JUMPSTART GUIDE. Trimble AutoBid SheetMetal Software

Similar documents
JumpStart Guide. Trimble QuickPen AutoBid Mechanical Software

PROJECT DATA. Trimble. AutoBid SheetMetal Software

AutoBid Mechanical INSTALLATION GUIDE SOFTWARE. Revision A September 2017 TRANSFORMING THE WAY THE WORLD WORKS

TRIMBLE AUTOBID SHEETMETAL 2018V1

TRIMBLE AUTOBID SHEETMETAL 2017V1

TRIMBLE AUTOBID MECHANICAL 2017V1

INSTALLATION GUIDE. Trimble PipeDesigner 3D Software

AutoBid SheetMetal 2018v2

Release Notes, 2012 v Trimble Navigation Limited. All rights reserved.

AutoBid Mechanical CONVERTING DATA FROM THE AUTOBID MECHANICAL 2014V3 FORMAT

AutoBid Mechanical 2018v1 SOFTWARE

DuctDesigner 3D SOFTWARE. Introduction. What you receive with release 2019 v1. Upgrade procedure. Introduction

Getting Started Guide. Trimble Accubid Classic Software

Trimble Accubid Classic 15

2017 v1 RELEASE NOTES

2016 v1 RELEASE NOTES

Trimble FabShop RELEASE NOTES

Trimble FabShop RELEASE NOTES

TRIMBLE ACCUBID CLASSIC 14

INSTALLATION GUIDE. Trimble AllTrak Software

INSTALLATION INSTRUCTIONS

MICROSOFT OFFICE. Courseware: Exam: Sample Only EXCEL 2016 CORE. Certification Guide

6.8 RELEASE NOTES. Trimble Accubid Enterprise Software. Introduction. New Features/Modifications. Update Installation Instructions. Product Assistance

TRIMBLE ACCUBID CLASSIC 14.1

Tr im ble QuickPen PipeDesigner 3D Soft w ar e

6.3 RELEASE NOTES. Trimble Accubid Enterprise Software. Introduction. New Features/Enhancements. Version 6.3 Revision A_ENG

Basic Software Maintenance. Ham Station Ultra Software Package

13.3 RELEASE NOTES. Trimble Accubid Classic Software. Introduction. New Features/Modifications. Update Installation Instructions. Product Assistance

Getting Started With Estimating Extended

Sage Estimating (SQL) v17.13

SARS ANYWHERE ADMINISTRATION MANUAL APPENDICES

RELEASE NOTES. Trimble Accubid Classic Software. Introduction. New Features/Modifications. Update Installation Instructions. Product Assistance

Sage Estimating (SQL) v18.11

CHAPTER 1 COPYRIGHTED MATERIAL. Finding Your Way in the Inventor Interface

2015 v2 RELEASE NOTES

Sage 50 Accounting. Premium 2015 Level 1. Courseware For Evaluation Only. MasterTrak Accounting Series

Accubid LiveCount and LiveCount Pro

Trimble Navigation Limited. All rights reserved.

CITO2 Installation & User Instructions

Windows 10: Part 2. Updated: May 2018 Price: $1.80

FaxFinder Fax Servers

IP4 - Running reports

WINDOWS NT BASICS

Funasset Limited Foundry House Foundry Road Taunton Somerset TA1 1JJ. Tel: +44 (0) Fax: +44 (0) mailmarkup.com funasset.

What s New in BUILD2WIN Version 3.2

Access Gateway Client User's Guide

ATX Document Manager. User Guide

Trimble PipeDesigner 3D Software

EXCEL BASICS: MICROSOFT OFFICE 2010

Unit III: Working with Windows and Applications. Chapters 5, 7, & 8

Top Producer 7i Tips & Tricks Volume 1

Introduction to Microsoft Excel 2010

2 Frequently Asked... Questions. 4 How Do I... 1 Working within... Entries

Policy Commander Console Guide - Published February, 2012

CRITERION Vantage 3 Admin Training Manual Contents Introduction 5

EXCEL BASICS: MICROSOFT OFFICE 2007

Software Conversion Guide

Technical Users Guide for the Performance Measurement Accountability System. National Information Center For State and Private Forestry.

USER GUIDE Time and Attendance User Administration Human Capital Management Suite

NAMI Affiliate Profile Center Contact Manual

Get Started. Estimating Explorer

Discovering Computers & Microsoft Office Office 2010 and Windows 7: Essential Concepts and Skills

Lesson 9 Reports in QuickBooks

Bucknell University Digital Collections. LUNA Insight User Guide February 2006

GUARD1 PLUS Documentation. Version TimeKeeping Systems, Inc. GUARD1 PLUS and THE PIPE are registered trademarks

Introduction to Microsoft Word 2010

Introduction In this document, users will Llearn how to utilize SysQue Systems Pipe, and how to draw Pipe into their projects.

Dostek 440A BTR. Software Guide

QuickStart Training Guide: The Accounting Review Role

Storing Your Exercise Files

Investigator Site OC RDC PDF User Guide

Top Producer for Palm Handhelds

Getting Help in Microsoft Office

Release Notes. Sage Master Builder CD

Getting Started (1.8.7) 9/2/2009

Lehigh University Library & Technology Services

Table of Contents Lesson 1: Introduction to the New Interface... 2 Lesson 2: Prepare to Work with Office

MultiSite Suite: General Ledger

Process Eye Professional. Recall

Getting Started with Windows XP

GUARD1 PLUS Manual Version 2.8

Xton Access Manager GETTING STARTED GUIDE

How to create a prototype

2 Getting Started. Getting Started (v1.8.6) 3/5/2007

Illustrated Roadmap. for Windows

TestAnyTime User Manual (Imaging) English Version

2.0 RELEASE NOTES. Trimble Field Points Software. Introduction. Compatibility. New Features/Enhancements. Version 2.

[ Getting Started with Analyzer, Interactive Reports, and Dashboards ] ]

