1 EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston Decision Summary EBRO File No.: 16EBR001.R Issue: The Ministry of the Environment and Climate Change received an Application for Review on June 29, 2016 pursuant to the Environmental Bill of Rights, 1993 requesting the ministry conduct a review of the Environmental Compliance Approval issued in 2013 to Cruickshank Construction Limited. The application also requested that the ministry consider reviewing the facility s proposed 2016 Environmental Compliance Approval amendments which were posted for public comment on the Environmental Registry under EBR# On October 25, 2016, the ministry received additional comments from one of the applicants related to the facility which have also been considered in this review. The ministry has considered the applicant s concern that relates to combining site-wide air and noise emissions in the facility s Environmental Compliance Approval submission. An Environmental Bill of Rights Application for Review is for a review of existing policies, acts, regulations or instruments, in this case, a review of the Environmental Compliance Approval. As the application also outlines several issues of non-compliance with the existing Environmental Compliance Approval, the ministry s review also assessed the compliance activities related at the site, which is documented as an appendix to this Environmental Bill of Rights request. Summary of the EBR Application Request for Review & Consideration: The application outlines several reasons for the non-compliance with the Environmental Compliance Approval (ECA) which have been summarized as follows Inadequate Noise Control Deficiencies in the noise control requirements identified in the operator s ECA # CPZG when approved in

2 10 noise barriers (berms) in Schedule A of the 2009 ECA were not built to control off-site impacts. Noise audits required by the 2009 and 2013 ECAs were not carried out. There are only 4 berms instead of 5. The quarry has operated for decades without noise protection for the nearest residential receptor, located 120 metres from main quarry entrance. A huge berm is shown on early site plans (2003) along the licenced boundary and Golder Noise Assessments (2007, 2009, 2010) specified a major berm in the same location. The operator failed to build the berm in 2015; it remains half built. Throughout this entire time, the quarry was in non-compliance, but was allowed to remain in full operation. Inadequate Dust Control Dust control measures at the facility have been insufficient as apparent from the complaints to the operator which were not communicated to the ministry. The Best Management Practices Plan was not properly implemented. Operation of Equipment Crushing and washing occurred in the north location of the quarry in without completing the required acoustic audits. Hours of Operation The facility has operated outside its approved hours of operation. Ministry Enforcement Additional problems were identified in correspondence with ministry staff in Kingston, supported by records obtained under the Freedom of Information and Protection of Privacy Act. Minimal enforcement action taken by the local ministry staff to correct major site problems. Public concerns about ministry s true capacity to regulate this facility properly in the future. Approval Uncertainty / Accountability 2

3 The meaning of the refusal notice for the 2016 ECA application, in particular, whether the 2013 ECA remains in effect despite the refusal decision. Expressed concern that the facility might launch a successful appeal regarding the decision of the 2016 ECA refusal. Emissions Report Concerns that pollutants from the aggregates operation, asphalt plant and the CBM Ready Mix Plant have historically been submitted/considered in isolation from each other. Ancillary operations in the same area should be combined and considered as one facility. Concerned with the quality of work from Golder Associates Ltd. (the consultant). Background The Elginburg quarry was purchased in 1965 by McGinnis & O'Connor Limited. In 1986 the quarry was owned and operated by Frontenac Aggregates and Construction, a division of Cruickshank Construction Ltd. As of 2005, Cruickshank Construction Limited still owns and operates the quarry under a licence by the Ministry of Natural Resources and Forestry under the Aggregate Resources Act. Cruickshank Construction Limited (operator) operates under a 2013 ECA issued by the Ministry of the Environment and Climate Change. The ECA authorizes the operation of a hot mix asphalt plant and contains conditions related to operation and maintenance, noise, fugitive dust, and reporting requirements. The ECA further regulates noise and dust emissions from all activities associated with the entire quarry operation. The facility previously operated under an ECA dated 2009 which was revoked and replaced by the 2013 ECA. The 2009 ECA was issued based on the company s proposal to construct 10 new berms (in addition to the existing north perimeter berm) at specific locations and dimensions specified in Schedule A. The 2009 ECA application was reviewed in accordance with ministry noise guidelines and approved with the requirement that the 10 new berms be constructed not later than three months from the date of the issued approval. Within the same period of three months the company had to strategically locate shielding of some asphalt plant components. The details of the specific abatement measures for this task were required to be provided within an updated Acoustic Assessment Report. There was also a specific condition for an updated Acoustic Assessment Report to be sent to the ministry no later than four months after the issuance of the ECA. 3

4 Schedule A of the ECA stated that all Noise Control Measures (Phase 1 berms and strategically located shielding of some asphalt plant components, and Phase 2 abatement measures for the replacing of existing diesel generators with quieter units, and locating the entire crushing operation deeper, up to 10 metres, into the quarry floor) had to be implemented in accordance with approved stated time periods for their implementation. The ECA also included a condition for an acoustic audit to be conducted by an independent consultant, and the acoustic audit report was required to be submitted to the ministry no later than three months after fully implementing the Noise Control Measures detailed in Schedule A of the ECA. o The ministry did not receive an acoustic audit since the company did not implement the noise controls as mentioned in Schedule A. Instead, the company submitted an application for an amended ECA. In accordance with condition 4 of the noise related conditions in the 2009 ECA, the consultant (on behalf of the operator) submitted the updated Acoustic Assessment Report within the four month requirement of the issuance of the 2009 ECA. The updated report dated October 30, 2009 showed that only five noise barriers (BR-4 incorporated previously existing north perimeter berm) were in existence at the time the updated report was completed and submitted to ministry for a review. The ministry reviewed the updated report and determined that there were modifications in relation to previously approved equipment, facility operation time, noise control measures and assessment criteria. Ministry technical review also revealed that the methodology for establishing new assessment criteria presented in the report was not acceptable. Therefore the ministry issued a letter on February 5, 2010 advising the company that condition 4 of the 2009 ECA had not been fulfilled and that the company was required to resubmit an Acoustic Assessment Report. In June 2010, the ministry received an application to amend the 2009 ECA to include a below-grade generator for the facility s mobile crusher, relocate the crushing and washing operation to the north quarry, and to update the noise profile of the facility to reflect only five berms for noise control. A new ECA (which revoked and replaced the 2009 ECA) for the site was issued in The 2013 noise profile was updated according to the application submitted by the operator, which is mentioned on page 2 of the 2013 ECA. An amendment was issued in 2013 which revoked and replaced the 2009 ECA noise conditions because the supporting Acoustic Assessment Report dated June 2010 demonstrated that only five berms were needed for noise control. It is noted that the berm closest to the nearest residential receptor, located 120 metres from main quarry entrance (BR-2) as referenced in the applicants submission, was required as part of the 2009 ECA, however it was later deemed to be one of the five berms not required in order for the facility to operate in accordance 4

