PEPFAR/MoH Data Alignment. Post-PALS Webinar 2 November 1, 2017

Similar documents
PEPFAR/MoH Data Alignment. Managing Facilities and Maintaining Harmonization within DATIM and General Q & A October 24, 2018

Data for Accountability, Transparency and Impact Monitoring (DATIM) MER Data Import Reference Guide Version 2. December 2018

Preparing the Results File

How to Use the ETL App and Submit a Test File Editing Submission of Narrative

FY2018 PEPFAR ER Data Review and Approval Instructions: Agency Field Reviewer (Level 2)

Data for Accountability Transparency and Impact (DATIM)

A TRAINER S GUIDE TO THE DATA ENTRY SESSION

Special Education Room and Board Reimbursement Claim User Guide

System Performance Measures:

VTC FY19 CO-OP GOOGLE QUALIFICATIONS PARAMETERS & REIMBURSEMENT DOCUMENTATION HOW-TO

Strengthening Surveillance: The TB Surveillance Checklist of Standards and Benchmarks Rationale and Development

Eukleia LMS Tenant administrator guide

Data for Accountability Transparency and Impact (DATIM)

How to Add and Remove Permissions to Your Page

SIMS ANALYSIS CHEAT SHEET

WHO/AFRO SLIPTA UPDATE

Creating a Unique View on PEPFAR SharePoint

Introduction: User Privileges

System Performance Measures:

Overview of DIR Reporting Requirements, P2P Reconciliation, and Reconciliation Exclusion Process

LIHP Monthly Aggregate Reporting Instructions Manual. Low Income Health Program Evaluation

INSPIRE. User Screen Guide: MST, Administrative

MS SharePoint Tip Sheet

Introduction to Generation Availability Data System (GADS) Wind Reporting

Overview and Preparation for Analysis of MER 2.0 Data Level 2 DATIM Exercise Part II: Testing to Treatment Linkage Using Group Sets

PEPFAR Data for Accountability Transparency Impact Monitoring (DATIM)

AMP User Manual Reports

Objectives. Demonstrate how quality reporting must be uploaded to Millennium

LOMSHA Database Documentation Team Revision :23:20 Version 2.28

MA FINANCIAL DATA REPORTING APPLICATION (MAFDRA) Company User s Guide Effective January 2014

MHA LPI Date Correction Request Process

PEPFAR Panorama Tutorial. January 2018

GLOBAL AIDS SYSTEM FOR EVALUATION & REPORTING USER MANUAL

Client Services Procedure Manual

Monitoring and Evaluation Tool

Data for Accountability, Transparency and Impact Monitoring (DATIM) Validation of Data Payloads for DATIM Using R Validation Package

VTC CO-OP GOOGLE QUALIFICATIONS PARAMETERS & REIMBURSEMENT DOCUMENTATION HOW-TO

POC User Guide. Financial Disclosure Management

Provider Monitoring Process

Global Model Workstation Release Log

Objectives. Demonstrate how quality reporting must be uploaded to Millennium

Ministry of Energy. Submitting Data Through Portfolio Manager for Ontario s Energy and Water Reporting and Benchmarking Initiative

A trainer s guide to the Data Analysis overview and Data Visualizer session

EPM Live 2.2 Configuration and Administration Guide v.os1

IMPROVING Sepsis SURVIVAL. Data Portal User Manual version 2.0

Engaged Management ReView Author Guidelines V.1.0. Friday, March 11, 2015

Getting Started Guide for HR Admins

Table of Contents Extension Risk Management Education 10/4/2017 2

/Internet Random Moment Sampling. STATE OF ALASKA Department of Health and Social Services Division of Public Assistance

Undergraduate Admission File

Physical Security Reliability Standard Implementation

Steps for Extracting Data from Alpine Achievement SPED EOY

Upgrading AngelPoints 2012 R New Features...4. Resolved Issues...5. Upgrading AngelPoints v r New Features...

