WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES

Similar documents
GBB (WA) 1.8 (BUILD 316) RELEASE NOTES

GBB (WA) 1.11 (BUILD 345) RELEASE NOTES

AEMO S RESPONSE TO MARKET AUDITOR S REPORTS FOR AUDIT PERIOD 1 AUGUST 2015 TO 30 JUNE 2016

2018 Summary Report into the cyber security preparedness of the National and WA Wholesale Electricity Markets. AEMO report to market participants

METERING SERVICE PROVIDER REGISTRATION PROCEDURE (PART1)

Guide to Contract Reference Selections 1.00 Final March 2019

WEMS SUBMISSION SPECIFICATION VERSION 5.0

VAR DISPATCH WEB INTERFACE USER GUIDE VERSION 0.3

Data Interchange Framework and Glossary 1.01 Final September 2018

MARKET PROCEDURE: METER DATA SUBMISSIONS

A Guide to the Input Data and Model of the 2018 National Electricity Market Electricity Statement of Opportunities

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL

TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

THE NATIONAL GAS MARKET BULLETIN BOARD - PARTICIPANT REGISTRATION KIT

METERING SERVICE PROVIDER APPLICATION FORM (PART 2)

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

GUIDE TO GAS SUPPLY HUB CSV FILE TRANSACTIONS

MMS DATA SUBSCRIPTION SERVICES USER INTERFACE GUIDE

GUIDE TO DATA SUBSCRIPTION PROVIDES INSTRUCTIONS FOR USING THE DATA SUBSCRIPTION WEB INTERFACE IN THE EMMS MARKETS PORTAL. Version: 3.

Power System Operating Incident Report Trip of Calvale No.2 275kV busbar and Calvale-Halys 8810 and 8811 transmission lines on 30 March 2014

INTRODUCTION TO MSATS PROVIDES AN INTRODUCTION TO THE MARKET SETTLEMENT AND TRANSFER SOLUTION (MSATS)

GUIDE TO B2B VALIDATION MODULE SOFTWARE COVERS THE SET-UP AND USE OF THE B2B VALIDATION MODULE SOFTWARE

POWER SYSTEM OPERATION PROCEDURE: NETWORK MODELLING DATA

ST PASA Report. User Guide- Public

Forced and Planned Outage Substitution, RAAIM Pre-Calc

MSATS PROCEDURES: CATS PROCEDURE PRINCIPLES AND OBLIGATIONS

MSATS USER INTERFACE GUIDE

Proposal for an in-period capex adjustment to account for new market reform obligations

Provision of Network Information to System Management (RC_2014_10)

GBB (WA) REPORT APPLICATION PROGRAMMING INTERFACE (API) VERSION 1.5

Accounts. User Guide December 2016 Version 1.5

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

Therapy Provider Portal. User Guide

B2B PROCEDURE ONE WAY NOTIFICATION PROCESS

Cash Funding (Derivatives)

B2B MAPPING TO ASEXML

Description of the Application Process for Small Embedded Generators

POWER SYSTEM DATA COMMUNICATION STANDARD

MSATS PROCEDURE: MDM PROCEDURES

Deutsche Bank Corporate Banking & Securities. TradeMatch. User Guide.

ALLOCATION OF EMBEDDED NETWORK CODES

NEM 12&13 FILE FORMAT CLARIFICATIONS

PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification)

Balancing and Settlement Code BSC PROCEDURE

MMS DATA MODEL GUI INSTALLER GUIDE

Depository. User Guide June 2016 Version 1.5

WP24 CFD Settlement: Required Information

COMMERCIAL BANK OF DUBAI PSC GENERAL CONDITIONS OF ACCESS AND USE OF COMMERCIAL BANK OF DUBAI FACEBOOK BRANCH

EMMS DATA INTERCHANGE GUIDE

Resource Adequacy Pre-Market Simulation Training Workshop

UPDATES ON IMPLEMENTATION OF SDPC AT SYSTEM INJECTION POINTS WITH MULTIPLE SUPPLY SOURCES

ASX Clear (Futures) Static Data Portal User Manual ETD only Clearing Participants

ReferencePoint TM Corporate Actions Dissemination Guide

AdviserCentral. Reverse Fact Find Creation. Release 5

Guidance version control

SERVICE LEVEL PROCEDURE:

Guidance: Operational Conditions Precedent (OCPs) September 2016 Version 1

ALGORITHMIC TRADING AND ORDER ROUTING SERVICES POLICY

ISO / IEC 27001:2005. A brief introduction. Dimitris Petropoulos Managing Director ENCODE Middle East September 2006

MTPASA BID FORMAT AND VALIDATION

User Guide for the New Kofax Partner Portal

Policy 24 Identity Theft Prevention Program IDENTITY THEFT PREVENTION PROGRAM OF WEBB CREEK UTILITY DISTRICT

Information paper on the registry

Guidelines on Unmetered Load Management Version 2.1

KYOCERA Premium Partner Program Terms and Conditions

Site Impact Policies for Website Use

Introduction to ASX Derivatives Clearing System Open Interface V1.4.4

Extranet Site User Guide for IATA Aircraft Recovery Portal (IARP) (Website Structure)

Market Results Interface - Settlements User Guide

Service Description NBN Co Platform Interfacing Service

Ongoing conformance of the product with the standard is the responsibility of the certificate holder and the Australian manufacturer or importer.

