Install Cards and Fiber-Optic Cable

Size: px
Start display at page:

Download "Install Cards and Fiber-Optic Cable"

Transcription

1 CHAPTER 2 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration. Rather, these terms, as well as "Path Protected Mesh Network" and "PPMN," refer generally to Cisco's path protection feature, which may be used in any topological network configuration. Cisco does not recommend using its path protection feature in any particular topological network configuration. This chapter explains how to install the Cisco ONS cards and fiber-optic cable (fiber). Before You Begin This section lists the chapter procedures (NTPs). Turn to a procedure for applicable tasks (DLPs). 1. NTP-A15 Install the Common Control Cards, page 2-2 Complete this procedure first before installing any other cards. 2. NTP-A16 Install the OC-N Cards, page 2-12 Complete as needed. 3. NTP-A249 Install the Transponder and Muxponder Cards, page 2-14 Complete as needed. 4. NTP-A17 Install the Electrical Cards, page 2-16 Complete as needed. 5. NTP-A246 Install Ethernet Cards and Connectors, page 2-17 Complete as needed. 6. NTP-A274 Install the FC_MR-4 Cards, page 2-23 Complete as needed. 7. NTP-A247 Install Fiber-Optic Cables on OC-N Cards, page 2-29 Complete this procedure to install fiber on OC-N cards, Ethernet Gigabit Interface Converters (GBICs), or small form-factor pluggables (Ps). 8. NTP-A242 Install the DWDM Cards, page 2-25 Complete as needed. 9. NTP-A243 Install the DWDM Dispersion Compensating Cards, page 2-28 Complete as needed. 10. NTP-A244 Install Fiber-Optic Cables on DWDM Cards, page 2-41 Complete as needed. 11. NTP-A245 Route Fiber-Optic Cables, page 2-56 Complete as needed. 12. NTP-A116 Remove and Replace a Card, page 2-57 Complete this procedure as needed to remove and replace a card, including deleting the card from Cisco Transport Controller (CTC) and changing an OC-N card without losing the card s provisioning. 13. NTP-A20 Replace the Front Door, page 2-59 If the front door was removed, complete this procedure to replace the front door and ground strap after installing cards and fiber. 2-1

2 NTP-A15 Install the Common Control Cards Chapter 2 Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Caution Unused card slots should be filled with a blank faceplate (Cisco P/N BLANK). The blank faceplate ensures proper airflow when operating the ONS without the front door attached, although Cisco recommends that the front door remain attached. NTP-A15 Install the Common Control Cards Purpose This procedure describes how to install the common control cards. Tools/Equipment Redundant TCC2 cards Redundant XC, XCVT, or XC10G (cross-connect) cards AIC/AIC-I card (optional) Prerequisite Procedures NTP-A13 Perform the Shelf Installation Acceptance Test, page 1-67 Required/As Needed Required Onsite/Remote Onsite Security Level Provisioning or higher During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. If you install a card incorrectly, the LED flashes continuously. Step 1 If you plan to install XC/XCVT cards, review Table 2-1 to determine card/slot compatibility. If you plan to install XC10G cards, review Table 2-2 on page 2-5 to determine card/slot compatibility. Step 2 Complete the DLP-A36 Install the TCC2 Cards task on page 2-7. Step 3 Step 4 Complete the DLP-A37 Install the XC, XCVT, or XC10G Cards task on page 2-9 unless you are provisioning a DWDM-only node. Complete the DLP-A38 Install the Alarm Interface Controller or Alarm Interface Controller International Card task on page 2-11, as needed. 2-2

3 Chapter 2 NTP-A15 Install the Common Control Cards If you install the wrong card in a slot, see the NTP-A116 Remove and Replace a Card procedure on page Step 5 Continue with one of the following: If the node you are provisioning is TDM-only (no DWDM cards installed), install the traffic cards. To determine the appropriate procedure, see the NTP list in the Before You Begin section on page 2-1. If the node you are provisioning is DWDM-only or a hybrid, continue with Chapter 3, Connect the PC and Log into the GUI. In Table 2-1, X indicates that a card is supported in the slot. Table 2-1 Card and Compatibility for the XC and XCVT Cards Type MS 1 MS 1 MS 1 MS 1 HS 2 HS TCC XC AIC XC TCC HS HS MS 1 MS 1 MS 1 MS 1 TCC2 X X XC/XCVT X X AIC X AIC-I X DS1-14 X X X X X X X X X X X X DS1N-14 X 3 X 3 X X 3 X 3 X 3 X 3 X 3 X 3 X X 3 X 3 DS3-12 X X X X X X 4 X 4 X X X X X DS3-12E X X X X X X 4 X 4 X X X X X DS3N-12 X 3 X 3 X X 3 X 3 X 3,4 X 3,4 X 3 X 3 X X 3 X 3 DS3N-12E X 3 X 3 X X 3 X 3 X 3,4 X 3,4 X 3 X 3 X X 3 X 3 DS3I-N-12 5 X 3 X 3 X X 3 X 3 X 3, X 3, X 3 X 3 X X 3 X 3 DS3XM-6 X X X X X X 4 X 4 X X X X X EC1-12 X X X X X X 6 X 6 X X X X X E100T-12 X X X X X X X X X X X X E X X X X X X X X X X X X E100T-G X X X X X X X X X X X X E G X X X X X X X X X X X X G Not supported with XC/XCVT cards. Requires XC10G cards. G1K-4 X X X X ML X X X X ML X X X X OC3 IR 4/STM1 SH 1310 X X X X X X X X X X X X OC3IR/STM1SH Not supported with XC/XCVT cards. Requires XC10G cards

4 NTP-A15 Install the Common Control Cards Chapter 2 Table 2-1 Card and Compatibility for the XC and XCVT Cards (continued) Type MS 1 MS 1 MS 1 MS 1 HS 2 HS TCC XC AIC XC TCC HS HS MS 1 MS 1 MS 1 MS 1 OC12 IR STM4 X X X X X X X X X X X X SH 1310 OC12 LR/STM4 X X X X X X X X X X X X LH 1310 OC12 LR/STM4 LH 1550 X X X X X X X X X X X X OC12 IR/STM4 Not supported with XC/XCVT cards. Requires XC10G cards. SH OC48 IR X X X X OC48 LR 1550 X X X X OC48 IR/STM16 X X X X SH AS 1310 OC48 LR/STM16 LH AS 1550 X X X X OC48-ELR/STM 16 EH 100 GHz OC48 ELR 200 GHz OC192 SR/STM64 IO 1310 OC192 IR/STM64 SH 1550 OC192 LR/STM64 LH 1550 OC192 LR/STM64 LH ITU 15xx.xx X X X X X X X X Not supported with XC/XCVT cards. Requires XC10G cards. Not supported with XC/XCVT cards. Requires XC10G cards. Not supported with XC/XCVT cards. Requires XC10G cards. Not supported with XC/XCVT cards. Requires XC10G cards. P_MR_2.5G X X X X X X X X X X X X PP_MR_2.5G X X X X X X X X X X X X P_MR_10G X X X X X X X X X X X X FC_MR-4 X X X X MXP_2.5G_10G X X X X X X X X X X X X 1. MS identifies slots 1 to 4 and 14 to 17 ( multispeed slot). 2. HS identifies slots 5, 6, 12, and 13 ( high-speed slot). 3. This identifies 1:N cards that operate as normal DS1 or DS3 cards when installed in certain slots. 4. This DS3 card cannot be used in this slot if used with a high-density EIA or in a 1:N configuration. 5. This card can only be use with the XCVT card, not the XC card. 2-4

5 Chapter 2 NTP-A15 Install the Common Control Cards 6. EC1 cards cannot be used in this slot if used with a high-density EIA. 7. The OC48AS will operate in the high speed slots with the XC/XCVT in R3.4 and later. In Release R3.3, OC48AS with XC/XCVT is not supported. In Table 2-2, X indicates that a card is supported in the slot. The XC10G card requires the ANSI shelf (5454-SA-ANSI) or the high-density shelf (15454-SA-HD). Table 2-2 Card and Compatibility for the XC10G Card Type MS 1 MS 1 MS 1 MS 1 HS 2 HS 2 TCC XC AIC XC TCC HS 2 HS 2 MS 1 MS 1 MS 1 MS 1 TCC2 X X XC10G X X AIC X AIC-I X DS1-14 X X X X X X X X X X X X DS1N-14 X 3 X 3 X X 3 X 3 X 3 X 3 X 3 X 3 X X 3 X 3 DS3-12 X X X X X X 4 X 4 X X X X X DS3-12E X X X X X X 4 X 4 X X X X X DS3N-12 X 3 X 3 X X 3 X 3 X 3,4 X 3,4 X 3 X 3 X X 3 X 3 DS3N-12E X 3 X 3 X X 3 X 3 X 3,4 X 3,4 X 3 X 3 X X 3 X 3 DS3XM-6 X X X X X X 4 X 4 X X X X X EC1-12 X X X X X X 5 X 5 X X X X X E100T-12 Not supported with the XC10G card. E Not supported with the XC10G card. E100T-G X X X X X X X X X X X X E G X X X X X X X X X X X X G X X X X X X X X X X X X G1K-4 X X X X X X X X X X X X ML X X X X X X X X X X X X ML X X X X X X X X X X X X OC3 IR 4/STM1 X X X X X X X X X X X X SH 1310 OC3IR/STM1SH X X X X X X X X OC12 IR STM4 X X X X X X X X X X X X SH 1310 OC12 LR/STM4 X X X X X X X X X X X X LH 1310 OC12 IR/STM4 X X X X X X X X SH OC12 LR/STM4 LH 1550 X X X X X X X X X X X X 2-5

