1 Journal of Scientific & Industrial Research Vol. 76, May 2017, pp Analysis of Single Flow Line Multi Stage Multi-Product Pull Control Systems G G Sastry 1 * and R Garg 2 1,2 Department of Mechanical Engineering University of petroleum and Energy Studies, Dehradun , Uttarakhand, India Received 21 December 2015; revised 20 August 2016; accepted 04 March 2017 The production control systems in industries become a significant pre-requisite for its success. The pull control systems could be a systematic approach for the effectiveness of production systems. This paper covers the investigation and performance analysis of Constant Work in Process (CONWIP), Kanban Control System (KCS) and Extended Kanban Control System (EKCS) using real time industrial problem. The industry manufactures two gears of different diameters and the demand for each is 20 per day. The CONWIP, KCS and EKCS are modeled as network diagrams in MATLA- SIMULINK and simulated. The performance of EKCS is optimal as compared to KCS and CONWIP. The EKCS was implemented for one month and the production is increased by 54%. Keywords: CONWIP, KCS, EKCS, Kanban, WIP, Average Waiting Time, Utilization, Demand Rate Introduction The modernized manufacturing sectors find a competitive environment for producing the products of distinguished quality and high perish ability. The competitiveness is the key requirement for the country s growth and employment opportunities 1. The industries follow make-to-order approach based on the customer demand 2 as compared to make-to-stock approach which yields high inventory cost 3. The multi-product pull control system works on dedicated and shared type of kanban system. The kanban is attached to each product independently in dedicated system whereas kanban is shared between the product types in shared system 4. However, the determination of lot size and set up time is an important parameter for the selection of multi-product systems 4. The shared kanban system shows superior performance as compared to dedicated kanban system 8. The multiproduct KCS processed on single manufacturing facility 5 using decomposition method. It depends upon number of kanbans for computing the steadystate performance. The performance of hybrid system, which is the combination of pure push and pure pull system 6, was analyzed. The pure push system was more significant as compared to pure pull system. Also, the kanban systems are reviewed for design and operational systems 7 and analyzed for other sequencing rules for the performance measurement. *Author for Correspondence ggsastry@gmail.com The performance of multi-product, multi kanban with multiple demands are reviewed 9, simulated and analyzed to optimize the inventory in real time 10. A two moment parametric-decomposition-based analytical 11 approach is used to measure throughput and mean queue length at individual stations for multi-product systems. The simulation results obtained using numerical values are compared. The optimal and meta-heuristic methods are developed to compute number of production kanban, withdrawal kanban and lot sizes in a supply chain system 12. The performance of GASA is superior as compared to GA heuristic method. Gradient base heuristic methods are applied to GA for the design of multi-product kanban system 14. The case studies are analyzed for number of kanbans and lot size for modified GA and classical GA. The performance of KCS, CONWIP and SCS for multi-stage multi-product manufacturing systems are analyzed using simulation 13. The ase stock system showed optimal performance for varying demand rate. In this paper, the performance of CONWIP, KCS and EKCS are compared using the simulation results and implementation of EKCS in the real industrial scenario. Problem statement The objective is to analyze the performance of the three pull production control systems; CONWIP, KCS and EKCS for single flow line multi stage multiproduct system using industrial case study. The model is developed and simulated by using technical computing software as specified. The performance is

