1 JOINT TWG-WGT2 18 June 2010 WGT2/2010/131-rev Summary of the May 2010 joint meeting of the TWG and WGT2 Held on Wednesday, 12 May :00 to 12:30 C.E.T at the Hotel Lev (conference room "Karantanija" ground floor), Ljubljana, Slovenia (hotel address: Vošnjakova ulica 1, 1000 Ljubljana) 1. Introduction Mr Sylvain Debeaumont (WGT2 Chairperson, ECB) welcomed the participants to the joint meeting in Ljubljana. On behalf of the joint group, Mr Roger Jones (TWG Chairperson) and Mr Debeaumont thanked Mr Sašo Črnugelj (WGT2 representative from Slovenia) and colleagues at the Banka Slovenije for the organisation and for hosting the May joint meeting. The agenda was adopted by the joint group. Upon the request from Mr Gerd Luebke Chairman of the Back-up Task Force, the reporting to the joint group on Task Force developments was agreed to take place at the beginning of the joint meeting (see reporting in agenda item 3.2). Due to tight flight schedules and the need for WGT2 to resume its meeting in the afternoon, the joint group agreed to close the joint meeting half and hour earlier, at 12: Reporting 2.1 TWG meeting Most of the issues discussed by the TWG in its May meeting were included in the agenda. Mr Roger Jones (TWG Chairperson) suggested covering them as they came up. In addition to these points and on behalf of the TWG he referred to the following: - Release management procedures: The TWG regarded the recent changes to the procedures as positive (e.g. the template for collecting changes and the extended time for user feedback), but still with some room for improvement. The TWG stands ready to contribute with a concrete proposal for fine tuning the procedures before the definition of the release 6.0. A proposal could be presented in the September 2010 joint TWG-WGT2 meeting.

2 - The two sets of Guidelines 1 have been reviewed and are expected for publication beginning of June 2010 on the EBF-FBE website ( plus the other ECSA websites. Comments by the joint group would be welcomed. - Around the interactions with T2S, the TWG would appreciate feedback to the questions raised in the February joint meeting. These were in relation to (i) the so-called change request number 8 discussed in the context of the changes to ISO standards; ii) the usage of ISO standards and their coexistence with FIN standards; and (iii) the use of the network. 2 Mr Jones highlighted the importance of identifying the issues at an early stage and advocated for TWG involvement on T2S issues affecting the cash management function. - The Danish user community raised the question whether it would be possible for non-euro countries to grant euro credit in the night time settlement in T2S. - In the March COGEPS meeting a presentation was made on the subject Liquidity management and Eurosystem services. Stemming from the presentation, Mr Jones would appreciate an explanation on a number of issues. On the release management procedures, Mr Debeaumont flagged that an advance notification would be appreciated on the issues where the TWG feels there is some room for improvement. After notification of the issues the WGT2 would be ready to assess them. On the question from the Danish community, Mr Debeaumont clarified that the issue has already been raised by Danmarks National bank itself and that discussions are about to take place. Once a decision is adopted by the central banks it will be communicated to the user community. Finally, since the joint group participants were neither present in the March COGEPS meeting nor had access to the presentation, it was agreed that questions are formulated in writing and sent to the ECB [Rapporteur s note: A response to the questions provided by Mr Jones was sent on Tuesday, 25 May]. 2.2 WGT2 meeting Since the last joint meeting in February the WGT2 had discussed a number of topics that are included in the agenda. These are the ongoing work on the implementation of release 4.0 including the preparation of the testing activities (the planning of which was published end April) and the amendment to the legal documentation, for which a presentation to the joint group was prepared. The WGT2 also discussed the outcome of the analysis carried out by the central banks in the context of the 1 st user consultation for the SSP release 5.0, and on the latest activities and developments around the interdependencies between T2 and T2S. A debriefing was also expected on the TARGET2 traffic figures for the first quarter 2010, and on forthcoming communication events. In addition the WGT2 has been engaged in the following: - The central banks have initiated a letter reply to the TWG letter dated 8 th March 2010 on issues around the Internet-based participation. In addition to the amendments to the TARGET2 Guideline, the letter includes reassurances to the concerns raised around the use of platform BIC 1 2 European Interbank Guidelines on Liquidity Management, and European Interbank Compensation Guidelines. More detailed on the questions raised are available on item 5, summary of the February 2010 meeting: 2

3 and the security requirements. [Rapporteur s note: The letter was sent to the TWG Secretariat on Friday, 28 May 2010]. - The WGT2 is working on the Static Data forms for the SSP release 4.0 as well as the new version of the static data user manual, to be published on the T2 website in the coming weeks. The majority of new/updated forms are related to introduction of Internet-based participants. - An effort is being made on the side of WGT2 to ensure the quality and coherence of TARGET2 statistics, for the benefit of the data that is shared with users and the general public. One step in this direction is the 2009 data available in the TARGET Annual Report (covered in agenda point 6.1), which is the first comprehensive publication under the new framework for TARGET2 payments statistics. - The WGT2 worked on the designation of credit institutions as critical participants. According to the tentative schedule the central banks will start notifying the critical participants beginning of June Statistics were collected on the basis of the 1 st quarter 2010 and a number of credit institutions were identified. The WGT2 is currently reviewing the requests for reclassification raised by individual central banks. It is worth noting that the top-five institutions only represent 15% of the total TARGET2 value, which denotes a very fragmented scene from a liquidity viewpoint. In the context of the designation of critical participants, the group also considered other standards than the ISO/IEC 17799:2005 that could be accepted for the self certification. For the time being only one request for assessment has been received, but any further demand would always be looked at Eurosystem level and all standards that are deemed acceptable would be published on the TARGET2 website. 3. SSP new releases 3.1 SSP release 4.0 (Nov 2010) On Thursday 29 April the testing activities and detailed test cases for interoperability testing for SSP release version 4.0 were published on the T2 website and notified to TWG members. The communication specifies the testing requirements as well as the testing procedures applicable to that release. 3 In a letter dated 08 March 2010 (EBF ref: 0068) the TWG expressed interest to see the amendments to the Guideline before the Governing Council approval, but neither the current procedures nor the envisaged timeline allow for a prior consultation. Nevertheless, to partially accommodate to the TWG request, Ms Sara Testi (ECB) made a presentation to the joint group on the nature and the structure of the amendments to the Guideline. The inclusion of Internet-based access in the legal texts has a very limited impact for the current (SWIFT) participants. The supplementary conditions that would apply to participants using the Internet-based access are included in a newly created Annex 5. To avoid inconsistencies in relation to possible cases of (T2 participant) insolvency, the rules for access of intraday credit will be aligned in the Guideline with those for monetary policy operations. This alignment will be part of the Guideline s revision corresponding to the release 4.0. In view of the TWG, the Internet-based participation would be acceptable as long as it is limited to the interactions with the Central Bank. It was therefore requested that the legal documentation reflects unequivocally this limitation applicable to Internet-based accounts. 3 For further information on the test procedures, please refer to the Guide for TARGET2 User Testing also available on the T2 website. 3