Table of Contents MICROSOFT WORD. What is MSWord? Features LINC ONE

Administrator s Guide

Switched-On Schoolhouse 2014 User Guide Reports & Application Functions

Getting started with your

Sage Estimating (SQL) v17.12

2016 Autosoft, Inc. All rights reserved.

Expense Management Asset Management

CCH INCORPORATED 05/03

Access Review. 4. Save the table by clicking the Save icon in the Quick Access Toolbar or by pulling

1. ECI Hosted Clients Installing Release 6.3 for the First Time (ECI Hosted) Upgrading to Release 6.3SP2 (ECI Hosted)

Version Operator Orientation. TIMMS Client. A guide to using the TIMMS System. Training & Navigation Notes

Software User s Manual

Transcription:

JUMPSTART GUIDE Trimble AutoBid SheetMetal Software Revision A August 2013 F

Englewood Office Trimble Navigation Limited 116 Inverness Drive East, Suite 210 Englewood, Colorado 80112 (800) 234-3758 Copyright and Trademarks 2005-2013 Trimble Navigation Limited. All rights reserved. Trimble and the Globe & Triangle logo are trademarks of Trimble Navigation Limited, registered in the United States and in other countries. Trimble AutoBid SheetMetal and Trimble Quick Link are trademarks of Trimble Navigation Limited. Other brand and product names are trademarks or registered trademarks of their respective holders. Release Notice This is the Trimble AutoBid SheetMetal software JUMPSTART GUIDE. (Revision A). The topics within this manual are subject to change without written notice. Companies, names, and data used in any examples are fictitious. Screenshots included in the help topics may not be exactly as in the software application.. Part Number ABSM8060.02.0813_JumpStart Tuesday, August 27, 2013 2:43 pm IV JUMPSTART GUIDE

Contents 1 Overview.................................. 9 General Information............................. 10 Application Modules......................... 10 Help Systems................................. 11 Software Introduction............................ 11 Get Started!.................................. 12 Install Trimble Quick Link...................... 12 Install AutoBid SheetMetal..................... 12 Configuration........................... 12 Open the AutoBid SheetMetal software.................. 12 Workstation/Network Computer................ 13 Stand-Alone Computer...................... 14 Login and Password........................ 15 Open Workstation/Stand-Alone Modules............ 16 Basic Navigation............................... 16 Global Data Administrator...................... 16 Online Help............................ 19 Bid Administrator........................... 20 Tabs/Buttons........................... 22 Online Help............................ 23 Conclusion............................... 23 2 Projects.................................. 25 Create Project................................. 26 New Project Setup.......................... 26 Add Drawing................................. 32 JUMPSTART GUIDE v

Conclusion............................... 33 3 TakeOff Overview............................ 35 Graphical View TakeOff........................... 36 On-Screen View TakeOff........................... 36 Audit Trail View TakeOff........................... 36 Additional Information........................ 37 4 Graphical View TakeOff......................... 39 Practice Drawing............................... 40 Open TakeOff................................. 41 Initial Procedures............................... 41 Orient TouchMenu........................ 41 TakeOff Window......................... 41 Align Drawing........................... 42 Verification............................. 43 Take Off Drawing............................... 44 HotSpots, WarmSpots, and CoolSpots.............. 48 5 Audit Trail................................ 49 Review..................................... 50 Print the Audit Trail........................ 50 Conclusion............................... 51 6 Reports.................................. 53 Calculations.................................. 54 Calculate Project......................... 54 Calculation Tabs.......................... 55 Calculation Messages....................... 56 Completion/General Information................ 57 Generate/Print Reports........................... 57 Recap Report............................. 57 Print Recaps Report........................ 59 Conclusion............................... 59 vi JUMPSTART GUIDE

Appendix A B C D Evaluation................................xciii Review (Multiple Choice)......................... xciv Terminology...............................xcix Windows Terminology.............................c AutoBid SheetMetal Terminology...................... cii Default Login............................... ciii Login Information..............................civ Practice Drawing..............................cv Graphical TakeOff Drawing.........................cvi JUMPSTART GUIDE vii

viii JUMPSTART GUIDE

CHAPTER 1 Overview 1 In this chapter: General Information Help Systems Software Introduction Get Started! Open the AutoBid SheetMetal software Basic Navigation Completing the procedures in this guide will enable you to start using the AutoBid SheetMetal software in the shortest time possible. The exercises are designed to give you confidence in using application. In addition to reviewing basic Windows skills, you will learn how to do the following procedures. Navigate the AutoBid SheetMetal software Create a new bid Take off duct using AutoBid SheetMetal Graphical View TakeOff Generate a Recap report Many of the Windows concepts and terms learned here apply to other Windows based software. JUMPSTART GUIDE 9

1 Overview B Tip Trimble strongly recommends that you attend the self-paced online training classes as soon as possible. Trimble also offers classes in our Colorado training center. These classes will help you successfully implement the AutoBid SheetMetal software. Contact Trimble at (800)234-3758 for more information. Trimble suggests that you read and perform the exercises in each chapter of this Guide until you are comfortable with the content and can complete the exercises easily. It is recommended that you review this Guide and go through our self-paced online training prior to attending the resident training class. General Information A high level description of the AutoBid SheetMetal software and online help are detailed in the following topics. Application Modules AutoBid SheetMetal includes a DataServer program and two interface applications, the AutoBid SheetMetal Global Data Administrator and the AutoBid SheetMetal Bid Administrator. DataServer The database is stored. Backup and restore procedures are also included in the DataServer module. Global Data Administrator This module contains all master information such as construction standards, labor and wage tables, and pricing. Bid Administrator Bid-specific information is retained in this module. This includes project information, specification schedules, drawings, takeoff, and reports. 10 JUMPSTART GUIDE