GN4: Section 3 How to enter, authorise and validate data

GradLeaders Service Request Process (for schools using GradLeaders Career Center)

ACTIVE Net Insights user guide. (v5.4)

Guide to Adjunct and Part Time Clinical Re- Appointments

Intellicus Enterprise Reporting and BI Platform

Dear Colleague: John Baumann, PhD Associate Vice President for Research Compliance Indiana University (317)

Child Care Initiative Project (CCIP)

Copyright 2016 Veeva Systems Inc., all rights reserved veeva.com

Web Client User Guide

Introduction. User Privileges. PEPFAR SharePoint: Poweruser Guide

Sage Guidance for ESG Recipients: Using Sage to Submit ESG CAPER Data. October 16, 2017

Student Achievement Data Exchange 2015/16. Purpose of the System. Overview

D&B Optimizer for Microsoft Installation Guide

RFC Editor Reporting April 2013

BEEDS portal Bank of England Electronic Data Submission portal. User guide. Credit unions Version 1.2

NCDB Vendor Webinar: NCDB Call for Data April 2019 and RQRS Updates

Release Administrative Module Manual

Grid Code Planner EU Code Modifications GC0100/101/102/104

Maintenance Minor Updates and Bug Fixes Release Dates... 8

ScholarOne Manuscripts. COGNOS Reports User Guide

Published: December 15, 2016 Revised: December 15, 2016

Microsoft SharePoint 2010

Published: December 15, 2017 Revised: December 15, 2017

WebOffice TM Getting Started Guide

Hands-On Lab. Lab: Developing BI Applications. Lab version: Last updated: 2/23/2011

Highline Excel 2016 Class 09: Date Functions

Bulk Registration and Pre-ID Label Tool User Tutorial

RELEASE NOTES. Overview: Introducing ForeSee CX Suite

SAS Web Report Studio 3.1

Doses Administered Reporting User Instructions

ReadyTalk for HubSpot User Guide

Guidelines on Dormant Accounts Web Reporting System

DocAve Backup for Salesforce. Release Notes

UNHCR. Planning Figures. Online Data Entry User Guide. Version: 1.2 Date: 26 March, 2015

Clearing Cache and Cookies: FIREFOX History Recent History Time range to clear Everything Details CHROME Chrome

Colorado Charter School Institute. Website Design & Development Request for Proposal

Commonwealth of Pennsylvania Office of Developmental Programs Year 8 Cost Report for the Consolidated Waiver Program

How Will the New Presort Data Update Schedule Impact Your Business?

Inpatient Quality Reporting (IQR) Program

COMCAS 2017 Author Instructions for Summary Submission

Use the table below to learn about the various user roles currently available in the Educator Dashboard. User Role For Who?

Submitting XML and Excel. Cost Reports

September Commonwealth of Pennsylvania Office of Developmental Programs. Provider Cost Report Follow-up Training

Ombudsman Registry Instruction Guide for Ombudsman Coordinators and RCC Warriors and Family Support Specialist

LEED Interpretations and Addenda Database Help Document

Device Quotas. Administrator's Guide

SpringCM. Release Notes December 2017

Transcription:

PEPFAR/MoH Data Alignment Post-PALS Webinar 2 November 1, 2017

Webinar Two Series Webinar 1 - October 18 at 8:00 9:00 AM Eastern. Overview of alignment next steps leading to MoH and PEPFAR aligned results analysis. Webinar 2 - November 1 at 8:00 9:00 AM Eastern. Final indicator results data submission. This webinar will discuss accessing the indicator results staging area and verification of submitted results. Webinar 3 - November 29 at 8:00 9:00 AM Eastern. Side-by-side PEPFAR & MoH results data analysis. This webinar will present preconfigured pivot tables and other tools that will be used to compare and analyze PEPFAR and MoH results for the six alignment indicators. Uploading data from PEPFAR to MoH

What we Accomplished! 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Botswana Cote d'ivoire Haiti Kenya Lesotho Malawi Namibia Rwanda Swaziland Tanzania Uganda Zambia Zimbabwe Org Unit/Facility Reconciliation: - 12 of the 13 countries have completed the Facility Reconciliation - 23,447 --> Number of Facilities in DATIM that are now mapped to their MoH Facility ID Indicator Mapping: - 12 of the 13 countries have completed the Indicator Mapping - Test Data Received and Validated Completed - 5 OUs (verified) Received/under review - 5 OUs Not received - 2 OUs

