Project Overview and Status

Similar documents
Baseline Project Definition

The WIDAR Correlator

Shared Risk Observing

Software Overview. Bryan Butler. EVLA Advisory Committee Meeting, March 19-20, EVLA Computing Division Head

SCHEDULE AND TIMELINE

EVLA Correlator P. Dewdney Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics

EVLA Monitor and Control. Transition Software. Development Plan

EVLA Software High-Level Design Presentation Notes

MCAF (Metadata Capture and Formatting)

Project Information Summary EVLA Advisory Committee May 8-9, Contents

Meeting Notes Correlator Face-to-Face Meeting April 3rd & 4 th Socorro, New Mexico

ALMA CORRELATOR : Added chapter number to section numbers. Placed specifications in table format. Added milestone summary.

2014 Bond Technology Infrastructure Status Report. March 10, 2016

Case Study: CyberSKA - A Collaborative Platform for Data Intensive Radio Astronomy

B. Carlson. National Research Council Canada. Conseil national de recherches Canada

CASA Joe McMullin J. McMullin EVLA Advisory Committee Meeting September 6-7, 2007

MAJOR RESEARCH EQUIPMENT $240,450,000 AND FACILITIES CONSTRUCTION

OCM ACADEMIC SERVICES PROJECT INITIATION DOCUMENT. Project Title: Online Coursework Management

An Overview of the WMKO Development Phases By Sean Adkins December 8, 2005

CATALOG FOR BASE CONTRACT MAY 20 TH 2010 MAY 19 TH 2015 MICROCOM DESIGN, INC. GSA SCHEDULE 871 PROFESSIONAL ENGINEERING SERVICES (PES)

MMA Design & Development Phase Milestones WBS Milestone tasks, sorted by WBS and date

2014 Bond Technology Update Progress of the Technology Network Infrastructure Upgrades Long Range Planning Committee March 4, 2015

TDP calibration and processing group (CPG): activities and status

Bill Boroski LQCD-ext II Contractor Project Manager

State of Florida Enterprise

SCHEDULE AND TIMELINE. The Project WBS, expanded to level 2, presented in the form of a Gantt chart

CASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION. Alan Stuart, Managing Director System Infrastructure Innovators, LLC

Council, 8 February 2017 Information Technology Report Executive summary and recommendations

CAD/PAD International Logistics Meeting (2018 ILM)

THE CUSTOMER SITUATION. The Customer Background

Implementation Status & Results Montenegro Energy Community of South East Europe APL 3 - Montenegro Project (P106899)

EVLA Vertex Room (and other mechanical considerations)

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

Quarterly Status Update (QSU) July September 2010

Transform your Microsoft Project schedules into presentation reports with Milestones Professional.

Wide-Area Reliability Monitoring and Visualization Tools

5 Servicing Capacity Assignment for Aurora, East Gwillimbury and Newmarket

Optics research for future receivers at NAOJ. Alvaro Gonzalez National Astronomical Observatory of Japan

CASE STUDY GLOBAL CONSUMER GOODS MANUFACTURER ACHIEVES SIGNIFICANT SAVINGS AND FLEXIBILITY THE CUSTOMER THE CHALLENGE

SPDO report. R. T. Schilizzi. US SKA Consortium meeting Pasadena, 15 October 2009

ICT Sector Support in Somalia Phase II (P152358)

Draft RIPE NCC Activity Plan and Budget 2016

CITY MANAGER MISSION STATEMENT: DEPARTMENT ORGANIZATION B-1

Digital Correlator and Phased Array Architectures for Upgrading ALMA Alain Baudry & Benjamin Quertier Université de Bordeaux / LAB on behalf of

Campus Communications & Networking

RPS Work Item: Beta Testing of Message Standard

Minutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

EVLA Front-End CDR. EVLA K-Band (18-26 GHz) Receiver

Our Mission: To provide technology resources for the County and set the vision for future technology investments

