Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi Chief Engineer (PSP&A II)

Similar documents
Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Member (PS) 2. Chief Engineer (PSPA-2) 3. Member Secretary 4. Chief Engineer (PSP&A - I) 5. The Member Secretary

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Controllers Address, Phone No., Fax No. &

Address and Tel.No. of the Director, Legal Metrology GOI

Minutes of 4 th Meeting of the National Reliability Council for Electricity (NRCE) held on at NRPC, New Delhi

State-wise Gross State Domestic Product by Industry of Origin (at Prices) % Share to Total State GSDP at Constant Prices

Handout on. Mobile Number Portability. For Sales Channels

Agenda for the Meeting of Southern Region constituents regarding Connectivity/LTA Applications of IPPs in SR received during November & December, 2016

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

POWER TRANSMISSION IN INDIA 2018

Monthly changes in the General Indices and CFPIs are given below: Monthly changes (%) in All India CPI (General) and CFPI: Dec over Nov.

CANARA BANK NRI CELL, CIRCLE OFFICE 1ST FLOOR, RED CROSS BHAVAN SACHIVALAYA MARG BHUBANESWAR : ODISHA, INDIA E MAIL ID:

Central Electricity Authority System Planning & Project Appraisal Division Sewa Bhawan, R.K. Puram, New Delhi

Distribution List: Constituents of Southern region.

Distribution List: Constituents of Northern Region.

Employer Registration Help File

Appendix 08: Details of Location under Each Category

Distribution List: Southern Region. 2. Joint Secretary Ministry of New and Renewable Energy, Block 14, CGO Complex, Lodhi Road, New Delhi

CALL LOGGING PROCESS

Employer Registration

Highlights of Telecom Subscription Data as on 28 th February, 2018

Distribution List: Constituents of Northern Region

Copy: with a request to kindly make it convenient to attend the above meeting

Additional Agenda Note for 30 th Meeting of Standing Committee on Power System Planning in Western Region

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

up of SPMU in States/UTs under NeGP A

Copy for Kind information : ED (Commercial & RC)/ED (NR-I)/COO (BDD)/ED (Engg-TL & SS)

Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist

Distribution List Chief Engineer (PSPA-2) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi FAX :

Jharkhand Orrisa West Bengal MP Maharashtra Chhattisgarh UMPP & NTPC projects

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

MoH&FW, Govt. of India, New Delhi

Smart Cities & Urban Development

Highlights of Telecom Subscription Data as on 31 st October, 2018

National e-governance Plan: State Data Centre (SDC) DVL Narayana Rao, Additional Director, DeitY

List of PNB Bank Branches for Sale of Information Brochure of All India SLIET Entrance Test (SET)-2013 of SLIET Longowal, District Sangrur (Punjab)

""""FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI["

ED (Commercial) / ED (CMG) / ED (ER-I) / ED (ER-II) / COO (BDD)

CAPACITY BUILDING OF DISCOMS UNDER DEMAND SIDE MANAGEMENT SCHEME XII PLAN INITIATED BY

The modified file structure for the same is given in Annexure 1 of this circular for reference.

Ahmedabad Amritsar Bangalore Bathinda

NIRMAL XBRL GENERATOR

Mother and Child Tracking System. Achievements and Challenges

DESIGN YOUR WORLD WITH YOUNG ENERGY

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m.

Economic Advisory Council to the Prime Minister. Government of India

Telecom Regulatory Authority of India

GRAS Education and Training Services Pvt. Limited ( GRAS Academy ) In Partnership with National Skills Development Corporation (NSDC)

ED (CMG) / ED (SR-I) / ED (SR-II) / COO (BDD) / ED (Commercial & RC)

POWER SYSTEM DEVLOPMENT FUND (PSDF) Summary Status of the schemes submitted by the entities for funding from PSDF

Road Transport Computerisation in Manipur

FORUM LOAD DESPATCHERS (FOLD)

Tata AIG General Insurance Company Limited. Visit us at Standard Fire and Special Perils, Policy Wording UIN: IRDAN108P0004V

