Similar documents
Dell EMC vsan Ready Nodes for VDI

Audience Profile Experienced system administrators and system integrators responsible for implementing desktop solutions

VMware Horizon 7 Administration Training

Dell EMC Ready Architectures for VDI

S6245 IT-as-a-Service With Visually Intensive VDI TONY FOSTER PRINCIPAL TECHNICAL MARKETING ENGINEER

VMware BCDR Accelerator Service

STATEMENT OF WORK. DHS Desktop Virtualization Project

ATTACHMENT A SCOPE OF WORK IMPLEMENTATION SERVICES. Cisco Server and NetApp Storage Implementation

Disclaimer This presentation may contain product features that are currently under development. This overview of new technology represents no commitme

ProfileUnity with FlexApp Technology

Disclaimer This presentation may contain product features that are currently under development. This overview of new technology represents no commitme

Technical Overview. Jack Smith Sr. Solutions Architect

Virtual Desktop VMware View Horizon

VMware vsphere: Install, Configure, Manage (vsphere ICM 6.7)

Aledo ISD VMware View Design Reference Implementation. Sr. Systems Engineer Sigma Solutions

Detail the learning environment, remote access labs and course timings

Availability for the modern datacentre Veeam Availability Suite v9.5

Branch Office Desktop

VMware Horizon View 5.2 Reviewer s Guide REVIEWER S GUIDE

Course 10324A: Implementing and Managing Microsoft Desktop Virtualization

VMware vsphere Customized Corporate Agenda

ProfileUnity with FlexApp Technology

VMware EUC a competitor to Citrix? 2010 VMware Inc. All rights reserved

REVISED 1 AUGUST REVIEWER'S GUIDE FOR VMWARE APP VOLUMES VMware App Volumes and later

REVISED 1 AUGUST QUICK-START TUTORIAL FOR VMWARE APP VOLUMES VMware App Volumes and later

IT User Experience Governance Committee

Exam Questions VCAW510

The 5 Keys to Virtual Backup Excellence

VMware vcloud Air Accelerator Service

Deploying VMware Mirage : Tips and Tricks for Success

Advanced IT Training. Authorized VMware & Fast Lane Virtualization Courses

VMware Horizon View. Read more VMWARE solutions. Contact Us MicroAge.com

DEPLOYING A VMWARE VCLOUD DIRECTOR INFRASTRUCTURE-AS-A-SERVICE (IAAS) SOLUTION WITH VMWARE CLOUD FOUNDATION : ARCHITECTURAL GUIDELINES

Horizon Console Administration. 13 DEC 2018 VMware Horizon 7 7.7

Introducing VMware Validated Design Use Cases. Modified on 21 DEC 2017 VMware Validated Design 4.1

Official Vmware Vsphere 5 Student Manuals

S5005 VIRTUALIZATION AN INTRO TO VIRTUALIZATION. Jeremy Main Senior Solution Architect - GRID

VMWARE HORIZON CLOUD SERVICE HOSTED INFRASTRUCTURE ONBOARDING SERVICE SILVER

Microsoft Virtualizing Enterprise Desktops and Apps

Tenant Onboarding. Tenant Onboarding Overview. Tenant Onboarding with Virtual Data Centers

Course Description. Audience. Prerequisites. At Course Completion

Migration. 22 AUG 2017 VMware Validated Design 4.1 VMware Validated Design for Software-Defined Data Center 4.1

VMware vsphere with ESX 4.1 and vcenter 4.1

Introducing VMware Validated Designs for Software-Defined Data Center

Flex-IO. Upgrade Guide

Introducing VMware Validated Designs for Software-Defined Data Center

VMware - VMware vsphere: Install, Configure, Manage [V6.7]

Lifecycle Manager User's Guide

VMware vsphere with ESX 6 and vcenter 6

Administering VMware vsphere and vcenter 5

Veeam Backup & Replication Version 6.0

What s new. James De Clercq (RealDolmen) Timothy Dewin (Veeam Software)

Virtualization Security & Audit. John Tannahill, CA, CISM, CGEIT, CRISC

VMWARE HORIZON 7. End-User Computing Today. Horizon 7: Delivering Desktops and Applications as a Service

Veeam Backup & Replication for VMware vsphere

Core Solutions of Microsoft Lync Server 2013

Table of Contents HOL SLN

ATA Infotech Ventures Pvt. Ltd.

VMware vsphere: Fast Track [V6.7] (VWVSFT)

VMware vsphere Administration Training. Course Content

TECHNICAL WHITE PAPER AUGUST 2017 REVIEWER S GUIDE FOR VIEW IN VMWARE HORIZON 7: INSTALLATION AND CONFIGURATION. VMware Horizon 7 version 7.