EVLA Monitor And Control Network

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #49 Page 1 of 10

AGENCY TOTAL-Capital $443,719 $482,493 $492,143 $501,986 AGENCY TOTAL-Informational $4,516,842 $4,574,381 $4,665,867 $4,759,185

EVLA Monitor & Control Software PDR. Status

Corridor Management Committee. January 12, 2017

IT company builds a virtual desktop infrastructure to improve performance

Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1

Implementation Status & Results Bangladesh BD Identification System for Enhancing Access to Services (IDEA) Project (P121528)

UNIT PLAN PART A Program/Pathway Update

Washington Metropolitan Area Transit Authority Board Action/Information Summary

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

Cisco Director Class SAN Planning and Design Service

ISO STANDARD IMPLEMENTATION AND TECHNOLOGY CONSOLIDATION

Botany IT Report. 1. Overview. 2. Background. 3. Actions. 3.1 Define the Mission. Prepared by Sean Shang March 8, 2013

Antiterrorism / Force Protection (AT/FP) Assessment Tool Training. Module 1: Policy Drivers for MARMS & AT/FP Assessments

Test Builder & Test Executor

OneUConn IT Service Delivery Vision

50 Years of Facility Operations or Rebuilding from the inside out

NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012

SAN JOSÉ FIRE DEPARTMENT. Strategic Planning

Our Mission: To provide technology resources for the County and set the vision for future technology investments

FRIB Project Status and Plans for Initial Operation

Texas Commission on Fire Protection

UNIT PLAN PART A Program/Pathway Update

WHITE PAPER ULTRA LOW LATENCY MICROWAVE THE NEED FOR SPEED: BEST PRACTICES FOR BUILDING ULTRA-LOW LATENCY MICROWAVE NETWORKS

NC Education Cloud Feasibility Report

Report. Diemer Plant Improvements Program Audit Report. Internal Audit Report for January 2011

THE VLBA SENSITIVITY UPGRADE

Next Generation Backup: Better ways to deal with rapid data growth and aging tape infrastructures

GLAST Large Area Telescope:

Department Heads Meeting December 17, 2009

Controlling Field-of-View of Radio Arrays using Weighting Functions

Community Development Commission of the County of Los Angeles

Broadband Rate Design for Public Benefit

Organizational Privacy Transformation: A case study from Critical Issues to Award Winning Success

Development of Focal-Plane Arrays and Beamforming Networks at DRAO

ALMA Correlator Enhancement

From Hyogo to Sendai. Anoja Seneviratne Disaster Management Centre

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

SERVICE DESCRIPTION MANAGED BACKUP & RECOVERY

European VLBI Network

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

Frontline Interoperability Test Team Case Studies

MPM210: Introduction to Project Management 1. MPM210: Introduction to Project Management. Project Plan for Learning Modules.

KVN. Duk-Gyoo Roh, and staffs of KASI & NAOJ + Kagoshima Univ. 8 th VERA User s Meeting, Mitaka NAOJ

Information Technology University Budget Hearing. April 5, 2018

Lecture Outline. Requirements Analysis I. Defining Requirements Analysis. Network Design: A Systems Approach. Jeremiah Deng.

LWDA Network Connection Implementation

For personal use only

Federal Data Center Consolidation Initiative (FDCCI) Workshop I: Initial Data Center Consolidation Plan

Transcription:

Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager

Outline Project Goals Organization Staffing Progress since last meeting Budget Contingency Risk Management Schedule

Project Goals Key goal: Improve the observational capabilities of the VLA (except for angular resolution) by a factor of ten or more. Achieve by: Adding new, wide bandwidth receivers Upgrading or replacing current receivers Replacing the data transmission system Replacing the correlator Provide a new monitor and control system, which must also allow operation of new and old antennas in transition. Perform careful astronomical observations to verify that EVLA hardware and software function properly. Provide new data management software, to include data post processing, for better access to array data products (effort distributed across divisions of NRAO)

Organization Number refers to WBS level 2 task (interface) EVLA Project is embedded within NRAO-NM operations