2 290 J SCI IND RES VOL 76 MAY 2017 analyzed for number of kanbans and breakdown to achieve optimized output. A small scale industry located at Ghaziabad India, with work force strength 15, is selected for investigation. The industry manufactures two Gears of different diameters, Gear A and Gear. with sequence of operations viz. turning and generation; profiling; cleaning/ burnishing. The processing mean time for Gear A is 17 minutes, 10 minutes and 22 minutes and for Gear is 20 minutes, 13 minutes and 18 minutes respectively. The expected demand for each gear type is 20 per day. The industry works for 6 days per 16 hours per day. Multi product system model generation Figure 1 illustrates the manufacturing system with two product types in three manufacturing stages MP i, where i=1, 2, 3. Queue p i r is the output buffer of product type r, and stage i where r =1, 2 and i =1, 2, 3. The finished product for each type is stored in the respective output queue. It synchronizes with the customer demand of the respective product type. The CONWIP, KCS and EKCS have three dynamic elements viz., product, demand and kanban (product authorization). The raw material or semi-finished product moves from upstream to downstream stage after processing and wait at the buffer of each stage. The demand moves from the output of downstream stage to the input of upstream stage. Product authorization is the kanban fixed for each stage along with product type associated with it. The kanban moves with the part or demand or alone in each stage. The dedicated kanban for stage i is synchronized with type r product. The allocation of the product type for each manufacturing stage is by specific rules depending on the batch size and availability of products in the buffer. The invariants of CONWIP system for one product consisting of kanban path are: M (D 1 ) M (P 3 A 3 ) = 0 M (D 1 A 1 ) + (MP 1 + MP 2 + MP 3 ) + P 3 A 3 = K 0 D 1 A 1 K 0 [(MP 1 + MP 2 + MP 3 ) + P 3 A 3 ] K The KCS consisting of kanban in each stage imply the invariants for one product are: M (D 1 A i+1 ) M (P i A i ) = 0 where i = 1, 2, 3... M(D 1 A i ) +M(MP i ) + M(P i A i ) = K i, where i =1,2,3.. 0 MP i K i, where i = 1,2, (MP i +P i A i ) K i, where i = 1, 2, 3 0 P i A i S i, where i = 1, 2, 3 The invariants and characteristics of EKCS in each stage for one product are: M (A i+1 ) M (P i A i ) M (D 1 ) = 0 where i = 1, 2,3,... K i S i M (A i ) + M (P i A i ) + M (MP i ) = K i where i = 1, 2, 3,.. M (A i ) = K i - S i, where i = 1,2,3, 0 M (A i ) K i, where i = 1,2,3, 0 MP i K i, where i = 1,2,3, 0 (MP i + P i A i ) K i, where i = 1,2,3, M (P i A i ) D 1 Si, where i = 1,2,3, Results and Discussions The developed models of CONWIP, KCS and EKCS are simulated for 5760 minutes (i.e. six 16 hours) for demand rate of 2.5 to 3 parts per day Fig.1 Qeuing Network diagram of single flow line multi stage multi-product system

3 SASTRY & GARG ANALYSIS OF SINGLE FLOW LINE MULTI STAGE MULTI-PRODUCT 291 (i.e. Demand mean time 20 minutes to 23 minutes). The mean time between failures is 480 minutes and mean time to repair is 30 minutes. The performance is analyzed and compared for two, three and four kanbans per stage with and without considering the machine breakdown. The simulation results of Gear A and Gear for 4 kanbans per stage are given in table 1. The production in CONWIP is less as compared to KCS and EKCS for the given input parameters. Hence, it was not considered for further analysis. However, the values of production and utilization in KCS and EKCS are similar at a demand rate of 2.72 parts per hour (i.e. demand mean time 22 min) for four kanbans per stage. Further, the WIP in EKCS is equal to or less than KCS. The average waiting time in EKCS is less as compared to KCS. Hence, for the given input parameters and customer demand, the performance of EKCS is optimal as compared to KCS considering production, average waiting time, WIP and utilization. Implementation of KCS and EKCS in Industry The KCS and EKCS were implemented on the shop floor for two days each on experimental basis. The data was recorded in real time considering the warm up time and breakdown. The same input data was used in the network model developed as discussed earlier and simulated for 1920 minutes for each system. Table 2 gives the comparative performance based on the results obtained from simulation and shop floor. The production in EKCS was high as compared to KCS. The machine utilization and WIP in KCS was high as compared to EKCS. However, the WIP in KCS and EKCS shows similar variation between simulation and actual results. Therefore, considering production, WIP and machine utilization, the performance of EKCS is optimum at demand mean time 22 minutes. Henceforth, EKCS was implemented for longer duration to analyze the performance. Performance of EKCS in Industry The EKCS was implemented in industry for one month and the results are recorded on weekly basis for optimum demand mean time 22 min i.e parts/hour. The batch size for each gear type is 21. Simultaneously, with the same input data, the system was simulated for one month i.e. four weeks (24 hours =23040 minutes). The simulation results and the real time output obtained after four weeks are Demand Rate Parts/hour Table 1 Simulation results of single flow line multi stage multi product system for 4 kanbans per stage WITHOUT REAKDOWN Constant Work in process (CONWIP) Kanban Control System (KCS) Extended Kanban Control system (EKCS) (min) WIP Utilizati on (%age) (Min) WIP Utilizatio n (%age) (Min) WIP Utilization (%age) A A A& A A A A WITH REAKDOWN Demand mean time 22 min. 4 Kanban/stage Table 2 Performance comparison of KCS and EKCS with simulation results and actual results PRODUCTION KCS Simulation KCS Actual EKCS Simulation EKCS Actual A A A A

