Generator Interconnection Process. Wholesale Transmission Overview

Similar documents
Interconnection Re-MAT September 11, 2013

Agreements and Queue Management

ATTACHMENT I: Generator Interconnection Procedures (GIP)

Interconnection and Transmission

Agreements and Queue Management

Agreements & Queue Management

Stakeholder Comments Template

Grid Interconnection of Renewable Generation

Business Practice Manual For. Generator Interconnection and Deliverability Allocation Procedures (GIDAP) BPM)

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Generation Interconnection Process. NEMSTF Education Session 1 January 19, 2012

July 26, Dear Mr. Millar:

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

2018 Interconnection Process Enhancements (IPE) Webconference November 12, 2018, :00 p.m. 4:00 p.m. (Pacific Time)

Colstrip Transmission System. Transmission Service and Interconnection Processes and Procedures

Specific topics covered in this brief include:

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Generation, Transmission, and End User Facilities

APPENDIX 4 to LGIP INTERCONNECTION FACILITIES STUDY AGREEMENT

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

The NYISO shall assign a Queue Position based upon the date and time of receipt of the

Appendix 1 Interconnection Request INTERCONNECTION REQUEST

Small Hydro Regulatory and Permitting Requirements California

Table of Contents. Purpose. Certification of Metering Facilities. Procedure No Version No. 1.4 Effective Date 2/14/2018. Operating Procedure

Table of Contents. Purpose. Meter Data Acquisition and Processing Procedure. Procedure No Version No. 1.3 Effective Date 2/14/2018

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

Feasibility Study on Load Flow and Short Circuit Project

132 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

Large Generator Interconnection Generator, Transmission, & Distribution Asset Responsibilities

CAISO RIG Acceptance Test Procedure

WELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

1. Responsibilities. Settlement Quality Meter Data (SQMD) Plan Submission & Approval Process (External) Operating Procedure

Go SOLAR Online Permitting System A Guide for Applicants November 2012

From: Laura Manz, Vice President of Market & Infrastructure Development

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document

Solar*Rewards Community MN Application Manual

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process

Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements

Supervisory Control and Data Acquisition (SCADA) Performance Criteria Transmission Maintenance Procedure No. 6

Appendix I: LOAD OPERATING AGREEMENT

Minnesota DER Interconnection Process Kristi Robinson, P.E.

Interconnection Standards for Delmarva Power & Light Company s Delaware Operating Territory

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

Description of the Application Process for Small Embedded Generators

RFP Attachment 13. January 2010

Memorandum. This memorandum requires Committee action.

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document

Facilities Study for the Mora Line Transmission Project. Non-Tariff Facilities Study

BPM Change Management Meeting

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

Superseding REVISED SHEET NO. 34D-8 REVISED SHEET NO. 34D-8 Effective May 27, 2010 Effective December 3, 2011

Clean Power Call BC Transmission Corporation & BC Hydro Joint Information Session July 8, 2008

National Grid draft document

Certification Program

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

LORAIN-MEDINA RURAL ELECTRIC COOPERATIVE, INC. NORTH CENTRAL ELECTRIC COOPERATIVE, INC.

2018 Request for Offers for Renewable and Storage Resources

Service Description: Advanced Services Fixed Price Cisco WebEx Advise and Implement Service (0-5,000 Users) (ASF- WBXS-UC-PDIBSE)

Checklist for Submission to Utility

Project Physical Security Directives Mapping Document

PG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug.

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DEPARTMENT OF PROCUREMENT

State of Minnesota Interconnection Process for Distributed Generation Systems

Security Annex for Firewalls Additional Terms for Firewall Service

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION NOTICE INVITING POST-TECHNICAL CONFERENCE COMMENTS. (June 3, 2016)

State of Minnesota Interconnection Process for Distributed Generation Systems

Southwest Power Pool BUSINESS PRACTICES WORKING GROUP Conference Call/Web Cast February 7, 2012

Standards Authorization Request Form

WN U-60 Original Sheet No. 152

Competitive Solicitation Process Enhancements. Status Update / Issue Paper

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Open Access Transmission Tariff of Southern Companies

SERVICE LEVEL AGREEMENTS CALNET 3, Category 7 Network Based Managed Security

Services Summary. Deliverables. Location of Services. Services Assumptions & Exclusions. General Project Management

First Federal Savings Bank of Mascoutah, IL Agreement and Disclosures

NETWORK INTEGRATION TRANSMISSION SERVICE. Preamble

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010

NESCOE Request For Information Supplemental Information Form Due: Close of business on Friday February 25, 2011

