2G Engine Installation

Similar documents
Networking Guide for Redwood Manager

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

SYSTIMAX 360 PATCHMAX Modular Panel Instructions

iconverter 2-Module Power Chassis

Installation Job Aid for Ethernet Routing Switch 5900 Series

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

SYSTIMAX 360 ipatch Network Manager Module Faceplate Instructions

Installation. Package Contents CHAPTER

Installation Job Aid for Ethernet Routing Switch 3600 Series

SYSTIMAX imvision impower Power Extender Installation

SYSTIMAX GS3 and 1100GS6 Evolve Modular Panel Instructions

TeSys IEC Contactors and Overload Relays

TRC-190 User s Manual

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W.

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

hp uninterruptible power system r12000 xr models installation instructions

Power Supply Installation

Junos WebApp Secure 5.0 Hardware Guide

High Power over Ethernet Midspans PD Port Model PD Port Model

HomeWorks Remote Power Feed-Through Panels

PD-6506, PD & PD-6524

TRC-190 User s Manual

Installation Job Aid for VSP 4450GTX-HT- PWR+

Rapier Series Switch Quick Install Guide

Electrical Integration of PV Systems. Ridha Hamidi, Ph.D.

FAZ Supplementary Protectors, FAZ Miniature Circuit Breakers, P2 Disconnect Switches Overview

USB 2.0 RG port USB m Cat 5e Extender System. User Guide

Installing the Cisco AS5400XM Universal Gateway

USER GUIDE. AXIS T8120 Midspan 15 W 1-port ENGLISH

Preparing to Install the VG248

RMB Peripheral Units Installation Guide

Power Supply and Fan Module Installation

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

Installation Job Aid for VSP 4850GTS

1.3. Miniature Circuit Breakers and Supplementary Protectors. Contents. WMZS Circuit Breaker. UL 1077 DIN Rail Supplementary Protectors

Switch Installation. Preparing. Safety Warnings CHAPTER

E1135C PDU and Pod Upgrade Procedure

M5 and M10 Routers Power Supply and Power Cord Component Replacement Instructions

CVH Slot Media Converter Chassis Quick Installation Guide

Rack Mount Power Supplies

Eaton 9PX PowerPass Distribution Modules and Transformers 9PXTFMR5, 9PXPPDM2, 9PXTFMR11, and 9PXPPDM1 User's Guide

Application Switchgear for industrial and advanced commercial applications. U e V AC 277/480 Y V DC 60

MODEL SST3-MV INSTALLATION INSTRUCTIONS FOR FEDERAL MODEL SST3-MV SELECTABLE SIRENTONE-MULTI VOLT

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

E-ACLM-V E-ACLM-P12/8/18 AC LINE MONITORS Installation and Operation Manual

Installing the Cisco MDS 9020 Fabric Switch

D-Link Switch User Manual. Table of Contents

BCM2 Series Branch Circuit Monitors Quick Setup Guide

Z-Wave Certified Wireless Lighting Control. Auxiliary Switch ZW2001 ZW2002 rev. 09/01/11

Installation Notes for the Catalyst 3750-X and 3560-X Switch Power Supply Modules

Liebert MicroPOD 230V

PV Rapid Shutdown device

SA-150, SA-300 Series Pure Sine Wave Inverter User s Manual

Replacing the Power Supply

INSTALLATION INSTRUCTIONS FOR THE BV10-100/1000

Owner s Manual. Isolate. Restore. Inspire! Power Conditioners Audio / Video Power Isolation Units Rack Mount / Consumer Series

PowerLogic High Density Metering System 1-Meter Enclosure

Installation and Maintenance

Instruction Manual. Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

Instruction Manual HPH-8

1 Overview. 2 Specifications. Product Installation Document

Panduit Basic Rack PDU with Local Meter

Configurable Output Distribution. 120V / 208V / 240V 60Hz. User Manual English

User Manual Entry Line Industrial Gigabit Ethernet High Power 60/95 W PoE Injector

User Manual Entry Line Industrial Fast Ethernet Switch 5x 10/100Base-TX

BTU-4D/BTU-4D-I Digital Temperature Unit & Sensors. Installation and Operation Manual

M250 (M LL) Safety

User s Guide. Mobile Rack Device Mounting Kit for Echo Express III-R and xmac Pro Server. Quick Start Guide Video Available Online!