Economic Corridors: The Rationale. 10 September 2010

Advanced Ultra Power Transmission Consultancy

9.Telecommunication. India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited)

F.No. 1/20/CIT(OSD)/efiling/Electronic Verification/ Dated: 27/12/2016

JSONRecharge API Document

GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS

Sub: Constitution of Committee for Preparation of Perspective Plan for Distribution Sector in Northern Region Regarding

SMART WIREFREE. Home Automation Solutions

UNDP GEF BEE Project: Energy Efficiency Improvements in Commercial Buildings (EECB) 5 th Regional Workshop on ECBC Implementation in States

College of Engineering, Pune (An autonomous Institute of Government of Maharashtra) Board of Technical Education Delhi

Video Door Phone Collection 2017

Policy Document on Grievance Redressal

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

"'-- :...:. ~ ~ ~ '''''tlr'

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited)

Established in 1995, Suzlon Energy Limited, was the first Indian company to make a place for itself in the global wind energy industry.

This booklet has been prepared with the support under the GoI-UNDP Disaster Risk Reduction Programme ( )

POWER SYSTEM DEVLOPMENT FUND (PSDF) Summary Status of the schemes submitted by the entities for funding from PSDF. Estimated cost of the schemes

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

2. Director (Projects) NTPC, NTPC Bhawan, Core 7,Scope complex- 6,Institutional Area, Lodhi Road, New Delhi- (Fax )

NTPC Ltd. WRHQ Mumbai Vendor Payments From To

2. Director (Transmission) Ministry of Power, Shram Shakti Bhawan, Rafi Marg New Delhi FAX No

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited)

~m"ifir ~ ~ ~1~ItI~UI ~ ~ ~ 4~~lut"11 ~iif>"f ~ ~~. ~ltt9l~i~~'1! ~ W "ip".~.: 26/10/2009-~. m. ti. ~/, l( b -(59 ~:

Distribution List: 11. Director Betam Wind Energy Private Limited 15 th Floor, Tower B, Vatika Tower, Golf Course Road, Sector-54, Gurgaon

Multi-circuit Towers -- Conserving Right of Way (Eco-friendly outlook)

Disclosure to Promote the Right To Information

CII - AVANTHA Centre sets its foot in the Footwear Industry AVANTHA launched a new Cluster with Bata India Limited-Kolkata and its vendors on January

Applications Granted Medium Term Open Access (MTOA) by POWERGRID

Energy Efficiency Initiatives in Commercial Buildings. Bureau of Energy Efficiency Government of India

Inspired By Nature List Price w.e.f. 1st July 2017

Government Of India Ministry of Power Central Electricity Authority New Delhi

HDFC General Insurance Limited (Formerly L&T General Insurance Company Limited)

lc11cr' ~ CbI~~~TCiI 3fft5 ~ ~ (1fffiJ meiffi q;y \RI'l{) POWER GRID CORPORATION OF INDIA UMITED (A Government of India Enterprise)

A Background Note. Aadhaar - Issues and Implications

CENTRAL PUBLIC PROCUREMENT PORTAL. System Administrators Guide for Tenders Meta Data transfer from Department Site to CPP Portal

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

Q3 FY Press & Analysts Meet Mumbai January 28, 2016

No. Tech 4562/NIB-Addr/04/ 06 March A separate letter is being issued for IP addresses for nodes of MP Telecom Circle.

List containing names and addresses of AD Cat. II licenced by Kanpur Regional Office. Sr /1207, Ansari Road, Sahaaranapur (U.P.