September 2010 Version 0.9

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Arizona Public Service ) Docket No. ER Company )

Q44 Generation Interconnection

Service Description: Advanced Services- Fixed Price: Cisco UCCE Branch Advise and Implement Services (ASF-CX-G-REBPB-CE)

PacifiCorp Transmission Technical Workshop

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Oracle Managed Cloud Services for Software as a Service - Service Descriptions. February 2018

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Cyber Security Supply Chain Risk Management

Transcription:

1 Generator Interconnection Process Wholesale Transmission Overview

2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent System Operator (CAISO) Tariff dated January 11, 2012. Information in subsequent versions of Appendix Y may supersede the information herein, so you should check the CAISO website (http://caiso.com/rules/pages/regulatory/tariffarchive/defa ult.aspx) for updates. The presentation does not replace the tariff. PG&E advises customers to become familiar with the tariff and use this presentation only as a supplement to it. Generation Interconnection Services Updated: September 18, 2012

Wholesale Transmission Generation Interconnection Process Overview 3 Application Processing Scoping Meeting Technical Studies Interconnection Agreement Project Implementation PG&E s transmission voltage level: 60 kv and higher Governed by CAISO Tariff All applications must be submitted to CAISO This presentation supplements CAISO Tariff Appendix Y

Application Source of Presentation Processing Timeline 4 (Independent Study Process and Fast Track Process) Application Processing Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Process Milestone Duration Responsible Party Submit application Clock start Customer Deem application complete or provide notice of outstanding items Provide outstanding items Notify customer of whether application is complete Notify customer whether ISP criteria are satisfied Deem application complete 10 BD CAISO 10 BD from deemed incomplete notification 5 BD after additional information is provided 15 BD from receiving interconnection request Customer CAISO CAISO CAISO BD Business Day CD Calendar Day

Application Processing Timeline (Cluster Study Process) 5 Application Processing Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Process Milestone Duration Responsible Party Submit application Clock start Customer Deem application complete or provide notice of outstanding items Provide outstanding items Notify customer of whether application is complete Deem application complete 10 BD CAISO 10 BD from deemed incomplete notification or 20 BD from close of application window 5 BD after additional information is provided BD Business Day Customer CAISO CAISO

Transmission Interconnection Application 6 Application Processing Scoping Meeting Technical Studies Interconnection Agreement Project Implementation The Transmission Interconnection Request form is located under Study Process on the CAISO website listed below: http://caiso.com/docs/2002/06/11/2002061110300427214.html

Complete Transmission Interconnection Application 7 Application Processing Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Complete Transmission Interconnections Applications Completed application Site plan diagram Single-Line Diagram Application fee Site control or in-lieu financial security

Scoping Meeting Purpose 8 Application Processing Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Scoping meeting: Ensures common understanding of project Ensures customer understanding of generator interconnection process Secures agreement on point of interconnection and generator size Advises which process (Independent, Fast Track or Cluster study) customer qualifies for and studies to be conducted Determines next steps Three business days after scoping meeting, customer must confirm point of interconnection and generator size to CAISO

Scope of Studies 9 Application Processing Scoping Meeting Technical Studies Interconnection Agreement (IA) Project Implementation Technical studies: Show impact of generation on CAISO-controlled electric grid Show capital improvements required to ensure safety, reliability and integrity of the CAISO-controlled grid: Generator-specific facilities required for interconnection Distribution upgrades to be triggered by generator Network upgrades to CAISO-controlled grid to be triggered by generator Provide schedule and cost estimate for scope of capital improvements

Interconnection Study Processes 10 Initial and Supplemental Review Fast Track 2 MW on 12kV, 3 MW on 21 kv and 5 MW on higher voltages Screens to analyze capacity limits System Impact and Facilities Study Independent Study Process Electrical independence screens CAISO commercial operation date screen No MW limit Financial security requirements Phase I and II Studies Cluster Study Process No MW limit One cluster study per interconnection Financial security requirements Customers requesting an Independent Study Process or a Cluster Study Process may apply for Full-Capacity Delivery. (Full-Capacity Delivery is the generating facility's ability to deliver its full output to the grid.)

