Experiences Commercializing FDD in the Northwest. Danny Miller, President Transformative Wave

Similar documents
Our Local Affiliate Partner. Chillersplus.com

Transformative Wave Technologies Kent, Washington

How to Get the Most out of Your Rooftop AC

INCENTIVES FOR ADVANCED RTU CONTROLS PILOT WITH THE CATALYST. May 2 nd 2017

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net

Technology overview of THE CATALYST. march 16, 2016

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Utility Incentives for RTU FDD in California. Mel Johnson Southern California Edison

How Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy

Energy Efficiency Retrofit Technologies for RTUs

CT AEE 2018 Energy Trends Fair

Advanced Rooftop Controller

Smart Equipment Controls (SEC)

Advanced RTU Campaign Taking Action Toward Efficient RTUs Michael Deru February 25, 2014

Economizer Fault Detection and Diagnostics (FDD) for Built-Up Air Handlers Draft Report

Advanced RTU Campaign Webinar June 17, 2013

BAS Chillers 8/15/2016. Achieving Energy Savings with BAS and Data Analytics Guanjing Lin Lawrence Berkeley National Laboratory August 10, 2016

Nonresidential HVAC Stakeholder Meeting #3

James Donahue Control Consultants, Inc.

A New Paradigm for Retrocommissioning: Moving Building Science to Green Collar Trades

EER Optimizer for DX Air Conditioners

Initial Review of ASHRAE/ANSI/ACCA Standard 180 (2010)

DATA CENTER AIR HANDLING COOLING SOLUTIONS

Commercial Controls. Advanced control for saving time and money

What Could Possibly Go Wrong? A Laboratory Investigation of In-Field and Onboard FDD on a 5 Ton RTU

Data Centers. Powerful Solutions That Put You in Control. Energy Management Solutions. Where your energy dollars are used. 1

A NEW RECIPE FOR HVAC SYSTEM PERFORMANCE & EFFICIENCY COOKING UP SAVINGS BY IMPROVING HVAC SYSTEM EFFICIENCY

Saving Energy and Reducing Costs Through Better Use of Building Automation Systems

ComEd Retro-Commissioning and Monitoring-Based Commissioning

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net

A NEW RECIPE FOR HVAC SYSTEM

ECON-ZIP-BASE. ZIP Economizer Base Unit. Wiring Diagram USA CANADA LATIN AMERICA / CARIBBEAN

How Electronics Are Transforming Equipment Diagnostics in HVACR. John Wallace Emerson Climate Technologies Retail Solutions

Committed to Energy Efficiency

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

How to Improve Energy Efficiency & Reduce Maintenance

Poor Installations Undermine the Benefits of High Efficiency HVAC Equipment

Verasys Enterprise Configuration and User Guide

Development of an Embedded RTU FDD using Open-Source Monitoring and Control Platform

Fault Detection and Diagnostics: Automated, Ongoing Commissioning Functionality for Large and Small HVAC Systems

Impact Evaluation of the 2012 Rooftop Unit Tune-up Initiative

Leveraging Building Automation Systems to support ongoing commissioning

Modernizing Control Systems for Campuses

The challenge is that BAS are often very complex with 1000s of data points to review. EMS Optimization Software

Development of an Energy Impact Model for RTU Economizer Faults

Fast Route to Reliable Energy Savings ZIP Economizer

Developing an Action Plan: Building Energy Metering and Beyond

Building Management System Application Datasheet

i-vu Building Automation System VVT Zoning System Total Control and Comfort for Your Building

Data Center Infrastructure Management ( DCiM )

Rooftop Unit Optimization Offering Frequently Asked Questions and Updates Released April 1, 2013

Development and Evaluation of an Automated Virtual Refrigerant Charge Sensor Training Kit

Data Center Optimized Controls

Building Management Solutions. for Data Centers and Mission Critical Facilities

Factsheet. Power Generation Service Energy efficiency in power generation and water