4 Mr Debeaumont however recalled that in the framework of the user consultation there had been requests from participants to use the Internet-based access for processing payments, even though the business case was primarily for the purpose of operations with the central bank. For that reason the request expressed by the TWG could not be accommodated. TWG representatives insisted that for current direct participants it is very important to identify the (real) participant that is sending the payment, also for the definition of bilateral limits. In the case of payments from Internet-based accounts this is assumed as problematic since the sender BIC would be a platform BIC and system changes would be needed at the level of participants to ensure identification of the true sending participant. However, Eurosystem-3CB representatives confirmed that in case of payments from Internet-based accounts (i.e. from a platform BIC) the direct participants would be able to unambiguously identify the participant on the sending side (i.e. field 52). It was also clarified that the formatting of payments initiated by Internet-based participants would be similar to that of mandated payments, transactions with which direct participants are already coping today. However, Mr. Jones explained that there were two significant differences between mandated payments and internet based access payments, namely: 1) It is understood that mandated payments are normally of an exceptional nature resulting from problems at the level of a direct participant, hence any manual intervention that may be needed, particularly in relation to queries, is limited. 2) In practice, for mandated payments the sending central bank is treated as the counterparty but this is not considered appropriate for regular payments both from and to internet based participants. The central banks corrected that the counterparty to a mandated payment (from a legal and also practical viewpoint) is the originating bank indicated in field 52 and not the central bank in the sender field. The TWG and the WGT2 Chairpersons convened that the necessary clarifications are included in the forthcoming letter response to the TWG. 3.2 List of changes for the SSP release 5.0 (November 2011) 1. Items short-listed for detailed central bank assessment The central banks collected 31 change requests from participants for the release 5.0. In a second step the change requests were distributed to the National User Groups and to the TWG for getting their feedback. On behalf of the WGT2, the ECB prepared a summary of the feedback received, which included also the outcome of the central bank analysis as agreed by the WGT2 in its May 2010 meeting. In general the WGT2 acknowledged the significant drop of traffic and revenues in TARGET2 in In this context the WGT2 focussed on the changes that either have the potential to increase the traffic or bring real new features to the users. This means that a number of requests, which were of a comfort nature, were discarded. This approach adopted by the central banks is typically the one applied in private systems and follows the logic of sound financial practices. As a result, the WGT2 identified eight change requests that could be assessed from a cost and feasibility viewpoint, the outcome of which will serve as a basis for the second user consultation in September. The necessary clarifications were made during the joint meeting on the reasons why a few changes were not included in the list for further assessment. A communication would be prepared to announce the outcome of the central bank short listing exercise [Rapporteur s note: The communication was available on the T2 website on Tuesday, 18 May]. 4

5 Some change requests were received from NUGs/NCBs which concern T2S. The WGT2 found it would be better to consider them in the context of the interdependencies (as discussions are still ongoing) and involve the user community when appropriate. For that reason the change requests were not included in the list. 2. Back up payment functionality Mr Gerd Luebke (Chairman of the Back-up Task Force BUTF ) reported on latest developments and the way to proceed around the back up functionality 4. Clarity has been achieved on the redistribution of liquidity and major progress made with regard to the use of a different value date in field 32 to enable identification of delayed payments as well as in the area of compensation. In addition, the Task Force prepared two change requests, the optional acceptance of different value in field 32A and switch off the value date with immediate effect. The joint group thanked Mr Luebke for his debriefing. On change request (switch off the value date check with immediate effect), the central banks judged it necessary to have a solid and unanimously agreed position from the user communities/the TWG before undertaking developments, envisaged as rather heavy. It was clarified that, since not all the users would be using it, the back up payments functionality (whatever functionality that may be developed at a later stage) would be available as an optional service and pricing would need to be considered. Mr Patrick Poncelet (EBF) suggested that the back up payments functionality would render a safer, more reliable and liquid TARGET2. However, it was made clear that the unanimous support from the NUGs/the TWG to the functionality is a requisite sine qua non its development could be assessed further. 4. Interdependencies between T2 and T2S Mr Debeaumont provided the joint group with an update on the latest activities and developments around the interdependencies between T2 and T2S. For the time being the discussions are still focussing very much on the connections and procedures between the systems (e.g. coherence of static data, handling of participants exclusion, accounting reconciliation, calculation of country positions, restrictions applying to out countries). It is however expected that when the issues are mature enough and when a clearer idea exists on the yearly release when the developments have to be implemented, users will be involved in particular on the issues having an impact on their business. In general the TWG is concerned with developments in T2S that could be decided in isolation and as a result be in conflict with T2 and the cash management side. Therefore, a proactive dialogue with the central banks around T2 and T2S interactions is needed to predict and address potentially conflictive issues well in advance. The joint group agreed on the possibility to discuss whether some features that could be offered by T2S to all connected RTGS systems should be developed in TARGET2. The opportunity brought by ISO20022 for the user interface) could also be investigated. However, the TWG believes that any impact on the current FIN based structure of T2 messaging would need very careful consideration pending any move of the global payments business away from FIN. 4 Additional information on the back up functionality is available in the October 2008, March and May 2009 joint meeting summaries 5