6 NTP-A15 Install the Common Control Cards Chapter 2 Table 2-2 Card and Compatibility for the XC10G Card (continued) Type MS 1 MS 1 MS 1 MS 1 HS 2 HS 2 TCC XC AIC XC TCC HS 2 HS 2 MS 1 MS 1 MS 1 MS 1 OC48 IR 1310 X X X X OC48 LR 1550 X X X X OC48 IR/STM16 X X X X X X X X X X X X SH AS 1310 OC48 LR/STM16 X X X X X X X X X X X X LH AS 1550 OC48-ELR/STM1 X X X X 6 EH 100 GHz OC48 ELR 200 X X X X GHz OC192 SR/STM64 IO 1310 X X X X OC192 IR/STM64 SH 1550 OC192 LR/STM64 LH 1550 OC192 LR/STM64 LH ITU 15xx.xx X X X X X X X X X X X X P_MR_2.5G X X X X X X X X X X X X PP_MR_2.5G X X X X X X X X X X X X P_MR_10G X X X X X X X X X X X X MXP_2.5G_10G X X X X X X X X X X X X FC_MR-4 X X X X X X X X X X X X 1. MS identifies slots 1 to 4 and 14 to 17 ( multispeed slot). 2. HS identifies slots 5, 6, 12, and 13 ( high-speed slot). 3. This identifies 1:N cards that operate as normal DS1 or DS3 cards when installed in certain slots. 4. This DS3 card cannot be used in this slot if used with a high-density EIA or in a 1:N configuration. 5. EC1 cards cannot be used in this slot if used with a high-density EIA. Stop. You have completed this procedure. 2-6

7 Chapter 2 DLP-A36 Install the TCC2 Cards DLP-A36 Install the TCC2 Cards Purpose Tools/Equipment Prerequisite Procedures Required/As Needed Onsite/Remote Security Level This task installs redundant TCC2 cards. The first card you install in the ONS must be a TCC2 card, and it must initialize before you install any cross-connect or traffic cards. Two TCC2 cards None Required Onsite None When installing cards, allow each card to boot completely before installing the next card. Step 1 Step 2 Step 3 Open the latches/ejectors of the first TCC2 card that you will install. Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the receptacle at the back of the slot ( 7 or 11). Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 4 If you insert a card into a slot provisioned for a different card, all LEDS turn off. Verify the LED activity of the TCC2 card: All LEDs turn on briefly. The red LED, the yellow /STBY LED, the red REM LED, the green SYNC LED, and the green ACO LED turn on and remain on for about 10 seconds. The red LED and the green /STBY LED turn on and remain on for about 40 seconds. The red LED blinks for about 10 seconds. The red LED turns on for about 5 seconds. Both green PWR LEDs turn on for 5 seconds. The PWR LEDs then turn red for 2 to 3 minutes before going to steady green. All LEDs (including the CRIT, MAJ, MIN, REM, SYNC, and ACO LEDs) blink once and turn off for about 10 seconds. The /STBY LED turns on. (The /STBY LED might take several minutes to turn on while the DCC processor boots.) It may take up to 3 minutes for the A and B power alarms to clear. If the LED is on continuously, see the tip below about the TCC2 card automatic upload. 2-7

8 DLP-A36 Install the TCC2 Cards Chapter 2 Alarm LEDs might be on; disregard alarm LEDs until you are logged into CTC and can view the Alarms tab. Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Verify that the /STBY LED is green for active. The IP address, temperature of the node, and time of day appear on the LCD. The default time and date is 12:00 AM, January 1, The LCD cycles through the IP address, node name, and software version. Verify that the correct software version displays on the LCD. If the LCD shows the correct software version, continue with Step 8. If the LCD does not show the correct software version, upgrade the software or remove the TCC2 card and install a replacement card. Refer to the Cisco ONS Software Upgrade Guide to replace the software. To exchange the TCC2 card, see the Cisco ONS Troubleshooting Guide. Open the latches/ejectors of the redundant TCC2 card. Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the receptacle at the back of the slot ( 7 or 11). Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 11 Verify the LED activity of the redundant TCC2 card: All LEDs turn on briefly. The red LED, the yellow /STBY LED, the red REM LED, the green SYNC LED, and the green ACO LED turn on for about 10 seconds. The red LED and the green /STBY LED turn on for about 40 seconds. The red LED blinks for about 10 seconds. The red LED turns on for about 5 seconds. All LEDs (including the CRIT, MAJ, MIN, REM, SYNC, and ACO LEDs) blink once and turn off for about 10 seconds. The /STBY LED turns on. (The /STBY LED might take several minutes to turn on while the DCC processor boots.) Tip If you install a standby TCC2 card that has a different software version than the active TCC card, the newly installed standby TCC2 card automatically copies the software version from the active TCC2 card. You do not need to do anything in this situation. However, the loading TCC2 card does not boot up in the normal manner. When the standby card is first inserted, the LEDs follow most of the sequence listed in Step 11. After the red LED turns on for about 5 seconds, the LED and the /STBY LED begin to flash alternately for up to 30 minutes while the new software loads onto the active TCC2 card. After loading the new software the upgraded TCC2 card s LEDs repeat the sequence from Step 11, and the amber /STBY LED turns on. If you insert a card into a slot provisioned for a different card, all LEDS turn off. 2-8

9 Chapter 2 DLP-A37 Install the XC, XCVT, or XC10G Cards Alarm LEDs might be on; disregard alarm LEDs until you are logged into CTC and can view the Alarms tab. Step 12 Step 13 Verify that the /STBY LED is amber for standby. Return to your originating procedure (NTP). DLP-A37 Install the XC, XCVT, or XC10G Cards Purpose This task installs the cross-connect (XC/XCVT/XC10G) cards. Cross-connect cards are not necessary in DWDM-only shelves. Tools/Equipment XC/XCVT/XC10G (cross-connect) cards Prerequisite Procedures DLP-A36 Install the TCC2 Cards, page 2-7 Required/As Needed Required in non-dwdm shelves. Onsite/Remote Onsite Security Level None Do not use this procedure to upgrade cross-connect cards. If you are upgrading an XC card to an XCVT, or an XCVT card to a XC10G, see Chapter 14, Upgrade Cards and Spans. When installing cards, let each card boot completely before installing the next card. Step 1 Step 2 Step 3 Open the latches/ejectors of the first XC, XCVT, or XC10G card that you will install. Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the receptacle at the back of the slot ( 8 or 10). Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 4 Verify the LED activity: The red LED turns on for 20 to 30 seconds. The red LED blinks for 35 to 45 seconds. The red LED turns on for 5 to 10 seconds. All LEDs blink once and turn on. The /STBY LED turns on. If you insert a card into a slot provisioned for a different card, all LEDS turn off. 2-9

10 DLP-A37 Install the XC, XCVT, or XC10G Cards Chapter 2 If the red LED does not turn on, check the power. If the red LED is on continuously or the LEDs act erratically, the card is not installed properly. Remove the card and repeat Steps 1 to 4. Step 5 Step 6 Step 7 Verify that the /STBY LED is green for active. Use the latches/ejectors to firmly slide the second cross-connect card along the guide rails until the card plugs into the receptacle at the back of the slot ( 8 or 10). Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 8 Verify the LED activity: The red LED turns on for 20 to 30 seconds. The red LED blinks for 35 to 45 seconds. The red LED turns on for 5 to 10 seconds. All LEDs blink once and turn on. The /STBY LED turns on. If you insert a card into a slot provisioned for a different card, all LEDS turn off. If the red LED does not turn on, check the power. If the red LED is turned on continuously or the LEDs act erratically, the card is not installed properly. Remove the card and repeat Steps 6 through 8. Step 9 Step 10 Verify that the /STBY LED is amber for standby. Return to your originating procedure (NTP). 2-10

11 Chapter 2 DLP-A38 Install the Alarm Interface Controller or Alarm Interface Controller International Card DLP-A38 Install the Alarm Interface Controller or Alarm Interface Controller International Card Purpose This task installs the AIC or AIC-I card. The AIC or AIC-I card provides connections for external alarms and controls (environmental alarms). Tools/Equipment AIC or AIC-I card Prerequisite Procedures DLP-A36 Install the TCC2 Cards, page 2-7 DLP-A37 Install the XC, XCVT, or XC10G Cards, page 2-9 for TDM and hybrid nodes Required/As Needed As needed Onsite/Remote Onsite Security Level None When installing cards, allow each card to boot completely before installing the next card. Step 1 Step 2 Step 3 Open the latches/ejectors on the card. Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the receptacle at the back of the slot ( 9). Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 4 Step 5 If you have installed the AIC card, verify the following: The red LED turns on for 1 second, then blinks for 1 to 5 seconds. After 1 to 5 seconds, all LEDs blink once and turn off. The LED turns on. If you have installed the AIC-I card, verify the following: The red LED turns on for 1 second, then blinks for 1 to 5 seconds. The PWR A and PWR B LEDs become red and the two INPUT/OUTPUT LEDs become green for approximately 3 seconds. The PWR A LED turns green, the INPUT/OUTPUT LEDs turn off, and the LED turns on. It may take up to 3 minutes for the PWR A and PWR B LEDs to update. If the red LED does not turn on, check the power. If you insert a card into a slot provisioned for a different card, no LEDs turn on. 2-11