Reliance Infrastructure Limited

qlq:~ ~ CbI"lq)~!l1OI 3ii4i ~;UI fclfcrds ('liffif ~ '5T ~) POWER GRiD CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

Performance Assessment of Electricity Distribution Utilities in India An Insight into Performance for FY 14 FY 16 and Outlook for FY 17

Transcription:

Distribution List: 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. 3. Chief Engineer (PSP&A - I) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 5. Member Secretary Western Regional Power Committee MIDC area, Marol, Andheri East, Mumbai 400 093 7. Director (Transmission) Transmission Corp. of Andhra Pradesh Ltd. (APTRANSCO) Vidyut Soudha Hyderabad 500 082. 9. Member (Transmission) Karnataka State Power Transmission Corp.Ltd. Cauvery Bhawan Bangalore 560 009. 11. Member (Distribution), Tamil Nadu electricity Board (TNEB) 6 th Floor, Eastern Wing, 800 Anna Salai, Chennai 600 002. 13. Chief Executive Officer POSOCO B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110 016 15. Executive Director Northern Regional Load Dispatch Centre 18-A, Qutab Institutional Area, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi 110 016 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066. 4. Member Secretary Southern Regional Power Committee 29, Race Course Cross Road Bangalore 560 009. 6. Member Secretary Northern Regional Power Committee 18-A, Qutab Institutional Area, Shaheed Jeet Singh Marg, Katwaria Sarai, New Delhi-110 016 8. Director (Transmission) Transmission Corp. of Telangana Ltd. (TSTRANSCO) Vidyut Soudha, Khairatabad Hyderabad 500 082. 10. Director (Trans. & System Op.), Kerala State Electricity Board Ltd. Vidyuthi Bhawanam, Pattom, P.B. No. 1028 Thiruvananthapuram 695 004. 12. Superintending Engineer I First Floor, Electricity Department Gingy Salai, Puducherry 605 001. 14. Executive Director Southern Regional Load Dispatch Centre 29, Race Course Cross Road, Bangalore 560009 16. Executive Director Western Regional Load Despatch Centre F-3, M.I.D.C. Area, Marol, Andheri East, Mumbai-400 093

17. Sh. V. Kiran General Manager Mytrah Energy (India) Pvt. Ltd. 8001, Q-City, S.No.109, Gachibowli Hyderabad - 500032, Telangana Ph.: 9900066530 Email: v.kiran@mytrah.com

Distribution List: Constituents of Northern Region. 1. Chief Engineer (Operation) Ministry of Power, UT Secretariat, Sector-9 D, Chandigarh - 161 009 3. Director(W&P), UPPTCL, Shakti Bhawan Extn, 3rd floor, 14, Ashok Marg, Lucknow-226 001 5. Managing Director, HP Power Transmission Corporation Ltd., Barowalias, Khalini, Shimla-171002 7. Chief Engineer(SO&C), HVPNL, Planning Directorate, Shakti Bhawan,Sector-6, Panchkula-134109, Haryana. 9. Development Commissioner (Power) Power Development Department, Grid Substation Complex, Janipur, Jammu 2. Director (Operations), Delhi Transco Ltd., Shakti Sadan, Kotla Road, New Delhi-110 002 4. Director (Technical), PSTCL, Head Office, The Mall, Patiala 147001, Punjab. 6. Director (Technical), RRVPNL, Vidyut Bhawan, Jaipur, Rajasthan-302005. 8. Director (Projects), PTCUL, Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. 10. Member (Power), Bhakra Beas Management Board, Sector-19 B, Madhya Marg, Chandigarh - 160019.

Distribution List: Constituents of Western Region. 1. Managing Director Gujarat Energy Transmission Corp. Ltd, Sardar Patel Vidyut Bhawan, Race Course, Vadodara -390 007 3. Managing Director Chhattisgarh State Power Transmission Co. Ltd., Dangania, Raipur- 492 013 5. Executive Engineer Administration of Daman & Diu (U.T.) Department of Electricity Moti Daman 396220 7. Chief Executive Officer POSOCO B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110 016 2. Chairman & Managing Director Madhya Pradesh Power Transmission Co. Ltd., Block No. 3, Shakti Bhawan, Rampur, Jabalpur-482 008 4. The Chief Engineer Electricity Department The Government of Goa, Panaji 6. Executive Engineer Electricity Department UT of Dadra & Nagar Havelli, Post Naroli-396 235, Silvassa 8. Director (Operation) Maharashtra State Electricity Transmission Co. Ltd., 4 th Floor, Prakashganga, Plot No. C- 19, E-Block, Bandra Kurla Complex, Bandra(East), Mumbai- 400051