Overview 1 Help Systems The AutoBid SheetMetal software contains an extensive online help system that will answer most of your questions while working in the application. The Global Data Administrator module includes an online help system (help and manual) that help you during the implementation process. The Bid Administrator module includes both online manuals and an online help system. B Tip Online manuals require Adobe Reader. This software is a free download from www.adobe.com. All online manuals can be printed if desired. See the Permission to Print topic in the online help system for more information. The What s New? videos and the Video Library (found on the Help menu) provide modular demonstrations of the various tasks in the AutoBid SheetMetal software. The online help system is easy to navigate and you will find that it answers many of the questions you might have when working in the database. Trimble encourages you to use it as much as possible. See page 11 for more detailed information. Software Introduction Using the information in this chapter, you will be able to navigate through the AutoBid SheetMetal software and other basic Windows programs; however, if you are not familiar with Microsoft Windows operating systems, Trimble recommends that you take an introductory Windows course. This section covers the following topics. Installation Required communication program Opening the AutoBid SheetMetal software Navigating and working in the Global Data Administrator and Bid Administrator modules Using online help and manuals JUMPSTART GUIDE 11

1 Overview Get Started! Install Trimble Quick Link Quick Link, a licensing and communication software application. Installation of Trimble Quick Link is required to provide continued licensing of the AutoBid SheetMetal software. Install AutoBid SheetMetal The next step is to install the software the AutoBid SheetMetal software application. Tip Trimble provides a comprehensive Installation manual that steps you B through the entire process. We recommend that you review and follow the instructions to ensure proper operation of your system. The Installation manual also includes instructions for attaching additional hardware to your computer (for example, a digitizer or a Smart Menu ). Configuration You must configure the AutoBid SheetMetal software to communicate with the Trimble Quick Link Hub. This provides access to licensing and other features available in the AutoBid SheetMetal software. Complete instructions are included in the Getting Started section of the AutoBid SheetMetal Installation manual. C CAUTION You will be unable to use the AutoBid SheetMetal software until the Trimble Quick Link application is installed and configured properly. Open the AutoBid SheetMetal software You can use any of the three following methods to open the application. Double-click the icon on the desktop. 12 JUMPSTART GUIDE

Overview 1 Right-click the icon on the desktop. From the menu, choose Open. Click the Windows Start menu and navigate to AutoBid SheetMetal. You will be working in either the Global Data Administrator or the Bid Administrator. The method you use to open these modules depends on whether you are using the application on a stand-alone computer or on a network server with workstation computers. Workstation/Network Computer When the AutoBid SheetMetal software is being used on a network (with workstations), the network server must be running and the DataServer open in order to attach to the database. Provided the DataServer is open, you can start the AutoBid SheetMetal software using any of the methods below. On the Windows Desktop, double-click on the icon for the module you wish to open, either Bid Administrator or Global Data Administrator. JUMPSTART GUIDE 13

1 Overview Right-click the icon and select Open from the menu. From the Windows Start menu, navigate to AutoBid SheetMetal and then click on the module you want to open from the sub-menu. If you have installed the AutoBid SheetMetal software as a workstation (network) and the DataServer is not open on the network computer, you will receive a message. Open the DataServer on the network server and try to open the AutoBid SheetMetal software again. Stand-Alone Computer In a stand-alone application, the DataServer automatically starts when you open the Global Data Administrator or the Bid Administrator. Depending on your computer settings, starting the DataServer manually may be required. To open the DataServer manually, proceed as follows: Click on the desktop icon or by going to the Start menu and navigate to AutoBid SheetMetal and click AutoBid SheetMetal DataServer. 14 JUMPSTART GUIDE

Overview 1 When you have completed the procedures in this manual, Trimble has included various online manuals, as well as an extensive online help system to guide you through working in the software. These are available within the program and on the installation media. Login and Password The AutoBid SheetMetal software contains security that requires a login name and password. When you first open the application, the Login window displays. The version and copyright date will change from release-torelease. 1. Complete the following fields. B Login name Enter your information in the Login name field. The graphic above displays the default Login name. Password Enter your Password to access the AutoBid SheetMetal. Tip our System Administrator may have changed the default login name and password after the installation is complete. This information should have been supplied to you. Contact your IT professional if you do not have this information. JUMPSTART GUIDE 15

1 Overview If you want to save the password for future sessions, choose the Save Password checkbox. This saves the password in the field so you do not have to re-enter. 2. Choose OK. Open Workstation/Stand-Alone Modules Once you have opened the Global Data Administrator or the Bid Administrator, you can easily open the other module from within the application. Global Data Administrator Go to File / Bid Administrator. OR Click. Bid Administrator Go to Tools / Global Data. OR Click. Basic Navigation This section provides some basic information relating to navigating the AutoBid SheetMetal system. Global Data Administrator The Global Data Administrator contains master information, which includes data needed for ductwork construction and installation. All data in this module is available to all projects. Some master tables are shared, meaning that this information is used by several other areas of the program. It is important to realize that any changes made to these master tables will affect all the projects using those same tables. 16 JUMPSTART GUIDE

Overview 1 Trimble has pre-loaded a large amount of data in the Global Data Administrator, which will make the implementation process easier. You can simply verify data and make modifications where necessary to comply with your company standards. This process is far easier than entering all data in its entirety; however, if required, tools are included to add new information as well. When you open the Global Data Administrator, the window displays as in the graphic. The commands detailed below provide the same functionality. Menus At the top of the window, the menus provide access to various components of the Global Data Administrator. JUMPSTART GUIDE 17