Installation Job Aid for Avaya Virtual Services Platform 8400

Installation Instructions CX254 Card Cage Power Injector

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER!

12382 South Gateway Park Place, 700 Draper, UT

Power Supply (48Vdc, 2.5A)

IntelliLED TM. Controls: User Guide. Picture for DALI only. Wireless adds external antenna. NOTE: These parts are NOT user serviceable

PM Series Power Meter

E-Series Site Preparation Guide

Panduit Basic Rack PDU

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.

Dual-Feed 80A Auto Low Voltage Disconnect Panel - 80LVD02

ENCELIUM EXTEND Manager Wiring and installation manual Light is OSRAM

ATS22D75S6 soft starter-ats22-control 220V-power 230V(18.5kW)/ V(37kW)/500V(45kW)

Manual 2Wire Converter

Dell Networking S4810 Open Networking (ON) Getting Started Guide

Digital Lighting Systems, Inc.

Rubber Foot Pads. Rackmount Kit VAC 50/60Hz Power Adapter

PANELITE ENCLOSURE LIGHTS OVERVIEW

Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

RM22TG. Product data sheet Characteristics. three-phase control relay Vac, 2 C/O. Main. Complementary. Network number of phases

ATS22D88S6U. ATS22D88S6U soft starter-ats22-control110v-power 208V(25hp)/230V(30hp)/460V(60hp)/575V(75hp) Product data sheet Characteristics.

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

Allworx 24x Service and Troubleshooting Guide

POWER AVAILABILITY 2U POD USER MANUAL. Power Output Distribution 120 Volt

M215 (M215-60) Safety

Chapter 1 Product Introduction

Disclaimer. Note that the Midspan is designed for indoor use only.

SW-UNM-24FE2GC-24POE 24 Fast Ethernet Ports PoE + 2 Giga Combo User Manual Ver 1.1

Installing the Cisco ATA

RMB-3 Peripheral Unit. Installation Guide INSTALLATION GUIDE WESTELL.COM. Westell Technologies Part # Rev. A

INSTRUCTION MANUAL DISTRIBUTION UNIT. Please read this manual thoroughly before use, and keep it handy for future reference.

Transcription:

Issue 3, April 2015 2G Engine Installation General The Redwood engine powers and communicates with Redwood gateways, sensors, and wall switches. The engine offers sophisticated controls that significantly reduce energy consumption. Multiple engines can be linked together to power and control hundreds or thousands of fixtures. The Redwood engine centralizes power conversion and control processing for LED lighting and control and communications for other lighting technologies, including fluorescent, CFL, and HID. It takes high-voltage 120 250 VAC or 277 VAC input power, converts it to low-voltage DC, and distributes the power to all fixtures via Redwood gateways using Class 2, low-voltage cabling. The engine can be located on a rack or wallmounted in an electrical or telecom closet. Ordering information is listed below: Part No. RE64-2G-120-250-ROS RE64-2G-277-ROS WallMount-Tray-1G RPC-RJ45-1G RPC-LSZH-RJ45-1G RPC-PD-1G Description Engine, 2G, 120 250 VAC. Includes one (1) license of the Redwood operating system (ROS) with Redwood manager software. Engine, 2G, 277 VAC. Includes one (1) license of the Redwood operating system (ROS) with Redwood manager software. Engine wall mount kit Patch cord with RJ45 connector Patch cord (low smoke zero halogen) with RJ45 connector Patch cord with open wire for punch down (without RJ45 connector) How to Contact Us Redwood Engine To find out more about CommScope products, visit us on the web at / For technical assistance: - Within North and South America, contact your local technical manager or technical support at 1-800-840-0709 (Option 2). Outside North and South America, contact your local technical manager or technical support at +1 510-270-5360 (Option 2). - Live technical support for Redwood products is available Monday through Friday from 8 AM to 5 PM (PST), excluding holidays. - An email can also be sent to RedwoodSupport@commscope.com for technical support. 2015 CommScope, Inc. All rights reserved For RoHS Inquiries: CommScope Inc. Corke Abbey, Bray Co. Dublin, Ireland Attn: Legal Department Page 1 of 8