6 In this context Mr Debeaumont recalled that the interdependencies with CCBM2 should not be underestimated. While on the functional side the impact for TARGET2 is very limited, the CCBM2 procedures are maturing and the work is starting. This is particularly the case for the operational aspects, testing and migration procedures which are currently being elaborated and which will have to be looked at from a TARGET2 viewpoint. Mr. Debeaumont also enquired whether, if it could be arranged, the TWG would appreciate a presentation on CCBM2 at the next joint meeting. The TWG Chair accepted this suggestion. On the interdependencies, and as way forward if and when needed, the idea of a small joint substructure to report to the joint TWG-WGT2 group, in similar ways as in T2 project times, might be presented to the PSSC for agreement. 5. Traffic statistics The WGT2 collected the TARGET2 statistics for the 1 st quarter of 2010 in a presentation to the joint group. The presentation covered the developments in terms of value and volume. Due to lack of time the presentation could not take place at the May joint meeting. [Rapporteur s note: The presentation was sent to the TWG Secretariat on Monday, 17 May]. 6. Any Other Business 6.1 Communication items The joint group was informed about the forthcoming publication of the TARGET2 Annual Report 2009 and the June 2010 issue of the TARGET2 Newsletter. In the September 2010 meeting the joint group will be provided with the details of the Eurosystem programme at Sibos 2010 in October in Amsterdam. The TARGET Annual Report 2009 was planned for publication on Tuesday, 18 May. 5 Similar to last year s report the TARGET Annual Report 2009 represents a more streamlined, analytic and at the same time reader-friendly version as compared to previous years. In its Chapter I the report provides information on the current TARGET2 system and background information of its predecessor. Chapter II details TARGET2 traffic activity, its performance and the main developments that took place in A number of dedicated information boxes have been included in the report covering items of special interest, for example, around the new methodology for TARGET2 payment statistics, the management of system release and the Internet-based participation. The publication of the next TARGET2 Newsletter is planned towards the end of June The central banks appreciate the proposals received from market representatives to contribute to the Newsletter; this will of course be taken into account in forthcoming issues. The June Newsletter is planned to contain an article comparing the T2 and Fedwire funds systems (Mr Bob Bucco Fed writing on T2 and Mr Patrick Papsdorf ECB writing on Fedwire funds, based on experience gained in their one-year swap), and an interview-article on a colleague who most of the joint group know well, Mr Dieter Becker (former Head of the TARGET and Collateral Division at ECB, and currently Head of the Enterprise Systems Division, Directorate General Information Systems, ECB). 5 Available on the ECB and TARGET2 websites at 6

7 6.2 Date and place of next joint meetings The next joint meeting is scheduled at the time of the September 2010 WGT2 meeting (07-08 September) at ECB premises in Frankfurt. The next joint TWG-WGT2 meeting dates are: - Wednesday 08 September (ECB) - Thursday 25 November (ECB) The meeting dates for 2010 have been chosen to fit with the planning for the SSP release 5.0. As it was the case in 2009, between the September and the November meetings the TWG and the WGT2 Secretaries will cooperate in view of proposing a joint meeting calendar in The meeting dates in 2011 will be selected to fit with the planning for the SSP release 6.0., and will likely be around similar dates/months as the joint meeting dates in 2009 and Follow up items after the February 2010 meeting An update of the follow up items after the February 2010 joint meeting is presented in the following: - Release 5.0, first consultation: The National Central Banks contacted the respective National User Groups and the ECB approached the TWG on the possible content of the release 5.0. Users feedback was collected by the central banks by 22 March Between 30 March and 22 April 2010, all collected proposals were compiled and circulated so that users could provide their feedback on changes proposed by other banking communities (see agenda point 3.2). - List of pending bugs: The Central Banks are working on a list that will be updated on a regular basis and available on the T2 website. At the time of preparing this summary the list was not yet available. - Bug corrections after release 3.0: A communication was posted on the T2 website on 19 February, announcing the bug-correction implementation in production on 08 March T2S interactions: ECB participants in the February joint meeting conveyed the concerns raised by TWG members to the T2S team. A reminder was sent shortly after the May joint meeting (more details in agenda points 2.1 and 4). - Internet-based participation: A letter from TWG to the central banks was sent on 08 March (EBF ref: 0068). A response to this letter was initiated by the central banks; its delivery to the TWG Secretariat is expected shortly after the May joint meeting (see agenda point 3.1). - Back-up functionality: The BUTF met beginning of March to further assess the technical feasibility of the back up functionality, and to formulate a change request (see agenda point 3.2.2). 7. Follow up table Task Responsible Deadline Target body 7

8 Interactions with T2S: The TWG would appreciate feedback to the questions raised in the February joint meeting (more details in agenda points 2.1 and 4). ECB - September 2010 joint meeting Release management procedures: Central banks would appreciate an advance notification on the issues the TWG feels there is some room for improvement (more details in agenda point 2.1) TWG - September 2010 joint meeting The WGT2 is working on the Static Data forms for the SSP release 4.0 as well as the new version of the manual, to be published on the T2 website after the May 2010 joint meeting. WGT2 Course of June - If possible a presentation on CCBM2 to be arranged for the September 2010 joint meeting. WGT2 - September 2010 joint meeting 8

Outcome 7 th Task Force on Future RTGS Services

Outcome 7 th Task Force on Future RTGS Services Outcome 7 th Task Force on Future RTGS Services 19 July 2017, from 09:30 until 17:00 held at the ECB, Sonnemannstraße 20, Frankfurt am Main, room C2.06 16 August 2017 1. Introduction The Chairperson will

More information

OUTCOME OF THE 3 RD MEETING OF TARGET CONSOLIDATION CONTACT GROUP (TCCG)

OUTCOME OF THE 3 RD MEETING OF TARGET CONSOLIDATION CONTACT GROUP (TCCG) 05 June 2018 OUTCOME OF THE 3 RD MEETING OF TARGET CONSOLIDATION CONTACT GROUP (TCCG) 24 April 2018 09:30 to 17:00 held at the premises of the European Central Bank, Sonnemannstraße 20, meeting room MB

More information

OUTCOME OF THE 8 TH MEETING OF TARGET INSTANT PAYMENT SETTLEMENT (TIPS) CONTACT GROUP

OUTCOME OF THE 8 TH MEETING OF TARGET INSTANT PAYMENT SETTLEMENT (TIPS) CONTACT GROUP 23 August 2018 OUTCOME OF THE 8 TH MEETING OF TARGET INSTANT PAYMENT SETTLEMENT (TIPS) CONTACT GROUP 4 July 2018 10:00 to 17:00 held at the premises of the European Central Bank, Sonnemannstraße 20, meeting

More information

Insight Session on T2S User Testing

Insight Session on T2S User Testing Insight Session on T2S User Testing Dedicated Info Session on T2S User Testing and Migration: an urgent matter Frankfurt, 3 July 2013 T2S Programme Office European Central Bank 1 T2S User Testing Agenda

More information

UNDAF ACTION PLAN GUIDANCE NOTE. January 2010

UNDAF ACTION PLAN GUIDANCE NOTE. January 2010 UNDAF ACTION PLAN GUIDANCE NOTE January 2010 UNDAF ACTION PLAN GUIDANCE NOTE January 2010 Table of Contents 1. Introduction...3 2. Purpose of the UNDAF Action Plan...4 3. Expected Benefits of the UNDAF

More information

T2S PROGRAMME STATUS AS OF MID-SEPTEMBER

T2S PROGRAMME STATUS AS OF MID-SEPTEMBER T2S PROGRAMME OFFICE ECB-PUBLIC AG Meeting 18/19 September 2012 Item 2 09.04.01/2012/007820 T2S PROGRAMME STATUS AS OF MID-SEPTEMBER 2012-1. Introduction In this note the T2S Programme Office provides

