Operational Overview. Interesting Day Overview: February 2013

Similar documents
National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010

Join at Slido.com. Gas Operational Forum October Log on wifi Open Network: RadissonBlu. #gasoct. SLIDO Interaction Tool

European Developments

This report is based on sampled data. Jun 1 Jul 6 Aug 10 Sep 14 Oct 19 Nov 23 Dec 28 Feb 1 Mar 8 Apr 12 May 17 Ju

All King County Summary Report

ACTIVE MICROSOFT CERTIFICATIONS:

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

software.sci.utah.edu (Select Visitors)

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Section 1.2: What is a Function? y = 4x

SCI - software.sci.utah.edu (Select Visitors)

ICT PROFESSIONAL MICROSOFT OFFICE SCHEDULE MIDRAND

Grade 4 Mathematics Pacing Guide

Freedom of Information Act 2000 reference number RFI

EU Harmonisation of Maintenance Publications at Interconnection Points 13/11/2015

October Real Sector Statistics Division. Methodology

The CPA Exam and Requirements. Adapted and modified from material originally created by David Reinus.

2

COURSE LISTING. Courses Listed. with SAP Hybris Marketing Cloud. 24 January 2018 (23:53 GMT) HY760 - SAP Hybris Marketing Cloud

IGO/INGO Identifiers Protection Policy Implementation. Meeting with the IRT 9 March 2016

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down.

UK Link Committee Meeting. Xoserve Report Pack. Meeting Date: 12 th January 2017 Reporting Month: December 2016

September Real Sector Statistics Division. Methodology

The CPA Exam and Requirements. Adapted and modified from material originally created by David Reinus.

Annex A to the MPEG Audio Patent License Agreement Essential Philips, France Telecom and IRT Patents relevant to DVD-Video Disc - MPEG Audio - general

BHARATI VIDYAPEETH`S INSTITUTE OF MANAGEMENT STUDIES AND RESEARCH NAVI MUMBAI ACADEMIC CALENDER JUNE MAY 2017

CIMA Asia. Interactive Timetable Live Online

What future changes are planned to improve the performance and reliability of the Wairarapa Connection?

TCA metric #3. TCA and fair execution. The metrics that the FX industry must use.

Polycom Advantage Service Endpoint Utilization Report

Undergraduate Admission File

Polycom Advantage Service Endpoint Utilization Report

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Criticality control in SFP. Radwaste and Decommissioning

2

Fluidity Trader Historical Data for Ensign Software Playback

2

AIMMS Function Reference - Date Time Related Identifiers

NCC Cable System Order

App Economy Market analysis for Economic Development

COURSE LISTING. Courses Listed. Training for Database & Technology with Modeling in SAP HANA. 20 November 2017 (12:10 GMT) Beginner.

CIMA Asia. Interactive Timetable Live Online

HPE Security Data Security. HPE SecureData. Product Lifecycle Status. End of Support Dates. Date: April 20, 2017 Version:

Demand Estimation Sub Committee Ad-hoc Work Plan

Martin Purvis CEO. Presentation following the AGM. 26 April 2012

Markets Gateway Roadmap

Imputation for missing observation through Artificial Intelligence. A Heuristic & Machine Learning approach

ISE Cyber Security UCITS Index (HUR)

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

ARRL RADIOGRAM A How To

Instructor training course schedule v3 Confirmed courses due completion by 31 st July 2019

DAS LRS Monthly Service Report

Automatic Renewal Using DIY Technology to Create an Improved Patron Experience

Understanding Today s Mobile Device Shopper. Google/Compete, U.S. Mar 2011

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

GREENWOOD PUBLIC SCHOOL DISTRICT AP Calculus AB Pacing Guide FIRST NINE WEEKS

Pushing the Limits. ADSM Symposium Sheelagh Treweek September 1999 Oxford University Computing Services 1

Eindhoven University of Technology - FTP Site Statistics. Top 20 Directories Sorted by Disk Space

Yield Reduction Due to Shading:

YOUR BUSINESS Networking Lunch & Vendor Fair

Annex A to the DVD-R Disc and DVD-RW Disc Patent License Agreement Essential Sony Patents relevant to DVD-RW Disc

BANGLADESH UNIVERSITY OF PROFESSIONALS ACADEMIC CALENDAR FOR MPhil AND PHD PROGRAM 2014 (4 TH BATCH) PART I (COURSE WORK)

Contents:

Notes Lesson 3 4. Positive. Coordinate. lines in the plane can be written in standard form. Horizontal

Code Contingency Guidelines V1:0 08/12/2008. Code Contingency Guidelines Documents Version 1:0

FREQUENTLY ASKED QUESTIONS

CBERS-2. Attitude Control and its Effects on Image Geometric Correction. Follow up to TCM-06 INPE CBERS TEAM

New Concept for Article 36 Networking and Management of the List

Tracking the Internet s BGP Table

San Joaquin County Emergency Medical Services Agency

Broadband Rate Design for Public Benefit

DATE OF BIRTH SORTING (DBSORT)

IANA Update ICANN Meetings, Marrakech Kim Davies Internet Assigned Numbers Authority

Council, 8 February 2017 Information Technology Report Executive summary and recommendations

Freddie Salas Manager Passport Nominations and Scheduling Jesse Battle Manager Business Process

COURSE LISTING. Courses Listed. Training for Database & Technology with Administration in Database Migration. 3 September 2018 (21:31 BST)

Billing and Collection Agent Report For period ending January 31, To FCC Contract Oversight Sub-Committee. February 11, 2019

Scaling on one node Hybrid engines with Multi-GPU on In-Memory database queries

RLMYPRINT.COM 30-DAY FREE NO-OBLIGATION TRIAL OF RANDOM LENGTHS MY PRINT.

UAE PUBLIC TRAINING CALENDAR

Birthdates by Species 12,064. Beef Bison Dairy Sheep. Birthdates by Year

Monthly SEO Report. Example Client 16 November 2012 Scott Lawson. Date. Prepared by

COURSE LISTING. Courses Listed. Training for Cloud with SAP Cloud Platform in Development. 23 November 2017 (08:12 GMT) Beginner.

ACTIVE MICROSOFT CERTIFICATIONS:

COURSE LISTING. Courses Listed. Training for Database & Technology with Development in SAP Cloud Platform. 1 December 2017 (22:41 GMT) Beginner

Airside Congestion. Airside Congestion

S-101. The New ENC Product Specification. Julia Powell S-100 Working Group Chair

CMIS 102 Hands-On Lab

All King County Summary Report

2014 Flow-Through Limited Partnerships

Induction Guide for Casual Employees. Creating a University of Melbourne Account & Themis Account

Training of BRs/NCs reviewers and experts for Biennial Update Reports technical analysis. 5 th BRs and NCs lead reviewers meeting

The latest update of power market in Latvia

Latin America Emerging Markets FY2015. Value Proposition

COURSE LISTING. Courses Listed. with Governance, Risk and Compliance (GRC) SAP BusinessObjects. 19 February 2018 (15:13 GMT) GRC100 -

Monthly Statistical Digest

Kaufman Brothers 13 th Annual Investor Conference

Houston Economic Overview Presented by Patrick Jankowski, SVP Research Greater Houston Partnership

Implementation Of Lame Delegation Policy. Ray Plzak ARIN

Pennington County Government Justice Center. Schematic Design - October 27, 2015

Transcription:

Operational Overview Interesting Day Overview: February 213

Interesting Day Overview High PCLP SMPB ( ) Bacton ASEP Scaleback w/c Dec 31st Jan 7th Jan 14th Jan 21st Jan 28th Feb 4th Exit Constraint Exit Constraint Bacton ASEP Scaleback 2