Distribution List: Constituents of Eastern Region 1. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 3. Member Secretary ERPC 14, Golf Club Road, Tollygunge Kolkata-700033 5. Member Secretary NRPC 18-A, Qutub Institutional Area, Shaheed Jeet Singh Marg Katwaria Sarai, New Delhi-110016 7. Managing Director BSPTCL Vidyut Bhavan, Baily Road Patna-800021 9. Executive Director (System) Damodar Valley Corporation DVC Towers, VIP Road, Kolkata-700054 2. CMD OPTCL Bhoinagar Post Office, Jan path, Bhubaneshwar-751022 4. Director (Operations) WBSETCL Vidyut Bhavan, 8 th Floor Salt Lake City Kolkata-700091 6. Principal Chief Engineer cum Secretary Power Department Government of Sikkim Gangtok, Sikkim 8. Director (Commercial) Grid Corporation of Orissa Ltd, Jan path, Bhubaneshwar-751022 10. Managing Director Jharkhand Urja Sancharan Nigam Limited (JUSNL) Engineering Building, HEC, Dhurwa, Ranchi -834004

Distribution List: Constituents of North Eastern Region 1. Engineer-in-Chief Power & Electricity Department, Govt. of Mizoram, Tuikhuahtlang, Aizawl (Mizoram) 3. Chief Engineer (Power) Electricity Department, Keisampat, Imphal (Manipur) 5. Managing Director Assam Electricity Grid Corporation Limited Bijulee Bhawan, Paltan Bazar Guwahati (Assam) 781001 7. Chairman-cum-Managing Director Meghalaya Energy Corporation Limited Lum Jingshai, Short Round Road Shillonq (Meghalaya) 793001 9. Chief Engineer (Power) Vidyut Bhawan, Department of Power Zero Point Tinali Itanagar (Arunachal Pradesh) 791111 2. Member Secretary North Eastern Regional Power Committee(NERPC), Meghalaya State Housing Finance Co-operative Society Ltd. Building Nongrim Hills Shillong (Meghalaya) 793003 4. Chairman-cum-Managing Director Tripura State Electricity Corporation Limited Bidyut Bhavan, Banamalipur Agartala, Tripura 6. Chairman and Managing Director North Eastern Electric Power Corporation Ltd Brookland Compound, Lower New Colony Shillong (Meghalaya) 793003 8. Chief Engineer Department of Power Nagaland, Kohima 10. Sh. S. Kalgaonkar Executive Director (T&RE) NHPC Ltd. NHPC Office Complex, Sector-33 Faridabad 121003 (Haryana) Phone No.(Landline) 0 129-2277523 Phone No.(Mobile) 9560782999 Fax 0 129-2277523

Proposal for Grant of LTA to M/s Mytrah Energy (India) Pvt. Ltd. at Tirunelveli, Tamil Nadu, Southern Region 1.0 M/s Mytrah Energy (India) Pvt. Ltd. (MEIPL) was earlier granted connectivity for 300 MW at Tirunelveli PS & LTA for 75 MW with target beneficiaries NR- 45 MW & SR-30 MW for its wind generation project Tirunelveli Area. 2.0 Subsequently, MEIPL has submitted LTA application for 225MW in Jan 17 seeking transfer of power to target beneficiaries in NR as per the details below: Sl. No. Applicant 1. Mytrah Energy (India) Pvt. Ltd. Location Tirunelveli, Tamil Nadu Date of Application 04.01.2017 Start Date 1 st Aug, 2018 LTA Sought (MW) 225 Target-NR 3.0 Accordingly agenda for grant of LTA to MEIPL was circulated vide letter dated 31.07.2017 for discussions in the 22 nd Southern Region constituents meeting regarding Connectivity/LTA Applications in SR. However, the meeting was deferred due to pending matter in CERC under Petition No. 145/MP/2017 for amendment to the Detailed Procedure for connectivity of wind/solar projects. 4.0 Since the matter pending in CERC was pertaining only to the grant of Connectivity, and MEIPL had already been granted Connectivity and had already signed bay implementation agreement, the agenda for grant of LTA to MEIPL was circulated on 06.12.2017 for comments/observations. 5.0 Subsequently MEILPL revised the target beneficiaries by submitting fresh LTA application for 225 MW with target region as NR, NER & ER. Sl. No. 1. Applicant Mytrah Energy (India) Pvt. Ltd. Location Tirunelveli, Tamil Nadu Date of Application Start Date End Date sought 02.01.18 01.09.18 30.09.43 LTA Sought (MW) NR: 25 NER: 50 ER: 150 MEIPL also requested for change in withdrawal region in the already granted LTA from SR-30 MW to NR-30 MW. Sl. No. 1. Applicant Location Start Date Mytrah Energy (India) Pvt. Ltd. Tirunelveli, Tamil Nadu Feb 16 or availability of transmission system for LTA whichever is later LTA Granted NR: 45 SR: 30 LTA change sought (MW) NR : 75 (change in region of 30 MW from SR to NR) 6.0 The aforesaid LTA shall involve power transfer of 100 MW (75 MW from earlier granted LTA and 25 MW from under process application) to NR, 50 MW to NER and 150 MW to ER from Southern Region. 1