1 Overview Toolbar Some of these commands available on the menus are also available in the buttons directly below. Additional toolbar button functionality includes the following. When you are in other components of the Global Data Administrator, you can click on the button to return to the main Global Data Administrator window. The button opens the Bid Administrator. (The Global Data Administrator remains open.) Forward and Back arrows allow you to easily move between screens you are working in. Graphical Navigation Option In the area of the window containing graphics, there are commands and picklists that provide access to the components of the Global Data Administrator. Libraries contain predefined individual parts and components that may be used in the Definitions or that can be taken off individually. Definitions are collections of library items. Examples might include duct connectors, duct reinforcement, and hangers. Ductwork contains construction standards that show duct material thickness, connectors, reinforcement, and labor tables. Other information in this section includes material types and pricing. Labor Standards includes labor correction factors, labor books, wage tables, and labor tables for detailing shop drawings and pressure testing. Company Settings includes security settings for the AutoBid SheetMetal software, employees, the Company List which contains information on vendors and subcontractors, and individual preferences selected by the workstation user. 18 JUMPSTART GUIDE

Overview 1 Below each header are lists that provide access to the various components in the Global Data Administrator. Online Help Detailed information about using the AutoBid SheetMetal Global Data Administrator can be found in online help system. Choose Help / applicable command on the menu. OR Press [F1] in any window. OR If available in the window, click the Help button. JUMPSTART GUIDE 19

1 Overview Bid Administrator The Bid Administrator is where you set up projects and take off your drawing. Before you take off the drawing, you must enter project specific information, such as drawing numbers, floors, and zones. Modifying Specification Schedules and Systems to fit the specific project will most likely be required also. Systems contain the default Specification Schedule and Pressure for each individual system. The Specification Schedule determines the appropriate construction standard to use for each combination of duct shape and pressure. The Specification Schedules also determine such items as hangers, flex connectors, and turning vanes. Tip The Specification Schedules are essentially the link between the (master) B Global Data Administrator and the (bid-specific) Bid Administrator. Once TakeOff is complete, you can calculate and generate reports. The Quote Manager and other worksheets are available that provide additional data information that is pulled into the Final Estimate. In the Final Estimate, you can adjust your bid and include such things as taxes, overhead, profit, and performance bond. 20 JUMPSTART GUIDE

Overview 1 When you open the Bid Administrator, the window displays similar to the graphic below. Menus At the top of the window, the menus provide access to various components of the Bid Administrator. Toolbar The toolbar commands provide access to the Project List and Global Data, as well as general maintenance commands. JUMPSTART GUIDE 21

1 Overview Additional button functionality includes the following commands. immediately updates the data displayed on-screen. (Executing this command is sometimes required when several users are working in the AutoBid SheetMetal software.) The button opens the Global Data Administrator. (The Bid Administrator remains open.) allows you to add text notes. Tabs/Buttons The tabs and buttons provide access to the following modules in the Bid Administrator. When you click a button on any tab, the associated module opens. Project Data This module includes setting up your project, Specification Schedules, Systems and Scopes. Much of the information created while in Project Data allows you to filter reports to break the project down by specific identifiers. TakeOff & Reports After you have completed all required data on the Project Data provides access to TakeOff, Calculations, Quote Manager, and Reports. Worksheets & Final Estimate The modules on this tab include worksheets (Subcontractors and G&A) as well as the Final Estimate Summary. If you are using the Vulcan Cutting System, you can also export data from the AutoBid SheetMetal software to this application. This tab also provides the Export Report Data feature. This allows you to export data from your takeoff to a format that can easily be imported into third-party applications, such as Microsoft Project or your accounting software. 22 JUMPSTART GUIDE

Overview 1 Online Help Detailed information about using the AutoBid SheetMetal software can be found in the online help system. The Global Data Administrator and Bid Administrator offer online help: Help System Choose Help / applicable command on the menu. OR Press [F1] in any window. OR If available in the window, click the Help button. Additionally, the Bid Administrator offers online manuals that you can print for reference, or simply view on your computer screen. Online manuals require Adobe Reader. If you do not have this application installed, it is a free download from www.adobe.com or you can install it from the AutoBid SheetMetal Installation disk. There are several methods you can use to open the online manuals. Go to the Help menu and click the manual command. Choose the Start menu and then navigate to AutoBid SheetMetal / Documentation. Click on the manual you want to open. Conclusion Now that you have reviewed the basic structure of the AutoBid SheetMetal software, you are ready to create a project and generate reports. This will introduce you to the procedures that provide easy and fast estimates using the AutoBid SheetMetal software JUMPSTART GUIDE 23

1 Overview 24 JUMPSTART GUIDE

CHAPTER 2 Projects 2 In this chapter: This chapter walks you through creating a new project, which includes copying Specification Schedules, Systems and Symbols. When you create the project, you also specify scopes (for example, drawings and floors). After you have completed creating the project, you will be ready to take off a drawing and then generate reports. All project-specific data is entered in the Bid Administrator. B Tip Instructions in this section assume that you have complied with all instructions included in the Installation manual. JUMPSTART GUIDE 25

2 Projects Create Project Trimble has included a base default job. The information contained in this job can be verified and modified to meet your company s requirements. The Construction Standards included in the default job provide you with a starting point for future jobs. Making modifications to the default job is discussed in more detail in the Projects Data online manual or in the online help system. Note: Creating a default job is covered in detail during the in-house class. When you create a new project, you actually enter information pertaining to the new bid. The easiest method to accomplish this task is by copying specifications and systems from the default job into the new job. You can then modify certain areas to accommodate the new project. New Project Setup These instructions will walk you through creating a new project. Once the project is completely created (including specifications, systems and scopes), you will be ready to take off a drawing and generate reports. In the Bid Administrator window, click on the screen for the New Project Wizard displays. button on the toolbar. The first 26 JUMPSTART GUIDE

