SECTION ELECTRIC METERING

Similar documents
SECTION DISTRIBUTION SWITCHBOARDS

SECTION ( ) LIGHTING CONTROL PANELBOARD

B. System Design and Performance Requirements

1. Coordination of series-rated devices is permitted where indicated on Drawings.

1510 MOTOR CONTROLLERS

UW Purchase Specification Section

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

Free Standing Emergency Department DGL Project No SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY PART 1 - GENERAL

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum)

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION PANELBOARDS

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

Power Meter PowerMonitor 500

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs)

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

NEW ERA METER. Installation & Operation Guide NE METER

B. System Design and Performance Requirements

SECTION SWITCHBOARDS

9.3. Metering Devices, Protective Relays, Software and Connectivity

SECTION (16410) - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION TRANSIENT VOLTAGE SURGE SUPPRESSION

SECTION SOLID-STATE REDUCED VOLTAGE STARTERS

Electronic Submeter with Advanced WiFi Ethernet Capability

PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT SCADA STANDARDIZATION PROJECT TABLE OF CONTENTS

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA)

AcquiSuite Ally 12 & 48 Advanced Multi-Circuit Meter

The City of Winnipeg Dry Type Transformers up to 600 V Primary Section Bid Opportunity No Page 1 of 2

EM-1000 /EM-2000/ EM-3000 Series Multifunction Power and Energy Meters

TECHNICAL SPECIFICATION FOR MEDIUM VOLTAGE METAL-CLAD SWITCHGEAR (15 KV)

SECTION SURGE PROTECTIVE DEVICES

*REQUIRED* 169 Main Street 700 Plaza Middlesex Middletown, CT T: F:

PDI Modular Compact Remote Power Panel

Document C0. Use for:

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

SECTION 16496E ATS MOLDED CASE WITH ATC 900 CONTROLLER

WEB-BASED POWER MONITORING COMMUNICATIONS SYSTEM Revised 4/30/ Electrical Systems

PowerFlex 400 AC Drive Guide Specification

Multilin EPM Energy and Demand Submeter with Wi-Fi. Monitoring & Metering. Communications. Key Benefits. Applications

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

C. New or replacement products installed in existing facilities shall be consistent with existing equipment.

1.2. All new meters will be one of the following meter forms: 2S for single-phase, and 9S for multi-phase.

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED

BSPD Surge Protective Devices

SPECIAL SPECIFICATION 8371 Field Terminal Server

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel

AcquiSuite Ally 48 Advanced Branch Circuit Monitor

SECTION DISCONNECT SWITCHES

SEM3 - Embedded Micro Metering Module

AcuRev 2000 Multi-Circuits Networked Multifunction Power and Energy Meter

SECTION PANELBOARDS. A. NECA (National Electrical Contractors Association) -Standard of Installation

Integrated Metering Systems, Inc.

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

Meter Enclosure and Equipment Standards

SPECIAL SPECIFICATION 1826 Field Ethernet Switch

AcuRev Multi-Circuit Power and Energy Meter. Shop for Accuenergy products online at:

installation Operation ADDRESS product diagram H8030/8031 INSTALLATION GUIDE

POWER SYSTEMS STUDY: SIGNIFICANT (OR TOTAL) DELETION OF EXISTING TEXT

SECTION WIRING DEVICES PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

SOUTH VALLEY WATER RECLAMATION FACILITY MISCELLANEOUS ELECTRICAL UPGRADES TABLE OF CONTENTS DIVISION 16 - ELECTRICAL

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

TECH NOTE #: CPS-1 SUMMARY OF APPLICABLE UL AND IEEE STANDARDS

UW Purchase Specification Section Central Cooling Water Meter Page 1 of 6

A2000 Multifunctional Power Meter

EM210 COMMUNICATION PROTOCOL. Version 3 Revision 1

Series 3000 User Manual and Product Features

Power Xpert Branch Circuit Monitor

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CONTRACT NO: T Division 13 SCADA AND INSTRUMENTATION DATE: August 2012 Page 1 of 1 DIVISION 13 SCADA AND INSTRUMENTATION

MODULAR CIRCUIT MONITORING SYSTEM

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

PowerLogic power-monitoring units. Power Meter PM500. Technical data sheet 2006

SECTION PROGRAMMABLE LOGIC CONTROLLER (PLC)

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC.

NEW Industry Leading Technology. Includes Modbus and DNP 3.0 A G G R E S S I V E T E C H N O L O G Y. High End Meter Performance

This section applies to the design and installation relating to automatic transfer switches (ATS).

GENERAL UL th EDITION BID SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC.

WESTERN AREA POWER ADMINISTRATION Meter Policy

Tmax molded case circuit breakers Specification guide

Selection & Application Guide. SEM3 - Embedded Micro Metering Module. Scan QR Code for more information.