More information

Urgency: Normal. 1. Legal/business importance parameter: Medium 2. Market implementation efforts parameter: Medium

Urgency: Normal. 1. Legal/business importance parameter: Medium 2. Market implementation efforts parameter: Medium General Information (Origin of Request) User Requirements (URD) Other User Functional or Technical Documentation (SYS) Request raised by: Deutsche Bundesbank Institute: NCB Date raised: 23/11/2015 Request

More information

Clarification on Messaging Topics from Previous TCCG Meetings

Clarification on Messaging Topics from Previous TCCG Meetings ECB DG-MIP T2-T2S Consolidation Clarification on Messaging Topics from Previous TCCG Meetings TARGET Consolidation Contact Group 6 th Meeting on 04 September 2018 Rubric Clarification on Messaging Topics

More information

1. Legal/business importance parameter: High 2. Market implementation efforts parameter: Low

1. Legal/business importance parameter: High 2. Market implementation efforts parameter: Low General Information (Origin of Request) User Requirements (URD) Other User Functional or Technical Documentation (SYS) Request raised by: 4CB Institute: 4CB Date raised: 05/01/2017 Request title: Handling

More information

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17 Page 1 of Report TR-01-17 SUBJECT: PRESTO operating agreement renewal update TO: FROM: Committee of the Whole Transit Department Report Number: TR-01-17 Wards Affected: All File Numbers: 465-12, 770-11

More information

BUSINESS JUSTIFICATION

BUSINESS JUSTIFICATION BUSINESS JUSTIFICATION FOR THE DEVELOPMENT OF NEW ISO 20022 FINANCIAL REPOSITORY ITEMS A. Name of the request: Cash aaccount reporting request and Notification messages B. Submitting organization: SWIFT

More information

GUIDE TO TARGET2 USER TESTING

GUIDE TO TARGET2 USER TESTING GUIDE TO TARGET2 USER TESTING Version 3.1 / October 2015 Public EWEC Foreword Foreword Testing activities are an important part of the change management procedures for TARGET2. In this context test requirements

More information

INSPIRE status report

INSPIRE status report INSPIRE Team INSPIRE Status report 29/10/2010 Page 1 of 7 INSPIRE status report Table of contents 1 INTRODUCTION... 1 2 INSPIRE STATUS... 2 2.1 BACKGROUND AND RATIONAL... 2 2.2 STAKEHOLDER PARTICIPATION...

More information

SR 2018 Business Highlights

SR 2018 Business Highlights This document provides summarised, high level, business information related to the changes made to FIN (MT) messages as part of Standards Release 2018 (SR 2018). 17 November 2017 Table of Contents Table

More information

TARGET Instant Payment Settlement User Requirements

TARGET Instant Payment Settlement User Requirements User s Status: FINAL Executive Summary Introduction The market consultation on the TARGET Instant Payment (TIPS) User s Document (URD) was initiated on 9 January 2017 and ran until 24 February 2017. Financial

More information

Client Services Procedure Manual

Client Services Procedure Manual Procedure: 85.00 Subject: Administration and Promotion of the Health and Safety Learning Series The Health and Safety Learning Series is a program designed and delivered by staff at WorkplaceNL to increase

More information

Endpoint Security for Wholesale Payments

Endpoint Security for Wholesale Payments Endpoint Security for Wholesale Payments 2018 CHICAGO PAYMENTS SYMPOSIUM EMILY CARON MANAGER, FMI RISK & POLICY FEDERAL RESERVE BOARD The views expressed in this presentation are those of the speaker and

More information

REPORT 2015/010 INTERNAL AUDIT DIVISION

REPORT 2015/010 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/010 Audit of information and communications technology strategic planning, governance and management in the Investment Management Division of the United Nations Joint

More information

Date of publication: 11/07/2017

Date of publication: 11/07/2017 Questions & Answers INVITATION TO SHIFT2RAIL JU ASSOCIATED MEMBERS TO SUBMIT AN ANSWER IN VIEW OF THE REALIGNMENT OF THEIR ACTIVITIES AND ADDITIONAL COMMITMENT TO THE SHIFT2RAIL PROGRAMME Date of publication:

More information

Code Administration Code of Practice

Code Administration Code of Practice Code Administration Code of Practice As part of the energy Codes Governance Review Ofgem proposed that a Code of Practice be established to facilitate convergence and transparency in code Modification

More information

REPORT 2015/149 INTERNAL AUDIT DIVISION

REPORT 2015/149 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results

More information

T2S GRAPHICAL USER INTERFACE BUSINESS FUNCTIONALITY

T2S GRAPHICAL USER INTERFACE BUSINESS FUNCTIONALITY TS GRAPHICAL USER INTERFACE Reference: 0.0.0/0/000 Author: ECB TS Programme Office Date: 0-0-0 Version:. Status: Draft Classification: TABLE OF CONTENTS TS GRAPHICAL USER INTERFACE INTRODUCTION.... Structure

More information

1. Legal/business importance parameter: High 2. Market implementation efforts parameter: Low

1. Legal/business importance parameter: High 2. Market implementation efforts parameter: Low General Information (Origin of Request) User Requirements (URD) Other User Functional or Technical Documentation (SYS) Request raised by: 4CB Institute: 4CB Date raised: 05/01/2017 Request title: Handling

More information

T2S GRAPHICAL USER INTERFACE BUSINESS FUNCTIONALITY

T2S GRAPHICAL USER INTERFACE BUSINESS FUNCTIONALITY TS GRAPHICAL USER INTERFACE BUSINESS FUNCTIONALITY Reference: 0.0.01/01/00 Author: ECB TS Programme Office Date: 01-0- Version: 1. Status: Draft Classification: Public TS Graphical User Interface TABLE

More information

Single Shared Platform. User Detailed Functional Specifications - Optional Services - 2nd book Version May 2013

Single Shared Platform. User Detailed Functional Specifications - Optional Services - 2nd book Version May 2013 Single Shared Platform User Detailed Functional Specifications - Optional Services - 2nd book Version 7.01 31 May 2013 Table of Contents Table of Contents 11 Introduction 12 User Guide for optional modules

More information

SR 2019 Business Highlights

SR 2019 Business Highlights This document provides summarised, high level, business information related to the changes made to FIN (MT) messages as part of Standards release 2019 (SR 2019). 16 November 2018 Table of Contents Table

More information

The Global Research Council

The Global Research Council The Global Research Council Preamble The worldwide growth of support for research has presented an opportunity for countries large and small to work in concert across national borders. Cooperation and