4 292 J SCI IND RES VOL 76 MAY days per week Table 3 Simulation and actual Results of EKCS Work in Process Utilization (%age) Simulation Actual Simulation Actual Simulation Actual A A analyzed on the basis of simulation results which indicate that the performance of KCS and EKCS is sensitive to part complexity, breakdown, average waiting time and WIP. The KCS and EKCS were implemented on the shop floor to evaluate the relative performance. The EKCS emerged best as compared to KCS on the basis of production, WIP and utilization. Earlier, the industry was producing gears of each type per day. After implementation of EKCS for one month, the production has increased from 20 to 21 gears of each type per day. Thus, the production has increased by approximately 54%. The WIP has decreased and machine utilization has shown significant improvement. Fig.2 Performance comparison of EKCS in Industry for production Fig.3 Performance Comparison and Analysis of EKCS in Industry for Utilization given in Table 3. The performance comparison of production, utilization and WIP respectively obtained by simulation, actuals before implementing the pull control system and actuals after implementation of EKCS are shown in figures 2 and 3. Conclusions The performance of CONWIP system, KCS and EKCS for single flow line multi stage multi-product system has been analyzed. Initially, the system was Acknowledgement The author thanks Mr Sanjay Kohli, Managing Director, M/s Premier manufacturer s pvt. Ltd for providing the case study and extending all the support and cooperation during the course of the work. References 1 Rajiv K & S G Abhijit, Towards A Competitive Manufacturing Sector, Ind Council Res Int Econ Relation, (2008) Callagham R, System dynamic perspective on JIT system, Int Conf of the sys dyna society, (1986) Sarker & J A Fitzsimmons, The performance of push and pull systems: a simulation and comparative study, Int J Prod Res, 27(10) (1989) aynat, JA uzacott & Yves Dallery, Multi product Kanban Like control systems, Int J Prod Res, 40(16) (2002) Krieg G & H Kuhn, A decomposition method for multi-product kanban systems with setup times and lost sales, IIE Transc 34(7) (2002) Krishnamurthy R Suri, Push can perform better than pull for flexible manufacturing systems with multiple products, Int J flex manufac, 16(2) Erhun F, M S Akturk & A Turkcan, Interaction of design and operational parameters in periodic review kanban systems, Int J Prod Res, 41(14) (2003) Sachin, Performance evaluation of multi-product Kanban like control systems, Univ South Florida in Grad Sch (2004). 9 Surendra M Gupta, G Udomsawat & A T Yousef, Multi- Kanban Model For Multi-Product disassembly with Multiple Demands, II World Conf POM and 15 th Annual POM Conference Cancun Mexico, (2004) James C, G Dennis & WA Oliver, Kanban and Enterprise Resource Planning the True Understanding of Lean, Oliver Wight White Paper Ser (2007).