Staffing Labor to complete project is supported by two funding accounts: Labor paid directly by funds allocated to EVLA project Contributed effort paid by other NRAO Operations funds Labor split is about 50/50 between accounts 286 FTE-years from EVLA project 266 FTE-years of contributed effort Project success is tied to continued support of both project and operations funding Plan developed to transfer some project personnel to operations budget Establishes base staff level for EVLA technical operations Retains mission-critical personnel in long term EVLA operations Actively used to manage staffing levels

Progress Since Last Meeting

Antennas Antenna conversions on track for completion in Q3 2010 Antennas placed in operation immediately after retrofit is complete 20 EVLA antennas now in use Account for 71.4% of total antenna hours used in observations Electronics outfitting of 21 st antenna underway Mechanical overhaul of 22 nd antenna just started Proceeding at desired rate of about 6 per year

Front Ends Excellent progress on feed horn fabrication L-band horns All horns fabricated for L, C, and Ka-bands Fabrication of S- and Ku-band horns underway Full production of Ka-band receivers underway First fringes on one baseline in Aug 2008 8 receivers installed in array now Call for Ka-band proposals issued in Jan 2009 Design and fabrication issues with OMTs resolved [Hayward/Coutts] L, C, and S-band OMTs meeting specifications Design of X-band OMT nearly complete First S-band receiver deployed Production of EVLA L-band receivers to begin in FY2009 Prototype EVLA Ku-band receiver under development S-band OMT

LO/IF Production of local oscillator (LO) and intermediate frequency (IF) modules is slightly ahead of antenna conversion schedule Module assembly should be complete by the end of 2009 Wideband d upgrade (from existing 1GHz bandwidth per downconverter module to 2x2GHz) is underway. Includes: Wideband filters Gain slope equalizers Second set of synthesizers Modules for round trip phase measurement placed in production Significant ifi progress made in resolving mechanical and thermal issues affecting phase stability [Jackson]

Fiber Optics and Data Acquisition iti Production of all modules for the data transmission system (DTS), except high speed sampler, is keeping pace with antenna retrofits Fiber infrastructure completed in 2007 Provides flexibility in locating antennas on the array High Speed Samplers (3-bit, 4Gsps) [Durand/Revnell] Digitizer chips delivered and perform to specification Issues with serial-to-parallel converter on sampler board delayed production Expect production to commence this summer Need WIDAR correlator to exploit capability

WIDAR Correlator S. Dougherty became new WIDAR project lead at DRAO Internal review of WIDAR management held in Feb 2008 Led to improved communication on management issues Production review of correlator boards held in Dec 2008 NRAO conducted on-the-sky tests of prototype in support of the review [Rupen] First fringes with WIDAR prototype recorded in Aug 2008 Production order for station boards placed in Jan 2009 Other major milestones achieved [Dougherty] Custom correlator chips (12,000) received in Apr 2008 Data cables and all 16 racks installed in Jun-Aug 2008 First fringes with subset of final WIDAR recorded on Mar 6, 2009 11

Software Proposal submission tool (PST) Used for all VLA, VLBA, and GBT proposals Observation preparation tool (OPT) [Harland] Replacement for VLA jobserve Used to support call for Ka-band proposals Current development focused on WIDAR support Observation scheduling tool (OST) Dynamically scheduled system now in place Development based on experience with dynamic scheduling of VLA Monitor and Control (M&C) [Butler] In 2007, implemented a new M&C system while continuing to support scientific observations with old and new antennas Systems integration of WIDAR underway Archive access tool (AAT) In place for EVLA, VLBA, and GBT data retrieval Uses storage technology from ALMA s Next Generation Archive System Developed standardized binary data format and science data model that is shared with ALMA

Budget: Funding Funding = $93.8M (FY06) New NSF funds $58.7M Provided over 11 years NRAO contributed effort $16.3M Canadian partner $17.0M Contribute correlator Mexican partner $1.8M Funds received