Metering Devices IQ 300

Spring Test 9 due 05/11/2013

Certification Exams. Detailed Content Outlines Level 2 Certified Assistant Technician Level 3 Certified Technician Level 4 Certified Senior Technician

ABB Industrial Systems Inc. Standard Drives. ACH500-06E Effective 6/1/95

NEW MODERNSTE TECHNOLOGIE. Elektronische Messgeräte mit hoher WiFi Ethernet Leistungsfähigkeit. Führende Technologie in der Industrie

LOW VOLTAGE BYPASS/ISOLATION BREAKER BASED AUTOMATIC TRANSFER SWITCHES SECTION 16496D

GENERAL UL th EDITION DESIGN-BUILD SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC.

Refurbishment of Switchgear and Switchgear Devices

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Transcription:

SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the furnishing, installation and connection of an electric metering system installed on electrical equipment such as low voltage switchgear, switchboards, distribution panels and/or branch circuit panelboards of the power system. 1.2 RELATED WORK //A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON- STRUCTURAL COMPONENTS: Requirements for seismic restraint of nonstructural components. // B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements and items that are common to more than one section of Division 26. C. Section 26 05 21, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW): Low voltage cable. D. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits and outlet boxes. E. Section 26 23 00, LOW-VOLTAGE SWITCHGEAR: Secondary distribution switchgear. F. Section 26 24 11, DISTRIBUTION SWITCHBOARDS: Secondary distribution switchboards. 1.3 QUALITY ASSURANCE Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.4 SUBMITTALS Submit in accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: A. Shop Drawings: 1. Sufficient information, clearly presented, shall be included to determine compliance with drawings and specifications. 2. Include devices, locations, connections, conduit runs, wiring type, details, and attachments to other work. 26 27 13-1

3. One line diagram: Show interconnections between components specified in this Section and devices furnished with power distribution system components. B. Manuals: 1. Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for ordering replacement parts. a. Wiring diagrams shall have their terminals identified to facilitate installation, maintenance, and operation. b. Wiring diagrams shall indicate internal wiring for each item of equipment and the interconnection between the items of equipment. c. Provide a clear and concise description of operation, which gives, in detail, the information required to properly operate the equipment. d. Approvals will be based on complete submissions of manuals together with shop drawings. 2. Two weeks prior to final inspection, deliver four copies of the final updated maintenance and operating manuals to the Resident Engineer/COTR. a. The manuals shall be updated to include any information necessitated by shop drawing approval. b. Complete "As Installed" wiring and schematic diagrams shall be included which show all items of equipment and their interconnecting wiring. c. Show all terminal identification. d. Include information for testing, repair, trouble shooting, assembly, disassembly, and recommended maintenance intervals. e. Provide a replacement parts list with current prices. Include a list of recommended spare parts, tools, and instruments for testing and maintenance purposes. f. Furnish manuals in loose-leaf binder or manufacturer's standard binder. C. Certifications: 1. Two weeks prior to final inspection, submit four copies of the following to the Resident Engineer/COTR: a. Certification by the Contractor that the assemblies have been properly installed, adjusted and tested. b. Certified copies of all factory design and production tests, and field test data sheets and reports for the assemblies. 26 27 13-2

1.5 APPLICABLE PUBLICATIONS A. Publications listed below (including amendments, addenda, revisions, supplements, and errata), form a part of this specification to the extent referenced. Publications are referenced in the text by basic designation only. B. Institute of Electrical and Electronic Engineers (IEEE): IEEE C2...(2007; Errata 2007) National Electrical Safety Code IEEE C37.90.1...(2002; Errata 2003) Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus IEEE C57.13...(1993; R 2003) Standard Requirements for Instrument Transformers IEEE Std 100...(2000) The Authoritative Dictionary of IEEE Standards Terms C. National Electrical Manufacturers Association (NEMA): NEMA C12.18...(2006) Protocol Specification for ANSI Type 2 Optical Port NEMA C12.20...(2002) Electricity Meter - 0.2 and 0.5 Accuracy Classes NEMA C62.61...(1993) Gas Tube Surge Arrestors on Wire Line Telephone Circuits D. National Fire Protection Association (NFPA): 70-2008... National Electrical Code (NEC) PART 2 PRODUCTS 2.1 SUBMETERING EQUIPMENT FOR SPECIAL LOADS A. The equipment shall meter all of the single phase and three phase electrical service used by the equipment shown on the drawings 2.2 VOLTAGE REQUIREMENTS A. Meter shall be capable of connection to the service voltage phases and magnitude being monitored. 2.3 CURRENT REQUIREMENTS A. Meter shall accept independent current inputs from each phase. Current transformer shall be installed with a full load rating as shown in the schedule. 2.4 ELECTRICAL MEASUREMENTS Power meter shall measure and report the following quantities: A. Kilowatt-hours of consumption, cumulative. B. Kilowatts of demand, peak average over a selectable demand interval between 5 and 60 minutes (typically 15 minutes). 26 27 13-3