Proposal for Grant of LTA to M/s Mytrah Energy (India) Pvt. Ltd. 7.0 The transfer of power from SR to NR/NER would be through WR & ER Grid. Presently SR is importing power from WR & ER Grid and the scenario is likely to continue in the near future also. Accordingly, no constraint is envisaged in transfer of 150 MW of power from SR to ER directly and 150 MW of power to WR/ER for onwards transfer to NR(100 MW) & NER(50 MW). 8.0 Presently the ATC between ER & NER is 1360 MW and sufficient capacity is available for transfer of 50 MW from ER to NER. 9.0 In regard to transfer of 100 MW power from SR to NR via WR, it is to mention that with the commissioning of Jabalpur-Orai 765 kv D/c lines, ATC between WR-NR is expected to enhance to 15300 MW from present ATC of 12600 MW. Based on the enhancement of above ATC and capacity created due to relinquishment/abandonment by LTA customers, it has been found that adequate margin shall be available in WR-NR corridor to facilitate transfer of 100 MW of power from WR to NR. 10.0 The system studies carried out from generation to target region(s) and the results are enclosed at Exhibits-I(a) & I(b). It is observed from the study results that the line loadings are generally in order. 11.0 Accordingly following is proposed for the change in target region and grant of LTA for the fresh application 1. Change in target region in earlier granted 75 MW LTA of MEIPL from NR-45 MW, SR-30 MW to NR-75 MW subject to payment of relinquishment charges as determined by CERC in Petition No. 92/MP/2015. 2. Grant LTA of 225 MW for power transfer from MEIPL (SR) to NR-25 MW, ER-150 MW & NER-50 MW from 01.09.18 to 30.09.43 with the transmission system at Annexure-A. -X-X-X- 2

Proposal for Grant of LTA to M/s Mytrah Energy (India) Pvt. Ltd. Annexure-A Transmission System for LTA Transmission System being implemented by POWERGRID under Green Energy Corridor: 1. Establishment of 2x500 MVA, 400/230 kv (GIS) S/s at Tirunelveli Pooling Station 2. Tirunelveli pooling station-tuticorin pooling station 400 kv 2xD/c (Quad) lines 3. 2x125 MVAR Bus Reactors at 400kV Tirunelveli Pooling Station Inter-regional System Strengthening Scheme for NR & WR which is under implementation as part of different schemes: 1. Jabalpur Pooling station - Orai 765 KV D/c line 2. Orai Aligarh 765kV D/c line 3. Orai Orai(UPPTCL) 400kV D/c (Quad) line 4. LILO of one circuit of Satna-Gwalior 765 KV line at Orai S/s 5. 2x1000MVA, 765/400KV substation at Orai S/s 6. LILO of Agra-Meerut 765 kv S/c line at Aligarh S/s 7. 765KV Switching Station at Aligarh (GIS) 8. LILO of Kanpur Jhatikara 765 kv S/c at Aligarh S/s 3