5 SASTRY & GARG ANALYSIS OF SINGLE FLOW LINE MULTI STAGE MULTI-PRODUCT Kumar S & A Krishnamurty, Performance evaluation of a multi-product system under CONWIP Control, IIE Transc 40 (2008) Widyadanaab G A, H M Wee & J Y Chang, Determining the optimal number of Kanbans in multi-products supply chain system, Int J Syst Sci, 41(2) (2010) Rotaru A, Comparison between Tree Pull Control Systems : Kanban, CONWIP and ase Stock, Annals Oradea Univer, Volume 10 (20) (2011) Huang L, Multi-Product Kanban System ased on Modified Genetic Algorithm, Int conf inform Engg and app, (IEA), 219 ( 2013)

IJSER

IJSER International Journal of Scientific & Engineering Research, Volume 4, Issue 1, October-213 1399 EFFECT OF KANBANS IN THE PERFORMANCE OF, AND E G.G Sastry 1, Dr. Mukesh Saxena 2, Dr. Rajnish Garg 3 Abstract

More information

Evaluation of the Effect of Erratic Demand on a Multi-Product Basestock Kanban-CONWIP Control Strategy

Evaluation of the Effect of Erratic Demand on a Multi-Product Basestock Kanban-CONWIP Control Strategy STOCHASTIC MODELS OF MANUFACTURING AND SERVICE OPERATIONS SMMSO 2013 Evaluation of the Effect of Erratic Demand on a Multi-Product Basestock Kanban-CONWIP Control Strategy Onyeocha, Chukwunonyelum E. Enterprise

More information

Comparative Analysis of GKCS and EKCS

Comparative Analysis of GKCS and EKCS International Journal of Scientific Computing, Vol.5, No.1, January-June 2011, pp. 1-7; ISSN: 0973-578X Serial Publications Comparative Analysis of GKCS and EKCS N. Selvaraj Department of Mechanical Engineering,

More information

BUFFER STOCKS IN KANBAN CONTROLLED (TRADITIONAL) UNSATURATED MULTI-STAGE PRODUCTION SYSTEM

BUFFER STOCKS IN KANBAN CONTROLLED (TRADITIONAL) UNSATURATED MULTI-STAGE PRODUCTION SYSTEM VOL. 3, NO., FEBRUARY 008 ISSN 89-6608 006-008 Asian Research Publishing Network (ARPN). All rights reserved. BUFFER STOCKS IN KANBAN CONTROLLED (TRADITIONAL) UNSATURATED MULTI-STAGE PRODUCTION SYSTEM

More information

Implementation of JIT Technique in a Mixed Model Assembly Line: A Case Study

Implementation of JIT Technique in a Mixed Model Assembly Line: A Case Study Volume-6, Issue-2, March-April 2016 International Journal of Engineering and Management Research Page Number: 485-489 Implementation of JIT Technique in a Mixed Model Assembly Line: A Case Study Himanshu

More information

Kanban Size and its Effect on JIT Production Systems

Kanban Size and its Effect on JIT Production Systems Kanban Size and its Effect on JIT Production Systems Ing. Olga MAŘÍKOVÁ 1. INTRODUCTION Integrated planning, formation, carrying out and controlling of tangible and with them connected information flows

More information

A Heuristic Approach to the Design of Kanban Systems

A Heuristic Approach to the Design of Kanban Systems A Heuristic Approach to the Design of Kanban Systems Chuda Basnet Department of Management Systems University of Waikato, Hamilton Abstract Kanbans are often used to communicate replenishment requirements

More information

LRm Laboratory for Responsible Manufacturing

LRm Laboratory for Responsible Manufacturing LRm Laboratory for Responsible Manufacturing Bibliographic Information Udomsawat, G., Gupta S. M. and Kamarthi, S. V., "A Multi-Kanban Model for Disassembly", Proceedings of the 2003 Northeast Decision

More information

Petri Net Models of Pull Control Systems for Assembly Manufacturing Systems

Petri Net Models of Pull Control Systems for Assembly Manufacturing Systems Petri Net Models of Pull Control Systems for Assembly Manufacturing Systems C. Chaouiya *, Y. Dallery ** Abstract: Pull control systems are a good way to control material flow in manufacturing systems.