Projects 2 Screen One 1. In the Project Name field, enter Graphical Bid. 2. Enter a Bid ID. This is a required field and must also be a unique identifier. For this project, we suggest you enter today's date in the following format: mm-dd followed by the letters GB; for example, November 11 would be entered as follows: 11-11GB. B Tip The Project type, Bid date and Bid time fields are not required. For this bid, we suggest you leave these fields empty. When you are creating a real bid, Trimble suggests you complete as much information as possible to help you better manage your estimates. 3. Click Next. The second New Project Wizard screen displays. Screen Two The second screen in the New Project Wizard allows you to copy Specification Schedules, Systems and Symbols from a similar project. In this exercise, the default job will be used as a starting point for a new project. It is not necessary to make any modifications at this time to this project as this is simply a practice exercise. Note The default job may be named AAA Default Job or another variation. Select the AAA project included with your AutoBid SheetMetal system. JUMPSTART GUIDE 27

2 Projects When you are ready to start using AutoBid SheetMetal for your live estimates, making modifications is suggested; however, you may find that the changes required are minimal. 1. Select the Specs copied from the list. 2. Click and select the default job from the list. 3. Leave Set Copied From project as default when creating new project empty for this exercise. Note Once you have modified or created a default project, this setting will help you when creating new projects. 4. Choose the following checkboxes: also copy Systems also copy Symbols 5. Leave the remaining fields on this screen empty. Click Next. The third New Project Wizard screen displays. 28 JUMPSTART GUIDE

Projects 2 Screen Three 1. In the Default scale for new drawings, leave the default (1/8). 2. In the Closest Drawing Size field, select the size drawing that is the closest size to the drawing that is attached to your digitizer. This field sets the size of the drawing on the digitizer and determines the size displayed on-screen. For this exercise, select 11 x 17 inches from the list. 3. In the Default Structure field, select Bar Joists from the list. The structure type is used to calculate the correct upper hanger attachment. Note This can be changed in TakeOff when needed. 4. In the Default Rack Spacing field, enter 5. 5. In the Audit Trail View TakeOff Method pane, select the Connected option button. 6. In the Adjust duct lengths for fittings in Audit Trail View TakeOff box, choose the For duct taken off using the digitizer checkbox. Note For this exercise, do not select the second checkbox! 7. In the Use Offsets pane, set the vertical changes value to 1. 8. Click Next to go to the fourth and final screen. JUMPSTART GUIDE 29

2 Projects Final Screen B Tip This screen provides a recap of the entries on the previous screens. If you want to make any changes, simply click the Back button, make the changes and then click Next until you get back to the recap screen. 9. Click Finish. A progress indicator displays during the copy process. When completed, you can open the AutoBid SheetMetal Project List window and your project will be listed. The Graphical Bid project is automatically highlighted because it is the active project. 30 JUMPSTART GUIDE

Projects 2 The active project also displays in the Bid Administrator window. JUMPSTART GUIDE 31

2 Projects Add Drawing Generally, several drawings are necessary for your regular projects. However, for this exercise you will add only one drawing. 1. In the main Bid Administrator window, choose the Project Data tab / Drawings. The Drawings window opens. 2. Click on the icon. The New Drawing window opens. 3. Enter M-1 and click Add and then Close. 4. Choose the scale used for the drawing from the Default scale list. For this exercise, select 1/4. 5. Close the Drawings window by clicking on the in the upper corner of the window. 32 JUMPSTART GUIDE

Projects 2 Conclusion The project created in this chapter will be used to create a Graphical TakeOff (in the next chapter). If you wish to find more information on the topics in this chapter, use the Bid Administrator online help system. JUMPSTART GUIDE 33

2 Projects 34 JUMPSTART GUIDE

CHAPTER 3 TakeOff Overview 3 In this chapter: Graphical View TakeOff On-Screen View TakeOff Audit Trail View TakeOff Additional Information There are several methods to take off a job: Graphical View, On-Screen View, or Audit Trail View. The method you use will depend upon circumstances and your preferences. JUMPSTART GUIDE 35

3 TakeOff Overview Graphical View TakeOff Graphical View TakeOff requires the use of a digitizer. AutoBid SheetMetal produces an on-screen image as you take off your drawing. This method also automatically generates fittings. This TakeOff method is much faster than using the Audit Trail View mode. This Guide focuses on using the Graphical View TakeOff method. Other types of TakeOff are covered in our training classes and in the online help and manuals. On-Screen View TakeOff On-Screen View TakeOff allows you to load your drawing directly into AutoBid SheetMetal and then take the drawing off using your mouse. This method also automatically generates fittings. A digitizer is not required to use this method of TakeOff. Audit Trail View TakeOff There are two types of Audit Trail View: Mouse and Digitized. Mouse This allows you to use a personal computer and a mouse to take off drawings and material lists. You select the items to take off from a list or use menu shortcuts. The lengths of duct are entered manually. Digitized This type of TakeOff requires the use of a digitizer. Lengths of duct are automatically calculated using a scaled drawing. You also have access to a TouchMenu on the digitizer to quickly select TakeOff items. 36 JUMPSTART GUIDE

TakeOff Overview 3 Additional Information In TakeOff, when the appropriate System is selected, default Specification Schedules, Insulation, Liner, and so on are also selected. You have the opportunity to change the selected defaults while in TakeOff. Based on the selections made, AutoBid SheetMetal determines the appropriate data to use; for example: hangers, types of flex connectors and turning vanes. The Construction Standards are determined based on the System and pressure class you choose in TakeOff. This removes much of the guesswork to eliminate mistakes during TakeOff. Tip The instructions in this chapter assume that you have already attached B and configured your digitizer. If this is not the case, see the Hardware Setup chapter in the Installation manual. This manual is provided in hard copy and is also available in the online manual. JUMPSTART GUIDE 37

3 TakeOff Overview 38 JUMPSTART GUIDE

CHAPTER 4 Graphical View TakeOff 4 In this chapter: Practice Drawing Open TakeOff Initial Procedures Take Off Drawing Using the project created earlier in this guide, the following procedures walk you through taking off a drawing. These exercises demonstrate the speed, ease and accuracy you can expect from the Graphical View TakeOff method. In this lesson you will take off items from a drawing. In Graphical View TakeOff, AutoBid SheetMetal automatically generates the fittings. This feature will save you a great deal of time in preparing your estimate. JUMPSTART GUIDE 39

