Target Interface / Construction Compliance Inspection Checklist

Similar documents
Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist

General. Exterior Cameras. Camera Towers

Installation Notes TII Model 341 Protector

Computer Network Design Guide Existing Systems 1 / 6

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION

Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

1993 SPECIFICATIONS CSJ , ETC. & SPECIAL SPECIFICATION ITEM 6132 ARTERIAL TRAFFIC MANAGEMENT SYSTEM

alid portable power cart epcc panel ccts EPCC-60 40" 60A, 120/208V 3PH 24 EPCC " 100A, 120/208V 3PH 24

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120

SECTION WIRING DEVICES PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION PANELBOARDS

The six major components of a structured wiring system are:

ICS Entrance Management Sign Installation Guide. Version 1.0

SECTION WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

Spring Test 16 due 06/14/2013

SECTION WIRING DEVICES

Spring Test 9 due 05/11/2013

Emery County Senior Center Green River 06/07

Fall Test 21 due 12/11/2012

Arca LED 5YEAR LED WARRANTY. Order Code: Pole Order Code: Customer: Date: Project: Qty: Type: ACL ACL. R2 Type II Distribution.

SECTION WIRING DEVICES

Site Preparation CHAPTER

Compact Series Wallmount Enclosures

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Now with Picture Memory

Haworth Power Technical Sheets January 2018

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

Aerial Façade. Cabinets and borders. Butt and Sleeves Closures for manholes and handholes

SECTION WIRING DEVICES

Tarleton State University. Specifications

Electrical Demand Specification (Reference SOP: )

Data Cabling / Low Voltage Technology Specifications

Meter Enclosure and Equipment Standards

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

NEC 2008 Code Changes Top 20 Revisions. By: Rafi Wartan, PE, LEED AP

MODELS PD230 AND PD1230 Installation Instructions

PAR+ & MSC+ Controller. Installation Manual

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

This Wiremold aluminum raceway system meets the

Spring Test 5 due 4/26/2013

Outdoor Risk and Equipment Protection

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC.

ONE GANG WEATHERPROOF OUTLET BOXES - DIE CAST METAL BWF Product Benefits & Features B-5V DB-5V B5-2V. Applications

Spring Test 17 due 06/14/2013

Installing the Cisco AS5400XM Universal Gateway

MS-7000: SuperStar Reader

Entry Level Assessment Blueprint Electrical Occupations

AlphaStatus Room Status System Installation and Use Instructions for the RSS400 Series Room Stations and Optional Master Station(s)

Instruction / Installation Sheet DataComm Electronics WH Recessed Pro-Power Kit with Duplex Receptacle and Straight Blade Inlet

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

Cabinet Location Plan FIG.01. Cabinet Symbol Key. Air Handler. Air Handler SAN disk storage. SAN disk storage. option B. Not To Scale.

MS-5000: MiniStar Reader

Avanti HP Series Centrifuges Preinstallation

POWER DISTRIBUTION

Installing the ILC LightSync 4.3 or 7 Touch Screen Station. Rev. B

Powering innovation. Powering efficiency. Powering home

Instruction Manual HPH-8

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

v2.5 was updated May 10, v2.6 is an updated copy from March 1, 2017.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

POKE-THRU FINISHES. Black Painted Flange with Nonmetallic Black Cover. Brass Flange with Nonmetallic Brass Cover. Brass Painted Flange and Cover

PowerLogic High Density Metering System 1-Meter Enclosure

Installation Job Aid for Ethernet Routing Switch 3600 Series

SPECIAL SPECIFICATION 6274 Microwave Vehicle Detection System

ORB TM 4-20 ma Input Box Installation & Operation Manual

Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS

10 Pg C1 - C-30.qxp 6/9/ :43 AM Page C1. BELL Weatherproof Boxes, Covers, and Lighting

Los Angeles Community College District Design Standards

Commodore SS Model CD General Specifications

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Cabinet

Secured Series: Hub Plus Kit Single Door Controller Package Installation Manual

Testing for safe and efficient branch circuits

SECTION PANELBOARDS. A. NECA (National Electrical Contractors Association) -Standard of Installation

IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures) Installation and User s Guide

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

Total Home Surge Protection for Point-of-Entry. FirstSurge TM. User Manual - Canada (English)

MS-5000 MiniStar Reader. Quick Start Guide MS The MS-5000 MiniStar Reader. 1.0 Specifications

Specialized Lighting Solutions, Inc. SLS DALI CONTROLLERC

Qty: 13 13ft ft ft ft. FMLxxx 3,4,6 Facade Module Large Opening. BL Semi-Matte Black. SV Silver. PC Buttonstyle

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

SECTION SWITCHBOARDS

Specifications, Installation, and Operating Instructions

OMEGA MODULAR PATCH PANEL EMPTY ENCLOSURE

Electrical Accessories

VRp Three-Phase Precision AC Voltage Regulator

Installing and Setting Up the Components

IntelliBrite Controller (For IntelliBrite Pool, Spa and Landscape Lighting Fixtures)

This Special Provision refers to the following standards, specifications or publications:

PanelView Plus/VersaView CE Terminals and Display Modules

BEJED DISTRIBUTION PRODUCTS FAX:

Transcription:

A. Targets Date: Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of stations meets DD 9, applicable TC -, and CEHNC Design Guide 0--. Trails and service roads provide adequate access to targets for maintenance C. Line of Sight Targets can be adequately seen from pertinent firing positions to allow 90% of target to be viewed Vegetation does not obscure target positions Left and right limit markers are outside greatest angle of fire from firing positions/points Testing Results-provided to the local government D. construction representative Secondary power cabling tests Data cabling tests including fiber optic and/or copper network (ie. Cate) Grounding tests results. Control building (ie. ROC) has Ohms or less earth resistance E. Drawings Contract drawings are available on-site Common Items "As-builts" will be made available to government representative after completed construction YES NO NOTES Page of

UAC Station Individual and Team Task Technique A. Layout of station building is IAW CEHNC DG 0-- Number of power outlets and type agree with CEHNC DG 0--. double target outlets total are required, per room Rafters do not interfere with tarining (ie. above 7ft) No tripping hazards exist in doorways All enclosures and rooms are clean of unwanted dirt and debris All power enclosures including the conduits or wireways on the interior of the training rooms are mounted a minimum of 7 feet above finished floor Target power outlet is NEMA L-0R and a NEMA L-0R 7 with wet location covers. Double target outlets have an additional NEMA L-0R and NEMA L-0R outlet GFCI maintenance receptacle (0A, 0V) are provided with in-use weatherproof covers in adequate number of locations mounted above 7 feet above finished floor including interior conduits/wireways Power outlet locations are permanently labeled (ie. SIT X) 9 and panel schedules agree with labels outlets is in a location to not interfere with training and is 0 adequately provided with ballistic protection if forward of firing line for live firing outlets has surge protection and is NEMA R minimum outlets has a panel schedule provided Handholes, pullboxes, manholes, or other materials if used within line of sight are adequately protected via berm or buried to keep from being shot or causing ricochet hazards Page of

UAC Station Squad and Platoon Task Technique A. Layout of station building is IAW CEHNC DG 0-- Number of power outlets and type agree with CEHNC DG 0--. 9 single target outlets and double target outlets total Rafters do not interfere with tarining (ie. above 7ft) No tripping hazards exist in doorways All enclosures and rooms are clean of unwanted dirt and debris All power enclosures including the conduits or wireways on the interior of the training rooms are mounted a minimum of 7 feet above finished floor Target power outlet is NEMA L-0R and a NEMA L-0R 7 with wet location covers. Double target outlets have an additional NEMA L-0R and NEMA L-0R outlet GFCI maintenance receptacles (0A, 0V) are provided with in-use weatherproof covers in adequate number of locations mounted above 7 feet above finished floor including interior conduits/wireways Power outlet locations are permanently labeled (ie. SIT X) 9 and panel schedules agree with labels outlets is in a location to not interfere with training and is 0 adequately provided with ballistic protection if forward of firing line for live firing outlets has surge protection and is NEMA R minimum outlets has a panel schedule provided Handholes, pullboxes, manholes, or other materials if used within line of sight are adequately protected via berm or buried to keep from being shot or causing ricochet hazards Adequate handrails are provided along second floor to protect people from falling Second floor has single target outlets IAW CEHNC DG 0-- Page of