More information

IMMD VII, University of Erlangen Nürnberg, Martensstr. 3, Erlangen, Germany.

IMMD VII, University of Erlangen Nürnberg, Martensstr. 3, Erlangen, Germany. A DESIGN METHODOLOGY FOR KANBAN-CONTROLLED PRODUCTION LINES USING QUEUEING NETWORKS AND GENETIC ALGORITHMS Markus Ettl and Markus Schwehm IMMD VII, University of Erlangen Nürnberg, Martensstr. 3, 91058

More information

Cincom Manufacturing Business Solutions. Cincom and complex manufacturing: meeting the goals of a Demand-Driven environment

Cincom Manufacturing Business Solutions. Cincom and complex manufacturing: meeting the goals of a Demand-Driven environment Cincom Manufacturing Business Solutions Cincom and complex manufacturing: meeting the goals of a Demand-Driven environment Cincom has long been providing solutions to companies that manufacture products

More information

Optimization of a Multiproduct CONWIP-based Manufacturing System using Artificial Bee Colony Approach

Optimization of a Multiproduct CONWIP-based Manufacturing System using Artificial Bee Colony Approach Optimization of a Multiproduct CONWIP-based Manufacturing System using Artificial Bee Colony Approach Saeede Ajorlou, Member, IAENG, Issac Shams, Member, IAENG, and Mirbahador G. Aryanezhad Abstract In

More information

Mechanical Engineering 101

Mechanical Engineering 101 Mechanical Engineering 101 University of California, Berkeley Lecture #19 1 Today s lecture Pull systems Kanban Variations, Scheduling, Assumptions CONWIP (constant work in process) choosing N backlog

More information

USING COMPUTER SIMULATION METHOD TO IMPROVE THROUGHPUT OF PRODUCTION SYSTEMS BY BUFFERS AND WORKERS ALLOCATION

USING COMPUTER SIMULATION METHOD TO IMPROVE THROUGHPUT OF PRODUCTION SYSTEMS BY BUFFERS AND WORKERS ALLOCATION Volume6 Number4 December2015 pp.60 69 DOI: 10.1515/mper-2015-0037 USING COMPUTER SIMULATION METHOD TO IMPROVE THROUGHPUT OF PRODUCTION SYSTEMS BY BUFFERS AND WORKERS ALLOCATION SławomirKłos 1,PeterTrebuna

More information

PRODUCTION & QUALITY MEASURES THROUGH KANBAN STUDY

PRODUCTION & QUALITY MEASURES THROUGH KANBAN STUDY PRODUCTION & QUALITY MEASURES THROUGH KANBAN STUDY Rahul Rana Dronacharya College Of Engineering ABSTRACT Globalization has changed the concept of quality & customer satisfaction, and has established new

More information

Test-King.MB6-884_79.Questions

Test-King.MB6-884_79.Questions Test-King.MB6-884_79.Questions Number: MB6-884 Passing Score: 800 Time Limit: 120 min File Version: 13.05 http://www.gratisexam.com/ Till now this is the latest material we have if there is any updates

More information

BEC. Operations Special Interest Group (SIG)

BEC. Operations Special Interest Group (SIG) Operations Special Interest Group (SIG) Operations Special Interest Group (SIG) Purpose: The purpose of the SIG is to provide the opportunity for attendees to discuss their experience with the topic area