ASX Austraclear. EXIGO Common Gateway GUI version 1-11 (Production and Test Bed) (HTHL File Upload) Installation and User Guide


DOCUMENT UPLOADS. NOTE: If you already have a pending filing created, select the Edit with the pending filing. Figure 1: Create New Filing

vendor guide CONNECTED DEVICES HELP CONTROL ELECTRICITY USE Smart Meter Connected Devices Service LOOK WHAT YOUR HOME S SMART METER CAN DO FOR YOU

FNM Expansion Training Webinar

MSATS PROCEDURES CATS PROCEDURE PRINCIPLES AND OBLIGATIONS. PREPARED BY: Retail Markets and Metering VERSION: 4.5 EFFECTIVE DATE: 1 December 2017

ASX Administration and Risk Terminal User Guide DRAFT - V0.2 INFORMATION CLASSIFICATION - PUBLIC

Building Information Modeling and Digital Data Exhibit

System Management. Network Operator Interface. Requestor User Guide: Secondary Works

DECISION OF THE EUROPEAN CENTRAL BANK

Schedule Identity Services

FINANCIAL OMBUDSMAN SERVICE AUSTRALIA. FOS Secure Services. Online Member Portal User Guide. January FOS Secure Services User Guide Page 1 of 19

Submission to the Senate Legal and Constitutional Affairs Legislation Committee on the Migration Amendment (Offshore Resources Activity) Repeal Bill

Market Participant Test Kit Version 5.3

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Royal Mail Mailmark Terms & Conditions

Terms and Conditions for External accounts Service

Request for Proposal for Technical Consulting Services

Published: December 15, 2016 Revised: December 15, 2016

User Management. User Guide June 2016 Version 1.5

GUIDANCE: INSTALLED CAPACITY & FINAL INSTALLED CAPACITY Version 1

Published: December 15, 2017 Revised: December 15, 2017

Electronic Filing Instructions Manulife Financial Corporation Securities Class Actions

GUIDELINES FOR SHARED TRANSMISSION CONNECTIONS IN VICTORIA

Message Manager Administrator Guide for ZA

Entrust WAP Server Certificate Relying Party Agreement

Web Hosting Customer Service Policy (CSP)

Transcription:

WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES Published: February 2018

IMPORTANT NOTICE Purpose The Australian Energy Market Operator has prepared this document to provide information about the Wholesale Electricity Market System (WEMS) 3.24 (Build 3.24-1356) and WEMS: RCM 1.5 (Build 1.5-2570) releases, as at the date of publication. Disclaimer This document or the information in it may be subsequently updated or amended. This document does not constitute legal or business advice, and should not be relied on as a substitute for obtaining detailed advice about the Wholesale Electricity Market Rules, or any other applicable laws, procedures or policies. AEMO has made every effort to ensure the quality of the information in this document but cannot guarantee its accuracy or completeness. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this document: make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this document; and are not liable (whether by reason of negligence or otherwise) for any statements or representations in this document, or any omissions from it, or for any use or reliance on the information in it.

VERSION RELEASE HISTORY Version Effective Date Summary of Changes 1.0 01/02/2018 Document Creation DOCUMENT APPROVAL Name and Position Martin Maticka Group Manager, WA Markets Date 02/02/2018

CONTENTS 1. INTRODUCTION 5 2. NEW FUNCTIONALITY 6 2.1 MPI Settlements Portal 6 2.2 Theoretical Sent Out Capability 6 2.3 NTDL Validations 7 3. RESOLVED ISSUES 8 ABBREVIATIONS 9 Abbreviations 9 AEMO 4