Setting New Standards for Ultra High Performance HVAC

Setting New Standards for Ultra High Performance HVAC

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power

Avoid Failures and Delays on Data Center Capital Projects

Western HVAC Performance Alliance

August 2017 Welcome Design Topic Product Focus

Trane Controls. Smart Solutions for Smart Buildings

Evolution Of Facility Management Systems. Stephen Mitchell King Kullen John Wallace Retail Solutions

BSRIA Air Conditioning Worldwide Market Intelligence

Global Heating, Ventilation and Air Conditioning (HVAC) Market: Industry Analysis & Outlook

Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II

OM Operation and Maintenance Manual. Intelligent Equipment for Daikin Applied Trailblazer Air-cooled Scroll Chiller. Models: AGZ-D and AGZ-E

CYLON ACTIVE ENERGY ENGINEERS IRELAND CONFERENCE 1 ST OCTOBER 2013 OVERVIEW 2013

Advanced RTU Campaign Technical Resources: Evaluating Performance December 10, 2013

SMART VENTILATION MANAGEMENT: CHANGING THE WAY WE THINK ABOUT VENTILATION

Run a Smart Workplace Introducing the Digital Building. Digital Building Solutions

Campus Continuous Improvement with Controls. Bill Broadhurst, PE, CEM, LEED AP Campus Energy Manager

Simplifying Device and System Integration Specifications for Building Automation Systems

Energy Action Plan 2015

Taking Control of your Rooftop Units- Retrofitting RTU Controls. DTE Energy. Presented by

2013 Building Energy Efficiency Standards Non-Residential HVAC Alterations

Optimizing Laboratory Controls through Fault Detection and Diagnostics Software. Laura Dyas, PE, LEED AP O+M, CEM Bryce Buchanan, PE, CCP, CEM

Liebert Economizer Cooling Solutions Reduce Cooling Costs by up to 50% Without Compromising Reliability

SE7600E Series Application Guide

CGWN/CCUN indoor liquid chillers The compact AquaStream² solution

Precision Cooling Mission Critical Air Handling Units

Climate Technologies Investor Update

Daikin Blueprint: Five New Strategies to Reduce Operational Expenses for Air-cooled Chillers

Existing Building Energy Saving

Trailblazer AGZ-E air-cooled scroll chillers

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

Wireless Field Data Backhaul

Rethinking VDI: The Role of Client-Hosted Virtual Desktops. White Paper Virtual Computer, Inc. All Rights Reserved.

BCPro System Product Bulletin

Setting Your Business Apart Through Industry Certification

TECHNICAL TRAINING CATALOG

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System

Pathfinder AWV air-cooled screw chillers

Liebert. icom Thermal System Controls Greater Data Center Protection, Efficiency & Insight

The world is at a crossroad.

PRODUCT BULLETIN. M-Graphics. modifications. graphic development

The new generation of dedicated HVAC drives

Ecoflair Air Economizers

GE SmartSignal powered by Predix

Transcription:

Experiences Commercializing FDD in the Northwest Danny Miller, President Transformative Wave

Our Background Transformative Wave is the manufacturer of the leading HVAC retrofit solution for constant volume HVAC systems, the CATALYST. Subsidiary of a 30-year-old HVAC commercial service company in the Pacific Northwest. Team has surveyed, serviced, and/or applied our technology to over 5,000 unique RTUs in the U.S. and Canada. Have been collecting and analyzing RTU data for the last five years. Our approach and views are driven by real-life experience and HVAC expertise.

Our Technology The CATALYST is proven to reduce HVAC overall energy use by 25-50% in multiple DOE and utility field trials. http://www.pnl.gov/main/publications/external/technical_reports/pnnl-22656.pdf The energy savings provides the economic fuel to finance our web-enabled advanced features included in the eiq Platform. http://transformativewave.com/eiq RTU s are connected wirelessly with 40-points of data collected and stored in a SQL database at 1-minute interval histories. Features include fault detection and diagnostic capabilities that focus on RTU efficiency and performance from a whole unit perspective. Annunciated via smart phones, tablets, & browsers. Automated Demand Response (ADR) capable

Our FDD Features

Our FDD Features Controller-level real-time faults include: Sensor failures including values out of range and loss of connectivity Drive faults involving numerous fault codes generated by the variable frequency drive and communicated via a ModBus IP interface. Communication faults Inadequate airflow Lack of cooling performance Lack of heating performance Economizer actuator and damper failure Fan belt slippage indicating need for replacement or adjustment. Proper functionality of the CATALYST and its individual components.

