NPA Technical and operational requirements for remote tower operations

Size: px
Start display at page:

Download "NPA Technical and operational requirements for remote tower operations"

Transcription

1 NPA Technical and operational requirements for remote tower operations General Comment: welcomes recognition within the draft Guidelines of the entry into law of Regulation (EU) 2017/373 and its eventual revocation of Regulations (EC or EU) 1034/2011 and 1035/2011. An indication of how and when the document will be amended to reflect 2017/373 taking effect in 2020 (e.g. replacement of references to ICAO text in lieu of 2017/373 text), and subsequent amendments resulting from incorporation of Parts AIM and FPD, plus amendments to Parts ATS and MET would be welcome. Justification: Provision of clarity on planned document maintenance. Page No: 8 Paragraph No: 2 nd paragraph beginning in relation to the argument. Comment: agrees that there is no requirement for a specific remote aerodrome ATS rating. Justification: Aerodrome control service remains aerodrome control service in terms of the provision of the ATS itself. The processes and systems used by the ATCO to deliver that ATS may change but that is associated with local implementation and should be delivered through the unit training plan and endorsement course. A Unit License Endorsement (ULE) must be passed for each aerodrome and appropriate levels of currency must be maintained for each endorsement. Page No: 9 Paragraph No: Question to stakeholders. Comment: believes there is no need to include a distinct RTF callsign suffix; pilots should be aware that this is the case through briefing (SERA.2010(b) and ICAO Annex 2 Page 1 of 27

2 requirement). There is no requirement to change established RTF procedures regarding the identity of the ATS function being provided. Justification: Alignment with SERA and ICAO Annex 2. Page No: 9 Paragraph No: Question to stakeholders Comment: does not support the addition of any phraseology to indicate the provision of remote aerodrome ATS. An inclusion in the AIP together with the annotation of the main camera housing (RTR) on the aerodrome chart is considered sufficient. Justification: Avoidance of superfluous radiotelephony requirements. Page No: 14 onwards Paragraph No: Draft guidelines Comment: There is a case for a summary of the SESAR JU remote tower trials and outcomes. However, this would be better presented as an Annex to the Guidelines rather than scattered throughout the draft. Justification: Better document layout and readability. Proposed Text: Remove all SESAR JU-related text and present in a dedicated Annex to the Guidelines. Page No: 14 Paragraph No: 1.3 Document Structure Comment: This is unnecessary (the document structure is addressed by the comprehensive table of contents) and merely adds bulk to the draft. We believe this paragraph should be deleted. Justification: Better document layout and readability. Page No: 17/18 Page 2 of 27

3 Paragraph No: 2 Definitions Comment: Presentation of Definitions in unnecessarily repetitive and the lack of alphabetical order does not make for intuitive reading. Presentation as per EU Regulations and EASA AMC/GM convention is preferred and recommended. Justification: Ease of reference. Proposed Text Taking into consideration comments concerning controller working position (CWP), conventional tower, remote tower, visual presentation and visual presentation system, amend to read as follows: For the purpose of these Guidelines the following definitions apply. Aircraft movement means an aircraft take-off or landing at an aerodrome. Direct visual observation means observation through direct eyesight of objects situated within the line of sight of the observer, possibly enhanced by external elements (e.g. binoculars). Identify/identification means the ability to couple a detected or recognised object with a specific individual aircraft/vehicle. This may be done via e.g. visual means (e.g. by reading the registration mark of an aircraft), by applying probability theory (e.g. the aircraft/object currently on final must be the same aircraft as I have on my flight strip as there are no other flight strips and no other known aircraft in the aerodrome vicinity ), by system support providing the call-sign or squawk code (or upon squawk ident request), by aircraft position reports, by requesting aircraft turns/movement/flashing lights to identify. Multiple mode of operation means the provision of ATS from one remote tower module for two or more aerodromes at the same time (i.e. simultaneously). Operational context means the operational characteristics such as aerodrome size/layout, traffic volume and complexity, related airspace and flight procedures, number of simultaneously served aerodromes, etc. that should be considered when remote aerodrome ATS is to be implemented. Out-the-window (OTW) view means a view of the areas of responsibility of the aerodrome ATS unit from a conventional tower, obtained via direct visual observation. Remote aerodrome ATS means provision of aerodrome ATS based on a view of the aerodrome and its vicinity through the means of a visual presentation system (and supported by other technology as needed). Remote tower means a facility from which aerodrome ATS can be provided to aerodrome traffic through real-time visual presentation by electronic means of the elements contained in its area of responsibility (manoeuvring area and vicinity of the aerodrome, together with other elements that support the operation where the ATS is provided from a location different from where the view on the visual presentation is acquired from. Remote tower centre (RTC) means a facility housing one or more remote tower modules. Remote tower module (RTM) means a combination of systems and constituents from where remote aerodrome ATS can be provided, including one or more CWP(s) and the visual presentation. (It can be compared with the tower cabin of an aerodrome conventional tower.) Single mode of operation means the provision of ATS from one remote tower module for one aerodrome at a time. Page 3 of 27

4 Visual presentation means a view of the areas of responsibility of the aerodrome ATS unit, provided by means of a visual surveillance presentation system.. Visual surveillance system means an electro-optical system providing an electronic visual presentation of traffic and any other information necessary to maintain situational awareness at an aerodrome and its vicinity. A visual surveillance system will normally consist of numerous integrated elements, including sensor(s), data transmission links, data processing systems and situation displays. Workstation means the ATCO/AFISO working position, which includes the ATS systems/functions as necessary for the service provision, but excludes the visual presentation. Page No: 17 Paragraph No: Definition of conventional tower Comment: A definition of conventional tower is not necessary. An explanation of what the guidelines mean by a conventional tower is better placed in the text in the guidelines placed in parenthesis upon first use of the term. Justification: Risk associated with a definition at this stage in development. Proposed Text: At first use of the term conventional tower add (i.e. what has to date been understood as an on-site control tower building. Page No: 17 Paragraph No: Definition of remote tower Comment: The definition only states real-time visual presentation, however this doesn t necessarily mean the visual presentation is by electronic means. One could argue that a conventional tower view acquired by means of having a glass window tower is also a form of a visual presentation. Justification: Clarity Proposed Text: Amend to read as follows: remote tower means a facility from which aerodrome ATS can be provided to aerodrome traffic through real-time visual presentation by electronic means of the elements contained in its area of responsibility (manoeuvring area and vicinity of the aerodrome, together with other elements that support the operation where the ATS is provided from a location different from where the view on the visual presentation is acquired from. Page 4 of 27

5 Page No: 17 Paragraph No: Definition of controller working position (CWP) Comment: The definition describes a ATCO/AFISO workstation as a CWP ; however, an AFISO is not a controller, therefore it is a misnomer to term this a CWP. It should therefore be described as a workstation. This will further require the removal and replacement of the term CWP from all other text. Justification: Inclusivity of EU regulatory materials. Proposed Text: Amend to read as follows: Workstation means the ATCO/AFISO working position, which includes the ATS systems/functions as necessary for the service provision, but excludes the visual presentation. Page No: 17 Paragraph No: Definition of Visual presentation Comment: It is suggested that a conventional tower view acquired by means of having a glass window tower is also a form of a visual presentation. Therefore, the proposed definition must reflect the means by which the views are presented. Justification: The definition lacks clarity. Proposed Text: Amend to read as follows: Visual presentation means a view of the areas of responsibility of the aerodrome ATS unit, provided by means of a visual surveillance system. Page No: 18 Paragraph No: Definition of Visual presentation system Comment: Suggest adoption of the ICAO definition of visual surveillance system as proposed in state letter AN 7/ /23 and what we believe to be the current ANC position regarding adoption. Pending notification of ICAO s decision in this regard the UK CAA recommends delaying publication of revised EASA guidance until all are certain of what ICAO has adopted. EASA s proposed text is useful guidance so could be merged into the proposed ICAO text. Page 5 of 27