More information

ISO/IEC JTC 1 N

ISO/IEC JTC 1 N ISO/IEC JTC 1 N 8667 2007-07-27 ISO/IEC JTC 1 Information Technology Replaces Document Type: Meeting Resolutions Document Title: Recommendations of the 24-26 July 2007 SWG-Directives Meeting, Paris, France

More information

Insight Session: T2S User Testing and Migration

Insight Session: T2S User Testing and Migration Insight Session: T2S User Testing and Migration T2S Info Session Vienna, 5 October 2012 T2S Programme Office European Central Bank ECB-PUBLIC 0 Agenda 1 T2S User Testing 2 T2S Migration 1 User testing

More information

GUIDE TO TARGET2 USER TESTING

GUIDE TO TARGET2 USER TESTING GUIDE TO TARGET2 USER TESTING Version 4.0 / August 2018 ECB-Unrestricted EWEC Foreword F o r e w o r d Testing activities are an important part of the change management procedures for TARGET2. In this

More information

T2S Final Wave Iberclear: Functional modifications and migration procedures

T2S Final Wave Iberclear: Functional modifications and migration procedures T2S Final Wave Iberclear: Functional modifications and migration procedures Further to the pre-announcement D17030 dated 5 May 2017, Clearstream Banking AG, Frankfurt 1 informs customers about the scheduled

More information

2016 COM ebcd-twg Doc. No. PWG-403 / 2016 November 15, 2016 (8:37 AM)

2016 COM ebcd-twg Doc. No. PWG-403 / 2016 November 15, 2016 (8:37 AM) EBCD WORKING GROUP (ebcd-twg) Original: English SUMMARY REPORT - 2016 Introduction This serves as a general report to the Commission on the overall status of ebcd system development and implementation

More information

Single Shared Platform User Detailed Functional Specifications - Optional Services - 2nd book

Single Shared Platform User Detailed Functional Specifications - Optional Services - 2nd book Single Shared Platform User Detailed Functional Specifications - Optional Services - 2nd book Version 12.0 23 March 2018 Table of Contents Table of Contents 11 Introduction... 1 12 User Guide for optional

More information

2 nd Project Coordination Committee Meeting under the Co-operative Mechanism in the 16 October 2009 Straits of Malacca and Singapore 16 October 2009

2 nd Project Coordination Committee Meeting under the Co-operative Mechanism in the 16 October 2009 Straits of Malacca and Singapore 16 October 2009 2 nd Project Coordination Committee Meeting under the Co-operative Mechanism in the 16 October 2009 Straits of Malacca and Singapore 16 October 2009 2 ND PROJECT COORDINATION COMMITTEE MEETING UNDER THE

More information

IMO MEASURES TO ENHANCE MARITIME SECURITY. Outcome of the 2002 SOLAS conference. Information on the current work of the ILO

IMO MEASURES TO ENHANCE MARITIME SECURITY. Outcome of the 2002 SOLAS conference. Information on the current work of the ILO INTERNATIONAL MARITIME ORGANIZATION E IMO MARITIME SAFETY COMMITTEE 77th session Agenda item 6 MSC 77/6/9 20 March 2003 Original: ENGLISH MEASURES TO ENHANCE MARITIME SECURITY Outcome of the 2002 SOLAS

More information

Single Shared Platform User Detailed Functional Specifications - Optional Services - 2nd Book

Single Shared Platform User Detailed Functional Specifications - Optional Services - 2nd Book Single Shared Platform User Detailed Functional Specifications - Optional Services - 2nd Book Version 11.0 17 March 2017 Table of Contents Table of Contents 11 Introduction... 1 12 User Guide for optional

More information

This report was prepared by the Information Commissioner s Office, United Kingdom (hereafter UK ICO ).

This report was prepared by the Information Commissioner s Office, United Kingdom (hereafter UK ICO ). REPORT TO THE 38 th INTERNATIONAL CONFERENCE OF DATA PROTECTION AND PRIVACY COMMISSIONERS - MOROCCO, OCTOBER 2016 ON THE 5 th ANNUAL INTERNATIONAL ENFORCEMENT COOPERATION MEETING HELD IN MANCHESTER, UK,

More information

IOGP. Supplementary Procedure for Development and Maintenance of ISO Standards as an ISO Liaison Member. Approved

IOGP. Supplementary Procedure for Development and Maintenance of ISO Standards as an ISO Liaison Member. Approved IOGP Supplementary Procedure for Development and Maintenance of ISO Standards as an ISO Liaison Member Approved 20170707 Disclaimer Whilst every effort has been made to ensure the accuracy of this procedure,

More information

Reported by Jim Moore, The MITRE Corporation, ,

Reported by Jim Moore, The MITRE Corporation, , ISO/IEC JTC 1/SC 22/WG 9 N 454 Meeting Report: ISO/IEC JTC 1/SC 22 (Programming Languages, Operating Systems and Environments), 29 September to 2 October 2005, Mont Tremblant, Quebec, Canada Reported by

More information

Digital TV Group (DTG) response to the BBC Trust s Canvas Proposals Provisional Conclusions

Digital TV Group (DTG) response to the BBC Trust s Canvas Proposals Provisional Conclusions Digital TV Group (DTG) response to the BBC Trust s Canvas Proposals Provisional Conclusions Context The DTG s membership of over 140 organisations is drawn from broadcasters, manufacturers, platform operators,

More information

TARGET Instant Payment Settlement CRDM TIPS UDFS Version v TIPS Contact Group #6

TARGET Instant Payment Settlement CRDM TIPS UDFS Version v TIPS Contact Group #6 TARGET Instant Payment Settlement CRDM TIPS UDFS Version v.0.3.0 TIPS Contact Group #6 Frankfurt am Main, 09.04.2018 Summary 1. Market feedback on CRDM TIPS UDFS v.0.2.0 2. Overview of CRDM TIPS UDFS v.0.3.0

More information

IECEx Scheme Braunschweig Meeting of ExTAG 4 th and 5 th of September. Draft Minutes and decision list

IECEx Scheme Braunschweig Meeting of ExTAG 4 th and 5 th of September. Draft Minutes and decision list Attendance List : see ExTAG(Braunschweig)01 1 Opening and Welcome IECEx Scheme Braunschweig Meeting of ExTAG 4 th and 5 th of September Draft Minutes and decision list ExMC(Braunschweig/ExTAG)4 1.1 Welcome

More information

13174/15 AT/tl 1 DGE 2B

13174/15 AT/tl 1 DGE 2B Council of the European Union Brussels, 6 November 2015 (OR. en) 13174/15 ER 359 COEST 325 RELEX 833 INFORMATION NOTE From: General Secretariat of the Council To: Delegations Subject: External energy relations