More information

Optimal Manufacturing Scheduling for Dependent Details Processing

Optimal Manufacturing Scheduling for Dependent Details Processing PROCEEDINGS OF WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY VOLUME 30 JULY 0 ISSN 1307- Optimal Manufacturing Scheduling for Dependent Details Processing Ivan C. Mustakerov, and Daniela I. Borissova

More information

Kanban Scheduling System

Kanban Scheduling System Kanban Scheduling System Christian Colombo and John Abela Department of Artificial Intelligence, University of Malta Abstract. Nowadays manufacturing plants have adopted a demanddriven production control

More information

Global and Indian Touch screen display and control Industry, 2018 Market Research Report

Global and Indian Touch screen display and control Industry, 2018 Market Research Report CIN: U74994PN2018PTC176685 GST Number: 27AAACQ5401A1Z3 About the report: https://www.qurateresearch.com/reports/ict/qbi-pr-ict-84456 Global and Indian Touch screen display and control Industry, 2018 Market

More information

Global and Chinese Analog Handset Industry, 2018 Market Research Report

Global and Chinese Analog Handset Industry, 2018 Market Research Report CIN: U74994PN2018PTC176685 GST Number: 27AAACQ5401A1Z3 About the report: https://www.qurateresearch.com/reports/ict/qbi-pr-ict-93327 Global and Chinese Analog Handset Industry, 2018 Market Research Report

More information

Fuzzy time series forecasting of wheat production

Fuzzy time series forecasting of wheat production Fuzzy time series forecasting of wheat production Narendra kumar Sr. lecturer: Computer Science, Galgotia college of engineering & Technology Sachin Ahuja Lecturer : IT Dept. Krishna Institute of Engineering

More information

The Kanban Course. Workbook

The Kanban Course. Workbook The Kanban Course Workbook Batch Production and Signal Kanban Contains the modules Kanban in Batch Production and Calculating Signal Kanban Quantities A workbook intended to accompany the Facilitator s

More information

Handling Multi Objectives of with Multi Objective Dynamic Particle Swarm Optimization

Handling Multi Objectives of with Multi Objective Dynamic Particle Swarm Optimization Handling Multi Objectives of with Multi Objective Dynamic Particle Swarm Optimization Richa Agnihotri #1, Dr. Shikha Agrawal #1, Dr. Rajeev Pandey #1 # Department of Computer Science Engineering, UIT,

More information

Course Outline LEAN Manufacturing in Microsoft Dynamics AX TO TRAIN

Course Outline LEAN Manufacturing in Microsoft Dynamics AX TO TRAIN 80310 - LEAN Manufacturing in Microsoft Dynamics AX 2012 General Description This course provides students with a detailed overview of the Lean Manufacturing module in Microsoft It provides a description

More information

Deadlock Avoidance in Flexible Manufacturing Systems Using Finite Automata

Deadlock Avoidance in Flexible Manufacturing Systems Using Finite Automata 424 IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, VOL. 16, NO. 4, AUGUST 2000 TABLE IV NUMERICAL RESULTS FOR EXAMPLE 3 REFERENCES [1] H. Chen, C. Chu, and J. M. Proth, A more efficient Lagrangian relaxation

More information

Name: Prof. Dr. Iftikhar Hussain. Designation: Vice Chancellor. Department: Industrial Engineering. Specialization: Flexible Manufacturing Systems

Name: Prof. Dr. Iftikhar Hussain. Designation: Vice Chancellor. Department: Industrial Engineering. Specialization: Flexible Manufacturing Systems Name: Prof. Dr. Iftikhar Hussain Designation: Vice Chancellor Department: Industrial Engineering Specialization: Flexible Manufacturing Systems Email: iftikhar@uetpeshawar.edu.pk Area of Interest: Design,

More information

Lean Manufacturing II

Lean Manufacturing II Lean Manufacturing II Leverage Lean Manufacturing in Microsoft Dynamics AX Date: February 1st, 2010 www.ebecs.com www.leancentreofexcellence.com Contents LEAN MANUFACTURING II... 3 INVENTORY TRACE CONTROL...