6 Justification: For alignment with ICAO terms and definitions. Proposed Text: Amend to read as follows: Visual surveillance system means an electro-optical system providing an electronic visual presentation of traffic and any other information necessary to maintain situational awareness at an aerodrome and its vicinity. A visual surveillance system will normally consist of numerous integrated elements, including sensor(s), data transmission links, data processing systems and situation displays. Page No: 18 Paragraph No: Definition of Detect/Detection Comment: We disagree with the need for the definition of detect/detection. proposes the deletion of the definition of detection. Users of the words detect/detection would apply the common understanding of the dictionary definition. Justification: Detection cannot be limited to visual acuity. There is the possibility of confusion when comparing this definition with the dictionary definition of detect/detection. Proposed Text: Delete text. However, if EASA remains minded to include the definition, it is more appropriate for it to read: Detect/Detection means the ability to determine the presence of an object in the optical field of view for a human eye or for an optical sensor, or the ability to determine the presence of an object by means of electronic signal processing for a non-optical electronic surveillance sensor that uses radio signals. This is considered more appropriate as it captures visual and non-visual means of detection. Page No: 18 Paragraph No: Definition of Recognise/Recognition Comment: The does not support incorporation of the definition of recognise/recognition. Users of the words recognise/recognition should apply the common dictionary meaning of the word. Justification: No need to define recognise/recognition. Proposed Text: Delete text. However, if EASA remains minded to include the definition, it is more appropriate for it to read: Page 6 of 27

7 Recognise/Recognition means the ability to determine the class, category or type of an object by means of the human eye or an optical sensor, or by means of image processing or radio signal processing capabilities and algorithms. This is considered more appropriate as it captures visual and non-visual means of recognition. Page No: 18 Paragraph No: Definition of identify/identification Comment: The definition of Identify/identification is not necessary. Users of the words Identify/identification can apply the common understandings of each. Justification: There is the possibility of confusion when comparing this definition with the common understanding of the term. Proposed Text: Delete text Page No: 19 Paragraph No: Section 3 title: Introduction to remote aerodrome ATS Comment: We believe the title does not encapsulate the scope of the subsequent text to the extent that it should. In addition, Section 1 is also titled Introduction. Justification: The draft would be enhanced by a better section title. Proposed Text: Amend title to read: The remote aerodrome ATS concept and modes of operation Page No: 19 Paragraph No: Section 3 sub-paragraphs 4 and 6 Comment: We believe the text is better placed in Section 1 Introduction. Justification: Better placing of text. Page 7 of 27

8 Page No: 19 Paragraph No: Section 3 sub-paragraph 5 Comment: The text merely provides historical background with no bearing on the Guidelines, and we recommend should be removed. Justification: Text appears to serve no purpose. Page No: 19 Paragraph No: Section 3 sub-paragraph 7 Comment: The text merely provides generic historical background with no bearing on the Guidelines, and we recommend should be removed. Justification: Text appears to serve no purpose. Page No: 19 Paragraph No: Paragraph 3.1 title: Concept overview Comment: The title does not encapsulate the scope of the subsequent text and should be renamed Modes of operation Justification: The draft would be enhanced by a better section title. Proposed Text: Amend title to read: Modes of operation Page No: 20 Paragraph No: 3.1, 2 nd sub-paragraph Comment: We believe the second sub-paragraph is unnecessary it does not provide any meaningful insight - and should be removed. Justification: Unnecessary text. Page 8 of 27

9 Page No: 20 Paragraph No: 3.1, Final sub-paragraph Comment: We believe the final sub-paragraph in unnecessary and should be removed. Justification: Unnecessary text. Page No: 20 Paragraph No: 3.3, 2 nd sub-paragraph Comment: The text as presented seems unnecessarily wordy. Justification: Unnecessary text. Proposed Text: Amend to read as follows: Operational applications include, but are not limited to: Page No: 21 Paragraph No: 3.4 Figure 1 Comment: We believe Figure 1 does not enhance the text in paragraph 3.4 and therefore is considered unnecessary and could be removed. Justification: The graphic appears to be superfluous. Proposed Text: Delete graphic. Amend paragraph 3.4 sub-paragraph 2 to reflect deletion of graphic. Page No: 22 Paragraph No: Bullet points 13 & 14 Comment: The 13 th and 14 th bullets appear to distinguish between detection and tracking by image processing systems based on optical systems - visual tracking) and detection and tracking based on surveillance data - radar tracking. There are many categories of what can Page 9 of 27

10 be considered as surveillance data. Further, these two points do not mention recognition and identification which is also possible by image processing or by radar type processing. Justification: would seek to expand this list further to provide greater clarity and distinction between the various means. Proposed Text: Add: Dedicated means to facilitate detection i.e. presence of a static or moving object or for recognition or identification using image processing techniques. Using image processing techniques for tracking an object (i.e) moving object correlation. This is to establish that the detected object is correlated in position and the track is of the same object when moving from one position to another. Dedicated means to facilitate the detection and tracking in the non-optical field using radio waves such as infrared, laser or other conventional type of surveillance sensor such as primary radar, SSR, MLAT or ADS-B for position data calculation (e.g. range/bearing) of a moving object. (position data may be output in ASTERIX) Dedicated means for identifying objects using any conventional type ATS surveillance sensor or using conventional ATS sensor data for labelling purposes; Using processing algorithms for recognition of objects and distinguish between classes of objects displayed on the visual presentation, Overlay or integration of data from conventional ATS surveillance sensors. A correlation functionality is needed to correlate the image on the visual presentation with the surveillance data. Page No: 23 Paragraph No: 4 Comment: The paragraph seems rather wordy and would benefit from being shortened. Justification: Need for brevity. Proposed Text: Replace with: Regardless of the operational context (aerodrome size and complexity, traffic volume/density, the number of simultaneous aerodromes, etc.), the implementation of remote aerodrome ATS will depend upon a local safety assessment, in accordance with the procedures accepted by the relevant competent authority. SESAR JU trials applied the following descriptions: basic and advanced features is a division of technical enablers to validate different equipage levels; low density aerodromes are aerodromes with typically a low capacity utilisation, Page 10 of 27

11 where the prevailing traffic is mostly single aircraft movement operations, rarely reaching or exceeding two simultaneous aircraft movements per aerodrome; medium density aerodromes are aerodromes with typically a medium capacity utilisation, where simultaneous aircraft movement operations can be expected, frequently experiencing more than one aircraft movement simultaneously per aerodrome. Page No: 23 Paragraph No: 4.1, Single mode of operation Comment: The paragraph seems rather wordy and would benefit from being shortened. Justification: Need for brevity. Proposed Text: Replace with: Single mode of operation is, in principle, envisaged to have the potential to be implemented for aerodromes of all sizes and conditions. Page No: 24 Paragraph No: 4.1.1, Final paragraph starting Nevertheless Comment: The paragraph does not allow for a simple operation at densities exceeding low. It should be recognised that at an aerodrome with a simple operation, the basic features (potentially with additional mitigations) may be sufficient for that operation without the need for advanced features. Justification: Enhanced relevance of text. Proposed Text: Replace with: Depending on the quality of the visual presentation, the basic features may be sufficient for aerodromes where traffic exceeds the low density or low complexity characteristics. However, it is recommended that ATS providers consider using the advanced features especially for medium density aerodromes. Page No: 24 Paragraph No: 4.1.4, Footnote 23 Comment: We recommend quoting the text at Regulation (EU) 2017/373 paragraph Page 11 of 27

12 ATM/ANS.OR.A.070 (2017/373 having now been adopted into EU law). Cross-reference to source ICAO material remains necessary given 2017/373 s effective date of 2 Jan 20. Justification: Greater, and more appropriate alignment with other EU regulatory material. Page No: 26 Paragraph No: 4.2.2, Simultaneous aircraft movements on different aerodromes - General Comment Comment: Recently published SESAR Validation trials at Budapest would seem to have exceeded this provision with 3 airports working traffic at a rate of 30 per hour (Validation 3 airports). EASA are asked to reconsider the validity and appropriateness of the comment as presented. Page No: 29 Paragraph No: 5.1, bullet 5 beginning When ATS is provided to several Comment: The is of the view that this language could be simplified and made more readily understandable. Justification: Text refinement. Proposed Text: Replace with: When ATS to several aerodromes is provided from one RTC, care should be taken to ensure an RTC does not become a single point of failure for aerodromes which otherwise would not be interdependent. (See also Section 9 for more on this aspect). For example, one aerodrome at an RTC may be planned as an alternate for destination aerodrome at the same RTC so a total failure at that RTC may mean a given flight will have no alternate available. Page No: 30 Paragraph No: Last paragraph Comment: We believe it is inappropriate to state that the visual presentation is based on a visible spectrum sensor-based solution. EASA has previously and appropriately - stated that thermal or infrared is a non-visible spectrum but the NPA refers in section 3.5 to use of Page 12 of 27