12 NTP-A16 Install the OC-N Cards Chapter 2 If the red LED is on continuously or the LEDs act erratically, the card is not installed properly. Remove the card and repeat Steps 1 to 5. Step 6 Return to your originating procedure (NTP). NTP-A16 Install the OC-N Cards Purpose This procedure describes how to install optical (OC-N) cards (OC-3, OC-12, OC-48, and OC-192). Tools/Equipment OC-3, OC-12, OC-48, and OC-192 cards (as applicable) Prerequisite Procedures NTP-A15 Install the Common Control Cards, page 2-2 Required/As Needed As needed Onsite/Remote Onsite Security Level None During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Class I (21 CFR and ) and Class 1M (IEC ) laser products. Invisible laser radiation may be emitted from the end of the unterminated fiber cable or connector. Do not stare into the beam or view directly with optical instruments. Viewing the laser output with certain optical instruments (for example, eye loupes, magnifiers, and microscopes) within a distance of 100 mm may pose an eye hazard. Use of controls or adjustments or performance of procedures other than those specified may result in hazardous radiation exposure. On all OC-N cards except the OC192 LR/STM64 LH 1550 card, the laser is on even when the optical port is not in service. On the OC192 LR/STM64 LH 1550 card, the laser is active when the card is booted and the safety key is in the on position (labeled 1). The laser is off when the safety key is off (labeled 0). Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. 2-12

13 Chapter 2 NTP-A16 Install the OC-N Cards To simplify path protection to bidirectional line switch ring (BLSR) conversion and node addition, install OC-N cards according to a high-speed east (s 12 and 13) and west (s 5 and 6) configuration. This configuration is not mandatory. If you install a card incorrectly, the LED flashes continuously. During the boot process an out-of-service (OOS) OC-N port will output AIS-L to any in-service (IS) far-end receivers. See the Cisco ONS Troubleshooting Guide for further information about the AIS-L condition. Step 1 Step 2 If you installed XC or XCVT cards, review Table 2-1 on page 2-3 to determine card/slot compatibility. If you installed XC10G cards, review Table 2-2 on page 2-5 to determine card/slot compatibility. Install higher-capacity cards first; for example, install an OC-192 card before installing an OC-48 card. Let each card completely boot before installing the next card. Open the card latches/ejectors. Step 3 Before installing an OC192 LR/STM64 LH 1550 card, make sure the safety key on the faceplate is in off position (labeled 0). When in the on position (labeled 1), the laser is activated. Use the latches/ejectors to firmly slide the OC-N card along the guide rails until the card plugs into the receptacle at the back of the slot. If you install the wrong card in a slot, complete the NTP-A116 Remove and Replace a Card procedure on page Step 4 Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 5 Step 6 Verify the LED activity: The red LED turns on for 20 to 30 seconds. The red LED blinks for 35 to 45 seconds. All LEDs blink once and turn off for 5 to 10 seconds. The or /STBY LED becomes amber. The signal fail () LED can persist until all card ports connect to their far end counterparts and a signal is present. If the card does not boot up properly, or the LED activity does not mimic Step 5, check the following: When a physical card type does not match the type of card provisioned for that slot in CTC, the card might not boot. If an OC-N card does not boot, open CTC and ensure that the slot is not provisioned for a different card type before assuming the card is faulty. If the red LED does not turn on, check the power. 2-13

14 NTP-A249 Install the Transponder and Muxponder Cards Chapter 2 If you insert a card into a slot provisioned for a different card, all LEDS turn off. If the red LED is on continuously or the LEDs behave erratically, the card is not installed properly. Remove the card and repeat Steps 2 to 5. Step 7 Continue with the NTP-A247 Install Fiber-Optic Cables on OC-N Cards procedure on page Stop. You have completed this procedure. NTP-A249 Install the Transponder and Muxponder Cards Purpose This procedure describes how to install the P_MR_10G, P_MR_2.5G, PP_MR_2.5G (transponder) and MXP_2.5G_10G (muxponder) cards. Tools/Equipment P_MR_10G, P_MR_2.5G, PP_MR_2.5G, and MXP_2.5G_10G cards (as applicable) Prerequisite Procedures NTP-A15 Install the Common Control Cards, page 2-2 Required/As Needed As needed Onsite/Remote Onsite Security Level None During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Class 1 Laser Product. Complies with 21 CFR and except for deviations pursuant to Laser Notice No. 50, dated July 26, Invisible laser radiation may be emitted from the end of the unterminated fiber cable or connector. Do not stare into the beam or view directly with optical instruments. Viewing the laser output with certain optical instruments (for example, eye loupes, magnifiers, and microscopes) within a distance of 100 mm may pose an eye hazard. Use of controls or adjustments or performance of procedures other than those specified may result in hazardous radiation exposure. Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. 2-14

15 Chapter 2 NTP-A249 Install the Transponder and Muxponder Cards If you install a card incorrectly, the LED flashes continuously. Cisco recommends that you install transponder and muxponder cards after you install OC-N cards, as applicable. Step 1 Step 2 Step 3 If you installed XC or XCVT cards, review Table 2-1 on page 2-3 to determine card/slot compatibility. If you installed XC10G cards, review Table 2-2 on page 2-5 to determine card/slot compatibility. Open the card latches/ejectors. Use the latches/ejectors to firmly slide the transponder or muxponder card along the guide rails until the card plugs into the receptacle at the back of the slot. If you install the wrong card in a slot, complete the NTP-A116 Remove and Replace a Card procedure on page Step 4 Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 5 Step 6 Step 7 Verify the LED activity: The red LED turns on for 20 to 30 seconds. The red LED blinks for 35 to 45 seconds. All LEDs blink once and turn off for 5 to 10 seconds. The or /STBY LED turns on. The signal fail () LED can persist until all card ports connect to their far end counterparts and a signal is present. If the card does not boot up properly, or the LED activity does not mirror Step 5, check the following: When a physical card type does not match the type of card provisioned for that slot in CTC, the card might not boot. If a transponder or muxponder card does not boot, open CTC and ensure that the slot is not provisioned for a different card type before assuming the card is faulty. If the red LED does not turn on, check the power. If you insert a card into a slot provisioned for a different card, all LEDS turn off. If the red LED is on continuously or the LEDs behave erratically, the card is not installed properly. Remove the card and repeat Steps 2 to 5. If you installed an MXP_2.5G_10G, P_MR_2.5G, or PP_MR_2.5G card, complete the DLP-A469 Install GBIC or P Connectors task on page Step 8 Continue with the NTP-A247 Install Fiber-Optic Cables on OC-N Cards procedure on page Stop. You have completed this procedure. 2-15

16 NTP-A17 Install the Electrical Cards Chapter 2 NTP-A17 Install the Electrical Cards Purpose This procedure describes how to install electrical cards (DS-1, DS-3, DS3XM-6 and EC-1). Tools/Equipment Electrical cards Prerequisite Procedures NTP-A15 Install the Common Control Cards, page 2-2 Required/As Needed As needed Onsite/Remote Onsite Security Level None During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. Install higher-capacity cards first; for example, install a DS-3 card before installing a DS-1 card. Let each card boot completely before installing the next card. If you are installing OC-N, P, or MXP cards Cisco recommends that you install these before you install electrical cards, as applicable. Step 1 Step 2 Step 3 If you installed XC or XCVT cards, review Table 2-1 on page 2-3 to determine card/slot compatibility. If you installed XC10G cards, review Table 2-2 on page 2-5 to determine card/slot compatibility. Open the card latches/ejectors. Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the receptacle at the back of the slot. If you install the wrong card in a slot, complete the NTP-A116 Remove and Replace a Card procedure on page Step 4 Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. 2-16