Important Notes and Recommendations For installations in Canada, no uninsulated live parts in the output from the Redwood Engine can be readily accessible, as defined by the Canadian Electrical Code (CES). Accessibility is determined using the risk of shock accessibility criteria by using the finger probe from the CSA standards cited for the category associated with the C-UL Mark. Also consider access to such parts for panels that can be removed without tools. Insulated parts, such as wire or cabling with outer insulation or a jacket that is certified and carries a sufficient voltage rating (>60V), can be accessible to contact. If a fixture requires more than one channel for power, use additional wiring (see each fixture s specification for requirements). All additional channels for a two- or three-channel fixture must be connected to the same engine. Wiring for an individual fixture cannot be spread across multiple engines. For one engine in a group of co-located engines, it is recommended that one bank of eight ports be left unused to facilitate future expansion of the system. It also provides a measure of redundancy. It is recommended that the fixtures in a single space be interleaved across engines to provide a level of redundancy. If an electrical failure affects an engine, only a portion of the lights in a room would turn off. The Redwood engine, director, sensors, gateways and wall switches are designed for commercial use only and are not for household use. Preparation 1. Determine location for all fixtures and Redwood wall switches. 2. Determine location for all Redwood engines. The engine is a 2U rack mountable system and can be installed in a standard server rack via supplied rack-mounting L brackets, or to the wall with a Redwood wall mount kit. The engine requires a minimum of 6 (152mm) clearance on front, back, and sides for ventilation. 3. Run low-voltage cable from engine location to each fixture location. 4. Run low-voltage cable from the engine location to each Redwood wall switch location. 5. Options for connector preparation: If using 18 AWG (1mm) wiring to connect to the engine, strip wire ends to ¼" (6mm). If using RJ45 connectors, these can wired as T568A (straight through) or T568B (crossover). 6. Install third-party light fixtures according to vendor s installation instructions. Page 2 of 8

860576792 Installation Rack Mount Instructions 1. Attach the two rack mount brackets to each side of the engine using the screws provided. 2. With the power disconnected, install the engine in a standard server rack, using mounting brackets (included). Ensure that air vents are not blocked and that the conditions support the ambient operation temperature of 32 F to 122 F (0 C to 50 C). The engine requires a minimum of 6 (152mm) clearance on front, back, and sides for ventilation. 3. Connect the cables (next topic). Wall Mount Instructions Note: The Redwood engine can be installed flush against a wall using a Redwood wall mount kit as shown above. View of Completed Installation Wall-mounted engines must be installed using the Redwood wall mount kit, as shown above. The wall mount kit contains a tray and a drip pan. Use a ¾" (19mm) plywood backing board (purchased locally). Plywood must be taller and wider than the wall mount tray and wide enough to span the wall studs. 1. Attach the plywood backing board to the wall studs using screws (not provided) that can hold at least 125 lbs (57kg). For a typical situation where the drywall is 5/8" (16mm) thick, a 2" (51mm) or longer drywall screw on each corner of the plywood is recommended. 2. Attach the wall mount tray to the plywood backing board using the provided screws. 3. With power disconnected, attach the engine to the wall mount tray using provided screws. Mount the engine with the input power connection facing up and the port connectors facing down. 4. Attach the drip pan to the wall mount tray using the provided screws, and rotate it to the position shown in the installed view of the wall mount assembly. Page 3 of 8

