Meeting of October 21 st, 2016 WebEx Online Meeting

Similar documents
ACCREDITATION OF VR REPAIR ORGANIZATIONS

Rules for Certified Individuals

Qualification of National Board Team Leaders and National Board Representatives

AGENDA. Meeting of October 21, 2014 Columbus, Ohio

AGENDA. Meeting of October 21, 2014 Columbus, Ohio


C-BPVCA ADMINISTRATIVE PROCEDURES DELEGATED TO ASME CONFORMITY ASSESSMENT STAFF

NOTICE ON REQUESTS FOR EXTENSION OF CERTIFICATE EXPIRATION DATE

MODULE B - PROCESS SUBMODULES B1.

USOAP Continuous Monitoring Approach (CMA) Workshop

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION {A, M, PP, S, E, H, HLW, U, UM, U2, U3, PRT and T}

From: Jean Johnson Sent: Wednesday, July 12, :06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson

For Facilitator Use Only. B3. Conformity Assessment: Roles and Responsibilities (Perfect score: 30 points)

BORSIG GmbH Egellsstraße Berlin Germany

TSSA PORTAL TRAINING GUIDE. Insurer Processes

Health Department Licensing User Guide

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS

Regulations Respecting Examinations and Certificates of Engineers and Firemen

ISO 5208 INTERNATIONAL STANDARD. Industrial valves Pressure testing of metallic valves

IEEE P1564 Voltage Sag Indices Task Force Meeting

ISO INTERNATIONAL STANDARD. Design of graphical symbols for use in the technical documentation of products Part 1: Basic rules

SV81H Safety and Relief Valve

Renewal CSWIP Plant Inspector Level 1 10 Year 300 CSWIP Plant Inspector Level 2 10 Year 300

ASME CA Connect. Applying for Certification. Jon Labrador Managing Director, Conformity Assessment

Mount Pleasant Waterworks. Cross-Connection Control Program Guidelines October 2010

ASME Conformity Assessment: Statistics, Process, and CA Connect. Dan Sharp Manager, Process Management Dept. August 10, 2016

Manufacturer certification in plant, metal and rolling-stock engineering

Conformity Assessment. Jon Labrador April 2018

CMRTA CERTIFIED REVENUE OFFICER PROGRAM RE-CERTIFICATION PROCESS

USOAP Continuous Monitoring Approach (CMA) Workshop

Consideration of Issues and Directives Project Modeling Data (MOD B) October 7, 2013

Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads

Home Phone No.: Work Phone No.: Cell Phone No.:

ASME Conformity Assessment: Statistics, Process, and CA Connect

ASME BPVC.CC.NC.S Approval Date: June 30, Code Cases will remain available for use until annulled by the applicable Standards Committee.

API 570 Preparation Training for API 570 Exam & Certification Course Objectives & Agenda

TSSA PORTAL TRAINING GUIDE

ASME s Certification & Accreditation Programs. Matthew Vazquez S&C Project Engineer Advisor April 11 th 2016

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

ASNT Identification Number If you have previously been given an ASNT identification number, please enter it in this box:

USER GUIDANCE ON THE SHIP FUEL OIL CONSUMPTION GISIS MODULE (IMO SHIP FUEL OIL CONSUMPTION DATABASE) CONTENTS

CASTI. CASTI Career Path. rev

The scheduled dates for API 510 Inspector Certification Examination is as below:

ASME Section III New Developments

Instructions Please read and follow carefully. KEEP THIS PAGE FOR YOUR REFERENCE

American Nuclear Society Standards Committee Subcommittee 8 Meeting

DSA School Energy Coalition

EEMUA Technical Committees

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code

Working Group Charter: Basic Profile 1.2 and 2.0

ISO INTERNATIONAL STANDARD

Content of mandatory certificates

Update assessment for the Guard I/O DeviceNet Safety Modules 1791DS-IB8XOBV4, 1732DS-IB8XOBV4, 1791DS-IB16 and 1732DS-IB8. Rockwell Automation

National Accredited Housing Maintenance Technician NAHMT. and National Accredited Housing Maintenance Supervisor NAHMS. Credential Application

PROCEDURES ISSUE 3, REVISION 6 STANDARD QUALIFICATION CRITERIA FOR DESIGNEES FOR ACCREDITATION AND PRODUCT CERTIFICATION ACTIVITIES

SAI GLOBAL PRODUCT SERVICES

LONG-RANGE IDENTIFICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II)

MT. SAN ANTONIO COLLEGE 2018 Educational and Facilities Master Plan HMC ARCHITECTS // COLLABORATIVE BRAIN TRUST

Buck-IRB Amendment User Guide

Ch. 5 UPC SCANNING SYSTEMS CHAPTER 5. UPC SCANNING SYSTEMS AND PLU DEVICES GENERAL

IEEE 1588 Working Group Update

Western Canada Black Liquor Recovery Boiler Advisory Committee

Views on the Framework for Improving Critical Infrastructure Cybersecurity

Solid & Infectious Waste / C&DD License Renewal User Guide

Requirements for NCOWCICB certification with Business Succession Exemption Please read and follow carefully.