17 Chapter 2 NTP-A246 Install Ethernet Cards and Connectors Step 5 Verify the LED activity: The red LED turns on for 10 to 15 seconds. If the red LED does not turn on, check the power. The red LED blinks for 30 to 40 seconds. All LEDs blink once and turn off for 1 to 5 seconds. The or /STBY LED turns on. The LED can persist until all card ports connect to their far end counterparts and a signal is present. If you insert a card into a slot provisioned for a different card, all LEDs turn off. If the red LED is on continuously or the LEDs behave erratically, the card is not installed properly. Remove the card and repeat Steps 2 to 5. Step 6 Continue with the NTP-A246 Install Ethernet Cards and Connectors procedure on page 2-17 if necessary. Stop. You have completed this procedure. NTP-A246 Install Ethernet Cards and Connectors Purpose This procedure describes how to install the Ethernet cards (E100T-12, E100T-G, E1000-2, E G, G1000-4, G1K-4, ML100-T-12, and ML10002). Tools/Equipment Ethernet cards Prerequisite Procedures NTP-A15 Install the Common Control Cards, page 2-2 Required/As Needed As needed Onsite/Remote Onsite Security Level None During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Class I (21 CFR and ) and Class 1M (IEC ) laser products. Invisible laser radiation may be emitted from the end of the unterminated fiber cable or connector. Do not stare into the beam or view directly with optical instruments. Viewing the laser output with certain optical instruments (for example, eye loupes, magnifiers, and microscopes) within a distance of 100 mm may pose an eye hazard. Use of controls or adjustments or performance of procedures other than those specified may result in hazardous radiation exposure. 2-17

18 DLP-A39 Install Ethernet Cards Chapter 2 Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. If you are installing OC-N, P, or MXP cards Cisco recommends that you install these before you install Ethernet cards Step 1 Step 2 If you installed XC or XCVT cards review Table 2-1 on page 2-3 to determine card/slot compatibility. If you installed XC10G cards, review Table 2-2 on page 2-5 to determine card/slot compatibility. Complete the DLP-A39 Install Ethernet Cards task on page Allow each card to boot completely before installing the next card. If you install the wrong card in a slot, complete the NTP-A116 Remove and Replace a Card procedure on page Step 3 Complete the DLP-A469 Install GBIC or P Connectors task on page 2-20 if you are using E1000-2, E G, G1000-4, or ML cards. If you need to remove a GBIC or P, complete the DLP-A470 Remove GBIC or P Connectors task on page Step 4 Continue with the NTP-A245 Route Fiber-Optic Cables procedure on page Stop. You have completed this procedure. DLP-A39 Install Ethernet Cards Purpose This task installs the Ethernet cards. Tools/Equipment Ethernet cards Prerequisite Procedures NTP-A15 Install the Common Control Cards, page 2-2 Required/As Needed As needed Onsite/Remote Onsite Security Level None Step 1 Step 2 Open the card latches/ejectors. Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the receptacle at the back of the slot. 2-18

19 Chapter 2 DLP-A39 Install Ethernet Cards Step 3 Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 4 Verify the LED activity: The red LED turns on for 20 to 30 seconds. The red LED blinks for 35 to 45 seconds. All LEDs blink once and turn off for 1 to 5 seconds. The or /STBY LED turns on. The LED can persist until all card ports connect to their far end counterparts and a signal is present. If the red LED does not turn on, check the power. If you insert a card into a slot provisioned for a different card, all LEDs turn off. Step 5 Return to your originating procedure (NTP). 2-19

20 DLP-A469 Install GBIC or P Connectors Chapter 2 DLP-A469 Install GBIC or P Connectors Purpose Tools/Equipment This task installs gigabit interface converters (required for E-Series Ethenet, G-Series Ethernet, and FC_MR-4 cards) and small-form factor pluggables (Ps) (required for ML and MXP cards) and attaches fiber to the connectors. For E G use: SX GBIC= for short-reach applications LX GBIC= for long-reach applications For the G or G1K-4 card use: SX GBIC= for short-reach applications LX GBIC= for long-reach applications ZX GBIC= for extra long-reach applications DWDM GBIC= for DWDM applications For the ML card use: SX P= for short-reach applications LX P= for long-reach applications For the MXP card use: 15454E-P-L.16.1= for short-reach applications ONS-SE-2G-S1= for long-reach applications For the FC_MR-4 card use: ONS-GX-2FC-SML= (2Gb FC 1310nm Single mode with SC connectors) ONS-GX-2FC-MMI= (2Gb FC 850nm Multi mode with SC connectors) Prerequisite Procedures NTP-A249 Install the Transponder and Muxponder Cards, page 2-14 DLP-A39 Install Ethernet Cards, page 2-18 NTP-A274 Install the FC_MR-4 Cards, page 2-23 Required/As Needed As needed Onsite/Remote Onsite Security Level None G-Series cards manufactured before August 2003 do not support DWDM GBICs. G cards compatible with DWDM GBICs have a CLEI code of SNP8KW0KAB. Compatible G1K-4 cards have a CLEI code of WM5IRWPCAA. All versions of G and G1K-4 cards support CWDM GBICs. 2-20

21 Chapter 2 DLP-A469 Install GBIC or P Connectors GBICs and Ps are hot-swappable and can therefore be installed/removed while the card/shelf assembly is powered and running. Step 1 Step 2 Remove the GBIC or P from its protective packaging. Check the label to verify that the GBIC or P is the correct type for your network. Table 2-3 shows the available GBICs. The GBICs are very similar in appearance. Check the GBIC label carefully before installing it. Table 2-3 Available GBICs GBIC 1000BaseSX 1000BaseLX Associated Cards Application Fiber Product Number E G G G1K-4 E G G G1K BaseZX G G1K-4 Short reach Long reach Extra long reach Multimode fiber up to 550 m long Single-mode fiber up to 5km long Single-mode fiber up to 70 km long FC_MR-4 Long reach Single-mode fiber, 1310nm FC_MR-4 Intermediate reach Multi-mode fiber, 850nm 15454E-GBIC-SX= 15454E-GBIC-LX= 15454E-GBIC-ZX= ONS-GX-2FC-SML= ONS-GX-2FC-MMI= Table 2-4 shows the available Ps. Table 2-4 Available Ps P Associated Cards Application Fiber Product Number 1000BaseSX ML Short reach Multimode fiber up to 550 m long 15454E-P-LC-SX= 1000BaseLX ML Long reach Single-mode fiber up to 5 km long 15454E-P-LC-LX= Step 3 Step 4 Verify the type of GBIC or P you are using: If you are using a GBIC with clips, go to Step 4. If you are using a GBIC with a handle, go to Step 5. If you are using an P, go to Step 6. For GBICs with clips: a. Grip the sides of the GBIC with your thumb and forefinger and insert the GBIC into the slot on the card. 2-21

22 DLP-A470 Remove GBIC or P Connectors Chapter 2 GBICs are keyed to prevent incorrect installation. Step 5 b. Slide the GBIC through the flap that covers the opening until you hear a click. The click indicates the GBIC is locked into the slot. c. When you are ready to attach the network fiber-optic cable, remove the protective plug from the GBIC and save the plug for future use. d. Continue with Step 7. For GBICs with a handle: a. Remove the protective plug from the SC-type connector. b. Grip the sides of the GBIC with your thumb and forefinger and insert the GBIC into the slot on the card. c. Lock the GBIC into place by closing the handle down. The handle is in the correct closed position when it does not obstruct access to an SC-type connector. d. Slide the GBIC through the cover flap until you hear a click. The click indicates that the GBIC is locked into the slot. e. Continue with Step 7. GBICs are Class I laser products. These products have been tested and comply with Class I limits. Step 6 Step 7 Invisible laser radiation may be emitted from the aperture ports of the single-mode fiber optic modules when no cable is connected. Avoid exposure and do not stare into open apertures. For Ps: a. Plug the LC duplex connector of the fiber into a Cisco-supported P connector. b. If the new P connector has a latch, close the latch over the cable to secure it. c. Plug the cabled P connector into the card port until it clicks. Return to your originating procedure (NTP). DLP-A470 Remove GBIC or P Connectors Purpose This task disconnects fiber attached to GBICs or Ps and removes the GBICs or Ps. Tools/Equipment None Prerequisite Procedures DLP-A469 Install GBIC or P Connectors, page 2-20 Required/As Needed As needed Onsite/Remote Onsite Security Level None 2-22

23 Chapter 2 NTP-A274 Install the FC_MR-4 Cards Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams or view directly with optical instruments. Step 1 Step 2 Step 3 Step 4 Step 5 Disconnect the network fiber cable from the GBIC SC connector or P LC duplex connector. If the P connector has a latch securing the fiber cable, pull it upward to release the cable. If you are using a GBIC with clips: a. Release the GBIC from the slot by squeezing the two plastic tabs on each side of the GBIC. b. Slide the GBIC out of the Gigabit Ethernet module slot. A flap closes over the GBIC or P slot to protect the connector on the Gigabit Ethernet card. If you are using a GBIC with a handle: a. Release the GBIC by opening the handle. b. Pull the handle of the GBIC. c. Slide the GBIC out of the Gigabit Ethernet card slot. A flap closes over the GBIC slot to protect the connector on the Gigabit Ethernet card. If you are using an P: a. If the P connector has a latch securing the fiber cable, pull it upward to release the cable. b. Pull the fiber cable straight out of the connector. c. Unplug the P connector and fiber from the card. d. Slide the P out of the Gigabit Ethernet card slot. Return to your originating procedure (NTP). NTP-A274 Install the FC_MR-4 Cards Purpose This procedure installs the Fibre Channel (FC_MR-4) card. Tools/Equipment FC_MR-4 card(s) Prerequisite Procedures NTP-A15 Install the Common Control Cards, page 2-2 Required/As Needed As needed Onsite/Remote Onsite Security Level None During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Class I (21 CFR and ) and Class 1M (IEC ) laser products. 2-23