More information

Address for Correspondence

Address for Correspondence Proceedings of BITCON-2015 Innovations For National Development National Conference on : Innovations In Mechanical Engineering For Sustainable Development Research Paper PRODUCTIVITY & QUALITY IMPROVEMENT

More information

Assembly line balancing to minimize balancing loss and system loss

Assembly line balancing to minimize balancing loss and system loss J. Ind. Eng. Int., 6 (11), 1-, Spring 2010 ISSN: 173-702 IAU, South Tehran Branch Assembly line balancing to minimize balancing loss and system loss D. Roy 1 ; D. han 2 1 Professor, Dep. of Business Administration,

More information

Time Shifting Bottlenecks in Manufacturing

Time Shifting Bottlenecks in Manufacturing Roser, Christoph, Masaru Nakano, and Minoru Tanaka. Time Shifting Bottlenecks in Manufacturing. In International Conference on Advanced Mechatronics. Asahikawa, Hokkaido, Japan, 2004. Time Shifting Bottlenecks

More information

Kanban, Flow and Cadence

Kanban, Flow and Cadence Kanban, Flow and Cadence Karl Scotland 1 KFC Development Kanban Controlled Work Flow Effective Work Cadence Reliable Work 2 Kanban Controlling the Workflow 3 Definition Kanban (in kanji 看板 also in katakana

More information

Algorithms/Procedures Details and Guide to Use

Algorithms/Procedures Details and Guide to Use Algorithms/Procedures Details and Guide to Use The following material appears at the website associated with this book. The details of the algorithms available at the website associated with this book

More information

A shortest route formulation of simple U-type assembly line balancing problem

A shortest route formulation of simple U-type assembly line balancing problem Applied Mathematical Modelling 29 (2005) 373 380 www.elsevier.com/locate/apm A shortest route formulation of simple U-type assembly line balancing problem Hadi Gökçen a, *,Kürsßat Ağpak b, Cevriye Gencer

More information

I R TECHNICAL RESEARCH REPORT. Selecting Equipment for Flexible Flow Shops. by Rohit Kumar, Jeffrey W. Herrmann TR

I R TECHNICAL RESEARCH REPORT. Selecting Equipment for Flexible Flow Shops. by Rohit Kumar, Jeffrey W. Herrmann TR TECHNICAL RESEARCH REPORT Selecting Equipment for Flexible Flow Shops by Rohit Kumar, Jeffrey W. Herrmann TR 2003-19 I R INSTITUTE FOR SYSTEMS RESEARCH ISR develops, applies and teaches advanced methodologies

More information

Introduction to Manufacturing Systems

Introduction to Manufacturing Systems MIT 2.853/2.854 Introduction to Manufacturing Systems Toyota Production System Lecturer: Stanley B. Gershwin Copyright c 2002-2005 Stanley B. Gershwin. Primary source: Toyota Production System by Yasuhiro

More information

FLEXIBLE ASSEMBLY SYSTEMS

FLEXIBLE ASSEMBLY SYSTEMS FLEXIBLE ASSEMBLY SYSTEMS Job Shop and Flexible Assembly Job Shop Each job has an unique identity Make to order, low volume environment Possibly complicated route through system Very difficult Flexible

More information

HYBRID FLOW STRATEGIES FOR HIGH VARIETY LOW VOLUME MANUFACTURING FACILITIES TO IMPLEMENT FLOW AND PULL

HYBRID FLOW STRATEGIES FOR HIGH VARIETY LOW VOLUME MANUFACTURING FACILITIES TO IMPLEMENT FLOW AND PULL University of Kentucky UKnowledge University of Kentucky Master's Theses Graduate School 2002 HYBRID FLOW STRATEGIES FOR HIGH VARIETY LOW VOLUME MANUFACTURING FACILITIES TO IMPLEMENT FLOW AND PULL Mukund