RESOLUTION ADOPTED BY THE GENERAL ASSEMBLY. [on the report of the Second Committee (A/54/588/Add.2)]

Power Known Proposals for Agenda 10.1 : Advanced Agenda 10.2 : Unlimited Agenda 10.3 : Yak-52 / Intermediate

PRODUCT CONFORMITY CERTIFICATE

ISO INTERNATIONAL STANDARD. Graphical symbols for diagrams Part 11: Devices for heat transfer and heat engines

Re: ENERGY STAR Telephony Draft 2 Version 3.0 Telephony Test Method and Data Call

Proposal for an IEEE 802 EC Privacy Recommendation Study Group. 18 th of July 2014

Standards Designation and Organization Manual

ISO/IEC INTERNATIONAL STANDARD

This document is a preview generated by EVS

LORAIN-MEDINA RURAL ELECTRIC COOPERATIVE, INC. NORTH CENTRAL ELECTRIC COOPERATIVE, INC.

The tips that we are presenting today are intended to help lenders avoid some of the issues and reasons for etool return that we ve seen recently.

IAS-accredited Special Inspection Agencies and Other Interested Parties

NEW YORK CITY DEPARTMENT OF BUILDINGS. Notice of Public Hearing and Opportunity to Comment on Proposed Rules

PCN CRITERIA FOR THE APPOINTMENT OF LEVEL 3 TECHNICIANS FOR GUIDED WAVE TESTING AS A TRANSITIONAL ARRANGEMENT

IMO MEASURES TO ENHANCE MARITIME SECURITY. Outcome of the 2002 SOLAS conference. Information on the current work of the ILO

JCP Training: General Session. 5 May 2008 JavaOne - San Francisco Harold Ogle

Standard CIP-006-3c Cyber Security Physical Security

Operating Instructions for Level Switch for Liquids. Model: RFS

Request Conditional Use Permit (Colleges & Universities, public or private) Staff Planner Ashby Moss

This document is a preview generated by EVS

American Petroleum Institute, 1220 L Street NW, Washington DC USA Tel Fax

National communication reporting guidelines for Annex I Parties. 4 th BRs and NCs lead reviewers meeting

1.2 Applicant An individual applying for initial, upgraded, reciprocity or renewal by submission of a standard application to the administrator.

ISO/IEC INTERNATIONAL STANDARD. Identification cards Machine readable travel documents Part 3: Machine readable official travel documents

Case: 5:10-cv SL Doc #: 15 Filed: 09/30/10 1 of 8. PageID #: 93 UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF OHIO EASTERN DIVISION

Title Stakeholder Webinar: Modifications to Joint Appendix 5: Technical Specifications for Occupant Controlled Smart Thermostats (OCSTs)

Exemption 5: DeliberativeExemption 5: DeliberativeExemption 5: DeliberativeExemption 5: Deliberative Exemption 5: Deliberative

MINUTES CERTIFICATION COMMITTEE

1510 MOTOR CONTROLLERS

The appendix to the certificate is part of the certificate and consists of 3 pages.

-2-4. Application for certificate of production system standard under regulated criteria at certification bodies that registered with the Food and

Engineering Document Control

APPLICATION FOR CERTIFICATION AS A WELDING INSPECTOR

Transcription:

Date Distributed: October 11th, 2016 NATIONAL BOARD SUBCOMMITTEE PRESSURE RELIEF DEVICES AGENDA Meeting of October 21 st, 2016 WebEx Online Meeting The National Board of Boiler & Pressure Vessel Inspectors 1055 Crupper Avenue Columbus, Ohio 43229-1183 Phone: (614)888-8320 FAX: (614)847-1828

1. Call to Order (11 a.m. Eastern Time) 2. Introduction of Members and Visitors 3. Adoption of the Agenda 4. Public Review Comments 5. Future Meetings 6. Adjournment Item Number: PR16-0301 NBIC Location: Part 4 Attachment Page 1 General Description: Include administrative requirements for valves from NB-514 into 1.4 and 4.8 Item Number: PR16-0501 NBIC Location: Part 4, 3.2.5.2 Attachment Pages 2 General Description: Add information about "T/O" program to paragraph Item Number: PR16-0502 NBIC Location: Part 4, Section 4 Attachment Page 3 General Description: Update paragraphs for consistency with recent changes to ASME marking requirements Item Number: PR16-0601 NBIC Location: Part 4, Attachment Page 4 General Description: Include allowance for supplementary loading systems on directed spring spring loaded PRVs January 9-12, 2017 San Diego, California July 17-20, 2017 Columbus, Ohio Respectfully submitted, Brad Besserman NBIC Secretary