24 NTP-A274 Install the FC_MR-4 Cards Chapter 2 Invisible laser radiation may be emitted from the end of the unterminated fiber cable or connector. Do not stare into the beam or view directly with optical instruments. Viewing the laser output with certain optical instruments (for example, eye loupes, magnifiers, and microscopes) within a distance of 100 mm may pose an eye hazard. Use of controls or adjustments or performance of procedures other than those specified may result in hazardous radiation exposure. Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. Step 1 Step 2 Step 3 If you installed XC or XCVT cards review Table 2-1 on page 2-3 to determine card/slot compatibility. If you installed XC10G cards, review Table 2-2 on page 2-5 to determine card/slot compatibility. Open the card latches/ejectors. Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the receptacle at the back of the slot. If you install the wrong card in a slot, complete the NTP-A116 Remove and Replace a Card procedure on page 2-57 and install the correct card. Step 4 Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 5 Verify the LED activity: The red LED turns on for 20 to 30 seconds. The LED is amber for 3 to 5 seconds. The red LED blinks for up to 2 minutes. If the red LED does not turn on, check the power. The and LEDs blink once and turn off for 1 to 5 seconds. The LED turns on green to indicate the card is operational. If you insert a card into a slot provisioned for a different card, all LEDs turn off. Step 6 Complete the DLP-A469 Install GBIC or P Connectors task on page 2-20 to install GBICs on the FC_MR-4 card. 2-24

25 Chapter 2 NTP-A242 Install the DWDM Cards If you need to remove a GBIC or P, complete the DLP-A470 Remove GBIC or P Connectors task on page Step 7 Continue with the NTP-A247 Install Fiber-Optic Cables on OC-N Cards procedure on page Stop. You have completed this procedure. NTP-A242 Install the DWDM Cards Purpose This procedure describes how to install DWDM cards (OPT-PRE, OPT-BST, 32MUX-O, 32DMX-O, 4MD-xx.x, AD-1C-xx.x, AD-2C-xx.x, AD-4C-xx.x, AD-1B-xx.x, AD-4B-xx.x, OSCM, or OSC-CSM). Complete this procedure when instructed to do so in Chapter 5, Turn Up a DWDM Node. Tools/Equipment OPT-PRE, OPT-BST, 32MUX-O, 32DMX-O, 4MD-xx.x, AD-1C-xx.x, AD-2C-xx.x, AD-4C-xx.x, AD-1B-xx.x, AD-4B-xx.x, OSCM, or OSC-CSM cards (as applicable) Prerequisite Procedures DLP-A36 Install the TCC2 Cards, page 2-7 Required/As Needed As needed Onsite/Remote Onsite Security Level Provisioning or higher During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Complies with 21 CFR and except for deviations pursuant to Laser Notice No. 50, dated July 26, Class 1M Laser Product. Invisible laser radiation may be emitted from the end of the unterminated fiber cable or connector. Do not stare into the beam or view directly with optical instruments. Viewing the laser output with certain optical instruments (for example, eye loupes, magnifiers, and microscopes) within a distance of 100 mm may pose an eye hazard. Use of controls or adjustments or performance of procedures other than those specified may result in hazardous radiation exposure. Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. 2-25

26 NTP-A242 Install the DWDM Cards Chapter 2 Caution Do not install the DWDM cards until you are directed to do so during DWDM node turnup. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. If you install a card incorrectly, the LED flashes continuously. The automatic node setup (ANS) of the ONS DWDM system begins to determine what kind of site you are installing as soon as you install cards. The automatic power control (APC) is enabled after ANS initializes and after a channel has been provisioned. To provision a DWDM channel, see the NTP-A227 Provision a DWDM Optical Channel Network Connection procedure on page For more information about amplifier power control, see the Cisco ONS Reference Manual. Step 1 Step 2 Step 3 Plan your node installation or consult the site plan. As soon as you begin installing cards, ANS determines what kind of site to set up based on the following parameters: Hub site Two 32DMX-O and two 32MUX-O cards are provisioned but no AD-xC or AD-xB cards are provisioned Terminal One 32DMX-O and one 32MUX-O card are provisioned, and no AD-xC or AD-xB cards are provisioned Line site Only one OPT-PRE or OPT-BST is provisioned per line direction. (Up to two OPT-PRE and/or two OPT-BST cards can be provisioned in the same shelf.) OADM site At least 1 AD-xC or AD-xB is provisioned and no 32DMX-O or 32MUX-O cards are provisioned Unknown Provisioned cards do not follow any of the previously listed categories Open the card latches/ejectors. Use the latches/ejectors to firmly slide the DWDM card along the guide rails until the card plugs into the receptacle at the back of the slot. If you install the wrong card in a slot, complete the NTP-A116 Remove and Replace a Card procedure on page 2-57 and install the correct card. Step 4 Use the following card placement guidelines. For specific information about each card, refer to the Cisco ONS Reference Manual. OPT-BST cards can be installed in any open east and west pair of slots but are often installed in s 1 and 17. OPT-PRE cards can be installed in any open east and west pair of slots but are often installed in s 2 and 16. OSCM cards, if used, are installed in s 8 and 10. OSC-CSM cards, if used (when there is no OPT-BST), can be installed in any open east and west pair of slots. 2-26

27 Chapter 2 NTP-A242 Install the DWDM Cards 32MUX-O cards are double-slot cards and are often installed in s 3 and 4 and s 14 and DMX-O cards are double-slot and are often installed in s 5 and 6 and s 12 and 13. AD cards (channel or band) and 4MD-xx.x combiner cards are installed in any open slots. Refer to Figures 2-8, 2-9, 2-10, and 2-11 to see typical site shelf diagrams that contain cards and show cabling schemes. Step 5 Verify that the card is inserted correctly and close the latches/ejectors on the card. It is possible to close the latches/ejectors when the card is not completely plugged into the backplane. Ensure that you cannot insert the card any further. Step 6 Step 7 Step 8 Verify the LED activity: The LED turns on for approximately 35 seconds The LED blinks for approximately 40 seconds All LEDs turn on and then turn off within 5 seconds If new software is being downloaded to the card, the and LEDs blink for 20 seconds to 3.5 minutes, depending on the card type The LED turns on The signal fail () LED stays on until all card ports connect to their far-end counterparts and a signal is present If the card does not boot up properly, or the LED activity does not mimic Step 5, check the following: When a physical card type does not match the type of card provisioned for that slot in CTC, the card might not boot. If a DWDM card does not boot, open CTC and ensure that the slot is not provisioned for a different card type before assuming the card is faulty. If the red LED does not turn on, check the power. If you insert a card into a slot provisioned for a different card, all LEDS turn off. If the red LED is on continuously or the LEDs behave erratically, the card is not installed properly. Remove the card and repeat Steps 2 to 6. If you installed OPT-PRE cards, complete the NTP-A243 Install the DWDM Dispersion Compensating Cards procedure on page Step 9 Complete the NTP-A244 Install Fiber-Optic Cables on DWDM Cards procedure on page Stop. You have completed this procedure. 2-27

28 NTP-A243 Install the DWDM Dispersion Compensating Cards Chapter 2 NTP-A243 Install the DWDM Dispersion Compensating Cards Purpose This procedure describes how to install the dispersion compensating cards (DCU-xx.x) for DWDM shelves and is required if OPT-PRE cards are installed. Required if the span is very long. If Metroplanner is used to generate the bill of materials, the need for DCUs will be indicated. Complete this procedure when instructed to do so in Chapter 5, Turn Up a DWDM Node. Tools/Equipment DCU-xx.x cards Prerequisite Procedures NTP-A15 Install the Common Control Cards, page 2-2 NTP-A242 Install the DWDM Cards, page 2-25 Required/As Needed As needed Onsite/Remote Onsite Security Level Provisioning or higher During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool due to electrical hazard. Complies with 21 CFR and except for deviations pursuant to Laser Notice No. 50, dated July 26, Class 1M laser product. Invisible laser radiation may be emitted from the end of the unterminated fiber cable or connector. Do not stare into the beam or view directly with optical instruments. Viewing the laser output with certain optical instruments (for example, eye loupes, magnifiers, and microscopes) within a distance of 100 mm may pose an eye hazard. Use of controls or adjustments or performance of procedures other than those specified may result in hazardous radiation exposure. Caution Always use the supplied ESD wristband when working with a powered ONS Plug the wristband cable into the ESD jack located on the lower-right outside edge of the shelf assembly. Caution Do not install the DWDM cards until you are directed to do so during DWDM node turnup. If protective clips are installed on the backplane connectors of the cards, remove the clips before installing the cards. 2-28

Install Cards and Fiber-Optic Cable

Install Cards and Fiber-Optic Cable CHAPTER 2 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Install Cards and Fiber-Optic Cable

Install Cards and Fiber-Optic Cable CHAPTER 2 This chapter explains how to install the Cisco ONS 15454 SDH cards and fiber-optic cable (fiber). Before You Begin This section lists the chapter procedures (NTPs). Turn to a procedure for applicable