Budget: Contingency Financial health of project is good All WBS elements of the project are operating within their budget allocations Project contingency, as percent of cost to complete: Has improved over last 3 years Remains at historically high levels 21.4% ($2.86M) Does not include work on the correlator, which is supported by Canadian funds No plans to exercise potential hardware descope options

Risk Management Risk management plan developed in Dec 2006 Financial impact and probability of occurrence for each risk are estimated Risks actively managed Since the plan was established, the total number of risks has decreased from 79 to 46 Total risk has decreased from $11.2M to $7.1M Sum weighted risk has decreased from $3.3M to $2.4M Contingency has always exceeded weighted risk, but is less than the total risk. Current challenge is effective allocation of contingency to mitigate remaining risks

Schedule: Growth of New Capability Interim receivers not shown

Schedule Project is on schedule At current rate, antenna conversions will be complete by Q3 CY2010 Correlator on schedule for completion in Q1 CY2010 Remaining major milestones paced by correlator delivery: Installation of final WIDAR boards begins Q2 CY2009 Anticipate first science with WIDAR in Q1 CY2010 Receiver installation to be complete in Q4 CY2012 Development of M&C software and basic user tools on track to support commissioning and early science observation

Summary Good progress has been made over past 18 months Project is going well Budget: Financial health of the project is good Technical issues largely resolved Project is on schedule: Antenna retrofits will be complete in Q3 CY2010 Receiver installation complete in Q4 CY2012 Correlator scheduled for completion in Q1 CY2010 Software development on track to support commissioning and early science

Backup

Budget: NSF Funding Profile Year Initial ($K) Current ($K) 2001 1,106 3,000 2002 6,900 5,000 2003 5,322 5,322 2004 5,434 9,340 2005 5,548 5,340 2006 5,665 5,440 2007 5,835 5,835 2008 6,010 6,010 2009 6,190 6,190 2010 6,376 6,376 2011 4,597 1,130 Ttl Total 58,983 58,983

Budget Distribution ib ti by WBS WBS Element Description % of Total Cost 601 Project Management 4.7 602 Systems Integration 6.6 603 Civil Construction 2.7 604 Antennas 4.9 605 Front End Systems 20.7 606 LO Systems 6.0 607 Fiber Optic Systems 10.8 608 IF Systems 6.0 609 Correlator 17.5 610 Monitor & Control 12.6 611 Data Mgt. & Computing 7.5 612 Education & Outreach 00 0.0

Risks by WBS Element WBS Risk Number Total Impact ($K) Wt. Impact ($K) Project Management 3 2,557 856 Systems Integration 2 100 10 Civil Construction 5 205 45 Antennas 3 355 83 Front End 10 1,202 549 Local Oscillator 1 300 90 Fiber Optics 3 115 45 Intermediate Freq. 0 0 0 Correlator Interface 2 190 128 Monitor & Control 7 570 194 Data Management 10 1,500 390

Risks Affecting Budget or Schedule Deployment of high speed samplers Contingency plans well developed Production should commence this summer Selection of X-band OMT Design of planar-style OMT pursued as risk mitigation measure to larger, conventional, waveguide-style OMT Selection will be made in next few months Virtual Correlator Interface (VCI) Software that configures correlator for observations Main focus of DRAO software development effort TelCal M&C software that intercepts visibility data and performs calculations needed to derive Telescope Calibration quantities Issue caused by staff departure. Replacement hire underway. 23

Examples of Retired Risks Retired risks ($ = impact, % = probability) Correlator spare boards ($200K, 40%) Design path for 3-bit sampler ($510K, 40%) Outsourcing of machined components for front ends ($600K, 80%) Marching army costs in front end group ($464K, 40%)

Risk Summary 25

Change Board History

Descope Options Given good financial health of the project, there are no plans to exercise descope options Descope options amount to receiver bands Ka, S, and Ku-bands were under consideration for descope long ago, but we are now proceeding with their full production Still possible to descope X-band: $1.0M Could also eliminate solar observing mode: $0.2M Impact Advertised scientific productivity of EVLA requires all hardware and software deliverables to be met. Recovering from descopes would take many years.