13 infrared cameras outside of the visible spectrum. believes that this means that the primary means of capturing the replicated image on the visual presentation system is via optical camera sensors. The term visual cameras should more correctly read cameras ; the term is considered too vague and all cameras are visual regardless of the spectrum(s) in which they operate Justification: Need for more precise text. Proposed Text: Amend to read: For the purposes of this document, it is assumed that the video image displayed on the visual presentation is primarily based on an optical sensor-based solution (where cameras in the visible spectrum capture the image at the aerodrome and the image is relayed to the ATCO s/afiso s screens), possibly enhanced by optical sensors from the non-visible spectrum, such as thermal or infrared etc. Page No: 34 Paragraph No: , Notes 1 & 2 Comment: We propose that text in both notes is combined for clarity as it appears the first note is contradictory to the second. Proposed Text: Replace with: Note: EUROCAE ED-240 [18] (REQ 01) stipulates a maximum end-to-end delay of 1 second for the visual presentation. However, this should be seen in the context of the specific operational and technical conditions applicable to the site to which aerodrome ATS is provided remotely. Therefore, subject to the submission to and acceptance by the Competent Authority (CA) of an appropriate safety case, an alternative maximum end-toend delay period may be applied. Page No: 35 Paragraph No: , 2 nd Note, final sentence Comment: The final sentence in the 2 nd Note states: The video update rate is therefore recommended to be evaluated and defined for each implementation. believes that a minimum video update rate should be set, if not by EASA then locally by the competent authority. Proposed Text: Replace with: While the video update rate can be defined for each different implementation, the Page 13 of 27

14 Competent Authority can set a universal minimum refresh rate should they choose to do so. Page No: 37 Paragraph No: 5.2.5, 1st and 2 nd bullets 2 beginning visual information from and Surveillance information from.. Comment: The words visual and surveillance at the start of these bullets are redundant. Justification: Need for improved text. Proposed Text: Amend to read: information from optical sensors, i.e system detection of moving objects (including also noncooperative targets) or in the visual field of view (commonly referred to as visual tracking ). information from ATS surveillance sensors such as radars, ADS-B etc., targeting primarily cooperative targets (commonly referred to as radar tracking ); Page No: 37 Paragraph No: 5.2.5, 4th bullet beginning Overlaid framings/symbols Comment: The text describes the overlays being used specifically in low visibility or bad weather. However, an operator may wish to use these overlays at any time. We recommend specifically should read especially. Proposed Text: Amend to read: especially in darkness and during low visibility conditions. Page No: 37 Paragraph No: 5.2.5, Considerations when implementing visual presentation technical enablers Comment: This text is considered repetitive the reader could be referred directly to 4.1.1, and We believe no additional text is required Proposed Text: Replace with: Page 14 of 27

15 Guidance is given in Sections 4.1.1, and Page No: 41 Paragraph No: Final sentence of paragraph 5.7, 2 nd sub-paragraph, beginning The exact requirements for the recording Comment: This could be interpreted as contradicting the ICAO text referenced at the beginning of paragraph 5.7. NSAs may simply use the existing ICAO 30 day requirements as the benchmark, despite the significant cost associated with that amount of storage. Justification: Accuracy of EU Regulatory materials. Proposed Text: Replace with: The exact requirements for the recording and retention of systems data specific to remote tower operations should be determined and specified by the CA, taking into account the aspects described herein. Page No: 42 Paragraph No: 5.9.1, beginning The remote tower infrastructure Comment: The premise of the remote tower is that essentially the operational aspect remains unchanged, therefore this paragraph is considered superfluous and the management of aerodrome assets should not change in remoting the service Proposed Text: Replace with: The remote tower infrastructure should enable the ATCO/AFISO to operate and monitor all pre-existing assets which will remain the responsibility of the remoted service provider. Page No: 43 Paragraph No: 5.9.4, Final sentence beginning As the monitoring and manoeuvring of such assets are not ATS tasks, Comment: At many aerodromes these are routinely, ATS tasks. Proposed Text: Replace with: Page 15 of 27

16 In cases where the monitoring and manoeuvring of such assets are ATS tasks and will continue to be, or at aerodromes where such assets are not ATS tasks,, Page No: 43 Paragraph No: 5.10, RTC/RTM aerodrome communication aspects Comment: This paragraph highlights a critical element of the remote tower concept and we believe, runs the risk of being lost in background noise in its current place in the NPA and should therefore be more prominent. We suggest placing the paragraph earlier in the document. Page No: 44 Paragraph No: 5.11, Part way through final sentence beginning In case of severe failures Comment: The requirement for monitoring technical systems is laid down elsewhere, so should simply be referenced here. The final sentence talks about closing down the service yet, there should be mitigations in place for systems failures. Proposed Text: Replace with: for the ATCO/AFISO to call for the technical supervisory specialist, close down the service or implement pre-arranged contingency plans. Page No: 44 Paragraph No: 5.12, Other ATS systems/functions Comment: As these systems will remain unchanged, we recommend that they are not mentioned, as to do so could confuse the reader. Proposed Text: Delete paragraph. Page No: 44 Page 16 of 27

17 Paragraph No: 5.13, Working environment Comment: We believe this paragraph is too detailed. It refers to a poor working environment and state-of-the-art ergonomic design. All of this is considered superfluous, while each application may want to consider these aspects, cost will be the main driver. Proposed Text: Delete paragraph. Page No: 45 Paragraph No: , Handling of abnormal and emergency situations in multiple mode of operation Comment: This paragraph refers to ABES training which is mandated elsewhere. Each application will need to consider its own mitigation methods; therefore, the cited examples are unnecessary. While multiple mode is a new operation, there should be no significant difference in the emergency procedures. Also, the paragraph would benefit from some minor restructuring. Proposed Text: Amend the first sub-paragraph to read as follows: The ATS provider should put in place procedures and contingency plans that clearly define how to deal with unexpected events, such as an emergency at one of the aerodromes significantly increasing ATCO/AFISO workload and affecting their ability to continue to provide ATS to all aerodromes under their responsibility. Such procedures and situations require adequate and recurrent training. Each application for multiple mode of operation will require careful consideration for potentially exacerbated emergency situations and therefore the potential exists for enhanced training and mitigations. Page No: 45 Paragraph No: , 1 st bullet beginning temporarily delay Comment: An AFISO cannot issue delaying or other actions. We therefore recommend that some text will need to be developed to highlight the actions available to AFISO in these circumstances. Justification: Consistency of EU Regulatory materials with ICAO provisions. Page 17 of 27

18 Page No: 45 Paragraph No: , Note: An RTC Supervisor may support the ATCO/AFISO to apply these procedures. Comment: The purpose and meaning of this note is not clear and needs to be reworded. Justification: Unclear text. Page No: 46 Paragraph No: , Communication procedural aspects in multiple mode of operation, 3 rd sub-paragraph Comment: does not believe that such a detailed description of cross-coupling is required, given the common application of this practice in most (if not all) ATS disciplines as and when circumstances permit/require. The individual applications should submit their cross-coupling proposals as a part of their safety submission and each application should be judged on the individual operational requirement. Proposed Text: Replace 3 rd sub-paragraph with: Each individual application of remote ATS in a multiple mode of operation will need to consider any frequency cross coupling requirements for their operations and submit the relevant safety considerations, mitigation and operational functionality to their Competent Authority for consideration and approval. Page No: 47 Paragraph No: , CWP/RTM design considerations in multiple mode of operation Comment: Considering the level of detail some aspects have been attributed to in the NPA, we consider that this lacks detail. No mention is made of the potential for variable equipage at sites. It may be that sites have differing equipage levels so it is questioned how that is managed when multiple aerodromes are being controlled at the same time. In a basic sense, how does one control the lights independently at 2 or more aerodromes? This equally applies to flight progress strips, they represent the aircraft and are separated in their respective bays, especially the runway bay. How does one create and manage 2 or more runway bays and which aircraft is in which, and when? A bespoke runway bay may be required for the various configuration of runway bays Proposed Text: We recommend that all such areas need to be carefully considered and moderated. We Page 18 of 27