A. Date: UAC Station Grenadier Gunnery Emplacement size: Front wall height is ". Front wall length is ". Floor width is ", Wideneded SIT floor width is 0". A minimum of 9" of clearance is provided to the rear of the emplacement allowing space for the target in the down position. Adequate space is available in emplacement for target mechanism. Berm fill is level with the top of the protective timber at the front of the emplacement and free of holes. Emplacements are sloped to the rear for drainage. All emplacements and enclosures are clean of dirt and debris. All power and data enclosures are mounted no higher than 7 inches from top of wall. Target power outlet is () NEMA L-0R and () NEMA L- 0R with wet location covers. GFCI maintenance receptacle (0A, 0V) is provided with 9 an in-use weatherproof cover. All boxes and enclosures have weatherproof covers 0 installed A -foot free length coil of # AWG bare copper ground cable is provided above ground from the grounding rod for future bonding to target mechanism. Emplacement is permanently labeled (ie. SIT X) and power center panel schedule agrees with label. All data and power conduits are routed to the rear or side of emplacement. Power panel feeding the SIT emplacements, façade, and limit markers has surge protection and is NEMA R minimum Power panel feeding the SIT emplacements and façade is in a location to not interfere with training Distance between termination points does not exceed 90m (9ft) in data cable length Handholes, pullboxes, manholes, or other materials if used 7 within line of sight are adequately protected via berm or buried to keep from being shot or causing ricochet hazards Data cables are daisychained between targets back to control shed. Home runs of data cables from each target back to control shed is not acceptable Loadcenter (LC) in SIT Emplacements and Main Façade B. SIT Emplacements Only 0/0V is provided via feeder circuit. Size of LC is maximum "Hx"Wx"D. LC has SPD installed properly The façade has double pole circuit breakers, one for each target outlet. Typically two load centers are provided at each façade. LC is properly grounded via a minimum # AWG bare copper ground cable to SIT ground rod. Location of LC is adequate to allow lid to be opened. Panel schedule is provided which indicates circuit 7 designations and where feeder circuit originates (ie. SIT X and panelboard PB-X) There are no LCs installed in front of the door. Targets cannot be installed directly in front of a LC. Page of

UAC Station Grenadier Gunnery C. Master Target Data Panel (MTDP) Size of MTDP is "x"x" Type of MTDP/TDP enclosure is galvanized steel NEMA. NEMA rating is maintained after installation (ie. screws do not penetrate the enclosure). The gasket is one piece and seamless in the enclosure cover. Cable seal fittings are properly installed on cables entering MTDP/TDP from underground. Location of MTDP/TDP is adequate to allow lid to be opened. A back plate is installed that covers the entire back of the MTDP/TDP. A 0"x0" space is available for target installer equipment 7 in MTDP. Data cabling is installed neatly and orderly and properly anchored or fastened in the MTDP/TDP. 9 Fiber cabling is armored and properly grounded. 0 Fiber is terminated with SC connectors. Fiber is permanently tagged and labeled (ie. To SIT X or From SIT X). Fiber SC connectors are terminated on a patch panel with number of ports to support total number of fiber strands terminated. Fiber patch panel is mounted to the back plate. Minimum meter service loop of fiber cabling is provided and properly secured inside MTDP. Fiber cabling has no visible microbending, pinching, or other marking to indicate fiber damage. Fiber terminations allow adequate space for target installer to jumper to target installer equipment. Buffer tube fanout kit and furcation unit for the fiber cabling 7 is anchored or securely fastened. A standard duplex receptacle (0A, 0V) is mounted to the back plate and properly grounded. 9 The duplex receptacle is not GFCI protected. 0 Cate or better cabling is shielded and properly grounded. Each end of Cate shall be terminated on a data network surge protector with a V-0V clamping voltage. Each surge protector shall not be larger than "x". Cate cable is terminated on a 0-block style modular outlet. RJ- connertor patch cable connects modular outlet to surge protector. MTDP/TDP is grounded to the target ground rod via # AWG bare copper ground cable. Page of

