD3460 Storage Arrays

Hardware Replacement Guide

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

Snap Server 4400 Power Supply

Managing Individual Components

To connect the AC adapter:

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

Microsoft Azure StorSimple Appliance 8600 Hardware Installation Guide

Dell PowerEdge FD332. Owner's Manual. Regulatory Model: E02B Regulatory Type: E02B003

Dell MD1280 Storage Enclosure Getting Started Guide

Completing Your System Installation

IBM TotalStorage DS300 and DS400 Quick Installation Guide

Dell PowerVault MD3060e Storage Enclosure Owner's Manual

Power Systems. System processor assembly

JanusRAID SA-6692J Hardware User Manual

CHASSIS INSTALLATION GUIDE

ThinkPad Dock, ThinkPad Dock II. User s Guide

64 Bays SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.0

IBM System Storage DS3000 series Interoperability Matrix IBM System Storage DS3000 series Interoperability Matrix

Sun StorageTek SL48 Tape Library Getting started

E-Series Maintaining E2800 Hardware

Power Systems and 5877 removal and replacement procedures

HP EVA4400 M6412 drive enclosure

IBM System Storage DS3000 series Interoperability Matrix IBM System Storage DS3000 series Interoperability Matrix

E-Series Hardware Cabling Guide

Upgrading or Host Interface Card in the ST2500 M2 Array Module

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

ThinkCentre Hardware Installation and Replacement Guide. Machine Types 6062, 6065, 6071, 6076, 6089, 7103, 9011, 9014, 9071, 9089, 9162, 9182, 9303

CSM200 Expansion Tray

Quick Installation Guide

IBM. Setup Instructions. IBM RS/ Model 260 SA

SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.2

E-Series Hardware Cabling Guide

SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.1

Bull D20 I/O Drawer. Installation Guide ORDER REFERENCE 86 A1 39EG 01

Power Systems. IBM Power 595 (9119-FHA) removal and replacement procedures

Installing the Cisco SFS 3504 Server Switch

EMC Celerra NS-120 System (Dual Blade) Installation Guide

IBM. Setup Instructions. RS/ Model B50 SA

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

Dell SCv3000 and SCv3020 Storage System Owner s Manual

Dell SC5020 and SC5020F Storage System Owner s Manual

Tower to Rack and Rack to Tower System Conversion Guide

DIGITAL Server Rackmount Installation Guide

SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.1

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W.

EMC Celerra NS-120 System (Single Blade) Installation Guide

Dell SC7020 and SC7020F Storage Systems Owner s Manual

March , Revision B. SANnet II 200 SATA SE Array Quick Installation Guide

SCv360 Expansion Enclosure

ThinkCentre Hardware Installation and Replacement Guide. Machine Types 6417, 6418, 6449, 6453

Dell SC460 Expansion Enclosure Getting Started Guide

FlexPower Server User Guide

G3-APEX-ENT-32T. Apex technical specifications. Parts list

Transcription:

System Storage DS3950 Quick Start Guide This Quick Start Guide describes the basic procedure for installing, cabling, and configuring the IBM System Storage DS3950 storage subsystem (Machine Types 1814-94H and 1814-98H). For educational information about the DS3950 and other IBM System Storage products, go to http://ibmdsseriestraining.com/. For the latest information about IBM System Storage disk storage systems, go to http://www.ibm.com/ systems/support/storage/disk. For detailed information about the storage subsystem, see the IBM System Storage DS3950 Storage Subsystem Installation, User s, and Maintenance Guide. For safety information, see the multilingual IBM Safety Information document on the Documentation CD. Installation guidelines Before you install the storage subsystem in a rack cabinet, review the following guidelines: v Two or more people are required to install devices 18 kg (39.7 lb) or heavier in a rack cabinet. v Make sure that the room air temperature is below 35 C (95 F). v Do not block any air vents; usually 15 cm (6 in.) of space provides proper airflow. v Do not leave open spaces above or below an installed storage subsystem in your rack cabinet. To help prevent damage to storage subsystem components, always install a blank filler panel to cover the open space and to help ensure proper air circulation. v Install the storage subsystem only in a rack cabinet with perforated doors. v Plan the device installation starting from the bottom of the rack cabinet. v Install the heaviest device in the bottom of the rack cabinet. v Do not extend more than one device out of the rack cabinet at the same time. v Remove the rack doors and side panels to provide easier access during installation. v Connect the storage subsystem to a properly grounded outlet. v Do not overload the power outlet when you install multiple devices in the rack cabinet. v Install the storage subsystem in a rack cabinet that meets the following requirements: Minimum depth of 70 mm (2.76 in.) between the front support flange and inside of the front door. Minimum depth of 157 mm (6.18 in.) between the rear support flange and inside of the rear door. Minimum depth of 718 mm (28.27 in.) and maximum depth of 762 mm (30 in.) between the front and rear support flanges to support the use of the cable-management arm. Use safe practices when lifting. 18 kg (39.7 lb) 32 kg (70.5 lb) 55 kg (121.2 lb)