Timeline October 18th - Webinar 1 (8:00 9:00 AM Eastern) Overview of alignment next steps leading to MoH and PEPFAR aligned results analysis. Today November 1st - Webinar 2 (8:00 9:00 AM Eastern) Preparation for MoH Results Submission, Data Validation, OU Management November 8th - Data Submission Deadline November 15th - Data Imported into DATIM November 29th - Webinar 3 (8:00 9:00 AM Eastern) Side-by-side PEPFAR & MoH results data analysis, MoH Access to DATIM, Maintaining OU Harmonization

Results File The ultimate objective of this activity

File Submission The completed Indicator Mapping and Results File will be submitted through pepfar.net (PEPFAR SharePoint) Activity URL: https://www.pepfarii.net/ogac-hq/moh-daa/ From the pepfar.net homepage, navigate to the PEPFAR MOH Data Alignment under the HQ submenu at the top Step 1. Click on 2017 Shared Documents

File Submission Step 2. Select your OU Step 3. Click on Upload

File Submission After clicking on Upload, you will be able to choose your file: Step 4. Click to Choose File Step 5. Unclick the option to Add as a new version to existing files Step 6. Click OK

File Submission - General Guidelines Files should follow a consistent naming convention: LS- Indicator Mapping- v1 [ISO Country Code]-[File name: Indicator Mapping or Results File ]- v[version number] A new version with a unique name should be created for every file uploaded If you go back and edit your original files, it s possible that we would miss your changes Files should be in the specified format (i.e. csv file type with the specified headers)

Results File - CSV Template A CSV template is provided in the Resource Package, though it is recommended and likely easier to generate one s own CSV file depending on the country s information system and circumstances Below is an example demonstrating the first four lines of an example Results File as seen within MS Excel: and as seen within a generic text editor: Note: The order of the five fields above must remain as listed above

Results File - Test File - We are still waiting for a few more countries to submit their test file This test file has proven to be a very valuable step Ensure the process for generating the Results File is established and can efficiently be generated once the data are finalized. Allow for validation of the Indicator Mapping, ensuring expected results are appearing. Allow for validation of the mapped MoH Facility IDs; ensuring all applicable facilities are mapped and using proper coding format. - Data representing a single quarter will suffice for this exercise. Data will be removed before final data is imported.

Results File - Date Ranges/Periods In order for our teams to be prepared and to better accommodate potential need for differing Date Ranges, we are asking that you let us know how your results data will be received We expect that your data will be aligned to PEPFAR Q4 (Period = 2017Q3 ) If not, then what period will you be submitting? We expect to be receiving 4 quarters worth of data Do let us know if you foresee issues with this We expect the results to be the sum of all four quarters It might be the case that your quarterly or monthly data needs to be provided separately. Do let us know if you anticipate this need.

Results File - Date Ranges/Periods Clarity on acceptable reporting ranges for MoH annual results MoH results should be aligned to PEPFAR s Q4 (Oct-Sept) annual reporting period If able to align, then the Result File s Period will equal 2017Q3, in accordance to the DATIM date format If unable to align to PEPFAR s Q4, it is possible to submit annual data according to one of the previous quarters must start and end at a quarter (see table) Annual Range PEPFAR Data Alignment (based on fiscal year) (based on calendar year) January 1, 2016 December 31, 2016 Q1 2016Q4 April 1, 2016 March 31, 2017 Q2 2017Q1 July 1, 2016 June 30, 2017 Q3 2017Q2 October 1, 2016 September 30, 2017 Q4 2017Q3 Acceptable MoH results ranges Ideal MoH results range

Discussion Will your data be the sum of one year's worth of results and align to the PEPFAR Q4 calendar year?

Validating Data Validating Results using Pivot Tables in GeoAlign

Validating Data Data Validation is done in GeoAlign (not DATIM) using the Pivot Tables app (https://geoalign.datim.org) Country Teams will do this using the accounts that were created for the Facility Reconciliation Several Favorites have been created to assist in validation We encourage you to alter these to assist in your analysis (You will not be able to overwrite with your changes) or create your own

What you should be reviewing Reviewing the Imported MoH Results PEPFAR Country Teams should do this for both Test AND Final MoH Results file to ensure overall alignment with expectations Validate that your results in GeoAlign are what you expect Ensure the aggregated data are correct Ensure the results are accurately assigned geographically Validate that all the indicators you have mapped are represented and contain results If you provided calculations in your Indicator Mapping, validate that those calculations are producing the expected results