Attachment Page 1 PR16-0301 9-20-16 Attachment Page 1

Attachment Page 2 National Board of Boiler and Pressure Vessel Inspectors National Board Inspection Code Submission of Public Review Comment 2017 Draft Edition PLEASE SUBMIT ONLY ONE COMMENT/RECOMMENDATION PER PAGE Make additional copies as needed Comments Must be Received No Later Than: October 10, 2016 Instructions: If unable to submit electronically, please print this form and fax or mail. Print or type clearly. Date: 09/23/2016 J. Alton Cox 213 Park View Dr. Belmont, NC 28012 704-301-8532 704-820-8408 Commenter Name: Commenter Address: Commenter Phone: Commenter Fax: Commenter Email: alton@jaltoncox.com 3.2.5.2 Section/Subsection Referenced: Comment/Recommendation: Proposed Solution: New Text Revise Text Delete Text In the last sentence of the proposed 3.2.5.2 VALVE ADJUSTMENTS, the In-Service Test Only Organizations (T/O), as referenced in proposed 4.1 of Part 4, "T/O" In-Service Testing Only of Pressure Relief Valves, should be added after "VR" Certificate Holders. This T/O option was added by the National Board in July 2016, and therefore not a part of the existing draft. Source: Own Experience/Idea Other Source/Article/Code/Standard Submit Form To: Bradley Besserman, NBIC Secretary, The National Board of Boiler & Pressure Vessel Inspectors, 1055 Crupper Avenue, Columbus, OH 43229, email: bbesserman@nationalboard.org NB Use Only Commenter No. Issued: Comment No. Issued: PR16-0501 9-26-16 Project Committee Referred To: Attachment Page 2

Attachment Page 3 National Board of Boiler and Pressure Vessel Inspectors National Board Inspection Code Submission of Public Review Comment 2017 Draft Edition PLEASE SUBMIT ONLY ONE COMMENT/RECOMMENDATION PER PAGE Make additional copies as needed Comments Must be Received No Later Than: October 10, 2016 Instructions: If unable to submit electronically, please print this form and fax or mail. Print or type clearly. Date: 09/23/2016 J. Alton Cox 213 Park View Dr. Belmont, NC 28012 704-301-8532 704-820-8408 Commenter Name: Commenter Address: Commenter Phone: Commenter Fax: Commenter Email: alton@jaltoncox.com 4.2.1 a)2), 4.7.5, 4.8.5.4 d)1)a. Section/Subsection Referenced: Comment/Recommendation: Proposed Solution: New Text Revise Text Delete Text The above referenced paragraphs do not acknowledge recent changes to ASME marking requirements. The new ASME Certification Mark carries a specific designator to replace the former Code Symbols. The existing wording should be replaced with the following:... with the ASME Certification Mark with the V, HV, UV, or NV Designator or the supplanted V, HV, UV, or NV Code Symbol... This will allow VR Certificate Holders to repair PRVs manufactured prior to the 2014 ASME Certification Mark issuance, as well as more recently manufactured PRVs. Source: Own Experience/Idea Other Source/Article/Code/Standard Submit Form To: Bradley Besserman, NBIC Secretary, The National Board of Boiler & Pressure Vessel Inspectors, 1055 Crupper Avenue, Columbus, OH 43229, email: bbesserman@nationalboard.org NB Use Only Commenter No. Issued: Comment No. Issued: PR16-0502 9-26-16 Project Committee Referred To: Attachment Page 3

Attachment Page 4 National Board of Boiler and Pressure Vessel Inspectors National Board Inspection Code Submission of Public Review Comment 2017 Draft Edition PLEASE SUBMIT ONLY ONE COMMENT/RECOMMENDATION PER PAGE Make additional copies as needed Comments Must be Received No Later Than: October 10, 2016 Instructions: If unable to submit electronically, please print this form and fax or mail. Print or type clearly. Date: 2016-10-06 Commenter Name: Commenter Address: Commenter Phone: Commenter Fax: Commenter Email: Bernd Jörgensen LESER GmbH & Co.KG 20506 Hamburg, P.O.B 261651; Germany +49 (0) 40 25165 158 +49 (0) 40 25165 558 joergensen.b@leser.com para. 2.9.1 Valve Requirements- General Section/Subsection Referenced: Comment/Recommendation: Proposed Solution: New Text Revise Text Delete Text a) Only direct spring loaded safety valves with or without supplementary loading system, direct spring loaded safety relief valves with or without supplelemtary loading system, or pilot operated pressure relief valves designed to relieve steam steam shall be used for steam service. Rational: Supplementary Loading systems for safety (relief) valves are well known in the steam boiler market defined by internationl standards and are world wide available. Source: Own Experience/Idea Other Source/Article/Code/Standard Submit Form To: Bradley Besserman, NBIC Secretary, The National Board of Boiler & Pressure Vessel Inspectors, 1055 Crupper Avenue, Columbus, OH 43229, email: bbesserman@nationalboard.org NB Use Only Commenter No. Issued: Comment No. Issued: PR16-0601 10-6-16 Project Committee Referred To: Attachment Page 4