4 Graphical View TakeOff Practice Drawing Make a copy of the drawing included in Appendix D (page lxiii) and tape it to the digitizer. You can tape it anywhere inside the scribed corners that indicate the active area of the digitizer. Place your drawing on the digitizer within these marks. 40 JUMPSTART GUIDE

Graphical View TakeOff 4 Open TakeOff 1. In the main Bid Administrator window, select the TakeOff & Reports tab. 2. Click TakeOff. When TakeOff is opening, diagnostic procedures are performed. Note A reminder message may display regarding orienting your TouchMenu. Click OK in the message. When you orient the TrouchMenu, information is passed from the digitizer to AutoBid SheetMetal allowing for proper communication when you are processing a take off. Initial Procedures Before you begin taking off you drawing, you must complete some initial steps to ensure proper communication between the program and the digitizer board. Orient TouchMenu In the TakeOff window, choose Digitizer / Orient TouchMenu. Follow the on-screen instructions to complete the procedure. Once the TouchMenu is oriented, this procedure needs to be repeated only if you change or move the menu. TakeOff Window The AutoBid SheetMetal TakeOff window defaults to the last view, Graphical View TakeOff, On-Screen View, or Audit Trail View TakeOff. If the Audit Trail View TakeOff window opens, click View / Graphical View. A message displays allowing you to align the drawing. If the On-Screen View TakeOff window opens, proceed as follows: Click View / Audit Trail View. When the Audit Trail View window displays, choose View / Graphical View. When the Graphical View TakeOff window was the last viewed, a message displays allowing you to align the drawing. JUMPSTART GUIDE 41

4 Graphical View TakeOff Align Drawing Trimble recommends that you align the drawing when you first open the Graphical View TakeOff window. Tip Aligning the drawing ensures proper communication between the drawing B and AutoBid SheetMetal. When the prompt displays, follow the on-screen instructions to complete drawing alignment. 42 JUMPSTART GUIDE

Graphical View TakeOff 4 Verification Before you begin processing your TakeOff, verify or set the following data. Scale: 1/4 Drawing: M-1 System: Supply Pressure: 2" W.G. Trt In: <None> Trt Out: <None> Rct. Liner: None Insulate: <None> Structure: Bar Joists Hanger: Off JUMPSTART GUIDE 43

4 Graphical View TakeOff Take Off Drawing Once your drawing is properly aligned and the TouchMenu is oriented, you can begin to take off the drawing. In Graphical View mode, duct is taken off from a starting point and then through the run. For example, if you are taking off a run of 36" x 24" duct in the galvanized SMACNA low pressure Specification Schedule, you select the System and AutoBid SheetMetal has all of the information necessary (duct and fittings). You can then proceed through the drawing in a sequential manner: Take off duct, 36"x 24", starting at this point and going to the next point. 1. On the TouchMenu, touch 1 the Duct Rectangular icon. On your screen, a window displays prompting you for the duct dimensions. 2. On the TouchMenu, touch and then. For this exercise, disregard Start with item elevation Your window should display as in the graphic below. 3. On the drawing, touch the points labeled 1, 2, 3, 4, and 5. 1. Touch commands are accomplished by using a TouchPen and touching points on a drawing or plastic menu situated on a digitizer board. 44 JUMPSTART GUIDE

Graphical View TakeOff 4 4. Touch on the TouchMenu. The window below opens. 5. Touch OK. B Tip AutoBid SheetMetal creates an on-screen drawing using the points touched on the drawing. Points in the on-screen drawing may be different colors. For example, the mark at point 2 on the monitor screen represents a WarmSpot; points 3 and 4 are HotSpots; point 5 is a CoolSpot. See page 48 for a detailed explration. 6. On the TouchMenu, touch. A Start From window opens indicating Start From using: 12. 7. Touch again. The Start From window changes to Start From using: 12x12. 8. Touch the branch that starts at point 3 and then touch the hand damper at point 6. 9. Touch Symbols on the TouchMenu. JUMPSTART GUIDE 45

4 Graphical View TakeOff 10. Touch the down arrow on the right side of the TouchMenu until HD1[Rect] is highlighted. On the TouchMenu, touch OK. 11. A Line # window opens showing HD1 [Rect] with 12x12 dimensions. Touch OK. 12. Touch point 7, then touch Enter. 46 JUMPSTART GUIDE

Graphical View TakeOff 4 13. Repeat steps 6 through 12 for the branch from point 4 to point 9. All fittings are generated automatically. There is no need for you to take them off individually. The Hot Spots at points 3 and 4 were also automatically changed to Warm Spots when the increased area taps were generated. JUMPSTART GUIDE 47

4 Graphical View TakeOff HotSpots, WarmSpots, and CoolSpots These spots are used in the Graphical View to indicate an item taken off in the duct run. HotSpot A mark in the duct run that indicates you have touched a place in the run, but did not change direction, elevation, or size. By default, a hotspot is placed at the end of a run in Graphical View takeoff. WarmSpot A fitting generated automatically by the program. CoolSpot Selecting a fitting from a menu changes a HotSpot or WarmSpot to a CoolSpot. 48 JUMPSTART GUIDE

CHAPTER 5 Audit Trail 5 In this chapter: Review Conclusion At this point, you should review the audit trail to verify your takeoff. JUMPSTART GUIDE 49

5 Audit Trail Review To better view the Audit Trail, choose View / Audit Trail View Window. This opens an expanded view of the audit trail in the Audit Trail View view. Your audit trail will look similar to the graphic below, allowing for different digitizer pen touch points: Print the Audit Trail You may want to print the audit trail so that you can more easily verify the results in the reports that you need. 14. Go to File / Print. 15. Verify that All Lines is selected 16. Click Print. You are now ready to generate reports to complete the estimate. Close the TakeOff window by selecting File / Exit or click on the in the upper corner of the window. 50 JUMPSTART GUIDE