C. Reactive power, measured over the same interval as the peak kw reading. D. Power factor, measured over the same interval as the peak kw reading. 2.5 METER ACCURACY A. Power meter shall meet NEMA C12.20 for Class 0.2 and IEC 62053-22 accuracy requirements. Power meter accuracy shall be revenue grade, +/- 0.3%. Accuracies shall be measured as percent of reading at standard meter test points. 2.6 DISPLAY, OUTPUT AND READING CAPABILITIES A. The meter will have a face display plate and shall display every electrical parameter indicated to be recorded. Meters shall not be required to indicate interval data collected in a data logger with a communications output feature. Peak values, instantaneous and cumulative values shall be displayed. B. Meter shall include output option for pulse output. 2.7 COMMUNICATIONS METHODS A. Optical Port: The optical port shall communicate with a hand-held reading device according to the following requirements. 1. Communications standards: NEMA C12.18, MV90 protocol, NEMA C12.20. 2. Read operations: Current kwh values, demand (kw) values since last reset, last reset value, meter status//, load profile//. 3. Write operations: Meter setup. B. Serial Port: Provide onboard RS232 serial port for connection to modem module where required in this specification. C. Ethernet: For those meters using the Ethernet, logged information shall be sent using open standard Internet Protocols. 1. On-board Ethernet port support: HTTP, SMTP, Modbus. 2. Distribute stored data by on-board web server. 2.8 COMMUNICATIONS PROTOCOLS AND METHODS Communications protocols and methods shall be native to the meter. Provide communications module(s) as required to accomplish the following. A. Meter shall have a port that can be configured as a 10/100 Base-T port. A communication module that converts serial RS232 or RS485 to Ethernet will be acceptable. B. Meter shall be equipped with one pulse output channel that can be configured for operation as KYZ pulse output. 2.9 SPARE PARTS Provide spare parts as follows: A. Power meter - two for each type used. B. Current transformer - three for each type used. 26 27 13-4

C. Potential transformer - three for each type used. D. Communications module - one for each type used. E. Protocol module - one for each type used. F. Other electronic and power components - one for each type used. PART 3 - EXECUTION 3.1 INSTALLATION A. Meter shall be mounted at location shown on drawings. B. PTs (if required for proper voltage range) and CTs shall be physically connected to the service entrance cables inside the service entrance disconnect enclosure. 3.2 DISCONNECTING SWITCHES A. Disconnecting wiring blocks shall be provided between the current transformer and the meter. A shorting mechanism shall be built into the wiring block to allow the current transformer wiring to be changed without removing power to the transformer. The wiring blocks shall be located where they are accessible without the necessity of disconnecting power to the transformer. For multi-ratio current transformers, provide a shorting block from each tap to the common lead. B. Voltage-monitoring circuits shall be equipped with disconnect switches to isolate the meter base or socket from the voltage source. 3.3 METER PROGRAMMING A. Power meter shall be programmable by software supplied by the meter manufacturer. B. Software shall allow the user to configure the meter, troubleshoot meter, query and display meter parameters and configuration data and stored values. C. Meter firmware shall be upgradeable through one of the communications ports without removing the unit from service. 3.4 ACCEPTANCE CHECKS AND TESTS A. Visual and mechanical inspection: 1. Compare equipment nameplate data with specification and approved shop drawings. 2. Inspect physical and mechanical condition. 3. Verify grounding of metering enclosure. 4. Verify that the CT ratio and the PT ratio are properly included in the meter multiplier or the programming of the meter. 5. Verify that correct multiplier has been placed on face or meter where applicable. B. Electrical tests: 26 27 13-5

1. Prior to system acceptance, the Contractor will demonstrate and confirm the meter is properly wired and is displaying correct and accurate electrical information. 3.5 FOLLOW-UP VERIFICATION Upon completion of acceptance checks, settings, and tests, the Contractor shall show by demonstration in service that the meters are in good operating condition and are displaying and storing correct and accurate electrical information. 3.6 INSTRUCTION A. The Contractor shall conduct a training course for meter configuration, operation, and maintenance of the system as specified. The training shall be oriented for all components and systems installed under this contract. The training shall include: 1. Physical layout of each piece of hardware. 2. Meter configuration, troubleshooting and diagnostics procedures. 3. Repair instructions. 4. Preventive maintenance procedures and schedules. 5. Testing and calibration procedures. 6. Use of metering software. - - - E N D - - - 26 27 13-6