19 would suggest the following as an exemplar starting point; Propose new sub paras for: Variable equipage; Guidance on the simultaneous use of multiple runway bays; Potential hazards of multiple switching i.e. can runway lights at multiple aerodromes be operated simultaneously? If so, brilliance requirements can, for a variety of reasons be different in each location so individual control will still be required (to be considered as part of the design phase). Variable equipage control systems must allow for different levels of equipage at different aerodromes being controlled simultaneously. While the objective will be to have the minimum number of control switches and these should be shared as much as possible, it is inevitable that there will be a requirement for some independent controls specific to certain equipage levels. Where one aerodrome in the multi-mode module has an approved enhancement or overlay that the other(s) do not, that enhancement must be only applicable to that operation and disabled for the others. Page No: 48 and 49 Paragraph No: , , Comment: The ability to independently control all the required equipment at multiple aerodrome simultaneously is not mentioned. There is a level of technical complexity to the management of a variety of equipment, which may vary in design, control and presentation from site to site. This must be considered in any application considering multiple mode operations. Justification: Incomplete guidance Page No: 50 Paragraph No: Chapter 6 Comment: The management of change is well documented elsewhere (1035/2011) so it is questioned why this is detailed here as well. We recommend simply referring to the source text. Page No: 50 Page 19 of 27

20 Paragraph No: 6.1.1, Dependencies and interfaces Comment: The second paragraph of paragraph contains the word shall as follows: In reference to Commission Implementing Regulation (EU) No 1035/2011 [3], Annex II, recital 3.2.1(c) 75, these dependencies shall be taken into account by the ATS provider when conducting the safety assessment. The purpose of the document is to provides guidance (paragraph 1.1, page 14 refers), therefore the use of the word shall is inconsistent with the purpose of the document. The inclusion of the word shall should be restricted to the replication of text taken directly from other documents. Proposed Text: Replace as follows: Any dependencies are required to be taken into account by the ATS provider when conducting the safety assessment in accordance with Commission Implementing Regulation (EU) No 1035/2011 [3], Annex II, recital 3.2.1(c) 75. Page No: 50 Paragraph No: 6.1.2, Identification of hazards Comment: We believe that there is too much detail here and recommend that it should remain as a high-level reference to the source text. In addition, paragraph contains the word shall. Replacement text is proposed below. Justification: The purpose of the document is to provides guidance (paragraph 1.1, page 14), therefore the use of the word shall is inconsistent with purpose of the document. The inclusion of the word shall should be restricted to the replication of text taken directly from other documents. Proposed Text: Replace with: In accordance with Commission Implementing Regulation (EU) No 1035/2011[3], Annex II, Sections and , an ATS provider is required to perform a hazard identification. Page No: 56 Paragraph No: 6.2.2, 6 th bullet Comment: There is a typo in the 6 th bullet point on page 56 AFIOs rather than AFISOs Proposed Text: AFISOs Page 20 of 27

21 Page No: 57 Paragraph No: 6.3.1, 6 th bullet point Comment: There is a typo in the 6 th bullet point on page 57, AFIOs should read AFISOs Proposed Text: AFISOs Page No: 58 Paragraph No: 6.3.3, Common aspects for a transition/implementation plan Comment: We believe there is nothing here which would not equally apply to a conventional tower other than the speed at which the tower will transition to an unplanned termination. We recommend that the text should be consolidated and referenced to source. Page No: 59 Paragraph No: 6.4, Information and cyber security Comment: The 4th paragraph of paragraph 6.4 contains the word shall as follows: Consequently, the introduction of remote aerodrome ATS may affect the security risk assessment and these security vulnerabilities may have an impact on safety. For this reason, these security vulnerabilities may add new causes to the existing safety hazards (e.g. possible corruption of navigation aids information, loss of visual presentation data) or may add new hazards (e.g. complete loss of the provision of ATS). Based on these considerations, the ATS provider shall (in reference to Regulations 1035/2011 and 2017/373, see above) conduct a dedicated security risk analysis and take the necessary measures to protect its systems and constituents against information and cyber security threats. The results of this security risk analysis should be considered as input to the safety assessment. Justification: The purpose of the document is to provides guidance (paragraph 1.1, page 14 refers), therefore the use of the word shall is inconsistent with purpose of the document. The inclusion of the word shall should be restricted to the replication of text taken directly from other documents. Page 21 of 27

22 Proposed Text: Replace with: Consequently, the introduction of remote aerodrome ATS may affect the security risk assessment and these security vulnerabilities may have an impact on safety. For this reason, these security vulnerabilities may add new causes to the existing safety hazards (e.g. possible corruption of navigation aids information, loss of visual presentation data) or may add new hazards (e.g. complete loss of the provision of ATS). Based on these considerations, the ATS provider is required in accordance with Commission Implementing Regulation (EU) No 1035/2011 and 2017/373 to conduct a dedicated security risk analysis and take the necessary measures to protect its systems and constituents against information and cyber security threats. The results of this security risk analysis should be considered as input to the safety assessment. Page No: 60 Paragraph No: 6.5, Contingency planning Comment: There appears to be an inconsistency of formatting of text replicated from Implementing Regulations. We believe the 1 st paragraph replicated below should be italicised. Justification: The standard appears to be that text taken from other documents and replicated within the NPA are italicised. Proposed Text: As stipulated by point 8.2 in Annex I of Regulation (EU) No 1035/ [3], a service provider and therefore also the ATS provider shall have in place contingency plans for all the services it provides in the case of events which result in significant degradation or interruption of its operations. Page No: 60 Paragraph No: 6.5, Contingency planning Comment: Section 5.1 paragraph 5 refers to RTC and of the need to exercise caution if an alternate aerodrome is lost because the RTC itself, as a single point of failure, is lost. Paragraph 6.5 should include the requirement for contingency plans to be available in the event of such an occurrence. We therefore recommend that a new sub-paragraph is added to address Failure of RTC Page 22 of 27

23 Page No: 62 Paragraph No: 6.6, Remote tower system constituents Comment: Reference is made to the interoperability regulation EC 552/2004, and it is later concluded that that the ground infrastructure for capturing images and sound should be considered as ATS, not CNS, which aligns with policy. However currently there are no specific requirements for ATS within Part B of EC 552/2004 for visual presentation except Human-machine and new concepts of operation. If this understanding is correct, then we suggest the proposed text below should be included. Justification: Clarity required of the specific requirements for visual presentation, binocular functionality and aerodrome sound. Proposed Text: Additional item to be added under The following is noted: on page 63: Specific requirements as defined in Part B of Regulation (EC) No 552/2004 for Visual Presentation, binocular functionality and aerodrome sound are limited to Human-machine interface systems and Support for new concepts of operation. Page No: 65 Paragraph No: 7.1.2, Aerodrome manual Comment: Aerodrome manual inclusion will differ from application to application and from ANSP to ANSP for different applications, and the list may not be as comprehensive as necessary. For example, there is no mention of interacting with wildlife management, airside work parties and/or direct pilot briefings, which the sees as being essential considerations. Justification: More comprehensive list of examples. Proposed Text: The following bullets should be added: Interaction with wildlife management Interaction and briefing of working parties Conduct of aerodrome briefings Page No: 65 Paragraph No: Aerodrome manual Comment: The is uncomfortable with such detailed lists however, if they must exist, they should include as many examples as possible and in this instance, Page 23 of 27

24 Bullet 3 refers to co-ordination ; clarification of what co-ordination means in the context is requested. Justification: Need for clarification Page No: 66 Paragraph No: 7.2.2, Aerodrome safeguarding Comment: Safeguarding is universal, we believe there is no need to reference it here, other than as proposed below. Proposed Text: Replace with: Aerodrome safeguarding There are no anticipated additional impacts on aerodrome safeguarding procedures as a result of remote towers. Page No: 67 Paragraph No: 7.2.4, Management of the change to remote aerodrome ATS Aerodrome operator Comment: Management of change is addressed in chapter 6. We recommend paragraph should be incorporated into chapter 6. Page No: 70 Paragraph No: 9, Aeronautical information products and services Comment: We disagree with the level of detail provided. The only change required would be to highlight that the service is provided remotely and marking the SLG on the aerodrome chart. Proposed Text: Remove all text after the 1 st paragraph Page 24 of 27