Our FDD Features Time-based degradation faults using historic data: Improper schedules Excessive use of after-hours override functions Disproportionate runtime between RTUs Changes in the economizer performance Degraded cooling output Comparative RTU energy use analytics for outlier identification

Our FDD Features California Title 24 Compliant: Air temperature sensor failure/fault Not economizing when it should Economizing when it should not Damper not modulating Excess outdoor air

Pending FDD Features Under contract with PNNL/DOE on refrigerant side rooftop unit embedded diagnostics using Purdue s virtual sensor method: Fouled condenser Coil Fouled evaporator coil Low refrigerant charge Excessive refrigerant charge Liquid line restriction Compressor valve leakage Non-condensable gas present

Our Findings Things are worse than we think Most of it is preventable Reliance on Building Management Control systems is inadequate Remarkably, even those paying for a facility monitoring service are subject to much of the same. The majority of deployed RTUs lack advanced features and those that do have FDD are not leveraging it. Customers are rarely interested in investing in features that cannot be cost justified in the short term.

Our Challenges Getting customers to avoid taking low-cost short cuts to the fan energy savings. The trend is that retailers, who control the majority of RTUs, opt for simple drive products or VFD s. This is shortsighted and misses the larger opportunity. Convincing customers to buy into the CATALYST with eiq offering where higher incentives and savings will pay for FDD. Getting multi-site customers to properly consider the value of these robust tools and the positive impact they will have. Overcoming customer s belief that they have inadequate staff to handle information they already receive. Consultants, contractors and technicians have not yet bought into advanced FDD tools.

Our Recommendations 1. Promote tools that make smart simple to deal with the information overload that currently exists. We believe customers need a robust tool set that does not prescribe the priority or messaging conditions. When the customer understands that they will not be overwhelmed with emails or alerts, their resistance subsides. FDD can be very complex under the hood but customers want simple intuitive tools that are easily customizable.

Our Recommendations 2. Invest more into validating and quantifying the cost of not knowing. The case must be made using data on a customer-specific basis. General cost justification numbers don t create the kind of confidence and buy-in necessary for AFDD to gain traction. If we can create cost-avoidance tables or demonstrate an accumulated value for the FDD, the customer will be able to justify it. Everyone answers to someone and those recommending capital investment need to be armed with hard evidence that supports the value of FDD as an enterprise priority.

Our Recommendations 3. Consider radical alternatives: Should the utilities take on the cost and management of FDD for ratepayers if the benefit is so great and the resistance so formidable? Should the major national and regional accounts be required to invest in the deployment and use of FDD by retrofitting existing equipment and in the purchase of new equipment?

Questions??

Transformative Wave Technologies, LLC www.transformativewave.com danny@twavetech.com

North America s Leading Retrofit Solution for Rooftop Packaged HVAC Systems

Web Accessible Control, Visualization, & Fault Detection

Advanced Fault Detection & Remote Diagnostics Energy Saving Hardware Upgrade CATALYST with eiq comprehensive solution Efficiency & Performance Verification Tools M&V Data Collection Mechanism Demand Response Technology Building Control System

Third-party Validated Savings New study by PNNL shows CATALYST saved an average energy savings of 57% on 66 RTUs across four US climate zones.

Three Applications to Choose from CATALYST BMS CATALYST eiq CATALYST lite Full-featured CATALYST with Tridium BMS for control of HVAC and lighting with portfolio asset management tool. Full-featured CATALYST with web-based live views, fault detection, and energy accountability overlay to existing BMS. Smart VFD for those looking for supply fan control. Includes CATALYST ventilation and equipment protection features.

Live Demonstrations Available