Cabling Note: If using a category cable, see the Category Cabling instructions below. If using 18 AWG wiring, see the 18 AWG (1mm) Cabling instructions on page 6. Category Cabling Using the Redwood RJ45 Patch Cord with RJ45 Connectors Note: Use Category 5e or 6/6a cabling to connect the Redwood engine to the Redwood gateway via a Redwood patch cord (ordered separately) and a patch panel (not included). Connect each patch cord from a bank on the front of the engine to a patch panel, which is connected to the respective gateway and wall switches. The example above shows the punch-down of Category 5 cable at the back of a patch panel that connects to the LED gateway. 1. Connect the category cable wiring from the gateway to the punch-down side of your patch panel by a preferred method. 2. Connect the patch cord RJ45 connector to the front of the patch panel, and connect the green connector plug to the engine. 3. Connect each engine to AC power and turn on AC power using the circuit breaker. Confirm that the engine power light comes on. 4. Connect all engines to the local network via Ethernet ports marked primary. Note: The category cable should be punched-down at the patch panels according to T568A or T568B standards, which are straight through or crossover arrangements. Page 4 of 8

860576792 Category Cabling Using the Redwood Patch Cord without RJ45 Connectors 1. Using a preferred method, connect the category cable wiring from the gateway to the punch-down side of patch panel #1. 2. Connect the green connector plug of the Redwood patch cord to the Redwood engine, and connect the punch-down leads to patch panel #2. 3. Use an RJ45 jumper cable (or patch cable) to connect the corresponding ports from patch panel #1 to patch panel #2. 4. Connect each engine to AC power, and turn on the AC power using the circuit breaker. Verify that engine power light comes on. 5. Connect all engines to the local network via Ethernet ports marked primary. Page 5 of 8

18 AWG (1mm) Cabling Using Phoenix Connectors 1. Connect the cables from the gateways and wall switches to the engine ports by inserting the stripped cable end into the screw terminal of the removable connector blocks as shown on the next page. Eight Phoenix connectors are included. 2. Insert the connector blocks in to the mating connector on the front of the engine. Tighten the screw terminal to a torque of 2-4 in-lbf (0.22-0.45 Nm). Bare conductors should not be exposed after installation is complete. 3. Connect each engine to AC power, and turn on the AC power using the circuit breaker. Verify that engine power light comes on. 4. Connect all engines to the local network via Ethernet ports marked primary. Page 6 of 8

860576792 Engine Power Requirements 1. A dedicated branch circuit for the engines is recommended to ensure that no other loads on the same circuit draw too much current from the branch circuit and not allow the engines to operate continuously. The engine must be provided with a suitable disconnect in the input power distribution to remove AC power safely during servicing. The wiring must meet all NEC, state, and local electrical codes and must be installed by a qualified electrician. The AC input wiring must be protected by conduit. 2. Redwood engines are available as 277 VAC and 120 250 VAC power input versions. For the 277 VAC version, the Redwood engine requires a maximum of 7A of current from the branch circuit to which it is connected when operating at full power. At minimum, a 10A branch circuit is required for a single engine, given the standard 80% de-rating. AC input: 277 VAC/7A, 50 60Hz Max power consumption: 1580W For the 120 VAC 250 VAC version, the Redwood engine requires a maximum of 16A of current from the branch circuit to which it is connected when operating at full power. At minimum, a 20A branch circuit is required for a single engine, given the standard 80% de-rating. AC input: 120 VAC/16A, 200 250 VAC/10A, 50 60Hz Max power consumption: 1580W Note: Redwood does not furnish any pigtails, plugs, receptacles, conduit, or flex cable. Page 7 of 8

Troubleshooting The Redwood engine uses LEDs on the front panel to communicate system status. These LEDs provide information on the engine s operation and the status of port communication. Each Redwood engine has a single multi-color LED labeled Power to communicate its status. Power LED Indicator Engine Status Off No power is delivered to the engine. Blinking green The engine is booting. Redwood manager software is not yet running. Solid green Solid amber The engine is on and functioning normally. The engine is experiencing a problem. Call Redwood support. Each port on the engine has a multi-color LED to communicate status for that port. After a period of inactivity, the LEDs are turned off to save energy. To activate the lights, press the Show Status button on the engine faceplate. Engine Port LED Port Status Indicator Status Off No device connection is detected on the port. Solid green The engine recognizes the device connection. Blinking green The engine is upgrading the firmware of a gateway. Solid amber The engine is in the process of discovering a fixture. Alternately, an error has occurred after discovery. Ethernet Status Indicator Off Blinking green Ethernet Status An Ethernet connection is not detected on this port. The engine recognized the Ethernet connection. Page 8 of 8