5 with the ministry s noise guidelines. Subsequently, BR-2 was not one of the berms included in the 2013 approval. On February 3, 2014, the ministry received a Best Management Practices Plan from the operator, as required by their 2013 ECA, which describes, among other things, measures to minimize dust emissions from the facility. In April 2016, the facility submitted an updated Best Management Practices Plan to the ministry in accordance with the requirements in condition 7 and 8 of its ECA as a result of recent operational changes made at the site. On June 22, 2016, the ministry issued a Notice to the 2013 ECA that fulfilled this requirement. On June 3, 2016, following the ministry s technical review of the 2016 application for an amendment to the 2013 ECA, the ministry issued a Notice of Refusal as the facility operator was unable to supply the ministry with the requested site-wide Acoustic Assessment Report with detailed Noise Abatement Action Plan, demonstrating the compliance of the facility with the Environmental Protection Act and its regulations, in accordance with Section 9(4) of the Act. Outcome of Review: 2013 ECA After careful consideration of the information contained in the Environmental Bill of Rights Application for Review received on June 29, 2016, it is the ministry s position that the request for review of the 2013 Environmental Compliance Approval # CPZG was reviewed and issued in accordance to ministry standards ECA Also, since the 2016 ECA application for amendment, posted on the Environmental Bill of Rights Registry (EBR ) was refused based on insufficient information, the ministry did not undertake an Environmental Bill of Rights Review of this ECA. Next Steps Following the issuance of the Notice of Refusal in June 2016, the ministry participated in a pre-submission consultation meeting with the operator and their consultants in September The operator committed to resubmitting its application for an amendment to the ministry in winter 2016/2017. This resubmission will further address the outstanding concerns which led to the refusal of the 2016 amendment application. The resubmission will address the installation of the more efficient and quieter burner which will bring the company into compliance with its ECA, proposed on-site ventilation adjustments to the asphalt plant, and an earlier start time for the asphalt 5

6 plant. During the meeting the company advised the ministry that they will no longer be requesting the removal of BR-5 and that it will remain in place. The resubmission will include combined site-wide air and noise emissions. Following the resubmission, the ministry will again thoroughly conduct a review of the technical information submitted and will also conduct a site visit to support the review of the resubmission. When received, the resubmission will be posted on the Environmental Bill of Rights Registry for further public comment. The ministry will continue to communicate with the concerned citizens and be available to address any concerns associated with the site. 6

7 APPENDIX * EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry Kingston *Some of the information below has been introduced in the Decision Summary above. Overview of ECA and Compliance related Activities The Elginburg quarry was purchased in 1965 by McGinnis & O'Connor Limited. In 1986 the quarry was owned and operated by Frontenac Aggregates and Construction, a division of Cruickshank Construction Ltd. As of 2005, Cruickshank Construction Limited still owns and operates the quarry under a licence by the Ministry of Natural Resources and Forestry under the Aggregate Resources Act. Cruickshank Construction Limited (operator) operates under a 2013 ECA issued by the Ministry of the Environment and Climate Change. The ECA authorizes the operation of a hot mix asphalt plant and contains conditions related to operation and maintenance, noise, fugitive dust, and reporting requirements. The ECA further regulates noise and dust emissions from all activities associated with the entire quarry operation. The first complaint regarding the quarry was received by the Ministry of the Environment and Climate Change in late 2007 regarding a suspected well interference. The matter was resolved at that time. The facility previously operated under an ECA dated 2009 which was revoked and replaced by the 2013 ECA. The 2009 ECA was issued based on the company s proposal to construct 10 new berms (in addition to the existing north perimeter berm) at specific locations and dimensions specified in Schedule A. The 2009 ECA application was reviewed in accordance with ministry noise guidelines and approved with the requirement that the 10 new berms be constructed not later than three months from the date of the issued approval. Within the same period of three months the company had to strategically locate shielding of some asphalt plant components. The details of the specific abatement measures for this task were required to be provided within an updated Acoustic Assessment Report. There was also a specific condition for an updated Acoustic Assessment Report to be sent to the ministry no later than four months after the issuance of the ECA. Schedule A of the ECA stated that all Noise Control Measures (Phase 1 berms and strategically located shielding of some asphalt plant components, and Phase 7

8 2 abatement measures for the replacing of existing diesel generators with quieter units, and locating the entire crushing operation deeper, up to 10 metres, into the quarry floor) had to be implemented in accordance with approved stated time periods for their implementation. The ECA also included a condition for an acoustic audit to be conducted by an independent consultant, and the acoustic audit report was required to be submitted to the ministry no later than three months after fully implementing the Noise Control Measures detailed in Schedule A of the ECA. o The ministry did not receive an acoustic audit since the company did not implement the noise controls as mentioned in Schedule A. Instead, the company submitted an application for an amended ECA. In accordance with condition 4 of the noise related conditions in the 2009 ECA, the consultant (on behalf of the operator) submitted the updated Acoustic Assessment Report within the four month requirement of the issuance of the 2009 ECA. The updated report dated October 30, 2009 showed that only five noise barriers (BR-4 incorporated previously existing north perimeter berm) were in existence at the time the updated report was completed and submitted to ministry for a review. The ministry reviewed the updated report and determined that there were modifications in relation to previously approved equipment, facility operation time, noise control measures and assessment criteria. Ministry technical review also revealed that the methodology for establishing new assessment criteria presented in the report was not acceptable. Therefore the ministry issued a letter on February 5, 2010 advising the company that condition 4 of the 2009 ECA had not been fulfilled and that the company was required to resubmit an Acoustic Assessment Report. As only five of the required 10 berms were in place at the time the acoustic measurements were conducted in 2010, the ministry acknowledges that the facility was not in compliance with its 2009 ECA at that time, however the issue was addressed through subsequent submissions to amend the ECA. In June 2010, the ministry received an application to amend the 2009 ECA to include a below-grade generator for the facility s mobile crusher, relocate the crushing and washing operation to the north quarry, and to update the noise profile of the facility to reflect only five berms for noise control. A new ECA (which revoked and replaced the 2009 ECA) for the site was issued in The 2013 noise profile was updated according to the application submitted by the operator, which is mentioned on page 2 of the 2013 ECA. An amendment was issued in 2013 which revoked and replaced the 2009 ECA noise conditions because the supporting Acoustic Assessment Report dated June 2010 demonstrated that only five berms were needed for noise control. It is noted that the berm closest to the nearest residential receptor, located 120 metres from main quarry entrance (BR-2) as referenced in the applicants 8