ProfileUnity with FlexApp Technology

Simplify Client Virtualization

VMware vcenter Configuration Manager Administration Guide vcenter Configuration Manager 5.7

By the end of the class, attendees will have learned the skills, and best practices of virtualization. Attendees

Veeam Certified Engineer v9. Textbook

VMware vsphere 6.5/6.0 Ultimate Bootcamp

IT Managed Services. Schedule 1 Specification 11/07/18

Exam Questions VCP510-DT

HPE File Data Migration Service

VDI - WHY BRAZOS COUNTY CHOSE TO WAIT: AN INEXPENSIVE SUCCESS STORY

Enable Modern Work Styles with Microsoft VDI. Jeff Chin Windows Client Solutions Specialist

Cisco UCS Accelerated Accreditation Training

Disclaimer This presentation may contain product features that are currently under development. This overview of new technology represents no commitme

COURSE OUTLINE. COURSE OBJECTIVES After completing this course, students will be able to: 1 - INSTALLING & CONFIGURING DCS

"Charting the Course to Your Success!" MOC B Core Solutions of Microsoft Lync Server 2013 Course Summary

Availability for the Always-On Enterprise

VMware vrealize Operations for Horizon Administration. 20 SEP 2018 VMware vrealize Operations for Horizon 6.6

VMware vsphere 6.0 / 6.5 Infrastructure Deployment Boot Camp

Exam Name: VMware Certified Professional on vsphere 5 (Private Beta)

Adding a High Availability System

Microsoft Core Solutions of Microsoft SharePoint Server 2013

Backup and recovery of vsphere VCSA and Platform Services Controllers

Setting Up Published Desktops and Applications in Horizon 7. VMware Horizon 7 7.1

VMware View Upgrade Guide

HPE Data Replication Solution Service for HPE Business Copy for P9000 XP Disk Array Family

Introducing VMware Validated Designs for Software-Defined Data Center

ProfileUnity with FlexApp Technology

"Charting the Course... VMware vsphere 6.7 Boot Camp. Course Summary

Logical Operations Certified Virtualization Professional (CVP) VMware vsphere 6.0 Level 1 Exam CVP1-110

DOWNLOAD OR READ : VMWARE IN DESKTOP VIRTUALIZATION STANDARD REQUIREMENTS PDF EBOOK EPUB MOBI

VMware vsphere 6.5 Boot Camp

VMWARE VSPHERE: FAST TRACK V6.7 (EDU-VSFT67)

GRID SOFTWARE FOR VMWARE VSPHERE VERSION /370.21

HyperFlex. Simplifying your Data Center. Steffen Hellwig Data Center Systems Engineer June 2016

20331B: Core Solutions of Microsoft SharePoint Server 2013

Service Description: Advanced Services- Fixed Price: Cisco UCCE Branch Advise and Implement Services (ASF-CX-G-REBPB-CE)

CyberStore Veeam. Backup & Replication Appliances. Broadberry. CyberStore Veeam. Backup Storage Appliances. Powering these organisations

Planning and Administering SharePoint 2016

VMware Horizon 6. Horizon 6 FAQ. Q VMware Horizon. VMware Horizon / / Horizon. Windows

Transcription:

TO: FROM: SUBJECT: BOARD OF DIRECTORS KEVIN PLAMBECK, TECHNOLOGY & CTE DIRECTOR TECHNOLOGY INFRASTRUCTURE INTEGRATION SERVICES PHASE 2 (2015-2016) DATE: AUGUST 18, 2015 TYPE: ACTION REQUIRED On November 5, 2013, voters approved the School Facilities and Technology Levy. Some of the technology projects that are funded by this special levy required the services of a technology consultant and integration specialist firm. On August 5, 2014 the Board approved a contract with IVOXY for Technology Infrastructure Integration Services. The contract, based on the form found in Board Policy (Policy 6216F1), is in effect through the 5-year life of the School Facilities and Technology levy. The initial Scope of Work contracted with IVOXY was to provide a robust, redundant and low hands-on maintenance environment to support teaching and learning in the Stanwood-Camano School District. It required IVOXY to perform an assessment then design, build and implement a next generation network and user environment featuring VMWare Horizon View as the primary universal environment that all staff and students in the district will use for general purpose computing. The District is now entering into Phase 2 of this work. The plan for Phase 2 of the virtual desktop infrastructure (VDI) deployment takes the current configuration, which was used for general purpose desktops and student testing and move it into a fully functional VDI environment. The plan does not add additional servers, but leverages the current investment and adds components such as persona management, GPUs (graphic processing units), application virtualization, storage tuning and backup to build on the success of Phase 1 and further improve the user experience and capabilities of what can be offered to the students and staff in the Stanwood-Camano School District. The IVOXY Professional Services Estimate is 35 total days for consulting within the compute realm and 70 days of consulting within the networking realm. The total of consulting and integration days is 105. IVOXY s consulting rate as per contract is $2000 per day. The 2015-16 consulting and integration services expenditures will be $210,000. Recommendation: We recommend the board approve the Phase Two services for technology consultation and integration services with IVOXY Consulting LLC, of Kirkland, WA, and approve the execution of the attached scope of work.