Nomination Imbalance & NG Trades (mcm) 3 14 th January: High PCLP 6 43 5 4 42 15 th Jan 16 th Jan 41 4 3 39 2 1 38 37 36 35-1 34 33-2 -3 32 31-4 3 5: 3: 1: 23: 21: 19: 17: 15: 13: 11: 9: Sells Buys Actual National Linepack National Target LinePack Opening LinePack PCLP Total Shipper Imbalance Linepack (mcm)

355 35 345 34 Linepack (mcm) 335 33 325 32 315 5: 4 Supply & Demand Hourly Variation from 1/24 Rate 5 4 3 2 1-1 -2-3 -4-5 3: 1: 23: 21: 19: 17: 15: 13: 11: 9: HVOL (mcm) Interconnector Exports ldzofftake ntsindustrial ntspowerstation Storage injection Interconnector Imports Storage Withdrawal Terminal supplies Actual Linepack

Week commencing 14 th January: Linepack Swing Supply & Demand Profile impact on Actual Linepack 37 14/1/213 15/1/213 16/1/213 17/1/213 18/1/213 19/1/213 2/1/213 6 365 5 36 4 355 3 Linepack (mcm) 35 345 34 335 33 2 1-1 -2 325-3 32-4 315-5 31-6 1: 19: 13: 1: 19: 13: 1: 19: 13: 1: 19: 13: 1: 19: 13: 1: 19: 13: 1: 19: 13: Terminal Supplies Storage Withdrawal Interconnector Imports Interconnector Export LDZ Offtake Powerstation Storage Injection Industrial Actual National Linepack 5 Variation from 1/24th rate (mcm)

21/2 vs 211/12: Linepack Variation Comparison of within day max-min range of NTS linepack (mcm) 35 35 3 3 In day range of linepack (mcm) 25 2 15 1 25 2 15 1 5 5 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Range of linepack swing 21/2 Rolling 3 day average swing 21/2 Range of linepack swing 211/12 Rolling 3 day average swing 211/12 6

Nomination Imbalance & NG Trades (mcm) 7 14 th 15 th 16 th January 6 5 4 14 th Jan 15 th Jan 16 th Jan 43 42 41 4 3 39 2 1 38 37 36 35-1 34 33-2 -3 32 31-4 3 3: 21: 15: 9: 3: 21: 15: 9: 3: 21: 15: 9: Sells Buys Actual National Linepack National Target LinePack Opening LinePack PCLP Total Shipper Imbalance Linepack (mcm)

16 th January: DN & Power Station Diurnal Take 25 HVOL Profiles - Supply and Demand 2 15 1 5-5 -1-15 -2-25 8 HVOL mcm 9: 11: 13: 15: 17: 19: 21: 23: 1: 3: 5: Interconnector Export Industrial LDZ Offtake Power Station Storage Injection Sub Terminal Interconnector Import Storage Withdrawal

LDZ & CCGT Offtake Rate (mcm) 16 th January: LDZ & CCGT Demand Previous 7 days 38 4 37 35 3 36 25 35 2 34 15 1 33 5 32 9 Linepack (mcm) 9: 11: 13: 15: 17: 19: 21: 23: 1: 3: 5: Actual LP LDZ 16113 LDZ 7-day Average CCGT 16113 CCGT 7-day Average

15 1 95 9 85 8 75 7 65 16 th January: 1p/therm Prices and NG Actions 3 2 1 Actions (mcm) 1 Prices (p/therm) 9: 11: 13: 15: 17: 19: 21: 23: 1: 3: 5: Action Taken SAP SMP Buy SMP Sell

Prices (p/therm) 16 th January: Market Response 14 12 1 8 6 4 2 15 1 95 9 85 8 75 7 65 11 Flow Rate (mcm/d) 9: 11: 13: 15: 17: 19: 21: 23: 1: 3: 5: Interconnector Storage LNG SMP Buy

4 3 2 NG Trades (mcm) 1-1 -2-3 -4 12 16 th January: End of day position 43 42 41 4 39 38 37 36 35 34 33 32 31 3 5: 3: 1: 23: 21: 19: 17: 15: 13: 11: 9: Sells Buys Actual National Linepack National Target LinePack Opening LinePack PCLP Linepack (mcm)