Inventory list The following illustration and inventory list show the items that you need to install the storage subsystem in the rack cabinet. If any items are missing or damaged, contact your place of purchase. Notes: 1. The illustration might differ slightly from your hardware. 2. Depending on your DS3950 order, your shipping box might contain additional materials not shown in the following illustration. 3. The Small Form-factor Pluggable transceivers (SFPs) are preinstalled in the Fibre Channel host ports. 4. The host-interface cables, Ethernet cables, Fibre Channel signal cables, and iscsi signal cables are not shown in the following illustration. Support rails Backup battery unit Controller AC power supply and fan unit Storage subsystem M5 x 8 mm screws (12) M4 x 8 mm screws (4) Small Form-factor Pluggable transceivers (pre-installed) Firmware and DS Storage Manager DVDs AC power cord (2) After you unpack the DS3950, verify that you have the following items: v Enhanced disk drive modules (E-DDMs) or blank trays (16) (Your storage subsystem might come with up to 16 drives.) v RAID controllers (2) v AC power supply and fan units (2) v Fibre Channel signal cables (2) v iscsi signal cables (2) (model 98H only) v Battery units (2) v Power cables (2 rack jumper line cords) v Diagnostic wrap plug/coupler (1) v Serial cable adapter (1) v Rack-mounting hardware kit (1), including: Rails (2) (right and left assemblies) M5 black hex-head slotted screws (12) M4 screws (4) 2

Washers (8) v 8 Gbps SFPs (4) Note: The SFPs are preinstalled in the DS3950. Important: The DS3950 does not ship with region-specific ac power cords. You must obtain the IBM-approved power cords for your region. See the IBM System Storage DS3950 Storage Subsystem Installation, User s, and Maintenance Guide for more information. Tools Before you install the storage subsystem, the installation area must have an Internet connection, and you must have the following tools: v A cart to hold the storage subsystem and its components v Labels for the cable connectors v A medium flat-blade screwdriver v A No. 2 Phillips screwdriver or an M5 hex driver v Anti-static protection Installation overview The installation of the storage subsystem involves the following procedures: 1. Unpacking the storage subsystem on page 4 2. Installing the support rails on page 5 3. Removing the storage subsystem and expansion enclosure components on page 6 4. Installing the storage subsystem and storage expansion enclosures in the rack cabinet on page 7 5. Installing the cables on page 8 6. Turning on the power on page 14 7. Installing the software on page 15 8. Discovering and setting up the storage subsystem on page 16 9. Obtaining information from the IBM Support Web site on page 16 10. Updating the storage subsystem firmware on page 17 11. Configuring the storage subsystem on page 17 3

Unpacking the storage subsystem Statement 4: 18 kg (39.7 lb) 32 kg (70.5 lb) 55 kg (121.2 lb) CAUTION: Use safe practices when lifting. To unpack the storage subsystem, complete the following steps: 1. With the help of one other person, remove the storage subsystem from the shipping box and place it on a cart, table, or other raised surface. 2. Check the storage subsystem to make sure that you received all the necessary parts. See the Inventory list on page 2 section for the parts that are included with the storage subsystem. 3. Take the left and right support rails and the M5 screws and proceed to the Installing the support rails on page 5 section. 4