25 Page No: 71 Paragraph No: 10.2, Qualification and training of AFISOs Comment: There appears to be an inconsistency of formatting of text replicated from Implementing Regulations. We recommend that the text of this paragraph should be italicised as proposed below. Justification: The standard appears to be that text taken from other documents and replicated within the NPA are italicised. Proposed Text: With regard to the qualification and training of personnel providing Aerodrome Flight Information Service (AFISOs), it should be noted that at the time of publication of this document, the EU legislation does not include a detailed regulatory framework. However, point 5 of Annex 1 in Regulation 1035/ [3] stipulates that an air navigation service provider and therefore also the AFIS provider shall employ appropriately skilled personnel to ensure the provision of air navigation services in a safe, efficient, continuous and sustainable manner. In this context, the air navigation service provider shall establish policies for the recruitment and training of personnel. It is left to the Member States to define the appropriate regulatory means to meet this requirement in accordance with the local AFIS provision. To facilitate the development of AFISO training in the case of remote aerodrome ATS, the AMC and GM for the training and qualification of ATCOs can be considered in order to derive training plans and requirements that are appropriate to the local environment. Page No: 71 Paragraph No: 10.3, Qualification and training of ATSEPs Comment: Paragraph 10.3 states: Air Traffic Safety Electronics Personnel (ATSEP) involved in the operation and maintenance of equipment, facilities and installations enabling and supporting the remote aerodrome ATS, should be adequately trained, qualified and competent to perform their duties in accordance with the requirements laid down in Commission Implementing Regulation (EU) No 1035/2011 [3] (Annex II, point 3.3) The word should implies that it is optional for ATSEPs to be adequately trained, qualified and competent. Justification: EU 1035/2011 Annex II, point 3.3 states that Providers of air traffic services shall ensure that technical and engineering personnel including personnel of subcontracted operating organisations who operate and maintain ATM equipment approved for their operational use have and maintain sufficient knowledge and understanding of the services they are supporting, of the actual and potential effects of their work on the safety of those services, and of the appropriate working limits to be applied. The Regulation, which the NPA document references, uses the word shall. Page 25 of 27

26 Also, 2017/373 Annex XIII (Part-PERS) mandates that all ATSEPs shall be adequately trained and competent. Proposed Text: Replace with the following: Air Traffic Safety Electronics Personnel (ATSEP) involved in the operation and maintenance of equipment, facilities and installations enabling and supporting the remote aerodrome ATS, are required to be adequately trained, qualified and competent to perform their duties in accordance with the requirements laid down in Commission Implementing Regulation (EU) No 1035/2011 [3] (Annex II, point 3.3) Page No: Page 71 Paragraph No: 10.3, Qualification and training of ATSEPs Comment: Regarding ATSEP, reference is made to (EU) No 1035/2011, with Note 89 indicating replacement with (EU) No 2017/373 Annex XIII. However, within Annex XIII no provision is made for training requirements for visual presentation systems or systems providing aerodrome audio. recommends EASA development of appropriate ATSEP training requirements. Justification: To provide a joined up regulatory framework. Page No: 72 Paragraph No: 11, References Comment: This section provides a comprehensive and well-ordered list of references within the draft Guidelines and is most welcome. However, the presentation can be simplified by simply listing the reference materials and not cross-referencing them in the main body of the text. Use of numeric cross-referencing throughout the draft Guidelines (e.g. page 64 paragraph 7) is considered redundant anyway given that the titles of the referenced documents appear in full in the draft text. In addition, the reference to NPA Requirements for air traffic services ) is considered inappropriate given its ephemeral, non-definitive nature and requires deletion. Justification: Simpler presentation of reference material. Proposed Text: Delete referenced from the titles of the sub-sections. Page 26 of 27

27 Page No: 77 Paragraph No: 12.2, Table 2: List of operational hazards (SESAR safety assessment ATC case) Comment: The welcomes the list of operational hazards(ohs) in the table at paragraph 12.2 but believes additional OHs can be identified. Justification: The need to provide as comprehensive a list of OHs as possible. Proposed Text: The following additional OHs are proposed: OH-38: for multiple ops Remote ATS inadvertently provides information/ instructions valid for another aerodrome and not the one being controlled at that specific time, leading to confusion. OH-39: for multiple ops, remote ATS incorrectly identifies an aircraft at the wrong aerodrome, and issues a clearance or information to the wrong aeroplane. Page No: 77 Paragraph No: 12.2 Table Comment: Clarification is requested on what is meant by infringement and what is meant by tactical conflict. Page 27 of 27

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL SUMMARY OF RESPONSES (SOR) DOCUMENT FOR THE

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL SUMMARY OF RESPONSES (SOR) DOCUMENT FOR THE EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL SUMMARY OF RESPONSES (SOR) DOCUMENT FOR THE Draft Specification for Airspace Management (ASM) Support System Requirements supporting the

More information

Comment-Response Document (B.V(a)) Licensing and medical certification of air traffic controllers

Comment-Response Document (B.V(a)) Licensing and medical certification of air traffic controllers Rulemaking Directorate Comment-Response Document 2012-18 (B.V(a)) Licensing and medical certification of air traffic controllers (AMC to Part-ATCO, Subpart D, Section 2 (Initial training)) RMT.0153 (ATM.003(a))

More information

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679)

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Adopted on 4 December 2018 Adopted 1 Contents 1 Introduction... 3 2

More information

ICB Industry Consultation Body

ICB Industry Consultation Body ICB Industry Consultation Body POSITION PAPER Regulatory Response to ATM Cyber-Security Increasing reliance on inter-connected ATM systems, services and technologies increases the risk of cyber-attacks.

More information

ARTICLE 29 DATA PROTECTION WORKING PARTY

ARTICLE 29 DATA PROTECTION WORKING PARTY ARTICLE 29 DATA PROTECTION WORKING PARTY 18/EN WP261 Article 29 Working Party Draft Guidelines on the accreditation of certification bodies under Regulation (EU) 2016/679 Adopted on 6 february 2018 1 THE

More information

Advisory Circular. Subject: INTERNET COMMUNICATIONS OF Date: 11/1/02 AC No.: AVIATION WEATHER AND NOTAMS Initiated by: ARS-100

Advisory Circular. Subject: INTERNET COMMUNICATIONS OF Date: 11/1/02 AC No.: AVIATION WEATHER AND NOTAMS Initiated by: ARS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: INTERNET COMMUNICATIONS OF Date: 11/1/02 AC No.: 00-62 AVIATION WEATHER AND NOTAMS Initiated by: ARS-100 1.

More information

Development of the SPI Regulation

Development of the SPI Regulation Development of the SPI Regulation EC Workshop on the implementation of SPI Luc TYTGAT Director Pan-European Single Sky 07 March 2014 Introduction The SPI regulation was developed in close collaboration

More information

CIP Cyber Security Personnel & Training

CIP Cyber Security Personnel & Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-6 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the Bulk Electric

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Guidelines. on the security measures for operational and security risks of payment services under Directive (EU) 2015/2366 (PSD2) EBA/GL/2017/17

Guidelines. on the security measures for operational and security risks of payment services under Directive (EU) 2015/2366 (PSD2) EBA/GL/2017/17 GUIDELINES ON SECURITY MEASURES FOR OPERATIONAL AND SECURITY RISKS UNDER EBA/GL/2017/17 12/01/2018 Guidelines on the security measures for operational and security risks of payment services under Directive

More information

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Title of document ONR GUIDE COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Document Type: Unique Document ID and Revision No: Nuclear Security Technical Assessment Guide CNS-TAST-GD-4.4 Revision

More information

ICB Industry Consultation Body

ICB Industry Consultation Body ICB Industry Consultation Body Evolution of network management 17/11/2016 Issue Position Paper Long-term evolution of Network Management This position paper is intended to form the basis of advice to the

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 3 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

Reference No: 04/14. Issue Date: 16/10/14

Reference No: 04/14. Issue Date: 16/10/14 Reference No: 04/14 Issue 1 Issue Date: 16/10/14 Focal: FCL SAFETY REGULATION DIVISION PERSONNEL LICENSING ADVISORY MEMORANDUM (PLAM) TITLE GUIDANCE TO CANDIDATES FOR THE INITIAL ISSUE OF AN EU PART-FCL

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

European Aviation Safety Agency

European Aviation Safety Agency European Aviation Safety Agency EASA Management Board Decision 12-2007 Amending the products certification procedure MB meeting 04-2007 (11 September 2007) DECISION OF THE MANAGEMENT BOARD AMENDING DECISION

More information

ETNO Reflection Document on the EC Proposal for a Directive on Network and Information Security (NIS Directive)