Interconnection Study Results 11 + Technical Studies Contract Project Implementation Cost Estimate Accuracy Initial Review Supplemental Review System Impact Study Facilities Study Phase II Study Construction Project In service - Determines acceptance of Fast Track Process Phase I Study Provides the customer unit cost / good faith estimates Provides rough scope of work Provides the customer higher cost accuracy / billable estimates Provides scope of work Designs and gets detailed estimates for the job Provides detailed scope of work

Fast Track Process 12 Tariff Section 5 Applicability Must pass screens MW Limit 5 MW Application Fee $500 Study Timing* Fee* Initial review 15 BD $1,000 Supplemental review 10 BD $1,500 deposit *Determined by CAISO BD Business Day

Independent Study Process 13 Tariff Section 4 Applicability MW limit Application fee Commercial Operation Date Test No limit $50K plus $1K/MW (max $250K) Study Timing* Fee* System Impact Study Facilities Study 90 BD Included in app fee 90 BD Included in app fee *Determined by CAISO BD Business Day

Cluster Study Process 14 Tariff Section 6 & 7 Cluster application window Application fee See http://caiso.com/docs/2002/0 6/11/2002061110300427214. html $50K plus $1K/MW (max $250K) Study Timing* Fee Phase I 134 CD Included in app fee Phase II 196 CD Included in app fee *Determined by CAISO CD Calendar Day

Financial Security Postings 15 Posting Number Posting Type Posting Amount Timing ISP/CSP Phase Initial Interconnection facilities 20% of interconnection facilities cost 30 CD/90 CD After System Impact Study (ISP) Second Network upgrades Interconnection facilities and distribution upgrades Lesser of 15% or $20K/MW or $7.5M (>20 MW only), but in no event less than $50K (<20 MW) or less than $500K (>20 MW) 30 CD/90 CD After Phase I (CSP) 30% 90 CD/180 CD After Facilities Study (ISP) Third Network upgrades Interconnection facilities and distribution upgrades Network upgrades 100% Lesser of 30% or $1M (<20 MW) or $15M (>20 MW), but in no event less than $100K (<20 MW) or $500K (>20 MW) 120 CD/180 CD 100% On or before start of construction After Phase II (CSP) After Interconnection Agreement (acquisition of permits) CD Calendar Day

Financial Security Posting Instructions 16 Below is the link on the CAISO website, Participating transmission owner financial security instruments/pg&e to the PG&E Letter of Credit documents and the PG&E Surety Bond: http://caiso.com/docs/2002/06/11/2002061110300427214.html

Interconnection Agreement 17 Application Processing Scoping Meeting Technical Studies Interconnection Agreement (IA) Project Implementation Small Generator Interconnection Agreement (SGIA) 20 MW or less Large Generator Interconnection Agreement (LGIA) greater than 20 MW CAISO GIA is a three-party Agreement between CAISO, PG&E and interconnection customer Process Milestone Duration Responsible Party Provide final study results Clock start CAISO Tender IA 30 CD/15 BD (Fast Track) CAISO Respond to draft 30 CD All parties IA negotiated and agreed on 90 CD from clock start All parties Issue executable IA 15 BD CAISO All parties execute IA ASAP All parties Post final posting (except Fast Track) On or before start of construction Customer BD Business Day CD Calendar Day

Project Implementation 18 Application Processing Scoping Meeting Technical Studies Interconnection Agreement Project Implementation Post-Interconnection Agreement, PG&E and customer engineer, design, procure and construct (EPC) electrical interconnection PG&E engineers capital improvements per Interconnection Agreement Customer engineers electrical system on customer side of meter and any upgrades to be customer-built and deeded Post-EPC, PG&E, CAISO and customer coordinate a preparallel inspection and commissioning to achieve commercial operation

Transmission Deliverability Assessment 19 Customers who apply for interconnection under the Independent Study Process or Cluster Study Process can request a Deliverability Assessment To do this, select Full Capacity on the Interconnection Request form you submit to CAISO All Fast Track or other Energy-Only customers may apply for Full Capacity using the Additional Deliverability Assessment options under the CAISO s Generator Interconnection Procedures

Interconnection Resources 20 CAISO small and large generator interconnection procedures http://caiso.com/275e/275ed48c685e0.html CAISO Generation Interconnection Queue http://caiso.com/2826/2826b8435fe20.pdf Questions? Contact wholesalegen@pge.com

Appendix: Transmission Schedule Source of Presentation Summary Fast Track Process These diagrams are for estimating purposes only and assume immediate response from customer. 21 Independent Study Process Cluster Study Process

22 Thank You For more information please contact Generation Interconnection Services at wholesalegen@pge.com