Stanwood/Camano School District: Phase 2- Professional Services Estimate: Compute The current plan for Phase two (2) of the Stanwood VOl deployment takes the current configuration, which was used for general purpose desktops and student testing and move it into a fully functional VOl environment. The plan does not add additional server compute, but leverages the current investment and adds components such as persona management, GPUs, application virtualization, storage tuning and backup to build on the success of phase 1 and further improve the user experience and capabilities of what can be offered to the students and staff at Stanwood Camano School District. Persona Management (3 days) Deploy Liquidware Labs Profile Unity Train SCSD staff on Profile Unity Validate permissions and folder layout Review use cases Deploy one or more configurations for use cases Test and validate user experience Application Layering (3 days) Deploy Liquidware Labs FlexApp packaging console Deploy ThinApp Capture and build system Onsite training for FlexApp and ThinApp Evaluate needs Package and deploy application (FiexApp- DIA and UIA and ThinApp) Upgrade to vsphere 6.0 (6 days) Note: this is required for vgpu capabilities Validate compatibility of all components (UCS, SQL, VIBs, drivers, etc) Upgrade POD1 vcenter, mgmt vcenter o includes update manager, SSO, Web Client, etc o third party plugins Upgrade ESXi hosts o upgrade to latest ESXi per compatibility matrix built Upgrade templates (tools and hardware) Perform IVOXY acceptance tasks Upgrade View and expand (3 days) Plan upgrade and validate compatibility Upgrade View Add View Security infrastructure (Windows or F5 - tbd) o includes building in redundancy NVIDIA Grid Testing (4 days) Deploy latest drivers and patches Discuss use cases Build desktop pools to test vdga and vgpu use cases Application either thick installed or added as virtual apps Validate both with ProU and stare and compare Page I 1

Evaluate vsan (4 days) Evaluate both traditional and AFF vsan take the existing three node traditional VSAN hardware and expand to a four (4) node vsan Validate with real world and synthetic tests Sophos Install and configuration (3 days) Install vshield Install Sophos and deploy for desktop and servers Configure, test and train Veeam (4 days) Install and configure Veeam components o Backup server (s) o Repository servers (s) o Proxy server (s) Integrate with NetApp and vcenter Create backup jobs, test restore (single item, full VM and instant poweron) and validate Configure and test SureBackup Knowledge transfer and onsite training Printing (3 days) Stanwood has been looking at PaperCut to handle single driver remote badge pull of print jobs IVOXY can assist with the evaluation and configuration of ProfileUnity and I or other solutions (based on needs) Assist with the deployment of printer mapping to the various pools and use cases FS load-balancing for View (2 days) Deploy the F5 always-on solution for View Configure and test the solution for internal and external connectivity It is assumed that this will be load balancing only one View POD IVOXY Professional Services Estimate (Total Days- Compute)- 35 Page I 2

Stanwood/Camano School District: Phase 2 - Networking Review Networking Environment Design next phase Review requirements and adherence to best practices Review network performance Review network HA configuration Provide recommended configuration to finish project Provide hardware BOM to support project requirements Network implementation Build out network based on review Document and perform acceptance & redundancy testing Wireless Network implementation Support wireless configuration throughout the district Assist deploying access points Provide hardware BOM to support project requirements IPS/IDS Identify project requirements Create implementation plan Implement IPS/IDS Perform redundancy testing Deliverables, timelines and estimated billable time Project planning and seeping- (5 days) o Review current network implementation o Plan additional hardware deployment o Identify additional required hardware Deploy network equipment (30 days) o Configure and deploy new network equipment based on plan Deploy IPS/IDS software (5 days) o Implement IPS/IDS o Perform acceptance testing Update network documentation (5 days) o Update network drawing to include newly deployed equipment Deploy wireless network (25 days) o Configure wireless coverage o Assist with deciding on wireless placement IVOXY Professional Services Estimate (Total Days- Networking) -70 IVOXY Professional Services Estimate (Total Days- Compute & Networking) -105 Page I 3