ETNO Reflection Document on the EC Proposal for a Directive on Network and Information Security (NIS Directive) ETNO Reflection Document on the EC Proposal for a Directive on Network and Information Security (NIS Directive) July 2013 Executive Summary ETNO supports the European Commission s global approach to cyber-security

More information

JARUS RECOMMENDATIONS ON THE USE OF CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) IN THE RPAS COMMUNICATIONS CONTEXT

JARUS RECOMMENDATIONS ON THE USE OF CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) IN THE RPAS COMMUNICATIONS CONTEXT Joint Authorities for Rulemaking of Unmanned Systems JARUS RECOMMENDATIONS ON THE USE OF CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) IN THE RPAS COMMUNICATIONS CONTEXT DOCUMENT IDENTIFIER : JAR_DEL_WG5_D.04

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

1 NAT RLatSM Phase 2 Task List V.2017_2 1. LEAD(S) NOTE: leads will coordinate with groups identified in next column

1 NAT RLatSM Phase 2 Task List V.2017_2 1. LEAD(S) NOTE: leads will coordinate with groups identified in next column 1 NAT RLatSM Phase 2 Task List V.2017_2 1 TASK LIST SUPPORTING TRIAL IMPLEMENTATION OF RLATSM IN ICAO NAT REGION (NAT RLATSM TASK LIST V.2017_2) (as approved by NAT SPG Conclusion 54/2, 15 December 2017)

More information

Summary of Changes in ISO 9001:2008

Summary of Changes in ISO 9001:2008 s in ISO 9001:2008 Clause 0.1 Introduction General Added the phrase its organizational environment, changes in that environment, or risks associated with that environment, to the first paragraph Created

More information

CIP Cyber Security Personnel & Training

CIP Cyber Security Personnel & Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-5.1 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the BES from individuals

More information

Information Bulletin

Information Bulletin Application of Primary and Secondary Reference Documents Version 1.1 Approved for release July 2014 Table of Contents 1.0 Purpose statement... 3 2.0 Audience... 3 3.0 BCA requirements and referenced documents...

More information

SARI PART 147 NPA S

SARI PART 147 NPA S SARI PART 147 NPA 147-01- S Final issue dated 12 March 2016 Page 1 of 13 A. General: SARI Part 147 Initial Issue 1 dated 15 February 2013 has been developed on the basis of European Commission Regulations

More information

OPG Comments on REGDOC-1.1.5, Licence Application Guide: Small Modular Reactor Facilities

OPG Comments on REGDOC-1.1.5, Licence Application Guide: Small Modular Reactor Facilities From: TRAIN David -NUCLEAR [mailto:david.train@opg.com] Sent: September-25-18 2:51 PM To: Consultation (CNSC/CCSN) Cc: MANLEY Robin -NUCLEAR; KHAN Saad -NUCLEAR Subject: OPG Comments on REGDOC-1.1.5, Licence

More information

Instructor and assessor requirements from the perspective of the new Regulation on ATCO licensing

Instructor and assessor requirements from the perspective of the new Regulation on ATCO licensing Instructor and assessor requirements from the perspective of the new Regulation on ATCO licensing Zsuzsanna ERDÉLYI ATM Rulemaking Officer Budapest, 16 October 2014 ATM rulemaking ATCO licencing Dir. 2006/23

More information

Final Project Report. Abstract. Document information

Final Project Report. Abstract. Document information Final Project Report Document information Project Title Improved 1090 MHz ADS-B Ground station capacity and security Project Number 15.04.06 Project Manager Thales Deliverable Name Final Project Report

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 7/5/12 WORKING PAPER ANConf.12.WP.007.en.docx TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through

More information

Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679

Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679 Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679 Adopted on 25 May 2018 Contents 1. Introduction... 2 1.1. Scope

More information

MEMORANDUM OF UNDERSTANDING FOR THE INTERCONNECTION OF THE AUTOMATED SYSTEMS OF AAA AND BBB

MEMORANDUM OF UNDERSTANDING FOR THE INTERCONNECTION OF THE AUTOMATED SYSTEMS OF AAA AND BBB FOR THE INTERCONNECTION OF THE AUTOMATED SYSTEMS OF AAA AND BBB -2- Effective date: 17 SEP 2009 Pages: 2 of 24 Preface This document defines the Memorandum of Understanding that will allow AAA and BBB

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

OPERATIONS SEAFARER CERTIFICATION STANDARD OF TRAINING & ASSESSMENT. Security Awareness STCW A-VI/6-1

OPERATIONS SEAFARER CERTIFICATION STANDARD OF TRAINING & ASSESSMENT. Security Awareness STCW A-VI/6-1 Document No. STA-06-601 Version No, Date 1.0 01/06/2018 Effective Date 01/07/2018 Compiled by Consultant, Senior Examiner Deck, QSS - Developer Approved by Chief Examiner Approval date 31/05/2018 OPERATIONS

More information

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS Approved By: Executive: Accreditation: Mpho Phaloane Revised By: RBI STC Working Group Members Date

More information

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission... CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...

More information

Certification in the various domains

Certification in the various domains Certification in the various domains CE 6 Licensing, certification, authorization and/or approval obligations Annex 19 Appendix 1 The State shall implement documented processes and procedures to ensure

More information

The Accreditation and Verification Regulation - Verification report

The Accreditation and Verification Regulation - Verification report EUROPEAN COMMISSION DIRECTORATE-GENERAL CLIMATE ACTION Directorate A - International and Climate Strategy CLIMA.A.3 - Monitoring, Reporting, Verification Guidance Document The Accreditation and Verification

More information

ICAEW REPRESENTATION 68/16

ICAEW REPRESENTATION 68/16 ICAEW REPRESENTATION 68/16 Improving the Structure of the Code of Ethics for Professional Accountants - Phase 1 ICAEW welcomes the opportunity to comment on the Improving the Structure of the Code of Ethics

More information

Qualification Specification

Qualification Specification BCS Level 2 Certificate in IT User Skills (ECDL Core) Version 2.0 March 2018 This is a United Kingdom government regulated qualification which is administered and approved by one or more of the following:

More information

RMT 0599 Competency and evidence based training

RMT 0599 Competency and evidence based training RMT 0599 Competency and evidence based training Eric Bennett & Francisco Arenas Alvariño Project manager RMT0599 Air Operations & Air Crew Regulation Officers Flight Standards Directorate TE.GEN.00409-001

More information

Background Information TPL Transmission System Planning Performance Requirements

Background Information TPL Transmission System Planning Performance Requirements Comment Form for 6 th Draft of Standard TPL-001-1 Please DO NOT use this form to submit comments on the 6 th draft of the TPL-001-2 standard for. This comment form must be completed by May 31, 2011. If

More information

Cyber Security Incident Report

Cyber Security Incident Report Cyber Security Incident Report Technical Rationale and Justification for Reliability Standard CIP-008-6 January 2019 NERC Report Title Report Date I Table of Contents Preface... iii Introduction... 1 New

More information

Datalink performances

Datalink performances Datalink performances Outcome of the Datalink Performance Monitoring activities Jacky Pouzet Head of Communication and Frequency Coordination Unit WAC Madrid, March 2018 The Big Picture EC EASA Reminder:

More information

Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities

Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities This Implementation Plan applies to Cyber Security Standards CIP-002-2 through CIP-009-2 and CIP-002-3 through

More information

CIP Cyber Security Systems Security Management

CIP Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security System Security Management 2. Number: CIP-007-5 3. Purpose: To manage system security by specifying select technical, operational, and procedural requirements in

More information

PUBLIC CONSULTATION ON EBA XBRL TAXONOMY V2.1 EBA/CP/2014/ March Consultation Paper

PUBLIC CONSULTATION ON EBA XBRL TAXONOMY V2.1 EBA/CP/2014/ March Consultation Paper EBA/CP/2014/03 21 March 2014 Consultation Paper On XBRL Taxonomy (v2.1) related to remittance of supervisory data under Regulation (EU) No 575/2013 Contents 1. Responding to this Consultation 3 2. Executive

More information

PROPOSED DOCUMENT. International Medical Device Regulators Forum

PROPOSED DOCUMENT. International Medical Device Regulators Forum PROPOSED DOCUMENT International Medical Device Regulators Forum Title: Assembly and Technical Guide for IMDRF Table of Contents (ToC) Submissions (ToC-based submissions) Authoring Group: Regulated Product

More information

Guidelines for Handling Addressing Changes in the AMHS Network

Guidelines for Handling Addressing Changes in the AMHS Network EUR AMHS Documentation AMHS Addressing Change Guidance Guidelines for Handling Addressing Changes in the AMHS Network Document Reference: Author: EUR AMHS Documentation, AMHS Addressing Change Guidance

More information

18 April Re.: Exposure Draft, Improving the Structure of the Code of Ethics for Professional Accountants - Phase 1. Dear Mr.