More information

Technical Advisory Board (TAB) Terms of Reference

Technical Advisory Board (TAB) Terms of Reference Technical Advisory Board (TAB) Terms of Reference ACS Technical Advisory Board Terms of Reference V1.1 27 May 2017 Page 1 ACS Technical Advisory Board Terms of Reference V1.1 27 May 2017 Page 1 CONTENTS

More information

Report of the Working Group on mhealth Assessment Guidelines February 2016 March 2017

Report of the Working Group on mhealth Assessment Guidelines February 2016 March 2017 Report of the Working Group on mhealth Assessment Guidelines February 2016 March 2017 1 1 INTRODUCTION 3 2 SUMMARY OF THE PROCESS 3 2.1 WORKING GROUP ACTIVITIES 3 2.2 STAKEHOLDER CONSULTATIONS 5 3 STAKEHOLDERS'

More information

Version and Release Management for ISO Messages. Best Practices. 2 December 2016

Version and Release Management for ISO Messages. Best Practices. 2 December 2016 2 December 2016 Table of Contents Table of Contents Preface... 3 1 Introduction... 4 2... 5 2.1 Categorisation into Three Types of Change... 5 2.2 Determining the Type of Change... 7 2.3 Frequency of Changes...

More information

TARGET Instant Payment Settlement

TARGET Instant Payment Settlement TARGET Instant Payment Settlement Overview of the market feedback on the 1 st UDFS draft TIPS Contact Group #2 Frankfurt am Main, 07.11.2017 Summary 1. Overview of the market feedback on the UDFS 2. Main

More information

European Aviation Safety Agency

European Aviation Safety Agency European Aviation Safety Agency EASA Management Board Decision 12-2007 Amending the products certification procedure MB meeting 04-2007 (11 September 2007) DECISION OF THE MANAGEMENT BOARD AMENDING DECISION

More information

Background Document for Agenda Item 3: Briefing from the Secretariat on launch of the Green Coalition on the Belt and Road Initiative

Background Document for Agenda Item 3: Briefing from the Secretariat on launch of the Green Coalition on the Belt and Road Initiative United Nations Environment Programme 25 September 2018 Subcommittee Meeting of the Committee of Permanent Representatives 4 October 2018, 9:30 a.m. to 4:30 p.m. United Nations Office at Nairobi Gigiri

More information

12338/15 GS/sl DG D 1C

12338/15 GS/sl DG D 1C Council of the European Union Brussels, 28 September 2015 (OR. en) 12338/15 JAI 689 USA 28 DATAPROTECT 148 RELEX 743 COVER NOTE From: Ms Vanna Palumbo, Chair of the Europol Joint Supervisory Body date

More information

WP24 CFD Settlement: Required Information

WP24 CFD Settlement: Required Information WP24 Settlement: Required Information Working Practice Public Version: 3.0 Date: 16 May 2018 Table of Contents Change Amendment Record 3 1. Introduction 4 1.1 Scope and Purpose 4 1.2 Main Users and Responsibilities

More information

Statement by Mr. Vladimir Voronkov, Under-Secretary-General of the United Nations Office of Counter-Terrorism

Statement by Mr. Vladimir Voronkov, Under-Secretary-General of the United Nations Office of Counter-Terrorism Statement by Mr. Vladimir Voronkov, Under-Secretary-General of the United Nations Office of Counter-Terrorism Meeting of the United Nations Security Council Counter-Terrorism Committee Mr. Chairman, Excellencies,

More information

The Analysis and Proposed Modifications to ISO/IEC Software Engineering Software Quality Requirements and Evaluation Quality Requirements

The Analysis and Proposed Modifications to ISO/IEC Software Engineering Software Quality Requirements and Evaluation Quality Requirements Journal of Software Engineering and Applications, 2016, 9, 112-127 Published Online April 2016 in SciRes. http://www.scirp.org/journal/jsea http://dx.doi.org/10.4236/jsea.2016.94010 The Analysis and Proposed

More information

Green Star Volume Certification. Process Guide

Green Star Volume Certification. Process Guide Green Star Volume Certification Process Guide Contents Executive Summary... 3 Volume Certification... 3 The Volume Certification Process Guide... 3 Questions?... 4 Volume Certification Summary... 5 Stage

More information

User Pays User Group Minutes Wednesday 19 January 2011 (via teleconference)

User Pays User Group Minutes Wednesday 19 January 2011 (via teleconference) User Pays User Group Minutes Wednesday 19 January 2011 (via teleconference) Attendees Tim Davis (Chair) TD Joint Office Lorna Dupont (Secretary) LD Joint Office Claire Blythe CB Southern Electric Gas Ltd

More information

Consolidation Team INSPIRE Annex I data specifications testing Call for Participation

Consolidation Team INSPIRE Annex I data specifications testing Call for Participation INSPIRE Infrastructure for Spatial Information in Europe Technical documents Consolidation Team INSPIRE Annex I data specifications testing Call for Participation Title INSPIRE Annex I data specifications

More information

Information for 2016 Poster Displays

Information for 2016 Poster Displays Information for 2016 Poster Displays What is a poster display at the International Forum? Each year we receive hundreds of online submissions to display a poster board at our International Forum. A poster

More information

General Secretariat (SG)

General Secretariat (SG) General Secretariat (SG) Geneva, 22 February 2017 Ref: DM-17/1002 Contact: Ms Béatrice Pluchon Telephone: +41 22 730 6266 Telefax: +41 22 730 6627 E-mail: gbs@itu.int To Observer Member States of ITU Subject:

More information

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO

More information

Guideline 8: Submitting Electronic Funds Transfer Reports to FINTRAC

Guideline 8: Submitting Electronic Funds Transfer Reports to FINTRAC Guideline 8: Submitting Electronic Funds Transfer Reports to FINTRAC Guideline 8: Submitting Electronic Funds Transfer Reports to FINTRAC November 2004 This replaces the previous version of Guideline 8:

More information

Protocol Governance Committee Meeting #19 28/06/ h00 Summary Minutes

Protocol Governance Committee Meeting #19 28/06/ h00 Summary Minutes In attendance Protocol Governance Committee Meeting #19 28/06/2018 13h00 Summary Minutes Meeting chaired by Roger Gill (Vice-Chair) Hydropower Suppliers and Consultants Hydropower Operators or Developers

More information

REVIEW OF MANAGEMENT AND OVERSIGHT OF THE INTEGRATED BUSINESS MANAGEMENT SYSTEM (IBMS) January 16, 2009

REVIEW OF MANAGEMENT AND OVERSIGHT OF THE INTEGRATED BUSINESS MANAGEMENT SYSTEM (IBMS) January 16, 2009 APPENDIX 1 REVIEW OF MANAGEMENT AND OVERSIGHT OF THE INTEGRATED BUSINESS MANAGEMENT SYSTEM (IBMS) January 16, 2009 Auditor General s Office Jeffrey Griffiths, C.A., C.F.E. Auditor General City of Toronto