9 submission, was required as part of the 2009 ECA, however it was later deemed to be one of the five berms not required in order for the facility to operate in accordance with the ministry s noise guidelines. Subsequently, BR-2 was not one of the berms included in the 2013 approval. In the summer of 2015, the Ministry of Natural Resources and Forestry requested that the facility operator voluntarily erect a berm along the property boundary closest to the nearest receptor. This request was not made under Ministry of the Environment and Climate Change order and was not related to requirements of the existing ministry approval. The berm has been partially constructed per the Ministry of Natural Resources and Forestry s request in the same vicinity where the previous Ministry of the Environment and Climate Change berm BR-2 was originally to be positioned, however following an inspection by Ministry of Natural Resources and Forestry staff in May 2016, it was determined that this berm is not a requirement of the site plan. On February 3, 2014, the ministry received a Best Management Practices Plan from the operator, as required by their 2013 ECA, which describes, among other things, measures to minimize dust emissions from the facility. The ministry received its next complaint regarding the site in September Concerns were related to noise, dust and odours from the asphalt plant within the quarry. As a result, the ministry engaged the Ministry of Natural Resources and Forestry and the facility operator with respect to the concerns to ensure they were being addressed. The ministry received additional complaints and conducted an inspection of the asphalt plant in October No issues of non-compliance with the conditions of the 2013 ECA were identified through the inspection. During the inspection, the ministry reviewed the requirements of Condition 12 of the ECA related to notifying the ministry s district manager of each environmental complaint within 48 hours of receiving the complaint. However, at the time of the inspection, the ministry was not aware that the residents had been reporting their complaints to the operator directly. When the ministry became aware of this claim, the company was again reminded that going forward all complaints as they relate to their ECA, must be reported to the ministry. In February 2015, the ministry met with concerned residents about the proposal for expansion at the quarry. The residents were encouraged to contact the local district office with respect to any further concerns or questions about the existing operations. Throughout the 2015 operating season, comments and concerns about the proposed expansion and dust from the existing site operations were received by the ministry s local Kingston District Office. Concerns were raised with the facility 9

10 operator and were dealt with on a voluntary basis. Actions by the operator included updating its best management practices for dust control, which included having a dedicated water truck onsite. In July 2015, the ministry met with the operator to address complaints received regarding noise associated with night time and early morning operations at the facility. The operator cooperated and the ministry has not received any further complaints about night time or early morning operations. In response to numerous off-site dust concerns throughout the 2015 operating season, ministry staff conducted air quality monitoring both upwind and downwind of the quarry from early August to the end of November The results of the monitoring identified a few exceedances of the ministry s half hour limit in Ontario Regulation 419, for total suspended particulate. The matter was referred to the ministry s Investigations and Enforcement Branch and is currently under review. The ministry also met with the facility operator in early 2016 to discuss the results of the off-site dust monitoring and required action to address the issue. As a result the facility operator advised it would be making onsite adjustments to mitigate the offsite dust impact and would be submitting an application for an amendment to their ECA to address, among other things, measures to mitigate off-site impacts In September 2015, it was brought to the ministry s attention that crushing and washing operations had allegedly occurred in the north-east quadrant of the north quarry in without completing the required acoustic audits. During an inspection of the facility in October 2014 it was noted that crushing and washing operations were occurring only in the south quarry and had not commenced in the north-east quadrant of the north quarry. The information provided to the ministry in September 2015 was assessed by the ministry s Investigations and Enforcement Branch who advised that no further action would be taken at that time. The ministry also raised this matter with the operator to advise them that an acoustic audit must be conducted prior to any washing or crushing activities in the north-east quadrant of the north quarry. To date, the ministry is unaware of crushing operations occurring to the north. In September 2015, the ministry visited the site to assess what berms were in place at the quarry. At the time of the visit, one berm (BR-5) identified in the facility s 2013 ECA was not in place at the north side of the asphalt plant. All other berms were in place. The ministry advised the operator that they were required to erect BR-5 and in October 2015 the operator s consultant undertook noise measurements. Following this undertaking, the operator advised the ministry that these noise 10

11 measurements would be reflected in their upcoming application for amendment submission to its ECA, as well as the installation of the more efficient and quieter burner, possibly other changes to the asphalt plant, and the removal of BR-5 berm, as they informed the ministry that it was no longer required in light of the installation of the new burner. However the company was advised that pending approval of their amendment application, and prior to the commencement of spring operations, berm BR-5 must be erected. In April 2016, the company informed the ministry that berm BR-5 had been constructed along the north side of the asphalt plant, and it remains in place today. In December 2015, the ministry provided the company with the results of the off-site dust monitoring. In January 2016, the ministry met with the facility operator to discuss the results of the off-site dust monitoring and required action to address the issue. As a result the facility operator proposed on-site ventilation adjustments to mitigate the off-site dust impact and would also be including these ventilation upgrades in its application to amend its ECA. In April 2016, the facility submitted an updated Best Management Practices Plan to the ministry in accordance with the requirements in condition 7 and 8 of its ECA as a result of recent operational changes made at the site. On June 22, 2016, the ministry issued a Notice to the 2013 ECA that fulfilled this requirement. On June 3, 2016, following the ministry s technical review of the 2016 application for an amendment to the 2013 ECA, the ministry issued a Notice of Refusal as the facility operator was unable to supply the ministry with the requested site-wide Acoustic Assessment Report with detailed Noise Abatement Action Plan, demonstrating the compliance of the facility with the Environmental Protection Act and its regulations, in accordance with Section 9(4) of the Act. Next steps: The ministry s Kingston District Office remains committed to continuing with its communication with the concerned citizens to address their concerns. The ministry s Kingston District Office will communicate with the applicants on the outcome of the referral to the Investigations and Enforcement Branch regarding the air exceedances when it becomes available. 11

CAW Clean Wind Energy Project

CAW Clean Wind Energy Project Prepared by: M.K. Ince and Associates Ltd. September 19, 2012 Amended March 11, 2013 Table of Contents 1 INTRODUCTION... 1 2 PURPOSE... 1 3 COMPLAINT RESPONSE PROTOCOL... 1 3.1 COMPLAINT INITIATION...