More information

Install Cards and Fiber-Optic Cable

Install Cards and Fiber-Optic Cable CHAPTER 2 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Install Cards and Fiber-Optic Cable

Install Cards and Fiber-Optic Cable CHAPTER 2 This chapter explains how to install the Cisco ONS 15454 SDH cards and fiber-optic cable (fiber). Before You Begin This section lists the chapter procedures (NTPs). Turn to a procedure for applicable

More information

Installing Cisco ONS SONET/SDH MRC-12 Cards

Installing Cisco ONS SONET/SDH MRC-12 Cards Installing Cisco ONS 15454 SONET/SDH 15454 MRC-12 Cards Product Name: 15454-MRC-I-12 (SONET); 15454E-MRC-I-12 (SDH) This document provides card specifications and describes installation and removal procedures

More information

Ethernet Cards. 5.1 Card Overview CHAPTER

Ethernet Cards. 5.1 Card Overview CHAPTER CHAPTER 5 Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring

More information

Optical Cards. 4.1 OC-N Cards OC-N Card Overview CHAPTER

Optical Cards. 4.1 OC-N Cards OC-N Card Overview CHAPTER CHAPTER 4 This chapter describes the Cisco ONS 15454 optical card features and functions. It includes descriptions, hardware specifications, and block diagrams for each optical card. For installation and

More information

Installing ONS SDH OC3 IR 4/STM1 SH 1310 Cards

Installing ONS SDH OC3 IR 4/STM1 SH 1310 Cards Installing ONS 15454 SDH OC3 IR 4/STM1 SH 1310 Cards Product Name: 15454E-S1.1-4= This document contains a description of OC3 IR 4/STM1 SH 1310 card features, installation procedures, removal instructions,

More information

Create Circuits and VT Tunnels

Create Circuits and VT Tunnels CHAPTER 8 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

DWDM Topologies CHAPTER. This chapter explains Cisco ONS dense wavelength division multiplexing (DWDM) topologies.

DWDM Topologies CHAPTER. This chapter explains Cisco ONS dense wavelength division multiplexing (DWDM) topologies. CHAPTER 12 This chapter explains Cisco ONS 15454 dense wavelength division multiplexing (DWDM) topologies. Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature.

More information

General Troubleshooting

General Troubleshooting CHAPTER 1 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Upgrade, Add, and Remove Cards and Nodes

Upgrade, Add, and Remove Cards and Nodes 12 CHAPTER Upgrade, Add, and Remove Cards and Nodes The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in

More information

General Troubleshooting

General Troubleshooting 1 CHAPTER The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

9. NTP-C11 Remove and Replace an Ethernet Card, page 1-13 As needed, complete this procedure to remove and replace an ONS CL Ethernet card.

9. NTP-C11 Remove and Replace an Ethernet Card, page 1-13 As needed, complete this procedure to remove and replace an ONS CL Ethernet card. CHAPTER 1 This chapter provides procedures for installing the Cisco ONS 15310-CL shelf, cards, and fiber-optic cable. To view a summary of the tools and equipment required for installation, see the Required

More information

Shelf and FMEC Hardware

Shelf and FMEC Hardware CHAPTER 1 This chapter provides a description of Cisco ONS 15454 SDH shelf and backplane hardware. Card and cable descriptions are provided in Chapter 2, Common Control Cards, Chapter 3, Electrical Cards,

More information

Installing ONS SDH OC12 IR/STM4 SH 1310 Cards

Installing ONS SDH OC12 IR/STM4 SH 1310 Cards Installing ONS 15454 SDH OC12 IR/STM4 SH 1310 Cards Product Name: 15454E-S4.1-1= This document contains a description of OC12 IR/STM4 SH 1310 card features, installation procedures, removal instructions,

More information

Ethernet Cards. 5.1 Ethernet Card Overview CHAPTER

Ethernet Cards. 5.1 Ethernet Card Overview CHAPTER CHAPTER 5 Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring

More information

Create Circuits and Low-Order Tunnels

Create Circuits and Low-Order Tunnels CHAPTER 6 Create Circuits and Low-Order Tunnels The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a

More information

Create Circuits and Low-Order Tunnels

Create Circuits and Low-Order Tunnels 6 CHAPTER Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring

More information

Upgrade, Add, and Remove Cards and Nodes

Upgrade, Add, and Remove Cards and Nodes Upgrade, Add, and Remove Cards and Nodes Revised: November 24, 2016, OL-25031-02 Upgrade, Add, and Remove Cards and Nodes Note The terms Unidirectional Path Switched Ring and UPSR may appear in Cisco literature.

More information

Procedures in the chapter must be completed at every shelf (node) at your site.

Procedures in the chapter must be completed at every shelf (node) at your site. CHAPTER 3 This chapter explains how to provision a single Cisco ONS 15454 dense wavelength division multiplexing (DWDM) node and turn it up for service, including node name, date and time, timing references,

More information

Install the Cisco ONS CL

Install the Cisco ONS CL CHAPTER 1 This chapter provides procedures for installing the Cisco ONS 15310-CL shelf, cards, and fiber-optic cable. To view a summary of the tools and equipment required for installation, see the Required

More information

Install the Cisco ONS CL

Install the Cisco ONS CL 1 CHAPTER This chapter provides procedures for installing the Cisco ONS 15310-CL shelf, cards, and fiber-optic cable. To view a summary of the tools and equipment required for installation, see the Required

More information

Installing Cisco ONS XC10G Cards

Installing Cisco ONS XC10G Cards Product Name: 15454-XC-10G This document contains a description of XC10G card features, installation procedures, removal instructions, and technical specifications Use this document in conjunction with

More information

Create Circuits and Low-Order Tunnels

Create Circuits and Low-Order Tunnels 6 CHAPTER This chapter explains how to create Cisco ONS 15454 SDH low-order circuits and tunnels, high-order circuits, Ethernet circuits, and virtual concatenated (VCAT) circuits. For additional information

More information

CTC Information and Shortcuts

CTC Information and Shortcuts APPENDIXA CTC Information and Shortcuts Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional

More information

Turn Up a Node. Before You Begin CHAPTER

Turn Up a Node. Before You Begin CHAPTER CHAPTER 3 This chapter explains how to provision a single Cisco ONS 15454 dense wavelength division multiplexing (DWDM) node and turn it up for service, including node name, date and time, timing references,

More information

Manage Circuits. Before You Begin CHAPTER. This chapter explains how to manage Cisco ONS SDH electrical, optical and Ethernet circuits.

Manage Circuits. Before You Begin CHAPTER. This chapter explains how to manage Cisco ONS SDH electrical, optical and Ethernet circuits. CHAPTER 9 This chapter explains how to manage Cisco ONS 15454 SDH electrical, optical and Ethernet circuits. Before You Begin To create circuits, see Chapter 6, Create Circuits and Low-Order Tunnels. To

More information

Unless otherwise specified, ONS refers to both ANSI and ETSI shelf assemblies.

Unless otherwise specified, ONS refers to both ANSI and ETSI shelf assemblies. 2 CHAPTER Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring

More information

Add and Remove Nodes

Add and Remove Nodes CHAPTER 12 The terms Unidirectional Path Switched Ring and UPSR may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Manage the Node. Before You Begin CHAPTER

Manage the Node. Before You Begin CHAPTER CHAPTER 10 This chapter explains how to modify node provisioning for the Cisco ONS 15454 and perform common management tasks such as monitoring the dense wavelength division multiplexing (DWDM) automatic

More information

Convert Network Configurations

Convert Network Configurations 13 CHAPTER The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

System Overview. Introduction to the ONS CHAPTER

System Overview. Introduction to the ONS CHAPTER CHAPTER 1 Note The terms Unidirectional Path Switched Ring and UPSR may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Add and Remove Nodes

Add and Remove Nodes 14 CHAPTER The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

DLPs A100 to A199. DLP-A111 Changing the Maximum Number of Session Entries for Alarm History CHAPTER

DLPs A100 to A199. DLP-A111 Changing the Maximum Number of Session Entries for Alarm History CHAPTER 18 CHAPTER DLPs A100 to A199 DLP-A111 Changing the Maximum Number of Session Entries for Alarm History This task changes the maximum number of session entries included in the alarm history. Use this task

More information

Installing and Upgrading Internal Modules and FRUs

Installing and Upgrading Internal Modules and FRUs Installing and Upgrading Internal Modules and FRUs, page 1 This document describes how to install and upgrade internal modules and field replaceable units (FRUs) in the Cisco 1100 Series Integrated Services

More information

Installing the SFP, SFP+, and XFP Modules in Cisco CPT Platforms

Installing the SFP, SFP+, and XFP Modules in Cisco CPT Platforms Installing the SFP, SFP+, and XFP Modules in Cisco CPT Platforms Revised: February 24, 2015, OL-26709-03 Installing the SFP, SFP+, or XFP Modules in Cisco CPT Platforms This document provides compatibility

More information

DWDM Cards. 6.1 DWDM Card Overview CHAPTER

DWDM Cards. 6.1 DWDM Card Overview CHAPTER CHAPTER 6 This chapter describes Cisco ONS 15454 dense wavelength-division multiplexing (DWDM) card features and functions. For installation and card turn-up procedures, refer to the Cisco ONS 15454 Procedure

More information

CTC Information and Shortcuts

CTC Information and Shortcuts APPENDIX A Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring

More information

Pluggable Transceivers, Module Connectors

Pluggable Transceivers, Module Connectors Pluggable Transceivers, page 1 Module Connectors, page 7 Pluggable Transceivers This section provides brief descriptions of the pluggable transceivers that can be installed in the switch modules and supervisor

More information

Add and Remove Nodes

Add and Remove Nodes 13 CHAPTER The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Installing the Cisco NCS 2006 Door and Other Modules

Installing the Cisco NCS 2006 Door and Other Modules Installing the Cisco NCS 2006 Door and Other Modules Front Door This chapter explains how to install the NCS 2006 door and other modules. The sections are: Front Door, on page 1 NTP-L4 Installing the Standard

More information

This document provides information about Cisco NCS users and node timing. The document contains the topics mentioned below.