Audit Trail 5 B Tip When closing the TakeOff window, you may get a message asking if you want to save or discard changes. For purposes of this exercise, select the option to save your changes. Conclusion You have now learned the basics of the AutoBid SheetMetal estimating system. Setting up projects Taking off duct runs. The next chapter covers creating reports. JUMPSTART GUIDE 51

5 Audit Trail 52 JUMPSTART GUIDE

CHAPTER 6 Reports 6 In this chapter: Calculations Generate/Print Reports In AutoBid SheetMetal, the actual bid is created by generating reports from TakeOff data. This chapter covers the procedures for creating reports based on the Graphical Bid project from the previous chapter. JUMPSTART GUIDE 53

6 Reports Calculations All reports are generated in the Bid Administrator from the TakeOff and Reports tab. When you close TakeOff, you are automatically brought to this tab. If you are not on this tab, click on it. Calculate Project 1. On the TakeOff and Reports tab, click on the Calculations button. 2. Verify that the By Pound (& Piece) Labor Book is selected. 3. Verify that the Wage Table you want to use is selected. 7. Click. 8. Before you close the window, carefully review the data contained on each tab. See Calculations on page 54 for more information. 54 JUMPSTART GUIDE

Reports 6 Calculation Tabs The Notes tab in the Calculations window displays informational messages that explain different aspects of the calculation methods used. Parameters you select in the Calculations window, such as Wage Table and Labor Book display in this window. Other information, such as data entered when you set up the job, as well as factors and information obtained from AutoBid SheetMetal Global Data Administrator are displayed on the Notes tab if they impact calculation methods. Notes are informational and do not require any action. The Errors, Warnings and Hints tab is located in both the Calculations window and the Calculation Log. This tab reports potential problems that impact calculations, such as labor tables that have not been properly completed. Errors, Warnings & Hints tab JUMPSTART GUIDE 55

6 Reports Calculation Messages Hints Hints are informational messages. Although calculations have been performed for an Audit Trail line, the item requires examination. For example, the Calculations program has skipped a HotSpot. A hint is issued advising you to examine the line so you can decide how the Hotspot should be handled. Warnings Warnings detail items for which calculations have been completed; however, the accuracy of the calculation results is in question. Warnings should be examined to determine whether or not action is required. Errors Errors indicate that calculations could not be completed for an item. Errors are usually displayed due to missing information, such as undefined labor. If you receive an error message, you must locate the problem and correct the cause of the problem. Calculations cannot be completed until the error is resolved. Action Required All errors, warnings and hints should be investigated. Errors must be corrected along with warnings or hints that require action. Each warning or error provides details about why the message was generated. Read the message carefully, then go to the TakeOff Audit Trail to locate the specific item detailed in the message. Make the appropriate adjustments in TakeOff, or in AutoBid SheetMetal Global Data Administrator to correct the problem. Once this is done, calculations must be run again. 56 JUMPSTART GUIDE

Reports 6 Completion/General Information You have completed the calculations for the takeoff and are now ready to run reports. AutoBid SheetMetal offers additional features such as the Quote Manager, Subcontractors Worksheet and the G&A Costs Worksheet. For this exercise, these features will not be used. When you attend our training classes, detailed instructions are provided on using these features in conjunction with your bid. Generate/Print Reports AutoBid SheetMetal provides several reports that allow you to analyze the data from TakeOff. For purposes of this exercise, only the Recaps Report will be generated. Recap Report The Recap Report includes all the details of your TakeOff including material and labor cost, weight of duct, quantities of items used and additional information. Because the Recap Report contains detailed information from Graphical View TakeOff, it is a lengthy report. JUMPSTART GUIDE 57

6 Reports 1. On the TakeOff & Reports tab, click Reports. The Report Manager: Graphical Bid window opens. 2. Click Full Recaps. 3. Make sure the Non-metric and Screen options are selected. 4. Choose Run. The Recap Report displays on-screen. 58 JUMPSTART GUIDE

Reports 6 Print Recaps Report You can review the data on-screen and then print the report for further review. 1. Click on the icon. OR Choose File / Print. 1. Close the Report Viewer by clicking on the in the upper right corner of the window. OR Choose File / Exit. Close all the report windows. Additional reports available within the estimating system will be covered in detail during the AutoBid SheetMetal resident class in our training facility. Conclusion You have now learned the basics of the AutoBid SheetMetal estimating system. Project Setup TakeOff Reports If you have not already done so, we recommend that you contact our Training Coordinator at (800)234-3758 to get more information or to register for our AutoBid SheetMetal class offerings. Evaluation The next chapter includes a self-test that you can complete. This section will help you determine how well you understand the basics of AutoBid SheetMetal. Although not required, we strongly suggest that you complete the evaluation. This can be done as many times as you feel necessary until you are comfortable with the system. JUMPSTART GUIDE 59

6 Reports 60 JUMPSTART GUIDE

APPENDIX A Evaluation A In this Appendix: Review (Multiple Choice) Answer Key JUMPSTART GUIDE LXI

A Evaluation Review (Multiple Choice) 1. You can open a Windows-based program using which of the following methods? a. Clicking in the taskbar. b. Clicking the right mouse button on an icon, then selecting Open from the menu. c. Double-clicking an icon. d. Both B and C. 2. The three buttons at the top right corner of a Windows display allow you to: a. Maximize a window. b. Close a program. c. Minimize a window. d. All of the above. 3. AutoBid SheetMetal data is stored in a: a. Workstation b. Client/Stand-Alone c. DataServer 4. The contains master information. a. Global Data Administrator b. DataServer c. Bid Administrator LXII JUMPSTART GUIDE