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Hydro One Networks Inc. 483 Bay St 14th Floor, South

More information

Client Services Procedure Manual

Client Services Procedure Manual Procedure: 85.00 Subject: Administration and Promotion of the Health and Safety Learning Series The Health and Safety Learning Series is a program designed and delivered by staff at WorkplaceNL to increase

More information

Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air

Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air Practitioner s Group February 11 th, 2015 Overview Background

More information

Ministry of the Environment and Climate Change District Overview Sandra Thomas September 30, 2014

Ministry of the Environment and Climate Change District Overview Sandra Thomas September 30, 2014 Ministry of the Environment and Climate Change District Overview Sandra Thomas September 30, 2014 Ministry Overview Outline Key District Office Functions Compliance - Durham York Energy Centre 2 What We

More information

ENMAX Generation Portfolio Inc.

ENMAX Generation Portfolio Inc. Decision 22192-D01-2017 ENMAX Generation Portfolio Inc. September 5, 2017 Alberta Utilities Commission Decision 22192-D01-2017 ENMAX Generation Portfolio Inc. Proceeding 22192 Application 22192-A002 September

More information

Provider Monitoring Report. City and Guilds

Provider Monitoring Report. City and Guilds Provider Monitoring Report City and Guilds 22 May 2017 to 3 August 2017 Contents 1 Background 1 1.1 Scope 1 1.2 Provider Monitoring Report Timeline 2 1.3 Summary of Provider Monitoring Issues and Recommendations

More information

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949 Areas of for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949 1 st February 2014 1 Foreword Introduction The IATF recognizes certification

More information

Prepared Testimony of. Bohdan R. Pankiw. Chief Counsel Pennsylvania Public Utility Commission. before the

Prepared Testimony of. Bohdan R. Pankiw. Chief Counsel Pennsylvania Public Utility Commission. before the Prepared Testimony of Bohdan R. Pankiw Chief Counsel Pennsylvania Public Utility Commission before the Pennsylvania Senate Consumer Protection and Professional Licensure Committee and Pennsylvania Senate

More information

Special Education Room and Board Reimbursement Claim User Guide

Special Education Room and Board Reimbursement Claim User Guide Special Education Room and Board Reimbursement Claim User Guide OVERVIEW The Special Education Room and Board Reimbursement Claim system accessed through the Illinois State Board of Education s (ISBE)

More information

COMPLAINT FINANC1AL INDUSTRY REGULATORY AUTHORITY OFFICE OF HEARING OFFICERS. Disciplinary Proceeding SUMMARY

COMPLAINT FINANC1AL INDUSTRY REGULATORY AUTHORITY OFFICE OF HEARING OFFICERS. Disciplinary Proceeding SUMMARY FINANC1AL INDUSTRY REGULATORY AUTHORITY OFFICE OF HEARING OFFICERS Disciplinary Proceeding Department of Enforcement, No. 2010023220507 Complainant, Hearing Officer V. Ascendiant Capital Markets, LLC,

More information

Financial Planning Institute of Southern Africa SETTING THE STANDARD. Continuous Professional Development (Cpd) Policy

Financial Planning Institute of Southern Africa SETTING THE STANDARD. Continuous Professional Development (Cpd) Policy FPI FPI Financial Planning Institute of Southern Africa SETTING THE STANDARD Continuous Professional Development (Cpd) Policy Table of Contents Definitions 3-4 Introduction 4 Primary Responsibility 5 Mandatory

More information

Registering on the Environmental Activity and Sector Registry (EASR) Air Emissions EASR Regulation January 24 th, 2017 Ministry of the Environment

Registering on the Environmental Activity and Sector Registry (EASR) Air Emissions EASR Regulation January 24 th, 2017 Ministry of the Environment Registering on the Environmental Activity and Sector Registry (EASR) Air Emissions EASR Regulation January 24 th, 2017 Ministry of the Environment and Climate Change (MOECC) Modernization of Approvals

More information

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement Decision 21617-D01-2016 Crystal Lake 722S Substation October 5, 2016 Alberta Utilities Commission Decision 21617-D01-2016 Crystal Lake 722S Substation Proceeding 21617 Application 21617-A001 October 5,

More information

CBOE Regulatory Circular RG C2 Regulatory Circular RG15-007

CBOE Regulatory Circular RG C2 Regulatory Circular RG15-007 Date: To: CBOE and C2 Trading Permit Holders From: Regulatory Services Division RE: Transition of Certain Regulatory Services Performed on Behalf of the Exchanges by FINRA On December 19, 2014, CBOE and

More information

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT Balancing and Settlement Code BSC Procedure Production, Submission, Audit and Approval of Line Loss Factors BSCP128 Version 3.0- Effective Date: 30 June 2011 Balancing and Settlement Code Page 1 of 32

More information

IATF Transition Strategy Presenter: Cherie Reiche, IAOB

IATF Transition Strategy Presenter: Cherie Reiche, IAOB IATF 16949 Transition Strategy Presenter: Cherie Reiche, IAOB IATF 16949 Transition Strategy IATF 16949 transition strategy was presented at the IATF global stakeholder conference in Rome, Italy in April

More information

Compliance Quarterly Report Q3 2017

Compliance Quarterly Report Q3 2017 Compliance Quarterly Report Q 7 ISO Rules ISO Rule 9. and. Load Settlement. Alberta Reliability Standards Terminology Enter Footer Compliance Quarterly Report - ISO Rules - Q 7 The following charts summarize

More information

Comparison of MANE-VU SIP Template to EPA SIP Checklist. September 17, 2007

Comparison of MANE-VU SIP Template to EPA SIP Checklist. September 17, 2007 Comparison of MANE-VU SIP to EPA SIP Checklist 9/17/07: Draft 1 Comparison of MANE-VU SIP to EPA SIP Checklist September 17, 2007 Key to Color Codes action MANE-VU work product Class I states only (and

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L September 15, 2017 Alberta Utilities Commission Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L Proceeding 22769 Application

More information

Contractual Compliance Semi-Annual Report July Table of Contents

Contractual Compliance Semi-Annual Report July Table of Contents Table of Contents 1. INTRODUCTION... 1 1.1 Summary of Audit Activities and Results... 1 1.2 Consumer Complaint Analysis... 2 1.3 Whois Data Accuracy Study... 3 1.4 UDRP Grievance Intake Process... 3 1.5

More information

Cyber Security Reliability Standards CIP V5 Transition Guidance:

Cyber Security Reliability Standards CIP V5 Transition Guidance: Cyber Security Reliability Standards CIP V5 Transition Guidance: ERO Compliance and Enforcement Activities during the Transition to the CIP Version 5 Reliability Standards To: Regional Entities and Responsible

More information

EB CDM Exemption Hydro One Networks' Undertaking Responses ONLY HYDRO ONE UNDERTAKINGS Undertaking Description Filed Date Note

EB CDM Exemption Hydro One Networks' Undertaking Responses ONLY HYDRO ONE UNDERTAKINGS Undertaking Description Filed Date Note CDM Exemption Hydro One Networks' s ONLY HYDRO ONE S Description Filed Date Note J. J. J. TO PROVIDE NUMBERS OF NON-COMPLIANT APPLICATIONS REQUIRING AND NOT REQUIRING SITE ASSESSMENTS TO PROVIDE STAFFING

More information

For the Certification of Operations Located in Canada to the Canadian Organic Regime (COR)

For the Certification of Operations Located in Canada to the Canadian Organic Regime (COR) For the Certification of Operations Located in Canada to the Canadian Organic Regime (COR) CCOF CERTIFICATION SERVICES, LLC 2155 Delaware Ave, Suite 150 Santa Cruz, CA 95060 (831) 423-2263 ccof@ccof.org

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 12, 2015 DATE: December 1, 2015 SUBJECT: SP-84-U-15-1 USE PERMIT ASSOCIATED WITH A SITE PLAN for a telecommunications facility; located

More information

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT Balancing and Settlement Code BSC Procedure Production, Submission, Audit and Approval of Line Loss Factors BSCP128 Version 3.0 Effective Date: 30 June 2011 Balancing and Settlement Code Page 1 of 33 30

More information

Certification Commission of NAMSS Policies and Procedures

Certification Commission of NAMSS Policies and Procedures Certification Commission of NAMSS Policies and Procedures Recertification, Expiration, and Revocation of Certification Number: 300.30 Effective Date: March 2003 POLICY STATEMENT: Certification shall be

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor August 13, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor August 13, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting July 9, 2014 Executive Director Approval

More information

RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO

RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO June 27, 2016 Training provided for Ontario market participants by the Market Assessment and Compliance Division of the IESO Module 1 A MACD training presentation

More information

Wyoming Test of Proficiency and Progress (WY-TOPP)

Wyoming Test of Proficiency and Progress (WY-TOPP) Wyoming Test of Proficiency and Progress (WY-TOPP) 2018-19 District Test Coordinator Training August 28-30, 2018 Copyright 2018 American Institutes for Research. All rights reserved. Agenda Highlight WY-TOPP

More information

Chapter 1. Purpose, definitions and application

Chapter 1. Purpose, definitions and application Regulation on toll service provision for tolls and ferry tickets (the Toll service provider Regulation) Legal authority: Laid down by Royal Decree on dd.mm.yyyy pursuant to the Act of 21 June 1963 no.

More information

IATF Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB

IATF Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB IATF 16949 Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB IATF 16949 Transition Strategy IATF 16949 transition strategy was presented at the IATF global stakeholder conference in Rome, Italy

More information

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17 Page 1 of Report TR-01-17 SUBJECT: PRESTO operating agreement renewal update TO: FROM: Committee of the Whole Transit Department Report Number: TR-01-17 Wards Affected: All File Numbers: 465-12, 770-11

More information

TELECOMMUNICATION FACILITIES SITING AND CONSULTATION POLICY

TELECOMMUNICATION FACILITIES SITING AND CONSULTATION POLICY POLICY P-22 TELECOMMUNICATION FACILITIES SITING AND CONSULTATION POLICY Preamble It is recognized that while reliable and sophisticated telecommunication facilities are a benefit to the citizens of (CSRD),

More information

January Alberta Carbon Registries

January Alberta Carbon Registries January 2017 Alberta Carbon Registries User Manual v1.0 Version History Revision Date Version January 10, 2017 1.0 P a g e 2 of 35 Contents Overview... 5 About... 5 Alberta Emission Offset Registry...

More information

Protocol and Guideline for Establishing Wireless Telecommunication Facilities Within City of Brampton

Protocol and Guideline for Establishing Wireless Telecommunication Facilities Within City of Brampton Protocol and Guideline for Establishing Wireless Telecommunication Facilities Within City of Brampton (February 2002) (Revised, January 2011) Council approval CW062-2011 (Revised, February 2011) revisions

More information

MFC Power General Partner Ltd.,

MFC Power General Partner Ltd., Decision 21950-D01-2016 Preferential Sharing of Records Between, MFC Power Limited Partnership, URICA Energy Real Time Ltd., and URICA Asset Optimization Ltd. October 12, 2016 Alberta Utilities Commission

More information

Phase II CAQH CORE 202 Certification Policy version March 2011 CAQH 2011

Phase II CAQH CORE 202 Certification Policy version March 2011 CAQH 2011 CAQH 2011 Phase II CAQH CORE 202 Certification Policy GUIDING PRINCIPLES Phase II CORE 202 Certification Policy After signing the CORE Pledge and/or Addendum, the entity has 180 days to complete CORE certification

More information

Ministry of Government and Consumer Services. ServiceOntario. Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report

Ministry of Government and Consumer Services. ServiceOntario. Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report Chapter 3 Section 3.06 Ministry of Government and Consumer Services ServiceOntario Standing Committee on Public Accounts Follow-Up on Section 4.09, 2015 Annual Report In March 2016, the Committee held

More information

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL DATE

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL DATE 1 of 6 List of Topics Covered in this Item: Primary and Secondary Accreditation...1 Personnel...2 Fields of Accreditation...2 Interim Accreditation...3 Notification and Reporting...3 Corrective Actions

More information

Standard COM-002-2a Communications and Coordination

Standard COM-002-2a Communications and Coordination A. Introduction 1. Title: Communication and Coordination 2. Number: COM-002-2a 3. Purpose: To ensure Balancing Authorities, Transmission Operators, and Generator Operators have adequate communications

More information

ACCREDITATION OF CERTIFICATION BODIES OF SOCIAL ACCOUNTABILITY SYSTEMS SAAS ACCREDITATION REQUIREMENTS TABLE OF CONTENTS

ACCREDITATION OF CERTIFICATION BODIES OF SOCIAL ACCOUNTABILITY SYSTEMS SAAS ACCREDITATION REQUIREMENTS TABLE OF CONTENTS SOCIAL ACCOUNTABILITY ACCREDITATION SERVICES ACCREDITATION OF CERTIFICATION BODIES OF SOCIAL ACCOUNTABILITY SYSTEMS SAAS ACCREDITATION REQUIREMENTS TABLE OF CONTENTS 1.0 INTRODUCTION 2 2.0 REFERENCES 2