This document provides information about Cisco NCS users and node timing. The document contains the topics mentioned below. Introduction This document provides information about Cisco NCS users and node timing. The document contains the topics mentioned below. Node Timing Parameters, page 1 Network Timing, page 2 Synchronization

More information

Installing the Control Cards

Installing the Control Cards This chapter describes the common control cards needed for the Cisco NCS 2000 Series platforms and provides installation and card turn up procedures. Card Compatibility, page 1 Cards Supported in Cisco

More information

Storage Access Networking Cards

Storage Access Networking Cards CHAPTER 6 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

DLPs D400 to D499. DLP-D420 Install the Public-Key Security Certificate CHAPTER

DLPs D400 to D499. DLP-D420 Install the Public-Key Security Certificate CHAPTER 21 CHAPTER DLPs D400 to D499 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path

More information

Installing the Cisco NCS 2006 Door and Other Modules

Installing the Cisco NCS 2006 Door and Other Modules CHAPTER 22 Installing the Cisco NCS 2006 Door and Other Modules This chapter explains how to install the NCS 2006 door and other modules. 22.1 Front Door The front door of NCS 2006 provides access to the

More information

Introduction. Node Timing Parameters. Revised: June 5, 2017, OL This document provides information about Cisco NCS users and node timing.

Introduction. Node Timing Parameters. Revised: June 5, 2017, OL This document provides information about Cisco NCS users and node timing. Timing Reference Revised: June 5, 2017, OL-25030-01 Introduction This document provides information about Cisco NCS users and node timing. Note With references provided to configuration guides, see: For

More information

Manage Circuits. Before You Begin CHAPTER

Manage Circuits. Before You Begin CHAPTER CHAPTER 8 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Install the Shelf and Backplane Cable

Install the Shelf and Backplane Cable CHAPTER 1 Install the Shelf and Backplane Cable This chapter provides procedures for installing the Cisco ONS 15454. For a summary of the tools and equipment required for installation, see the Required

More information

Provision Transponder and Muxponder Cards

Provision Transponder and Muxponder Cards CHAPTER 5 This chapter explains how to provision transponder (TXP), muxponder (MXP), Xponder (GE_XP and 10GE_XP), and ADM-10G cards. The provisioning must be performed before you provision the dense wavelength

More information

Performance Monitoring

Performance Monitoring CHAPTER 15 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Unless otherwise specified, ONS refers to both ANSI and ETSI shelf assemblies.

Unless otherwise specified, ONS refers to both ANSI and ETSI shelf assemblies. 4 CHAPTER This chapter explains the ONS 15454 dense wavelength division multiplexing (DWDM) network applications and topologies. The chapter also provides network-level optical performance references.

More information

Connecting and Routing the Cables and Wires

Connecting and Routing the Cables and Wires This chapter explains how to install the NCS 2002 shelf. The sections are: NTP-L36 Attaching Wires to Timing, LAN, and Craft Pin Connections in NCS 2002, on page 1 NTP-L36 Attaching Wires to Timing, LAN,

More information

Installation Notes for the Cisco TwinGig and OneX Converter Modules

Installation Notes for the Cisco TwinGig and OneX Converter Modules Installation Notes for the Cisco TwinGig and OneX Converter Modules PID: CVR-X2-SFP and CVR-X2-SFP10G This note provides the installation instructions for the Cisco TwinGig and OneX Converter Modules.

More information

Installing the ASA 5550

Installing the ASA 5550 CHAPTER 3 Installing the ASA 5550 Caution Read the safety warnings in the Regulatory Compliance and Safety Information for the Cisco ASA 5500 Series and follow proper safety procedures when performing

More information

Installation Notes for the Catalyst 3750-X and 3560-X Network Modules

Installation Notes for the Catalyst 3750-X and 3560-X Network Modules Installation Notes for the Catalyst 3750-X and 3560-X Network Modules Published: October, 2011 This note provides the installation instructions for the Catalyst 3750-X and 3560-X network modules. Translations

More information

Cisco ONS SDH Product Overview

Cisco ONS SDH Product Overview The Cisco ONS 15454 SDH provides efficient bandwidth delivery and management in fiber-optic transport networks. It is a flexible, synchronous digital hierarchy (SDH) add/drop multiplexer that offers service

More information

Cards Specifications. 2.1 Card Overview CHAPTER

Cards Specifications. 2.1 Card Overview CHAPTER CHAPTER 2 This chapter contains specific information about cards for dense wavelength division multiplexing (DWDM) applications in the Cisco ONS 15454. Note The terms "Unidirectional Path Switched Ring"

More information

Compliance. Compliance Matrix APPENDIX

Compliance. Compliance Matrix APPENDIX APPENDIX A This appendix lists ONS 15454 compliance with regulatory and industry standards relevant to Class A, Type 2 and Type 4 devices. The following topics are covered in this chapter: Matrix, page

More information

Performance Monitoring

Performance Monitoring CHAPTER 15 Performance monitoring (PM) parameters are used by service providers to gather, store, set thresholds, and report performance data for early detection of problems. In this chapter, PM parameters

More information

Cisco Transport Controller Operation

Cisco Transport Controller Operation CHAPTER 8 This chapter describes Cisco Transport Controller (CTC), the software interface for the Cisco ONS 15454. For CTC set up and login information, refer to the Cisco ONS 15454 Procedure Guide. Chapter

More information

Removing and Replacing Chassis Components

Removing and Replacing Chassis Components This chapter provides instructions on how to remove and replace components from the Cisco NCS 4016 chassis., on page 1 Removing a Line Card This section describes how to remove a line card from the Cisco

More information

Optical Channel Circuits and Virtual Patchcords Reference

Optical Channel Circuits and Virtual Patchcords Reference CHAPTER 11 Optical Channel Circuits and Virtual Patchcords Reference This chapter explains the Cisco ONS 15454 dense wavelength division multiplexing (DWDM) optical channel (OCH) circuit types and virtual

More information

Installing the DS1-28/DS3-EC1-3 and DS1-84/DS3-EC1-3 Cards in the Cisco ONS MA

Installing the DS1-28/DS3-EC1-3 and DS1-84/DS3-EC1-3 Cards in the Cisco ONS MA Installing the DS1-28/DS3-EC1-3 and DS1-84/DS3-EC1-3 Cards in the Cisco ONS 15310-MA Product Names: 15310-28WBE-3BBE, 15310-84WBE-3BBE This document provides a card description, specifications, and an

More information

Create Circuits. Before You Begin CHAPTER

Create Circuits. Before You Begin CHAPTER CHAPTER 6 Create Circuits The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched

More information

CTC Information and Shortcuts

CTC Information and Shortcuts APPENDIX A This appendix describes how to navigate in the Cisco Transport Controller (CTC), change CTC table data displays, and lists menu and tool options for the Cisco ONS 15454 SDH. This appendix also

More information

DLPs D400 to D499. DLP-D420 Install the Public-Key Security Certificate CHAPTER

DLPs D400 to D499. DLP-D420 Install the Public-Key Security Certificate CHAPTER CHAPTER 21 DLPs D400 to D499 DLP-D420 Install the Public-Key Security Certificate Tools/Equipment Prerequisite Procedures Required/As Needed Onsite/Remote This task installs the ITU Recommendation X.509

More information

Upgrading Cisco ONS to Release 6.0

Upgrading Cisco ONS to Release 6.0 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Connecting and Routing the Cables

Connecting and Routing the Cables This chapter describes how to connect and route the cables for NCS 2015. The sections are: Cable Routing and Management, on page 1 NTP-L55 Routing and Locking Cable and Fiber Modules, on page 2 NTP-L56

More information

Installing the MWAM CHAPTER

Installing the MWAM CHAPTER CHAPTER This chapter provides information about installing the MWAM in a Catalyst 600/Cisco 7600 chassis and includes the following topics: Safety Recommendations, page -2, page - Verifying the Installation,

More information

Create Channels and Circuits

Create Channels and Circuits 7 CHAPTER This chapter explains how to create Cisco ONS 15454 dense wavelength division multiplexing (DWDM) optical channel client connections (OCHCCs), optical channel client network connections (OCHNCs),

More information

Unless otherwise specified, ONS refers to both ANSI and ETSI shelf assemblies.

