Well Advisor Project Ken Gibson, Drilling Technology Manager
BP Well Advisor Project Build capability to integrate real-time data with predictive tools, processes and expertise to enable the most informed operational decisions BPWA Focus on; Operational Safety : Number #1 priority Well Construction Efficiency : Average Offshore NPT approx. 30% Life of Well Reliability : High rate of impairments in early well life Develop a standardized company wide infrastructure Business transformation deployment of a solution Address technical challenges and organizational change Plan for the future 2
Project Vision and Technical Goals Driller s Dashboard BP Well Advisor System Recommendations Mud Logging MWD Rig Systems Real Time Data Wells Engineer or Wells Specialist Drilling Completions Interventions Analysis, Modeling, Recommended Practices High bandwidth telemetry - Wired Pipe Deployment NDS TM Project Vision: Build capability to integrate real time data with predictive tools, processes, and expertise to enable the most informed operational decisions Distributed Measurements New real time interpretation methods and processes Novel measurements (pressure at/near bit) Project Status: Phase 0 - Casing Running in Deployment Phase 1 - Consoles 2014 Deployment Phase 2 - Consoles in Development 3
Value Pyramid 4
Slide 5 IT Infrastructure and System Design Internet Web browser Microsoft.NET platform WITSML & OPC standards UTC time system Company wide approach Data synchronization Data aggregated, distributed and managed by system. 5
Console Overview Phased Development BPWA Console Casing Running Cementing Pressure Testing BOP Monitoring (NOV / GE / CAM) Rig Site Fluid Management Purpose Ensures operation runs within pre-determined safe operating windows Provides early warning signs of differential sticking between casing and wellbore Real-time cement placement and centraliser stand-off analysis Verification of cement well barrier elements Helps assure compliance with regulations and conformance with BP standards Remote monitoring / more efficient pressure testing operations Remote monitoring of BOP health and valves position BOP and control system diagnostics beyond rig site Early warning indicators for potential lost circulation and well control issues Annular pressure display to detect wellbore ballooning Displays correlation of sub-surface boundaries, zones of overpressure, and pre-drill risks No Drilling Surprises Real-time early warning indicators of sub-surface risks Improves ROP, optimizes drill-bit performance, reduces shock and vibration Rate of Penetration Drives a reduction in well construction costs in hard rock drilling areas Informs the drilling operation with real-time wellbore stability and hole cleaning information Drilling Operations Assists drillers in delivering a quality hole for subsequent tubulars Monitors tripping-in/out and associated reaming operations for any tubular; Includes torque, Tripping hookload, pressure and flow rate displays Near real-time event detection and wellbore condition monitoring Completions Extends Casing Running capabilities to incorporate tubing make-up and running Remote BOP Pressure Testing Combines BOP Monitoring with Pressure Testing consoles, remote monitoring 6
Deployed Consoles Casing Running Provides early warning signs of onset of differential sticking between casing and wellbore Hookloads monitored against planned drag curves Running speeds monitored against planned trip schedule Ensures operation runs within safeguards Cementing Real-time cement placement and centraliser stand-off analysis Cementing operations visible to rig and onshore engineers Verification of cement well barrier elements 7
Consoles to be Deployed in 2014 Pressure Testing Helps assure compliance with regulations and conformance with BP standards More efficient pressure testing operations Remote monitoring of pressure testing from onshore BOP Monitoring BOP control system diagnostics beyond rig site Simplifies complex diagnostic information Remote monitoring of BOP health and valves position 8
Consoles to be Deployed in 2014 Rig-Site Fluid Mgt. Early warning indicators for potential lost circulation and well control issues Annular pressure display to detect wellbore ballooning No Drilling Surprises Displays correlation of sub-surface boundaries, zones of overpressure, and pre-drill risks Real-time early warning indicators of subsurface risks Summarizes operational observations, annotations, and events 9
Consoles in Development Rate of Penetration (ROP) Deliver improvements and consistency in drilling performance Drive a reduction in well construction costs in hard rock drilling areas Improve ROP, optimize drill-bit performance, reduce shock and vibration Drilling Operations Inform the drilling operation with real-time wellbore stability and hole cleaning information Help the operations teams understand the drilling envelope Assist the driller in delivering a quality hole for subsequent tubular running operations Tripping Extend functionality of Casing Running console to BHA assemblies Monitor tripping-in and out and associated reaming operations for any tubular Provide near real-time event detection and wellbore condition monitoring 10
Casing Running console Highlights: Real-time monitoring of casing, liner and completions running operations Early warning indicators that help reduce stuck pipe incidents and mud losses Features Automated Drag Chart Detection of Static Friction Trip Schedule vs. actual running speeds Zone providing warning indicators of hookload (high & low), magnitude of static friction, running speed & hookload variance Hookload Signature showing calculated values of interest 11
Number of Runs Number of Runs Number of Runs Casing Running console Deployment Console Run Frequency 50 45 40 BPWA CRc Run Frequency (31 Aug 14) 3 4 Total Runs by Region 160 157 140 35 30 25 20 15 10 5 0 Console Total Runs 35 30 25 20 15 10 5 0 1 1 3 4 5 2 3 1 8 1 4 2 1 24 25 4Q10 1Q11 2Q11 3Q11 4Q11 1Q12 2Q12 3Q12 4Q12 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14 3Q14 31 30 27 Total Number of Runs = 273 Stuck Tubular Incidents = 0 Total Runs (Trouble Time) = 20 Total Runs (Trouble Free) = 253 24 22 18 17 13 BPWA CRc Total Runs by Rig (31 Aug 14) 11 11 11 8 Total Number of Runs = 273 Total Number of Rigs where CRc has been used = 28 Number of Rigs where CRc currently active = 26 6 6 5 5 4 4 3 3 2 21 4 33 40 46 2 2 2 2 2 2 1 1 35 120 100 80 60 40 20 0 AGT Key Messages North Sea GoM Technology deployed on 26 offshore rigs > 250 runs monitored live to date > 550km of tubulars run 51 Trinidad Angola No stuck tubular incidents have occurred 39 Total Number of Runs = 273 8 runs where console was used to make an intervention or significantly influence an outcome 20 6 12
Project Challenges Oil company management of large complex software projects product conceptualisation establishing right scope early change control Complexity in certain technical areas understanding strengths and weaknesses of real-time data need to focus on simple solutions first Right blend of deep technical specialists with operational experience needed for optimum product development Energizing engineers to make change diverse community involved in well construction Global deployment challenging not just about software but also about the business solution organisational change 13
Future Opportunities Move from Advisory system to Automation Deep embedment of technology in planning and operations Big data more data, extract more value Predictive analytics smarter analysis of data Advanced sensors improved clarity of operations Real-time monitoring of along string measurements Excellence in operational decision making 14