18 April Re.: Exposure Draft, Improving the Structure of the Code of Ethics for Professional Accountants - Phase 1. Dear Mr. 18 April 2016 Mr. Ken Siong Technical Director International Ethics Standards Board for Accountants 529 Fifth Avenue, 6 th Floor New York NY 10017, USA submitted electronically through the IESBA website

More information

Final Project Report

Final Project Report 16.04.02 Final Project Report Document information Project Title HP Tool Repository of SESAR standard HP methods and tools Project Number 16.04.02 Project Manager DFS Deliverable Name 16.04.02 Final Project

More information

BEST PRACTICE GUIDE for The classification of unforeseen variations

BEST PRACTICE GUIDE for The classification of unforeseen variations EMA/CMDv/499821/2008 CMDv/BPG/015 BEST PRACTICE GUIDE for The classification of unforeseen variations Edition number: 02 Edition date: 18 December 2012 Implementation date: 18 December 2012 1 1 Amending

More information

Port Facility Cyber Security

Port Facility Cyber Security International Port Security Program Port Facility Cyber Security Cyber Security Assessment MAR'01 1 Lesson Topics ISPS Code Requirement The Assessment Process ISPS Code Requirements What is the purpose

More information

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, New Delhi CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII, 2017 EFFECTIVE

More information

5. The technology risk evaluation need only be updated when significant changes or upgrades to systems are implemented.

5. The technology risk evaluation need only be updated when significant changes or upgrades to systems are implemented. Annex to the Financial Services Businesses Handbook Using Technology in the Customer Due Diligence Process A.1. Technology Risk Evaluation 1. A financial services business must, prior to deciding whether

More information

Final Project Report. Abstract. Document information

Final Project Report. Abstract. Document information Final Project Report Document information Project Title ATM Security Coordination and Support Project Number 16.06.02 Project Manager EUROCONTROL Deliverable Name Final Project Report Deliverable ID D100

More information

CIP Cyber Security Incident Reporting and Response Planning

CIP Cyber Security Incident Reporting and Response Planning Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Aerospace Technology Congress 2016 Stockholm, Sweden

Aerospace Technology Congress 2016 Stockholm, Sweden SESAR Aerospace Technology Congress 2016 Stockholm, Sweden Michael Standar, SESAR Joint Undertaking 2 ICAO projected global traffic scenario - 2040 The European ATM Master Plan SESAR - addressing global

More information

Common Understanding 10/2014 Implementation of Article 6(5) of the Commission Regulation (EU) 73/2010

Common Understanding 10/2014 Implementation of Article 6(5) of the Commission Regulation (EU) 73/2010 Common Understanding 10/2014 Implementation of Article 6(5) of the Commission Regulation (EU) 73/2010 Edition: 1.2 Date: 20 October 2016 Reference: ARWG CU 10/2014 1/6 1. INTRODUCTION This document describes

More information

ENISA s Position on the NIS Directive

ENISA s Position on the NIS Directive ENISA s Position on the NIS Directive 1 Introduction This note briefly summarises ENISA s position on the NIS Directive. It provides the background to the Directive, explains its significance, provides

More information

NHS Gloucestershire Clinical Commissioning Group. Business Continuity Strategy

NHS Gloucestershire Clinical Commissioning Group. Business Continuity Strategy NHS Gloucestershire Clinical Commissioning Group 1 Document Control Title of Document Gloucestershire CCG Author A Ewens (Emergency Planning and Business Continuity Officer) Review Date February 2017 Classification

More information

CIP Cyber Security Configuration Management and Vulnerability Assessments

CIP Cyber Security Configuration Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS

TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS Target2-Securities Project Team TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS Reference: T2S-07-0270 Date: 09 October 2007 Version: 0.1 Status: Draft Target2-Securities - User s TABLE OF CONTENTS

More information

Higher National Unit specification: general information. Graded Unit 2

Higher National Unit specification: general information. Graded Unit 2 Higher National Unit specification: general information This Graded Unit has been validated as part of the HND Computing: Software Development. Centres are required to develop the assessment instrument

More information

Google Cloud & the General Data Protection Regulation (GDPR)

Google Cloud & the General Data Protection Regulation (GDPR) Google Cloud & the General Data Protection Regulation (GDPR) INTRODUCTION General Data Protection Regulation (GDPR) On 25 May 2018, the most significant piece of European data protection legislation to

More information

European Union comments CODEX COMMITTEE ON FOOD HYGIENE. Forty-ninth Session. Chicago, Illinois, United States of America, November 2017

European Union comments CODEX COMMITTEE ON FOOD HYGIENE. Forty-ninth Session. Chicago, Illinois, United States of America, November 2017 European Union comments CODEX COMMITTEE ON FOOD HYGIENE Forty-ninth Session Chicago, Illinois, United States of America, 13-17 November 2017 Agenda Item 4: Proposed Draft Revision of the General Principles

More information

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Recovery Plans for BES Cyber Systems A. Introduction 1. Title: Cyber Security Recovery Plans for BES Cyber Systems 2. Number: CIP-009-5 3. Purpose: To recover reliability functions performed by BES Cyber Systems by specifying recovery plan

More information

Frequently Asked Questions November 25, 2014 CIP Version 5 Standards

Frequently Asked Questions November 25, 2014 CIP Version 5 Standards Frequently Asked Questions November 25, 2014 CIP Version 5 Standards This document provides answers to questions asked by entities as they transition to the CIP Version 5 Standards. The questions are listed

More information

Air Transport & Travel Industry. Principles, Functional and Business Requirements PNRGOV

Air Transport & Travel Industry. Principles, Functional and Business Requirements PNRGOV Air Transport & Travel Industry Principles, Functional and Business Requirements Version 15.1 Endorsed by WCO Council in July 2016 Table of Contents 1 INTRODUCTION... 3 1.1 PURPOSE... 3 1.2 SCOPE... 3

More information

Standards: Implementation, Certification and Testing Work group Friday, May 8, :00 Pm-1:30 Pm ET.

Standards: Implementation, Certification and Testing Work group Friday, May 8, :00 Pm-1:30 Pm ET. Standards: Implementation, Certification and Testing Work group Friday, May 8, 2015. 12:00 Pm-1:30 Pm ET. Agenda Complete Work group Comments- Group 1 Review Group 2 Comments. 2015 Edition Certification

More information

DIGITAL TOWER SERVICES

DIGITAL TOWER SERVICES COMPANY RESTRICTED NOT EXPORT CONTROLLED NOT CLASSIFIED DIGITAL TOWER SERVICES David A Shomar, Vice President Civil Security, MENA Region dshomar@saabsensis.com EVOLUTION COMPANY RESTRICTED NOT EXPORT

More information

Higher National Unit specification: general information. Graded Unit title: Computing: Networking: Graded Unit 2

Higher National Unit specification: general information. Graded Unit title: Computing: Networking: Graded Unit 2 Higher National Unit specification: general information This Graded Unit has been validated as part of the HND Computing: Networking. Centres are required to develop the assessment instrument in accordance

More information

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Recovery Plans for BES Cyber Systems A. Introduction 1. Title: Cyber Security Recovery Plans for BES Cyber Systems 2. Number: CIP-009-6 3. Purpose: To recover reliability functions performed by BES Cyber Systems by specifying recovery plan

More information

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Recovery Plans for BES Cyber Systems Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

SECURITY & PRIVACY DOCUMENTATION

SECURITY & PRIVACY DOCUMENTATION Okta s Commitment to Security & Privacy SECURITY & PRIVACY DOCUMENTATION (last updated September 15, 2017) Okta is committed to achieving and preserving the trust of our customers, by providing a comprehensive

More information

ISO/IEC INTERNATIONAL STANDARD. Information technology Software asset management Part 1: Processes and tiered assessment of conformance