More information

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

Audit Report. City & Guilds

Audit Report. City & Guilds Audit Report City & Guilds 21 February 2018 and 22 February 2018 Contents 1 Background 1 1.1 Scope 1 1.2 Audit Report and Action Plan Timescales 2 1.3 Summary of Audit Issues and Recommendations 3 1.4

More information

Phase I CAQH CORE 102: Eligibility and Benefits Certification Policy version March 2011

Phase I CAQH CORE 102: Eligibility and Benefits Certification Policy version March 2011 Phase I CAQH CORE 102: Eligibility and Benefits Certification Policy GUIDING PRINCIPLES After signing the CORE Pledge, the entity has 180 days to complete CORE certification testing. CORE will not certify

More information

Chain of Custody Policy. July, 2015

Chain of Custody Policy. July, 2015 July, 2015 Copies of this document are available for free in electronic format at the following website: www.rainforest-alliance.org Please send your comments or suggestions concerning this document to

More information

FINAL DECISION OF THE COMMUNICATIONS AUTHORITY DISRUPTION OF THE TELECOMMUNICATIONS SERVICES OF WHARF T&T LIMITED ON 12 AUGUST 2014

FINAL DECISION OF THE COMMUNICATIONS AUTHORITY DISRUPTION OF THE TELECOMMUNICATIONS SERVICES OF WHARF T&T LIMITED ON 12 AUGUST 2014 INAL DECISION O THE COMMUNICATIONS AUTHORITY DISRUPTION O THE TELECOMMUNICATIONS SERVICES O WHAR T&T LIMITED ON 12 AUGUST 2014 Telecommunications Licensee Investigated: Issue: Wharf T&T Limited ( WTT )

More information

Alberta Electric System Operator Secord 2005S Substation Needs Identification Document

Alberta Electric System Operator Secord 2005S Substation Needs Identification Document Decision 2014-271 Alberta Electric System Operator Needs Identification Document Facility Application September 24, 2014 The Alberta Utilities Commission Decision 2014-271: Alberta Electric System Operator

More information

Building Consent Authority Complaint 2017/002 6 October 2017 Complaint against Auckland Council

Building Consent Authority Complaint 2017/002 6 October 2017 Complaint against Auckland Council Building Consent Authority Complaint 2017/002 6 October 2017 Complaint against Auckland Council 1. About this complaint 1.1 This is a complaint under Part 3 Subpart 1 of the Building Act 2004 1 ( the Act

More information

Complaints and Compliments Policy. Date Approved: 28 September Approved By: Governing Body. Ownership: Corporate Development

Complaints and Compliments Policy. Date Approved: 28 September Approved By: Governing Body. Ownership: Corporate Development Complaints and Compliments Policy Date Approved: 28 September 2016 Approved By: Ownership: Governing Body Corporate Development Date of Issue: August 2017 Proposed Date of Review: August 2019 Date of Equality

More information

Provider Monitoring Process

Provider Monitoring Process Provider Monitoring Process This statewide provider monitoring process is applicable for all providers including direct vendors, Agency with Choice (AWC) Financial Management Services (FMS) providers and

More information

Chapter 21 Environmental management

Chapter 21 Environmental management Chapter 21 Environmental management November 2013 Table of contents 21. Environmental management... 21-1 21.1 Purpose of this chapter... 21-1 21.2 Environmental management process... 21-1 21.2.1 Overview...

More information

Ref No: RACS/PCS/10 Page 1 of 7. Revision No: 00 Revision Date: October 1, 2018 PRODUCT CERTIFICATION SCHEME FOR ELECTRICAL EQUIPMENT

Ref No: RACS/PCS/10 Page 1 of 7. Revision No: 00 Revision Date: October 1, 2018 PRODUCT CERTIFICATION SCHEME FOR ELECTRICAL EQUIPMENT Ref No: RACS/PCS/10 Page 1 of 7 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) to assure that Electrical

More information

Information for your Certification

Information for your Certification Information for your Certification General: The access to the certification body is open to all companies and persons. The certification body is liable to impartiality, avoiding any conflicts of interests

More information

New Brunswick 2018 Annual Implementation Plan Version 1

New Brunswick 2018 Annual Implementation Plan Version 1 New Brunswick Energy and Utilities Board Reliability Standards, Compliance and Enforcement Program New Brunswick 2018 Annual Implementation Plan Version 1 December 28, 2017 Table of Contents Version History...

More information

Report (CCR) Rule Retrospective Review: Electronic Delivery

Report (CCR) Rule Retrospective Review: Electronic Delivery Consumer Confidence Report (CCR) Rule Retrospective Review: Electronic Delivery U.S. EPA Office of Ground Water and Drinking Water January 17, 2013 Audio The call in number is located within the Audio

More information

Financial Planning Standards Council 2016 ENFORCEMENT AND DISCIPLINARY REVIEW REPORT

Financial Planning Standards Council 2016 ENFORCEMENT AND DISCIPLINARY REVIEW REPORT Financial Planning Standards Council 2016 ENFORCEMENT AND DISCIPLINARY REVIEW REPORT Table of Contents Financial Planning Standards Council... 1 Profile of the Profession... 2 Maintaining High Standards

More information

Telecommunications Equipment Certification Scheme FEBRUARY 2017

Telecommunications Equipment Certification Scheme FEBRUARY 2017 Telecommunications Equipment Certification Scheme FEBRUARY 2017 Canberra Red Building Benjamin Offices Chan Street Belconnen ACT PO Box 78 Belconnen ACT 2616 T +61 2 6219 5555 F +61 2 6219 5353 Melbourne

More information

CITY OF TORONTO TELECOMMUNICATION TOWER AND ANTENNA PROTOCOL (Industry Canada Local Land-use Authority Consultation)

CITY OF TORONTO TELECOMMUNICATION TOWER AND ANTENNA PROTOCOL (Industry Canada Local Land-use Authority Consultation) Attachment 1: Approved Telecommunications Protocol (Adopted by City Council - March 3, 4 and 5, 2008) CITY OF TORONTO TELECOMMUNICATION TOWER AND ANTENNA PROTOCOL (Industry Canada Local Land-use Authority

More information

Schedule Identity Services

Schedule Identity Services This document (this Schedule") is the Schedule for Services related to the identity management ( Identity Services ) made pursuant to the ehealth Ontario Services Agreement (the Agreement ) between ehealth

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

CUSTOMER COMPLAINT HANDLING PROCEDURES

CUSTOMER COMPLAINT HANDLING PROCEDURES CUSTOMER COMPLAINT HANDLING PROCEDURES CUSTOMER COMPLAINT HANDLING PROCEDURES These procedures describe how we will resolve complaints received from customers who are not satisfied with our services.