UAC Station Grenadier Gunnery D. Façade Façade layout is IAW CEHNC 0--. (see drawing FAC-A-0). Center post and beams across to the two SIT emplacements atop has adequate ballistic protection for outlets and future wiring by others weatherproof power outlets are installed on the center post for the two SITs atop the façade (two NEMA L-0R and two NEMA L-0R) with wet location covers Cate cables terminated with male RJ connectors are installed in a single gang weather proof enclosure with a blank cover and mounted on the center post for the two SITs atop the façade. weatherproof power outlets are installed on the center post for the SIT on the bottom level of the façade (one NEMA L-0R and one NEMA L-0R) with wet location covers Cate cable terminated with a male RJ connector is installed to a single gang weather proof enclosure with a blank cover and mounted on the center post for the SIT on the bottom level of the façade. Grounding cables (# AWG minimum bare copper) are 7 installed to all the metal SIT coffins and terminated to the ground system In each metal SIT coffin a foot length of ground cable (# AWG minimum bare copper) is terminated to the coffin and left coiled for future connection to the target mechanism 9 Each SIT has ballistic protection to keep from being shot 0 All metal parts are grounded properly The façade has double pole circuit breakers, one fore each target outlet. Typically two load centers are provided at the façade. A rubber matting is provided on the front of the façade to prevent the wood from shattering from the impact of grenades IAW CEHNC 0--. D. Control Shed Control shed location and orientation is IAW CEHNC DG 0-- and does not interfere with training MTDP is clear of unwanted dirt and debris MTDP rating is IAW CEHNC DG 0-- All conduit/cable entries into MTDP have conduit/cable sealed IAW enclosure rating A # AWG bare copper conductor is installed between ground rod and MTDP back plate. Cables and termination points in MTDP are permanently labeled identifying destination (ie. SIT X) 0V, 0A dedicated power receptacle is provided within 7 the MTDP and the receptacle is not GFCI nor on a GFCI Page of

UAC Station Urban Offense/Defense Building A. Layout of station building is IAW CEHNC RDG 0-- Number of power outlets and type agree with CEHNC RDG 0--. single target outlets total No tripping hazards exist in rooms or doorways All enclosures and rooms are clean of unwanted dirt and debris All power enclosures including the conduits or wireways on the interior of the training rooms are mounted a minimum of 7 feet above finished floor Target power outlet is NEMA L-0R and a NEMA L-0R with weatherproof covers GFCI maintenance receptacle (0A, 0V) are provided with weatherproof covers in adequate number of locations 7 mounted above 7 feet above finished floor including interior conduits/wireways Power outlet locations are permanently labeled and panel schedules agree with labels 9 outlets is located in the electrical room 0 outlets has surge protection outlets has a panel schedule provided Wireways/conduits are completely enclosed from power panel to power outlets Lighting is controlled via lighting contactor and panic buttons or switches provided in each room Lighting contactor is installed inside the electrical room or switches are recess mounted or protected from physical damage Lighting is adequate in appropriate locations Page 7 of

Limit Markers A. Limit marker locations are visible from pertinent firing positions Lighted or heated for night firing. Red lighting is used on the face of the limit marker or limit marker face is illuminated with white lighting shining upon it 0V, 0A, duplex GFCI receptacle is provided near the base of the limit marker Controls are provided In the Control Shed or locally at the LM or nearby location Any ground light, receptacle, and control switch are located or protected to avoid direct fire. Page of