Installing the support rails Support rail adjustment screws M5 screws Left support rail Right support rail Notes: 1. For proper weight distribution, install the support rails from the storage subsystem ship group in the lower portion of the rack cabinet. 2. Make sure that you allow room above and below the storage subsystem for storage expansion enclosures. 3. The support rails are marked R and L for right and left. To install the left and right support rails in the rack cabinet, complete the following steps. Use the front and rear rack-mounting templates on pages 18 and 19 to align the support rails with the correct rack holes. 1. Starting with the left support rail, loosen the two rail adjustment screws. The adjustment screws are used to lock the support rails at a certain length. 2. Hold the front of the left support rail against the inside of the front rack cabinet support flange, and extend the rear of the support rail until it makes contact with the rear rack cabinet support flange. The alignment pins at the rear of the support rail slide into the holes at the rear of the rack cabinet. 3. From the front of the rack cabinet, with the support-rail flanges positioned inside the rack cabinet support rail assemblies, tighten only the lower M5 screw completely with a Phillips screwdriver. Install the upper M5 screw and tighten it halfway. Notes: a. Do not tighten the upper M5 screw completely until you install the storage subsystem in the rack cabinet. b. Make sure that you use a washer when you install an M5 screw through a square hole on a rack-mounting flange. 4. From the rear of the rack cabinet, tighten the two M5 screws halfway with a Phillips screwdriver. Attention: Make sure that the screws are tight enough to support the weight of the storage subsystem. Do not completely tighten the screws until you install the storage subsystem in the rack cabinet. 5. Tighten the two rail adjustment screws with a medium flat-blade screwdriver. 6. Repeat steps 2 through 5 for the right support rail. 5

Removing the storage subsystem and expansion enclosure components Remove the controllers, hot-swap hard disk drives, ac power supply, and fan units before you lift the storage subsystem. This reduces the weight of the DS3950 during installation. Each component in the back of the DS3950 and EXP395 is held in place by a lever that has a locking latch. To remove the components, complete the following steps. Lever Latch 1. Release the lever: a. Squeeze the latch and pull the lever open 90 (so that the lever is horizontal). The latch is an orange-colored tab on the lever. b. Slowly pull the lever away from the chassis to remove the module. Label each controller and expansion enclosure environmental services monitor (ESM). Controller A and ESM A are in the upper-left slot, and controller B and ESM B are in the lower-right slot. Latch 2. Remove the hard disk drives: a. Label the hard disk drives so that you can replace them in their original order. b. Release the latch on the E-DDM by pressing on the inside of the bottom of the tray handle. c. Lift the closed latch to its open position. When the latch is open, it is at a 90 angle to the front of the E-DDM. d. Pull the E-DDM out of its bay. 6

e. Repeat steps 2b on page 6 through 2d on page 6 for each E-DDM. 3. If you have storage expansion enclosures, remove the enclosure components before you install them. See the Installation, User s, and Maintenance Guide that came with the enclosures for more information about removing the components. Installing the storage subsystem and storage expansion enclosures in the rack cabinet Statement 4: 18 kg (39.7 lb) 32 kg (70.5 lb) 55 kg (121.2 lb) CAUTION: Use safe practices when lifting. To install the storage subsystem, complete the following steps: 1. Slide the rear of the storage subsystem onto the support rails. 2. Align the front mounting holes on each side of the storage subsystem with the mounting holes on the front of the support rails. 3. Install and tighten the four M5 screws in the support holes on each side of the front of the storage subsystem. M4 screws M5 screws 4. Install and tighten the four M4 screws to secure the rear of the storage subsystem to the rack cabinet. 7

5. Tighten the two upper M5 screws, that secure the support rails to the front of the rack cabinet, that you installed in step 3 on page 5. 6. Tighten the four M5 screws, that secure the support rails to the rear of the rack, that you installed in step 4 on page 5. Installing the cables Statement 3: CAUTION: When laser products (such as CD-ROMs, DVD drives, fiber optic devices, or transmitters) are installed, note the following: v Do not remove the covers. Removing the covers of the laser product could result in exposure to hazardous laser radiation. There are no serviceable parts inside the device. v Use of controls or adjustments or performance of procedures other than those specified herein might result in hazardous radiation exposure. DANGER Some laser products contain an embedded Class 3A or Class 3B laser diode. Note the following. Laser radiation when open. Do not stare into the beam, do not view directly with optical instruments, and avoid direct exposure to the beam. Use the following illustrations to identify the parts, LEDs, and input/output ports on the front and rear of the DS3950 storage subsystem. Note: The following illustrations might differ slightly from your DS3950 hardware. Drive activity LED Drive fault LED Global locate LED Global summary fault LED Global power LED Link rate switch 8