More information

Nuts and Bolts of the Career and Professional Education Act (CAPE)

Nuts and Bolts of the Career and Professional Education Act (CAPE) Learning Today, Earning Tomorrow Nuts and Bolts of the Career and Professional Education Act (CAPE) Tara Goodman Tara McLarnon Division of Career and Adult Education Florida Department of Education 1 The

More information

SGS INTRON CERTIFICATIE CERTIFICATION AND ATTESTATION REGULATIONS 2015 TABLE OF CONTENT

SGS INTRON CERTIFICATIE CERTIFICATION AND ATTESTATION REGULATIONS 2015 TABLE OF CONTENT TABLE OF CONTENT 1. INTRODUCTION...2 2. PROCEDURES...3 2.1 SUMMARY... 3 2.2 ADMISSION PROCEDURES... 4 2.2.1 Information... 4 2.2.2 Quotations... 4 2.2.3 Conclusion of an agreement... 4 2.2.4 Admission

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Session 2: CORSIA MRV System: Monitoring of CO 2 Emissions. ICAO Secretariat

Session 2: CORSIA MRV System: Monitoring of CO 2 Emissions. ICAO Secretariat Session 2: CORSIA MRV System: Monitoring of CO 2 Emissions ICAO Secretariat Monitoring, Reporting and Verification (MRV) of CO 2 Emissions A monitoring, reporting and verification (MRV) system is a key

More information

Employment Ontario Information System (EOIS) Case Management System

Employment Ontario Information System (EOIS) Case Management System Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide Chapter 8B: Service Plan Management for Literacy and Basic Skills Version 2.7 December 2017 Table of Contents

More information

Market Participant Test Kit Version 5.3

Market Participant Test Kit Version 5.3 Market Participant Test Kit Version 5.3 07 February, 2018 Issued by SP Services Ltd Contacts/Further Information To request any further information or clarifications please email retailerhelp@spgroup.com.sg

More information

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT IFC SERVICE DESCRIPTION 17 OCTOBER 2016 Page 1 of 9 SERVICE DESCRIPTION 2-14: INTERNATIONAL FALCON CONNECTION SERVICE (IFC Service) 1. THE SERVICE

More information

Part of the service for dedicated servers includes 24/7 technical support and the guarantee of HW repair within two hours of the customer s request.

Part of the service for dedicated servers includes 24/7 technical support and the guarantee of HW repair within two hours of the customer s request. General Data Protection Regulation (GDPR) The protection of our clients personal data is a priority for us, and for this reason we would like to welcome the General Privacy Protection Regulation GDPR (General

More information

SECTION 115 MATERIALS CERTIFICATION SCHOOLS PROGRAM

SECTION 115 MATERIALS CERTIFICATION SCHOOLS PROGRAM SECTION 115 MATERIALS CERTIFICATION SCHOOLS PROGRAM The Materials Certification Schools (MCS) Program is offered by the Virginia Department of Transportation (VDOT) for individuals who wish to receive

More information

TxDOT Internal Audit Materials and Testing Audit Department-wide Report

TxDOT Internal Audit Materials and Testing Audit Department-wide Report Materials and Testing Audit Department-wide Report Introduction This report has been prepared for the Transportation Commission, TxDOT Administration and management. The report presents the results of

More information

Internal Audit Follow-Up Report. Multiple Use Agreements TxDOT Office of Internal Audit

Internal Audit Follow-Up Report. Multiple Use Agreements TxDOT Office of Internal Audit Internal Audit Follow-Up Report Multiple Use Agreements TxDOT Office of Internal Audit Objective Assess the status of corrective actions for high risk Management Action Plans (MAPs) previously communicated

More information

C E R T I F I C A T I O N O F M A N A G E M E N T S Y S T E M S

C E R T I F I C A T I O N O F M A N A G E M E N T S Y S T E M S GENERAL INFORMATION Vseobecne_informace o_certifikaci_angl.doc 01/17 Request Diagram of the certification procedure in Informative meeting Completed application form + questionnaires Examining the application

More information

EU Code of Conduct on Data Centre Energy Efficiency

EU Code of Conduct on Data Centre Energy Efficiency EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy Renew able and Energy Efficiency Unit EU Code of Conduct on Data Centre Energy Efficiency Introductory guide for all

More information

PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS ACTION STEPS RESPONSIBLE FREQUENCY per year

PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS ACTION STEPS RESPONSIBLE FREQUENCY per year VREDEKLOOF COMMUNITY IMPROVEMENT DISTRICT 5 YEAR IMPLEMENTATION PLAN 1st July 2018 to 30th June 2019 PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS 1. Successful day-to-day management and operations

More information

Audit Report. The Chartered Institute of Personnel and Development (CIPD)

Audit Report. The Chartered Institute of Personnel and Development (CIPD) Audit Report The Chartered Institute of Personnel and Development (CIPD) 24 February 2015 Contents 1 Background 1 1.1 Scope 1 1.2 Audit Report and Action Plan Timescales 2 1.3 Summary of Audit Issues and

More information

Data Protection System of Georgia. Nina Sarishvili Head of International Relations Department

Data Protection System of Georgia. Nina Sarishvili Head of International Relations Department Data Protection System of Georgia Nina Sarishvili Head of International Relations Department 14/12/2016 Legal Framework INTERNATIONAL INSTRUMENTS CoE 108 Convention AP on Supervisory Authorities and Trans-

More information

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application Decision 2014-039 Dawes Substation and Telecommunications Tower Project Facility Application February 19, 2014 The Alberta Utilities Commission Decision 2014-039: Dawes Substation and Telecommunications

More information

CANADIAN PAYMENTS ASSOCIATION LVTS RULE 11 CHANGE MANAGEMENT, TESTING AND CERTIFICATION

CANADIAN PAYMENTS ASSOCIATION LVTS RULE 11 CHANGE MANAGEMENT, TESTING AND CERTIFICATION CANADIAN PAYMENTS ASSOCIATION LVTS RULE 11 LVTS Rule 11, December 1998: as amended November 25, 2002, November 24, 2003, May 31, 2004, August 14, 2006, January 28, 2008, August 16, 2010, January 1, 2013,