ISO/IEC INTERNATIONAL STANDARD. Information technology Software asset management Part 1: Processes and tiered assessment of conformance INTERNATIONAL STANDARD This is a preview - click here to buy the full publication ISO/IEC 19770-1 Second edition 2012-06-15 Information technology Software asset management Part 1: Processes and tiered

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP 010 1 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

ISO/IEC INTERNATIONAL STANDARD

ISO/IEC INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 27006 Second edition 2011-12-01 Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems

More information

Cyber Security Standards Drafting Team Update

Cyber Security Standards Drafting Team Update Cyber Security Standards Drafting Team Update Michael Assante, VP & Chief Security Officer North American Electric Reliability Corp. February 3, 2008 Overview About NERC Project Background Proposed Modifications

More information

REQUEST FOR PROPOSALS ZONING ORDINANCE

REQUEST FOR PROPOSALS ZONING ORDINANCE REQUEST FOR PROPOSALS ZONING ORDINANCE City of Allegan Allegan County, Michigan A. Background. The City of Allegan is hereby requesting proposals from qualified, multidisciplinary professionals in the

More information

Web conference: CRD Part-NCO Overview

Web conference: CRD Part-NCO Overview Web conference: CRD Part-NCO Overview 30 September 2011 Willy Sigl EASA Outline O u t l i n e Rulemaking process CRD documents Rule structure Related documents Rule sources 2 Rulemaking process ToR Terms

More information

VdTÜV Statement on the Communication from the EU Commission A Digital Single Market Strategy for Europe

VdTÜV Statement on the Communication from the EU Commission A Digital Single Market Strategy for Europe Author Date VdTÜV-WG Cybersecurity October, 3 rd 2015 VdTÜV Statement on the Communication from the EU Commission A Digital Single Market Strategy for Europe VdTÜV e.v. welcomes the Communication on a

More information

Information technology Security techniques Information security controls for the energy utility industry

Information technology Security techniques Information security controls for the energy utility industry INTERNATIONAL STANDARD ISO/IEC 27019 First edition 2017-10 Information technology Security techniques Information security controls for the energy utility industry Technologies de l'information Techniques

More information

Consideration of Issues and Directives Federal Energy Regulatory Commission Order No. 791 June 2, 2014

Consideration of Issues and Directives Federal Energy Regulatory Commission Order No. 791 June 2, 2014 Federal Energy Regulatory Commission Order No. 791 June 2, 2014 67 and 76 67. For the reasons discussed below, the Commission concludes that the identify, assess, and correct language, as currently proposed

More information

ACM Policy rule on the provision of information concerning internet speeds

ACM Policy rule on the provision of information concerning internet speeds Please note that, although every effort has been made to ensure this translation is accurate and consistent, it is for informational purposes only. In case of any dispute or inconsistencies, the Dutch

More information

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History RP unique number: GI-UKEPR-CI-01-RP 0 30/06/2011 1 of 19 Approved for EDF by: A. PETIT Approved for AREVA by: C. WOOLDRIDGE Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011 Resolution Plan History

More information

REPORT ON AGENDA ITEM 4

REPORT ON AGENDA ITEM 4 15/2/00 AERONAUTICAL TELECOMMUNICATION NETWORK PANEL (ATNP) THIRD MEETING Montreal, 7 to 18 February 2000 Agenda Item 4: Review of existing technical and procedural provisions relating to the aeronautical

More information

Take responsibility for completing tasks and procedures subject to direction or guidance as needed.

Take responsibility for completing tasks and procedures subject to direction or guidance as needed. Relevant LINKS BACK TO ITQ UNITS [1] Handbook home page [2] Overview This is the ability to select and use a range of word processing software tools and techniques to produce documents that are at times

More information

(JSA) Job Safety Analysis Program. Safety Manual. 1.0 Purpose. 2.0 Scope. 3.0 Regulatory References. 4.0 Policy

(JSA) Job Safety Analysis Program. Safety Manual. 1.0 Purpose. 2.0 Scope. 3.0 Regulatory References. 4.0 Policy Page 1 of 7 1.0 Purpose Job Safety Analysis is a primary element of the Hazard Identification and Mitigation Management Process. JSA s are completed daily to identify and evaluate hazards associated with

More information

MARPA DOCUMENT MARPA 1100 DRAFT

MARPA DOCUMENT MARPA 1100 DRAFT Page 1 MARPA DOCUMENT MARPA 1100 DRAFT STREAMLINE PROGRAM FOR PMA APPLICATIONS OF NON-SAFETY-SIGNIFICANT ARTICLES SUBMITTED BY EXPERIENCED APPLICANTS WITH A QUALIFYING PERFORMANCE RECORD Page 2 TABLE OF

More information

EUROPEAN COMMISSION DIRECTORATE GENERAL FOR INTERPRETATION

EUROPEAN COMMISSION DIRECTORATE GENERAL FOR INTERPRETATION EUROPEAN COMMISSION DIRECTORATE GENERAL FOR INTERPRETATION RESOURCES AND SUPPORT DIRECTORATE Management of Technical Infrastructure Brussels, 23 January 2013 M/516 EN Ref. Ares(2013)136537-04/02/2013 REQUEST

More information

ADQ in Serbia and Montenegro

ADQ in Serbia and Montenegro ADQ in Serbia and Montenegro Implementation of EC 73/2010 requirements in Serbia and in Montenegro ADQ Roll-out workshop 7-8/6/2010 Brussels Emilija Radovanović Djordje Samardžija (SMATSA Ltd.) ADQ is

More information

Code of Practice for Service Delivery of Common mobile short-codes in the UK for all communications media

Code of Practice for Service Delivery of Common mobile short-codes in the UK for all communications media Overview Code of Practice for Service Delivery of Common mobile short-codes in the UK for all communications media Mobile Network Operators currently provide a range of services behind short codes for

More information

Formatting and content guidelines for unit standard change reports to be published on the NZQA website

Formatting and content guidelines for unit standard change reports to be published on the NZQA website Formatting and content guidelines for unit standard change reports to be published on the NZQA website Introduction This guide is to be used in conjunction with the report template published in August

More information

HIPAA Security. 3 Security Standards: Physical Safeguards. Security Topics

HIPAA Security. 3 Security Standards: Physical Safeguards. Security Topics HIPAA Security SERIES Security Topics 1. Security 101 for Covered Entities 2. Security Standards - Administrative Safeguards 3. Security Standards - Physical Safeguards 4. Security Standards - Technical

More information

Actions taken by Morocco Jamal KAITER ATC Study, Planning & Air traffic Coordination Division Chief

Actions taken by Morocco Jamal KAITER ATC Study, Planning & Air traffic Coordination Division Chief implementation Amendment 1 to the 15 th edition of the Doc 4444 Actions taken by Morocco Jamal KAITER ATC Study, Planning & Air traffic Coordination Division Chief structural approach In order to ensure

More information

April 28, Division of Dockets Management (HFA-305) Food and Drug Administration 5630 Fishers Lane, Room 1061 Rockville, MD 20852

April 28, Division of Dockets Management (HFA-305) Food and Drug Administration 5630 Fishers Lane, Room 1061 Rockville, MD 20852 701 Pennsylvania Avenue, NW Suite 800 Washington, D.C. 20004 2654 Tel: 202 783 8700 Fax: 202 783 8750 www.advamed.org Division of Dockets Management (HFA-305) Food and Drug Administration 5630 Fishers

More information

Computer Aided Draughting and Design: Graded Unit 1

Computer Aided Draughting and Design: Graded Unit 1 Higher National Graded Unit Specification General Information for Centres This Graded Unit has been validated as part of the HNC Computer Aided Draughting and Design (CADD) award. Centres are required

More information

Guidelines for Interface Publication Issue 3

Guidelines for Interface Publication Issue 3 Editorial Note : These Guidelines are based on the OFTEL Guidelines Issue 2, which provided guidance on interface publication under the R&TTE Directive. They have now been amended to reflect the terminology

More information

Integrated Aeronautical Information database

Integrated Aeronautical Information database Integrated Aeronautical Information database Workshop for the development of Operational skills for the transition from AIS to AIM for Civil Aviation Authorities (CAA) and Air Navigation Service Providers

More information

Graded Unit title: Computing: Networking: Graded Unit 2

Graded Unit title: Computing: Networking: Graded Unit 2 SQA Advanced Unit specification: general information for centres This graded unit has been validated as part of the SQA Advanced Diploma in Computing: Networking. Centres are required to develop the assessment

More information