The following illustration shows the back view of DS3950 Model 94H controllers with two Fibre Channel drive channels and two Fibre Channel host expansion channels per controller. Serial port Ethernet ports Dual-ported drive channel Fibre Channel host channels Enclosure ID Controller A Enclosure ID Fibre Channel host channels Dual-ported drive channel Ethernet ports Controller B Serial port The following illustration shows the back view of DS3950 Model 98H controllers with two Fibre Channel drive channels, two Fibre Channel host expansion channels, and two iscsi host expansion channels per controller. Serial port Ethernet ports Dual-ported drive channel iscsi host channels Fibre Channel host channels Enclosure ID Controller A Controller B Enclosure ID Power-fan canister Fibre Channel host channels iscsi host channels Controller canister Dual-ported drive channel Ethernet ports Serial port 9

Cabling a host server and storage subsystem controllers Before you cable the storage subsystem to a host server, determine which method of storage-subsystem management that you want to use. You can manage the storage subsystems with either an in-band management connection or an out-of-band management connection. The DS3950 supports redundant direct Fibre Channel connections and indirect (switch-enabled) iscsi connections to a maximum of four hosts. For more information about cabling a host server to the DS3950, see the IBM System Storage DS3950 Installation, User s, and Maintenance Guide that came with the storage subsystem. Notes: 1. The DS3950 does not support direct connections from the host systems to the iscsi ports on the storage subsystem. 2. The DS3950 does not support connections to both iscsi and Fibre Channel ports from the same host system. To cable the host server and the storage subsystem controllers for in-band management, complete the following steps: 1. The Small Form-factor Pluggable transceivers (SFPs) are preinstalled in the Fibre Channel host ports. Make sure the SFPs are seated completely in the host ports. 2. Remove any extra SFP transceivers from the host ports that will not be used. If a black, plastic plug is in the SFP transceiver, remove it. 3. Choose a direct topology, a switch or fabric topology, or a mixed topology for your configuration. Fore more information about host connection topologies, see the IBM System Storage DS3950 Installation, User s, and Maintenance Guide that came with the storage subsystem. Important: The DS3950 does not support connections to both iscsi and Fibre Channel ports from the same host system. 4. After you cable each host and controller connection, label each end of each cable with information about its connection. 5. Repeat steps 1 through 4 for every controller and host channel that you plan to use. 6. Make sure that the Link Rate switch is set to the 4 Gbps data-transfer rate. If the link rate is 2 Gbps, make sure that the power to the storage subsystem is turned off; then, move the switch to the 4 Gbps (left) position. To locate the Link Rate switch, see the illustration of the front of the storage subsystem on page 8. 7. See Cabling the storage subsystem and storage expansion enclosures on page 11 for information about cabling the storage subsystem with EXP395 and EXP810 storage expansion enclosures. In-band and out-of-band management In-band management requires host-agent software that you install on the host server. In-band management uses existing host connections, along with the Storage Manager Agent. No additional cabling is necessary. For more information, see the IBM System Storage DS Storage Manager Installation and Host Support Guide Out-of-band management uses Ethernet connections from a management station to each controller. You must install at least one management station. The management station can be the host server or a workstation on the Ethernet network. To use Ethernet cabling (for out-of-band management only), complete the following steps: 1. Connect one end of the Ethernet cable to the Ethernet port 1 connector on controller A. To locate the Ethernet ports, see the illustration of the rear of the storage subsystem on page 8. 2. Connect the other end of the Ethernet cable to the applicable network connection. 3. Repeat steps 1 and 2 for controller B. 10

Cabling the storage subsystem and storage expansion enclosures The DS3950 supports EXP395 and EXP810 storage expansion enclosures. To attach an EXP810 storage expansion enclosure, you must purchase the applicable feature option. For more information about cabling storage expansion enclosures, see the IBM System Storage DS3950 Installation, User s, and Maintenance Guide that came with the storage subsystem. For maximum redundancy and drive-loss protection, use the information in this section to install cables. To cable the storage subsystem and storage expansion enclosures, complete the following steps: 1. If not already installed, insert an SFP module in each of the required EXP810 or EXP395 drive ports. Remove extra SFPs from drive ports that will not be used. Note: Install a minimum of two drives per storage expansion enclosure. Start with the left slot. 2. Connect a fiber-optic cable from port 2, drive channel 1 of controller A in the storage subsystem to port 1B on the left ESM board of the first storage expansion enclosure. 3. Connect a fiber-optic cable from port 1, drive channel 2 of controller B to port 1B on the right ESM board of the first storage expansion enclosure. Storage subsystem Port 2, drive channel 1 Port 1, drive channel 1 Port 1, drive channel 2 Port 2, drive channel 2 1B 1A 1A 1B 11