More information

Continuing Professional Education (CPE) CPE Rules for Pesticide Advisors

Continuing Professional Education (CPE) CPE Rules for Pesticide Advisors Irish Agricultural Supply Industry Standards CPE Rules for Pesticide Advisors IASIS Limited 2015 IASIS Ltd., 31A Ravens Rock Road, Sandyford Industrial Estate, Dublin 18 +353 (0)1 293 0021 +353 (0)1 293

More information

Standard CIP-006-4c Cyber Security Physical Security

Standard CIP-006-4c Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-4c 3. Purpose: Standard CIP-006-4c is intended to ensure the implementation of a physical security

More information

Continuing Care Reporting System Data Submission User Manual,

Continuing Care Reporting System Data Submission User Manual, pic pic Continuing Care Reporting System Data Submission User Manual, 2014 2015 Types of Care Our Vision Better data. Better decisions. Healthier Canadians. Our Mandate To lead the development and maintenance

More information

Prepared by the Joint Stock Company National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank.

Prepared by the Joint Stock Company National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank. Environmental Monitoring Report Bi-annual Report Covering the period of January June 2015 KGZ: Power Sector Improvement Project Project Number: 43456-023 ADB Loan/Grant Number: L2671/G0218-KGZ Prepared:

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately

More information

Personnel Certification Program

Personnel Certification Program Personnel Certification Program ISO 9001 (QMS) / ISO 14001 (EMS) Form PC1000 Last Updated 9/11/2017 Page 1 of 14 INDEX Auditor Certification Quality or Environmental Program Pg 3-4 Certification Status

More information

Action Plan Developed by. Institute of Certified Public Accountants of Uganda BACKGROUND NOTE ON ACTION PLANS

Action Plan Developed by. Institute of Certified Public Accountants of Uganda BACKGROUND NOTE ON ACTION PLANS BACKGROUND NOTE ON ACTION PLANS Action Plans are developed by IFAC members and associates to address policy matters identified through their responses to the IFAC Compliance Self-Assessment Questionnaires.

More information

Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide

Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide Chapter 8C: Service Plan Management for the Canada- Ontario Job Grant Version 2.1July 2018 Table of Contents

More information

GUIDE ON APPLICATION FOR ROUNDTABLE FOR SUSTAINABLE PALM OIL PRINCIPLES AND CRITERIA (RSPO P & C) INCLUDING GROUP CERTIFICATION

GUIDE ON APPLICATION FOR ROUNDTABLE FOR SUSTAINABLE PALM OIL PRINCIPLES AND CRITERIA (RSPO P & C) INCLUDING GROUP CERTIFICATION GUIDE ON APPLICATION FOR ROUNDTABLE FOR SUSTAINABLE PALM OIL PRINCIPLES AND CRITERIA (RSPO P & C) INCLUDING GROUP CERTIFICATION Page 1 of 7 1. INTRODUCTION This guideline has been prepared to provide guidance

More information

Postal Inspection Service Mail Covers Program

Postal Inspection Service Mail Covers Program Postal Inspection Service Mail Covers Program May 28, 2014 AUDIT REPORT Report Number HIGHLIGHTS BACKGROUND: In fiscal year 2013, the U.S. Postal Inspection Service processed about 49,000 mail covers.

More information

Self-Certification Tutorial. Version 1.0 April 2013

Self-Certification Tutorial. Version 1.0 April 2013 Version 1.0 April 2013 The PLAN At the end of this tutorial, you will be able to: 1. Describe the purposes of Self-Certification 2. Identify deadlines 3. Describe the use of the Self-Certification template

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY TEGRA AUSTRALIA 1 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY This Plan remains the property of Tegra Australia, the return of it may be called upon at any time for changes and/or upgrades.

More information

Timber Products Inspection, Inc.

Timber Products Inspection, Inc. Timber Products Inspection, Inc. Product Certification Public Document Timber Products Inspection, Inc. P.O. Box 919 Conyers, GA 30012 Phone: (770) 922-8000 Fax: (770) 922-1290 TP Product Certification

More information

Our ambition is to upgrade 85% of Kiwis on our network onto Better Broadband.

Our ambition is to upgrade 85% of Kiwis on our network onto Better Broadband. Recipient name Organisation Address line 1 Address line 2 Address line 3 Chorus New Zealand Limited Chorus House 66 Wyndham Street AUCKLAND [Date] Dear [ ], Better Broadband Offer Our ambition is to upgrade

More information

BCI Principles & Criteria: Revision

BCI Principles & Criteria: Revision BCI Principles & Criteria: 2015-2017 Revision In January 2015 the BCI Council approved the proposal to launch a formal review of BCI s Principles & Criteria (P&C). This revision process provided an exciting

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

European Code of Conduct on Data Centre Energy Efficiency

European Code of Conduct on Data Centre Energy Efficiency EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Institute for Energy and Transport Renewable Energy Unit European Code of Conduct on Data Centre Energy Efficiency Introductory guide for applicants

More information

City of Winter Garden REQUEST FOR PROPOSAL RFP CR Mail and Fulfillment Services LEGAL ADVERTISEMENT CITY OF WINTER GARDEN

City of Winter Garden REQUEST FOR PROPOSAL RFP CR Mail and Fulfillment Services LEGAL ADVERTISEMENT CITY OF WINTER GARDEN City of Winter Garden REQUEST FOR PROPOSAL Mail and Fulfillment Services LEGAL ADVERTISEMENT CITY OF WINTER GARDEN REQUEST FOR PROPOSAL (RFP) NO. CR18-001 FOR A VENDOR TO PROVIDE DOMESTIC AND INTERNATIONAL

More information

This matter was opened to the New Jersey Board of Real FINDINGS OF FACT. 1. Gerilyn J. Fiore ("Respondent") is licensed as a State

This matter was opened to the New Jersey Board of Real FINDINGS OF FACT. 1. Gerilyn J. Fiore (Respondent) is licensed as a State STATE OF NEW JERSEY DEPARTMENT OF LAW & PUBLIC SAFETY DIVISION OF CONSUMER AFFAIRS NEW JERSEY BOARD OF REAL ESTATE APPRAISERS IN THE MATTER OF THE SUSPENSION OR REVOCATION OF THE LICENSE OR CERTIFICATION

More information