Evaluation A 5. Selecting the Bid Administrator button while in the Global Data Administrator screen: a. Closes the Global Data Administrator and opens the Bid Administrator. b. Returns the program to the Bid Administrator. c. Opens a list of bids. d. Opens the Bid Administrator and leaves the Global Data Administrator running. 6. Collections of parts and components are located in? a. Libraries b. Definitions c. Ductwork d. Labor Standards e. Company Settings 7. Calculations are located on which tab in the Bid Administrator? a. Project Data b. TakeOff & Reports c. Worksheets d. Final Estimate 8. This field entry is required when setting up a project and it must be unique. a. Bid ID b. Project Name c. Project Type d. All of the above JUMPSTART GUIDE LXIII

A Evaluation 9. Construction Standards are created in the Global Data Administrator. However, in individual projects, they are tied to: a. Systems b. Project Setup c. Ductwork d. Specification Schedule 10. Before you can open the Bid Administrator or Global Data Administrator, the must be running. a. Utilities module b. DataServer 11. When the Graphical TakeOff window opens for the first time in a project, the program prompts you to: a. Orient the TouchMenu. b. Align the drawing. c. Name a drawing. d. Enter a Bid ID. 12. A spot on the screen where you have changed direction is indicated by a: a. HotSpot b. CoolSpot c. WarmSpot d. Letter designation 13. From the Graphical TakeOff window, you can better view the audit trail by selecting: LXIV JUMPSTART GUIDE

Evaluation A a. View / Graphical Window b. View / Non-Graphical Window c. File / Reload Audit Trail d. None of the above. 14. Before printing a report, you must first: a. Run calculations. b. Complete the Quote Manager. c. Set zones to line numbers. d. None of the above. Answer Key The following provides answers to the Evaluation questions. We provide these to give you a quick way to check the accuracy of your answers. If you did not accurately answer the questions pertaining to AutoBid SheetMetal, you might want to go back and review the procedure for additional information. Note: We have included some basic Windows commands that may not be covered in this Guide. 1. D 2. D 3. C (see page 10) 4. A (see page 10) 5. D (see page 16) 6. B (see page 18) 7. B (see page 22) 8. A (see page 91) 9. D (see page 100) 10. B (see page 13) 11. B (see page 104) JUMPSTART GUIDE LXV

A Evaluation 12. C (see page 112) 13. B (see page 113) 14. A (see page 116) LXVI JUMPSTART GUIDE

APPENDIX B Terminology B In this Appendix: Windows Terminology AutoBid SheetMetal Terminology JUMPSTART GUIDE LXVII

B Terminology Windows Terminology Button An area of a display that can be selected by clicking with a mouse. Click Using a Mouse to select an item or button. Desktop The opening display in a graphical software program such as Microsoft Windows. Double-click To make a selection on the display by clicking the left mouse button twice in rapid succession. Drag-and-Drop To move an item to another location by clicking the item and then dragging to another location, such as a different folder. Drill To select a table or display by selecting successive displays, usually by clicking an ellipsis or or plus sign. Ellipsis [button] The button in a software window that, when selected, displays a list of choices that often can be edited. Folder An organizational segment of a computer operating system; folders may contain files or other folders. Highlight To indicate a file, folder, text, or some other displayed item by selecting it (typically) with the left mouse button; when highlighted, the item changes color to contrast with non-highlighted items. LXVIII JUMPSTART GUIDE

Terminology B Icon A symbol on the desktop or in a folder that represents a file or program. List A list of choices in a program; the picklist is typically displayed by clicking a button containing a downward-pointing triangle. Menu A list of commands or software selections. Mouse-click, Click [left-click] To make a selection on the display by clicking the left mouse button one time. Right-click To display a context-sensitive shortcut menu by clicking the right mouse button one time. Scroll bar A vertical or horizontal bar on the left side or along the bottom of a window that contains a scroll box. Clicking then dragging the scroll box or scroll arrow displays other items that were not visible because the information is outside the window. Taskbar The bar, usually along the bottom of the desktop, that shows which programs or files are open and accessible to the user. Toolbar A bar that provides easy mouse access to popular features in the program. Tree A graphical display of folders and files. JUMPSTART GUIDE LXIX

B Terminology AutoBid SheetMetal Terminology Audit Trail The table of items taken off in a bid; the audit trail displays the names of the items, sizes, quantities, and other information. Bid-specific Applying only to a specific job; not available to other jobs. Definition A collection of library items. Examples include duct connectors, duct reinforcement and hangers. Flag A letter or symbol in a line of the audit trail that indicates information about that line. For example, an "H" flag indicates that hangers are turned on for that line of takeoff. Master Applying to all jobs; available to all jobs. LXX JUMPSTART GUIDE

APPENDIX C Default Login C In this appendix: Login Information In order to open AutoBid SheetMetal, a login name and password are required. This chapter provides the default information. Keep in mind that your AutoBid SheetMetal System Administrator may have changed this information after the software installation. JUMPSTART GUIDE LXXI

C Default Login Login Information To open AutoBid SheetMetal the first time, enter the following information in the Login screen. Note Your System Administrator may have changed the default after installation. If you are unable to access AutoBid SheetMetal, contact your IT professional first to determine if this is the case. If you still experience issues, contact Trimble MEP Client Services at (800)234-3758 for assistance. B Login name admin Password admin Tip Your Windows login name may display in the Login name field. With your mouse, highlight the entire field and type in the Login name specified in this step. LXXII JUMPSTART GUIDE

Practice Drawing APPENDIX D D In this appendix: Graphical TakeOff Drawing The drawing used in the instructions beginning on page 40 is included in this Appendix. JUMPSTART GUIDE LXXIII

End Cap 5 Hand Damper 4 8 9 Hand Damper 12" x 12" 36" x 24" 3 6 7 1 2 QuickPen International JP 05/08/02 AutoBid SheetMetal 1/4"=1'