4. To connect a second storage expansion enclosure, connect a fiber-optic cable from port 1, drive channel 1 of controller A in the storage subsystem to port 1B on the left ESM board of the second storage expansion enclosure. Then, connect a fiber-optic cable from port 2, drive channel 2 of controller B to port 1B on the right ESM board of the second storage expansion enclosure. Storage subsystem Port 2, drive channel 1 Port 1, drive channel 1 Port 1, drive channel 2 Port 2, drive channel 2 1B 1A 1A 1B 1B 1A 1A 1B 12

Use the following diagram to cable the maximum of six storage expansion enclosures. Storage subsystem Port 2, drive channel 1 Port 1, drive channel 1 Port 1, drive channel 2 Port 2, drive channel 2 1B 1A 1A 1B 1B 1A 1A 1B 1B 1A 1A 1B 1B 1A 1A 1B 1B 1A 1A 1B 1B 1A 1A 1B 13

Turning on the power Statement 5: CAUTION: The power control button on the device and the power switch on the power supply do not turn off the electrical current supplied to the device. The device also might have more than one power cord. To remove all electrical current from the device, ensure that all power cords are disconnected from the power source. 2 1 Important: You must follow the power sequence in the order shown in the following procedure. To establish power redundancy for enclosures with two power supplies, use at least two power distribution units (PDUs) in the rack cabinet. Split the power connections from each enclosure into the separate PDUs. Then, connect the PDUs to external power receptacles that are on different circuits. To turn on the storage subsystem power, complete the following steps: 1. Connect a power cord to each power supply in the storage subsystem. 2. Connect the other end of each power cord to the power receptacle. Important: Before you turn on the power to the DS3950 storage subsystem, it must be populated with at least two hard disk drives. If at least two hard disk drives are not installed in the DS3950, an insufficient load to the enclosure power supplies might cause them to intermittently appear as failed, falsely indicating the power supplies are bad. All of the hard disk drives in the DS3950 storage subsystem and the connected storage expansion enclosure or enclosures must contain no prior configuration data. 3. Turn on the power to the switches, if applicable. 4. Turn on both power switches on all of the attached storage expansion enclosures, and wait 60 seconds. 5. Turn on both power switches on the storage subsystem. Note: When you turn off the power to the storage subsystem, complete the preceding steps in reverse order. Turn off the power to the storage subsystem first; then, turn off the power to the storage expansion enclosures. 14

Installing the software There are two types of computers that are associated with the storage subsystem. Hosts send input/output (I/O) to the storage subsystem LUNs. Management stations manage the storage subsystem. A computer can function as a host, a management station, or both. Use this section to install the DS Storage Manager software on a management station or a host. Note: The latest version of the DS Storage Manager software for your operating system is on the IBM Support Web site. See Obtaining information from the IBM Support Web site on page 16 for more information. The version of the software on the DS Storage Manager DVD that came with your storage subsystem might not be the latest version. Installing DS Storage Manager on a management station To install the DS Storage Manager software on a management workstation, complete the following steps: 1. If you have access to the Internet, download the latest version of the DS Storage Manager software from the IBM Support Web site (see Obtaining information from the IBM Support Web site on page 16 for more information). If you do not have Internet access, insert the DS Storage Manager DVD on the management workstation and locate the applicable directory for your operating system. Note: The type of operating system that the management station runs is the directory that you must locate on the DS Storage Manager DVD. For more information, see the operating-system and device-river readme files on the DS Storage Manager DVD. 2. Double-click the SMIA executable file. Follow the instructions in the setup wizard, and make sure that you select one of the following options when you are prompted: v Click Management Station if the computer will be used only as a management station. v Click Typical (full installation) if the computer will be used as a management station and a host. 3. If this computer is the only computer designated as a monitor, select Automatically Start Monitor when you are prompted. Note: If additional computers will manage the storage subsystem, do not click Automatically Start Monitor when you set up those additional computers. Instead, click Do Not Automatically Start the Monitor when you are prompted. Otherwise, multiple alert notifications will be sent when there are problems with the storage subsystems. Installing software on a host To install the software on a host, complete the following steps: 1. Check the host bus adapter (HBA) BIOS and device-driver versions for your current HBAs. If necessary, update them to the current level shown on the IBM Support Web site before you install the software (see Obtaining information from the IBM Support Web site on page 16 for more information). The DS Storage Manager DVD also contains HBA BIOS, device drivers, and readme files for IBM HBAs. The HBA BIOS, device drivers, and readme files are located in the HostAdapter directory on the DS Storage Manager DVD. Notes: a. The BIOS and device drivers for your HBAs should be obtained directly from the IBM Support Web site. See Obtaining information from the IBM Support Web site on page 16 for more information. b. For Microsoft Windows installations, install the StorPort version of the HBA device driver. 2. Install the multipath driver to manage the paths from the host HBAs to the storage subsystem controllers. For more information, see the IBM System Storage DS Storage Manager Version 10 Installation and Host Support Guide. 15