Preconfigured Pivot Table Favorites MOH_Totals MOH_Disags_HTS_TST MOH_Disags_PMTCT_STAT MOH_Disags_TX_CURR MOH_Disags_TX_NEW MOH_Disags_TX_RET

DHIS2 Pivot Tables Open the pivot table app

Open the favorite you wish to view

You will see data at the county level

Customizing the Pivot Table To drill down : 1) Select Organization units 2) Select the sub-units you wish to view 3) Select Update

Customizing the Layout To update the layout of the pivot: 1) Select Layout 2) Move Organization units to Row and Data to Columns

Pivot table layout updates

Save your Pivot table updates To save the updated table: 1) Select Favorites, Save As 2) Save the new favorite with a different name specific to your country By_OrgUnit

Validating Data For those that have already provided test data (and corrected any issues identified by the Support Team) then you can already find your data in GeoAlign for your review We will notify your Points of Contact once your files has been imported stating that your review can begin NOTE: It is your responsibility to validate and inform us ASAP if you find any issues with the data. We can help you identify where the error is happening and potentially help resolve. The MoH Results will be imported into DATIM on November 15th

DATIM Org Units OU Management within DATIM Maintaining Harmonization

DATIM OU Management During this Q4 Reporting Period Changes to your OU in DATIM are handled through DATIM Support, by creating a Support Ticket Starting in Q1 We will be providing clear guidance on OU management taking the facility harmonization with the MoH into account With this guidance, Site Admin permissions will be reinstated Allowing for creation of new sites, deletion (if OU has no data), and name changes We will go over this during Webinar 3

DATIM OU Management Data Alignment is dependent on Facility Harmonization As we mentioned in the last webinar, it is necessary to know when and how the Ministry makes changes to their OU so that they can be incorporated into DATIM If you haven t already, we recommend having discussions with your Ministry to put a process in place to track these changes when they are implemented If your Ministry has already created new sites since the initial facility alignment, AND if those facilities report on the relevant indicators, then these will need to be added in DATIM in order to import the Ministry s results

DATIM OU Management To ensure OU harmonization moving forward, we will go over the following methods in webinar 3 1. Conducting the realignment activity on an annual basis 2. Incorporating changes from MoH as they occur throughout the year 3. Implementing site synchronization automation More detail in Webinar 3

Discussion Have you discussed org hierarchy change management with MoH? What is your planned approach? Do you want to consider the automated sync? How can we best provide you with support?

Data Cleaning What & When

Data Cleaning Window We anticipate a potential need to make corrections to MoH data after the close of Q4. To that point, we are making preparations for a data cleaning window: The data cleaning period will align to the Q4 cleaning window, as described in the PEPFAR data calendar The process for cleaning data requires a resubmission of the full dataset, even if only changing one value The cleaning will be imported by the Support Team directly into DATIM (no longer in GeoAlign) Provide yourself enough time to validate the resubmission ensuring enough time to address potential issues This will be covered in more detail in Webinar 3

PEPFAR/MoH Data Sets

PEPFAR-MOH Alignment Data Set Data set is being created that will store both MOH data and matching PEPFAR data Data elements and disaggregates are being grouped into a data element group for easy location The data set includes a source (PEPFAR vs MOH) dimension for viewing the two data side by side

MOH Data Data will be processed based on the indicator mapping files that were provided provided by the countries It will be loaded into geoalign.datim.org for validation by the country team, once validated data will be moved to DATIM A number of pivot tables are being defined that will help you validate the data before it is imported into DATIM

PEPFAR Data Once FY2017 Quarter 4 data import is complete, Alignment data set will be populated with PEPFAR data; Pivot reports are being created that allow users with access to alignment data to analyze them

User Accounts For Data Validation and Testing For Analysis and Comparison

Additional User Accounts OU POC to submit list of new users to DATIM Support (https://datim.zendesk.com/hc/en-us) Please choose the PEPFAR/MoH Data Alignment from the Form drop down options (screenshot below). You can also mention PEPFAR/MoH Data Alignment in the ticket description. For each user provide following details: Name: OU: Email:

Summary

Q&A