1. INTRODUCTION These are the release notes for Wholesale Electricity Market (WEMS) 3.24 (Build 3.24-1356) and WEMS: RCM 1.5 (Build 1.5-2570). This WEMS release includes changes to the Settlements Portal component of the Market Participant Interface (MPI) which modify the search criteria for Participant Information Reports (PIR) and Statements. It also introduces new functionality to the Facility Registration component of the MPI, which displays Theoretical Sent Out Capability information for Scheduled Generators and Non-Scheduled Generators. The WEMS: RCM release includes changes to the validation performed for Non-Temperature Dependent Load (NTDL) assessment applications in situations where the ownership of a NMI changes. In addition, this release resolves several issues which are described in sections below. WEMS and RCM Version Summary The table below summarises the changes in the version after this release has been deployed. Application Current Version New Version WEMS 3.23 (Build 1336-2) 3.24 (Build 1356) WEMS: RCM 1.4 (Build 2366-6) 1.5 (Build 2570) To view the current version of both applications, please navigate to Help > About in the MPI. AEMO 5

2. NEW FUNCTIONALITY This section details the new functionality which will be delivered in this WEMS Release. 2.1 MPI Settlements Portal The functionality used to filter Statements and PIRs via the MPI Settlement Portal has been modified. Previously a Market Participant could filter these based on their creation date. This has been changed so that Market Participants can now filter them based on their published date instead. This change has been introduced to make it easier for Market Participants to locate PIRs and Statements. With the recent introduction of RCM, it is now possible for these to be created and published on different dates. Market Participants will be aware of the date that a document is published, but will not always know the date that the document was physically created. 2.2 Theoretical Sent Out Capability New functionality has been added to the WEMS MPI which allows Market Participants to view the Theoretical Sent Out Capability for Scheduled and Non-Scheduled Generators. Note that this is read only access. These values can only be entered or changed by AEMO personnel. The Theoretical Sent Out Capability information can be viewed by navigating to the Facility Reserve Capacity tab in MPI. This information comprises the effective date, the quantity in MW, and a link to the supporting evidence document. If Theoretical Sent Out Capability information has not been entered for a Scheduled Generator or Non- Scheduled Generator, the following message will be displayed instead. A new Change Request Type (Facility Capability Value) has been added which can be used to view historical information in the usual way. AEMO 6

The details of the historical change can be viewed by selecting the Change Request from the list. 2.3 NTDL Validations A validation has been added to ensure that only the Market Customer who is the nominated responsible party for a meter within the NTDL month being assessed can make a NTDL application for that meter. If a meter churns from one Market Customer to another Market Customer part way through a month, then both Market Customers are considered to be responsible parties within that month for the above validation. Either Market Customer may submit a NTDL application, however only one Market Customer will be able to see the NTDL result when AEMO makes its determination. The Market Customer who did not make the application or did not receive the result may request it from the Market Operations team via email (wa.operations@aemo.com.au). If a Market Customer has applied for NTDL assessment for a meter and that meter is assessed as Step 4 (failed) then that Market Customer may not re-apply for NTDL assessment until the next Capacity Year commences. In the event that the meter churns to a new Market Customer during the Capacity Year, a validation has been added to allow the new Market Customer to apply for NTDL assessment. AEMO 7

3. RESOLVED ISSUES Reference Summary Resolution WEMS-6691 The Energy Market Dispatch Report for Ex-Post Outages was unnecessarily restricting the information returned (from the web service) based on the Market Participant identified by the authentication certificate. See section 5.1 of the following document for the interface specification. http://wa.aemo.com.au/- /media/files/electricity/wem/participant_information/guides- and-useful-information/aemo---wems-report- Specification.pdf A change was made to the web service so that information for ALL Market Participants is now returned, rather than limiting it to information that is associated with the Market Participant identified by the authentication certificate. There are no changes required to the documented interface. WEMS-6643 The internal authentication mechanism used by the RCM has been improved to be consistent with the authentication mechanism used by the MPI. AS-5204 The format of the created timestamp in the settlements report web service interface was inconsistent with the format found in the header information of the associated PIR and IRCR_LOG files. The internal authentication mechanism used by the RCM has been improved to be consistent with the authentication mechanism used by the MPI. The web service has been modified to return the same creation time as that specified in the header of the file. AS-5203 The Trade Month specified in the header for IRCR_LOG settlement files was not in specified format. The header in the IRCR_LOG settlement files was using the start of the Capacity Year (October) as the first month in the year, rather than using January. This has been changed so that the October is now reported as month number 10 and January is reported as month number 1. Status Internal changes Minimal or no impact to Market Participants Needs Market Participants attention. Potentially requires system or operational procedure changes AEMO 8

ABBREVIATIONS Abbreviations Abbreviation Expanded name AEMO Australian Energy Market Operator IRCR Individual Reserve Capacity Requirement MPI Market Participant Interface MW Megawatt NTDL Non-Temperature Dependent Load NMI National Meter Identifier PIR Participant Information Report RCM Reserve Capacity Mechanism WEMS Release WEMS 3.24 (Build 1356) and RCM 1.5 (Build 2570) WEMS Wholesale Electricity Market System AEMO 9