More information

S90. SEMOpx Transitional Registration Guide DO NOT SEND BACK. Date: 17/05/2017 Document; Revision: 1.2

S90. SEMOpx Transitional Registration Guide DO NOT SEND BACK. Date: 17/05/2017 Document; Revision: 1.2 SEMOpx Transitional Registration Guide DO NOT SEND BACK Date: 17/05/2017 Document; Revision: 1.2 SEMOpx Transitional Registration Guide This document outlines the application requirements for existing

More information

Dated 3 rd of November 2017 MEMORANDUM OF UNDERSTANDING SIERRA LEONE NATIONAL ehealth COORDINATION HUB

Dated 3 rd of November 2017 MEMORANDUM OF UNDERSTANDING SIERRA LEONE NATIONAL ehealth COORDINATION HUB Memorandum of Understanding for Joint Working by Ministry of Health and Sanitation, Ministry of Information and Communication on the Government of Sierra Leone ehealth Coordination Hub Dated 3 rd of November

More information

Terms of Reference for the EIF Trust Fund Manager (TFM)

Terms of Reference for the EIF Trust Fund Manager (TFM) Terms of Reference for the EIF Trust Fund Manager (TFM) Introduction 1. The EIF is financed through a multi-donor trust fund (EIFTF) and contributions, whether bilateral, regional or multilateral. The

More information

Resolution adopted by the General Assembly on 14 December [without reference to a Main Committee (A/61/L.44 and Add.1)]

Resolution adopted by the General Assembly on 14 December [without reference to a Main Committee (A/61/L.44 and Add.1)] United Nations A/RES/61/132 General Assembly Distr.: General 1 March 2007 Sixty-first session Agenda item 69 (a) Resolution adopted by the General Assembly on 14 December 2006 [without reference to a Main

More information

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho TERMS OF REFERENCE Scaling-up Renewable Energy Program (SREP) Joint Mission September 27-29, 2017 Lesotho 1 SUMMARY 1. Mission objectives. The main objective of the Joint Mission ( the Mission ) is to

More information

International Policy Division, Global ICT Strategy Bureau

International Policy Division, Global ICT Strategy Bureau MIC International Policy Division, Global ICT Strategy Bureau Communications News Newsletter of the Ministry of Internal Affairs and Communications(MIC), Japan Please Feel free to use articles in this

More information

1. Legal/business importance parameter: Medium 2. Market implementation efforts parameter: Low

1. Legal/business importance parameter: Medium 2. Market implementation efforts parameter: Low General Information (Origin of Request) User Requirements (URD) Other User Functional or Technical Documentation (SYS) Request raised by: 4CB Institute: 4CB Date raised: 01/10/2014 Request title: Securities

More information

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017 Energy Regulators OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017 9 february 2017 ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG THE AGENCY FOR THE COOPERATION OF

More information

Stakeholder Participation Guidance

Stakeholder Participation Guidance Climate, Community & Biodiversity Alliance, Verra Stakeholder Participation Guidance Guidance to support stakeholder participation in design, implementation and assessment of policies and actions May 2018

More information

SELF ASSESSMENT OF SEPA COMPLIANCE November, 2013

SELF ASSESSMENT OF SEPA COMPLIANCE November, 2013 SELF ASSESSMENT OF SEPA COMPLIANCE November, 2013 Bucharest, November 2013 This document constitutes the self-assessment of TRANSFOND`s system SENT against the Eurosystem s SEPA-compliance criteria. The

More information

Bingo and Breakopen. SECTION A: Organization Information. 1. Have you previously held a gaming licence? YES NO

Bingo and Breakopen. SECTION A: Organization Information. 1. Have you previously held a gaming licence? YES NO and LGA Use Only APPLICATION Applying for: Allow up to 6 weeks for processing. Missing or incomplete information may result in a longer processing time. Refer to the application guide for assistance with

More information

10007/16 MP/mj 1 DG D 2B

10007/16 MP/mj 1 DG D 2B Council of the European Union Brussels, 9 June 2016 (OR. en) 10007/16 OUTCOME OF PROCEEDINGS From: On: 9 June 2016 To: General Secretariat of the Council Delegations No. prev. doc.: 9579/16 + COR 1 Subject:

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA

EUROPEAN COMMISSION DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA Ref. Ares(2011)514527-12/05/2011 EUROPEAN COMMISSION DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA Electronic Communications Policy Implementation of Regulatory Framework (I) Brussels, 6th May 2011

More information

Follow-up to Information Technology Security Audit

Follow-up to Information Technology Security Audit Follow-up to Information Technology Security Audit July 2004 Report Clearance Steps Follow-up process initiated September 2003 Report completed March 2004 Follow-up report approved by Departmental Audit

More information

Coordination Meeting of Standardisation Activities for assessing the Environmental Impact of ICT

Coordination Meeting of Standardisation Activities for assessing the Environmental Impact of ICT EUROPEAN COMMISSION Directorate-General Information Society and Media Directorate ICT addressing Societal Challenges Unit H4 ICT for Sustainable Growth Brussels, 28/01/2011 INFSO H4/PC/D(2010) Coordination

More information

CEB/2004/HLCM/16 for Coordination 20 July Third Meeting of the ICT Network. Summary Conclusions

CEB/2004/HLCM/16 for Coordination 20 July Third Meeting of the ICT Network. Summary Conclusions UNITED NATIONS SYSTEM CEB Chief Executives Board CEB/2004/HLCM/16 for Coordination 20 July 2004 ICT NETWORK Third session Rome, 17-18 May 2004 Third Meeting of the ICT Network Summary Conclusions Agenda

More information

CONCLUSIONS AND RECOMMENDATIONS

CONCLUSIONS AND RECOMMENDATIONS Chapter 4 CONCLUSIONS AND RECOMMENDATIONS UNDP and the Special Unit have considerable experience in South-South cooperation and are well positioned to play a more active and effective role in supporting

More information

WHO Secretariat Dr Oleg Chestnov Assistant Director-General Noncommunicable Diseases and Mental Health

WHO Secretariat Dr Oleg Chestnov Assistant Director-General Noncommunicable Diseases and Mental Health WHO Secretariat Dr Oleg Chestnov Assistant Director-General Noncommunicable Diseases and Mental Health WHO Secretariat Dr Douglas Bettcher Director Department for Prevention of NCDs UN General Assembly

More information

The United Republic of Tanzania. Domestication of Sustainable Development Goals. Progress Report. March, 2017