Discovering and setting up the storage subsystem To discover and set up the storage subsystem, complete the following steps: 1. Start the DS Storage Manager software from your management station. The Enterprise Management and Confirm Initial Automatic Discovery windows open. 2. Select Automatic Discovery from the Enterprise Management Window to discover the storage subsystem. After the initial automatic discovery is complete, the Enterprise Management window displays all hosts and storage subsystems that are attached to the local subnetwork. Note: To discover storage subsystems that are outside of the local subnetwork, click View > Task Assistant > Add Storage Subsystems. 3. Click Rename the Storage Subsystem. Use the serial number of the DS3950 as the first part of the subsystem name. The host name has a maximum of 30 characters. 4. Click Locate the Storage Subsystem. A blue LED flashes on the front of the selected storage subsystem. Label the storage subsystem with its associated name. Note: If the storage subsystem is not discovered automatically, add the storage subsystem manually by typing the IP address. 5. Highlight the storage subsystem and click Tools > Manage Storage Subsystem to open the Subsystem Management window and the Task Assistant. 6. If the storage subsystem is not in Optimal state, click the Recover from Failure icon in the Task Assistant. Follow the steps in the Recovery Guru. When the subsystem is Optimal, close the Task Assistant. 7. In the Subsystem Management window, click Storage Subsystem > View Profile. Click the Controller Firmware, NVSRAM, ESM Firmware, Drive Product ID, and Firmware Versions tabs, and write each number in the following table for future use. Controller firmware: NVSRAM: ESM firmware: Drive product ID: Firmware versions: 8. Save the profile for future use and close the profile window. Note: Save a copy of the storage subsystem profile and the Collect All Support Data bundle when you make configuration changes to the storage subsystems. Obtaining information from the IBM Support Web site The IBM System Storage documentation that is described in this Quick Start Guide and other IBM System Storage information is on the IBM support Web site. To access the latest documentation, downloads, and other technical updates on the IBM support Web site, complete the following steps. Note: Changes are made periodically to the IBM Web site. Procedures for locating firmware and documentation might vary slightly from what is described in this document. 1. Go to http://www.ibm.com/systems/storage/support/. 2. Under Select your product, intheproduct Family field, click Disk systems. 3. In the Product field, click DS3950, and then click Go. 4. Under Support & downloads, click the applicable support category. 16

Note: For detailed information about device-driver and firmware versions, make sure that you read the readme files that are posted with each package. Updating the storage subsystem firmware Note: The DS Storage Manager host code and HBA BIOS and device driver are current, if you completed all the steps in Installing the software on page 15. In the Subsystem Management Window, click Advanced > Maintenance > Download. Select the following options in the order listed: 1. Controller firmware 2. Controller NVSRAM 3. ESM firmware 4. Drive firmware Configuring the storage subsystem In the Subsystem Management Window, click View > Task Assistant. If the storage subsystem is Optimal, complete the following tasks in the order listed: 1. Configure alert notification for problems in the storage subsystem 2. Define hosts 3. Create new storage partitions 4. Save configuration 5. Set/change password 17

3 U 3 U Install second Bezel (front left) FRONT Rack Mounting Template Install second Bezel (front right) Install first Install first 2 U 2 U Install first 1 U 1 U Rail assembly (front left) Install first Rail assembly (front right) Install second Install second 0 U 0 U 18

3U 3U 2U REAR Rack Mounting Template Rail mounting guide 2U 1U Rail assembly (rear left) Rail assembly (rear right) 1U 0U Printed in the U.S.A 0U 19

First Edition (October 2009) Printed in the U.S.A. IBM and System Storage are trademarks of the IBM Corporation in the United States, other countries, or both. Microsoft and Windows are trademarks of Microsoft Corporation in the United States, other countries, or both. Copyright International Business Machines Corporation 2009. US Government Users Restricted Rights Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp. (1P) P/N: 59Y7027