Unless otherwise specified, ONS refers to both ANSI and ETSI shelf assemblies. 13 CHAPTER Maintain the Node This chapter provides procedures for maintaining the Cisco ONS 15454, including database backup and restoration, removing and replacing cards, viewing the ONS 15454 audit trail,

More information

Connect Router to the Network

Connect Router to the Network Port Connection Guidelines, on page 1 Route Processor Card Overview, on page 2 Install and Remove Transceiver Modules, on page 5 Connect Interface Ports, on page 15 Maintain Transceivers and Optical Cables,

More information

Switched Uplink Modules

Switched Uplink Modules APPENDIX D Switched Uplink Modules When installed in a FastHub 400 model, each 10BaseT/100BaseTX and 100BaseFX switched uplink module provides a separate switched collision domain for traffic to the workgroup

More information

Installing the TXP_MR_10E_C and TXP_MR_10E_L Cards in the Cisco ONS SONET/SDH

Installing the TXP_MR_10E_C and TXP_MR_10E_L Cards in the Cisco ONS SONET/SDH Installing the TXP_MR_10E_C and TXP_MR_10E_L Cards in the Cisco ONS 15454 SONET/SDH Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer

More information

Upgrading the Cisco ONS to Release 7.2

Upgrading the Cisco ONS to Release 7.2 October 2007 The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring configuration.

More information

Installing a Network Module

Installing a Network Module 3 CHAPTER This chapter describes how to install and connect a network module. Overview, page 3-1 in the Switch, page 3-4 SFP and SFP+ Modules, page 3-7 Finding the Network Module Serial Number, page 3-9

More information

Card Protection. 4.1 Overview CHAPTER

Card Protection. 4.1 Overview CHAPTER CHAPTER 4 Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring

More information

Cisco MSPP-on-a-Blade Card: Multiservice Aggregation for the Cisco ONS Platform

Cisco MSPP-on-a-Blade Card: Multiservice Aggregation for the Cisco ONS Platform Data Sheet Cisco MSPP-on-a-Blade Card: Multiservice Aggregation for the Cisco ONS 15454 Platform Cisco introduces the new Cisco Multiservice Provisioning Platform (MSPP)-on-a- Blade Card for the Cisco

More information

Hardware Specifications

Hardware Specifications APPENDIXA This appendix contains hardware and software specifications for the ONS 15454 SDH, including: A.1 Shelf Specifications, page A-1 A.2 SFP and XFP Specifications, page A-4 A.3 General Card Specifications,

More information

Create Circuits and VT Tunnels

Create Circuits and VT Tunnels CHAPTER 6 This chapter explains how to create Cisco ONS 15310-CL and ONS 15310-MA electrical circuits, Virtual Tributary (VT) tunnels, optical circuits, and Ethernet circuits. For additional information

More information

1-Port Gigabit Ethernet Line Card Overview

1-Port Gigabit Ethernet Line Card Overview CHAPTER -Port Gigabit Ethernet Line Card Overview This chapter describes the Cisco series -port Gigabit Ethernet line card (referred to as the -port Gigabit Ethernet line card), and contains the following

More information

Add and Remove Nodes

Add and Remove Nodes CHAPTER 14 Add and Remove Nodes This chapter explains how to add and remove Cisco ONS 15454 SDH nodes from multiplex section-shared protection rings (MS-SPRings), subnetwork connection protection (SNCP)

More information

Hardware Specifications

Hardware Specifications APPENDIXA This appendix contains hardware and software specifications for the ONS 15454 SDH. A.1 Shelf Specifications This section provides specifications for shelf bandwidth; a list of topologies; Cisco

More information

Cisco ONS CL Shelf Assembly Hardware

Cisco ONS CL Shelf Assembly Hardware CHAPTER 1 This chapter provides a description of Cisco ONS 15310-CL shelf hardware. Instructions for installing equipment are provided in the Cisco ONS 15310-CL and Cisco ONS 15310-MA Procedure Guide.

More information

Installing the ONS M12 (ANSI and ETSI) Shelf

Installing the ONS M12 (ANSI and ETSI) Shelf Installing the ONS 15454 M12 (ANSI and ETSI) Shelf This chapter explains how to install the ONS 15454 (ANSI and ETSI) shelf. Unless otherwise specified, ONS 15454 refers to both ANSI and ETSI M12 shelf

More information

A.1 Cisco ONS CL Shelf Specifications. This section includes hardware and software specifications.

A.1 Cisco ONS CL Shelf Specifications. This section includes hardware and software specifications. APPENDIX A Note The terms "Unidirectional Path Switched Ring" and "UPSR" may appear in Cisco literature. These terms do not refer to using Cisco ONS 15xxx products in a unidirectional path switched ring

More information

Port Type Link Status (Left Side LED) Speed (Right Side LED) Green solid: Link detected/no activity Off: No link/card offline

Port Type Link Status (Left Side LED) Speed (Right Side LED) Green solid: Link detected/no activity Off: No link/card offline C-Series FlexMedia Card: 36 Ports 10/100/1000 Base-T Ethernet (PoE and non-poe), 8 Ports 1G, 2 Ports 10G Feature Highlights and Installation Instructions Feature Highlights There are two versions of the

More information

Hardware Specifications

Hardware Specifications APPENDIXA Hardware Specifications This appendix contains hardware and software specifications for the ONS 15454 SDH, including: A.1 Shelf Specifications, page A-1 A.2 SFP and XFP Specifications, page A-4

More information

Card Protection. 7.1 Electrical Card Protection CHAPTER

Card Protection. 7.1 Electrical Card Protection CHAPTER CHAPTER 7 Card ion This chapter explains the Cisco ONS 15454 card protection configurations. To provision card protection, refer to the Cisco ONS 15454 Procedure Guide. Chapter topics include: 7.1 Electrical

More information

Installing Supervisor Engines

Installing Supervisor Engines CHAPTER Revised: July 0 This chapter describes how to safely install and remove supervisor engines modules in the Catalyst 00 series switches, and it contains these sections: Safety, page - Required Tools,

More information

DLPs H1 to H99. DLP-H1 Unpack and Verify the Shelf Assembly. DLP-H2 Inspect the Shelf Assembly CHAPTER

DLPs H1 to H99. DLP-H1 Unpack and Verify the Shelf Assembly. DLP-H2 Inspect the Shelf Assembly CHAPTER CHAPTER 16 DLP-H1 Unpack and Verify the Shelf Assembly Tools/Equipment Prerequisite Procedures Required/As Needed Onsite/Remote This task removes the ONS 15310-MA SDH shelf assembly from the package. None

More information

Power Systems and 5877 removal and replacement procedures

Power Systems and 5877 removal and replacement procedures Power Systems 5802 and 5877 removal and replacement procedures Power Systems 5802 and 5877 removal and replacement procedures Note Before using this information and the product it supports, read the information

More information

Overview. Inspection and Cleaning CHAPTER

Overview. Inspection and Cleaning CHAPTER CHAPTER The Cisco CRS- fiber-optic cleaning kit (CRS-FIBER-CLN-KIT=) is used to clean all multiferrule (MT) optics in a Cisco CRS- Carrier Routing System Multishelf System using the Cisco CRS- fiber-optic

More information

Protection Schemes and Network Topologies

Protection Schemes and Network Topologies CHAPTER 2 This chapter describes how protection is implemented on the Cisco ONS 15540 ESPx. It also describes the supported network topologies and how protection works in these topologies. This chapter

More information

Enhanced C-Band Optical Amplifier for the Cisco ONS Multiservice Transport Platform

Enhanced C-Band Optical Amplifier for the Cisco ONS Multiservice Transport Platform Enhanced C-Band Optical Amplifier for the Cisco ONS 15454 Multiservice Transport Platform The Cisco ONS 15454 Multiservice Transport Platform (MSTP) provides a comprehensive, intelligent dense wavelength-division

More information

MX Ring. WDM - MUX/DeMUX. MUX/DeMUX. Features Full native mode performance Optical connectors Passive model requires no power.

MX Ring. WDM - MUX/DeMUX. MUX/DeMUX. Features Full native mode performance Optical connectors Passive model requires no power. WDM - MUX/DeMUX MX20-3155 Dual Channel WDM MUX/DeMUX 5 MX20-3155 is a dual channel, passive, protocol transparent, WDM multiplexer/demultiplexer which utilizes two popular WDM lambda channels of 1310nm

More information

Create Circuits. Before You Begin CHAPTER

Create Circuits. Before You Begin CHAPTER 6 CHAPTER Create Circuits This chapter explains how to create Cisco ONS 15600 SDH circuits and tunnels. For additional information, refer to the Circuits and Tunnels chapter in the Cisco ONS 15600 SDH

More information

Change Card Settings

Change Card Settings CHAPTER 11 This chapter explains how to change transmission settings on cards in a Cisco ONS 15600. Before You Begin As necessary, complete the NTP-E57 Document Existing Provisioning procedure on page

More information