The United Republic of Tanzania. Domestication of Sustainable Development Goals. Progress Report. March, 2017 The United Republic of Tanzania Domestication of Sustainable Development Goals Progress Report March, 2017 Prepared by the National Bureau of Statistics Table of Contents 1. Background... 1 2. Progress

More information

REPORT 2015/186 INTERNAL AUDIT DIVISION

REPORT 2015/186 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/186 Audit of information and communications technology operations in the Secretariat of the United Nations Joint Staff Pension Fund Overall results relating to the effective

More information

Council, 8 February 2017 Information Technology Report Executive summary and recommendations

Council, 8 February 2017 Information Technology Report Executive summary and recommendations Council, 8 February 2017 Information Technology Report Executive summary and recommendations Introduction This report provides the Council with an update into the work of the Information Technology Directorate

More information

ENISA s Position on the NIS Directive

ENISA s Position on the NIS Directive ENISA s Position on the NIS Directive 1 Introduction This note briefly summarises ENISA s position on the NIS Directive. It provides the background to the Directive, explains its significance, provides

More information

Aneurin Bevan Health Board

Aneurin Bevan Health Board Aneurin Bevan Health Board Information Governance Committee Minutes of the meeting held on 10 February 2010, 2pm, in the Small Boardroom, Mamhilad House Present: Prof Janet Wademan - Independent Member

More information

Architecture and Standards Development Lifecycle

Architecture and Standards Development Lifecycle Architecture and Standards Development Lifecycle Architecture and Standards Branch Author: Architecture and Standards Branch Date Created: April 2, 2008 Last Update: July 22, 2008 Version: 1.0 ~ This Page

More information

Hundred and seventy-fifth session REPORT BY THE DIRECTOR-GENERAL ON THE IMPLICATIONS OF THE PROCLAMATION OF A WORLD DAY FOR AUDIOVISUAL HERITAGE

Hundred and seventy-fifth session REPORT BY THE DIRECTOR-GENERAL ON THE IMPLICATIONS OF THE PROCLAMATION OF A WORLD DAY FOR AUDIOVISUAL HERITAGE ex United Nations Educational, Scientific and Cultural Organization Executive Board Hundred and seventy-fifth session 175 EX/18 PARIS, 1 September 2006 Original: English Item 17 of the provisional agenda

More information

Reference Interconnect Offer. Luxembourg Online SA

Reference Interconnect Offer. Luxembourg Online SA Reference Interconnect Offer Luxembourg Online SA 2017 RIO - LOL 2017 Document published for public consultation Version 03 Document date : 29.03.2017 Version Status 01 Published on 11.03.2015 02 Published

More information

Subject: Open letter on REMIT transaction reporting data quality

Subject: Open letter on REMIT transaction reporting data quality Head of the Market Integrity and Transparency Department Ljubljana, 16 February 2017 ACER-VZ-IZ-pp-2017-94 To whom it may concern Subject: Open letter on REMIT transaction reporting data quality Dear Sir

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between the European Commission, the European Union Agency for Railways and the European rail sector associations (CER, EIM, EPTTOLA, ERFA, the ERTMS Users Group, GSM-R Industry

More information

Data Processing Agreement

Data Processing Agreement Data Processing Agreement Merchant (the "Data Controller") and Nets (the "Data Processor") (separately referred to as a Party and collectively the Parties ) have concluded this DATA PROCESSING AGREEMENT

More information

T2S high level programme plan and work streams

T2S high level programme plan and work streams T2S high level programme plan and work streams First meeting of the T2S central bank experts network 16-17 March 2009 Flora Laszlo T2S Division Technical Programme Management European Central Bank 1 Agenda

More information

CHESS Release 10.0 Business and Technical Specification

CHESS Release 10.0 Business and Technical Specification CHESS Release 10.0 Business and Technical Specification ASX mfund Enhancements CHESS 10 Version: 1.8 Publication Date: 1 August 2018 Property of: ASX Operations Pty Limited Copyright 2018 ASX Limited ABN

More information

Assessment of the progress made in the implementation of and follow-up to the outcomes of the World Summit on the Information Society

Assessment of the progress made in the implementation of and follow-up to the outcomes of the World Summit on the Information Society ECOSOC Resolution 2008/3 Assessment of the progress made in the implementation of and follow-up to the outcomes of the World Summit on the Information Society The Economic and Social Council, Recalling

More information

* - Note: complete submissions are to be submitted at least two weeks before any deadline to ensure timely closure.

* - Note: complete submissions are to be submitted at least two weeks before any deadline to ensure timely closure. PAGE 1 of 11 PROCESS OBJECTIVE : To effectively manage all feedback (as defined in QM-00-01 / 02) and associated correction and corrective action in an effective and objective manner. Feedback includes

More information

CHESS Release 10.0 Business and Technical Specification

CHESS Release 10.0 Business and Technical Specification CHESS Release 10.0 Business and Technical Specification ASX mfund Enhancements CHESS 10 Version: 1.6 Publication Date: 13 July 2018 Property of: ASX Operations Pty Limited Document History Version No.

More information

Ontario Smart Grid Forum: Support Presentation. Tuesday, March 8 th 2011

Ontario Smart Grid Forum: Support Presentation. Tuesday, March 8 th 2011 Ontario Smart Grid Forum: Support Presentation Tuesday, March 8 th 2011 Agenda Item # 1 S.G.F. Minutes 2 Agenda Item # 1: Minutes January 17 th 2011 minutes: no further comments received. Recommended as

More information

1. Legal/business importance parameter: Low 2. Market implementation efforts parameter: Low

1. Legal/business importance parameter: Low 2. Market implementation efforts parameter: Low General Information (Origin of Request) User Requirements (URD) Other User Functional or Technical Documentation (SYS) Request raised by: 4CB Institute: 4CB Date raised: 30.09.2016 Request title: Multiplex

More information

ISO20022 Messages types and flows in future RTGS services. 14 February 2017 Ad-hoc Workshop on messages for the Future RTGS Services

ISO20022 Messages types and flows in future RTGS services. 14 February 2017 Ad-hoc Workshop on messages for the Future RTGS Services ISO00 Messages types and flows in future RTGS s February 07 Ad-hoc Workshop on messages for the Future RTGS Services messages and message flow in TARGET (I) Background information for the RTGS s (today

More information

Consultancy for Trade and Supply Chain Finance Track Criteria

Consultancy for Trade and Supply Chain Finance Track Criteria Consultancy for Trade and Supply Chain Finance Track Criteria This document introduces the framework of the SWIFT Certified Specialist programme in the scope of consultancy for trade and supply chain finance.

More information