Bacton ASEP Scalebacks 18 th & 21 st January 213

4 3 2 NG Trades (mcm) 1-1 -2-3 -4 14 16 th 17 th January 43 16 th Jan 17 th Jan 42 41 4 39 38 37 36 35 34 33 32 31 3 Sells Buys Actual National Linepack National Target LinePack Opening LinePack PCLP Linepack (mcm)

18 th January: Start of Day Context Linepack (mcm) 45 44 43 42 41 4 39 38 37 36 35 34 33 32 31 3 Actual LP PCLP National Target LinePack Opening LinePack DFN Demand 15

18 th January: NG Actions Bacton ASEP Interruptible capacity scaled back. Release of additional firm entry capacity at Bacton withheld. 16

18 th January: Outturn 45 4 44 43 3 42 41 2 Actions (mcm) 4 39 38 37 36 35 1-1 34 33-2 32 31-3 3-4 9: 11: 13: 15: 17: 19: 21: 23: 1: 3: 5: NG Sell NG Buy Actual LP PCLP National Target LinePack Opening LinePack DFN Demand 17 Linepack (mcm)

NG Trades (mcm) 18 th 19 th 2 th January 43 42 41 4 39 38 18 4 3 2 1-1 -2-3 -4 18 th Jan 19 th Jan 2 th Jan 37 36 35 34 33 32 31 3 Sells Buys Actual National Linepack National Target LinePack Opening LinePack PCLP Linepack (mcm)

21 st January: Events Norwegian Supply loss at Langeled (approx 25mcm EoD) The forecast increase in flows at IoG to cover this supply loss combined with an already heavy system and high Bacton flows cause a concern over a potential constraint at Bacton. Firm capacity release restricted at Bacton ASEP & Interruptible capacity scaled back 11: Interruptible capacity restored & firm capacity released 19

43 42 41 4 39 38 37 36 35 34 33 32 31 3 21 st January: Outturn 4 3 2 NG Trades (mcm) 1-1 -2-3 -4 9: 11: 13: 15: 17: 19: 21: 23: 1: 3: 5: NG Sell NG Buy National Target LinePack Opening LinePack PCLP Actual Linepack DFN Demand 2 Linepack (mcm)

Exit Constraint 23 rd & 25 th January 213

NG Trades (mcm) 21 st 22 nd 23 rd January 43 42 41 4 39 38 22 4 3 2 1-1 -2-3 -4 21 st Jan 22 nd Jan 23 rd Jan 37 36 35 34 33 32 31 3 Sells Buys Actual National Linepack National Target LinePack Opening LinePack PCLP Linepack (mcm)

23 rd January: SW LDZ and Power Station demand Higher demand in SW for for LDZ and Power Stations on the 23 rd January 4 18 3.5 Power Station Demand (mcm) 3 2.5 2 1.5 1 17 LDZ Demand (mcm).5 19/1/213 2/1/213 21/1/213 22/1/213 23/1/213 Langage PS Marchwood PS Seabank PS SW LDZ Actual (D+1) 16 19/1/213 2/1/213 21/1/213 22/1/213 23/1/213 SW LDZ Actual (D+1) 16.96 17.21 17.19 17.38 17.53 Langage PS 1.68 1.38 1.86 2.7 2.48 Seabank PS.7 2.3.5 3.47 Marchwood PS.1.4 1.85 3.7 3.25 23

23 rd January: NG Actions Reconfigure the NTS Flow swap agreed Short Term NTS Flexibility Restriction issued in SW and SE Off-Peak Exit Capacity scalebacks initiated Locational offers and Exit Capacity surrender offers requested 24

25 th January: NG Actions Short Term NTS Flexibility Restriction issued in SW and SE No further actions required. 25

Lessons Learnt First time we have undertaken Exit Actions No Capacity Surrender offers received Some process learning with our control room Any feedback? Email: Jenny.Phillips@nationalgrid.com Phone: 1926 653977 26