More information

PRODUCTION SYSTEMS ENGINEERING:

PRODUCTION SYSTEMS ENGINEERING: PRODUCTION SYSTEMS ENGINEERING: Optimality through Improvability Semyon M. Meerkov EECS Department University of Michigan Ann Arbor, MI 48109-2122, USA YEQT-IV (Young European Queueing Theorists Workshop)

More information

A Two-stage Scheme for Dynamic Hand Gesture Recognition

A Two-stage Scheme for Dynamic Hand Gesture Recognition A Two-stage Scheme for Dynamic Hand Gesture Recognition James P. Mammen, Subhasis Chaudhuri and Tushar Agrawal (james,sc,tush)@ee.iitb.ac.in Department of Electrical Engg. Indian Institute of Technology,

More information

OPTIMAL BUFFER ALLOCATION FOR REMANUFACTURING SYSTEM USING META-HEURISTIC ALGORITHM

OPTIMAL BUFFER ALLOCATION FOR REMANUFACTURING SYSTEM USING META-HEURISTIC ALGORITHM OPTIMAL BUFFER ALLOCATION FOR REMANUFACTURING SYSTEM USING META-HEURISTIC ALGORITHM 1 V. A. POURGHADIM, 2 MAHDI ABBASGHOLIPOUR, 3 LEYLA ASGHARI 1 Dept. of Industrial Engineering, Islamic Azad University,

More information

M i 1. B i. M i. M i+1 M K 1 M B M B M B 1 M B M M 1 SB 3 SB 1 SB 2 S 1 DB 2 DB 1 DB 3

M i 1. B i. M i. M i+1 M K 1 M B M B M B 1 M B M M 1 SB 3 SB 1 SB 2 S 1 DB 2 DB 1 DB 3 Efficient Methods for Manufacturing System Analysis and Design Stanley B. Gershwin Λ, Nicola Maggio ΛΛ, Andrea Matta ΛΛ, Tullio Tolio ΛΛ, and Loren M. Werner Λ Abstract Thegoal of the research described

More information

Inventory Control by Kanban Based Pull System Implementation

Inventory Control by Kanban Based Pull System Implementation Inventory Control by Kanban Based Pull System Implementation Virendra Konde, Student, Rajgad Institute of Management Research Development, Dhankawadi, Pune. E-mail : vir96konde@rediffmail.com Mr. Rohan

More information

Tabu search and genetic algorithms: a comparative study between pure and hybrid agents in an A-teams approach

Tabu search and genetic algorithms: a comparative study between pure and hybrid agents in an A-teams approach Tabu search and genetic algorithms: a comparative study between pure and hybrid agents in an A-teams approach Carlos A. S. Passos (CenPRA) carlos.passos@cenpra.gov.br Daniel M. Aquino (UNICAMP, PIBIC/CNPq)

More information

EFFECT OF CUTTING SPEED, FEED RATE AND DEPTH OF CUT ON SURFACE ROUGHNESS OF MILD STEEL IN TURNING OPERATION

EFFECT OF CUTTING SPEED, FEED RATE AND DEPTH OF CUT ON SURFACE ROUGHNESS OF MILD STEEL IN TURNING OPERATION EFFECT OF CUTTING SPEED, FEED RATE AND DEPTH OF CUT ON SURFACE ROUGHNESS OF MILD STEEL IN TURNING OPERATION Mr. M. G. Rathi1, Ms. Sharda R. Nayse2 1 mgrathi_kumar@yahoo.co.in, 2 nsharda@rediffmail.com

More information

Load Balancing Algorithms in Cloud Computing: A Comparative Study

Load Balancing Algorithms in Cloud Computing: A Comparative Study Load Balancing Algorithms in Cloud Computing: A Comparative Study T. Deepa Dr. Dhanaraj Cheelu Ravindra College of Engineering for Women G. Pullaiah College of Engineering and Technology Kurnool Kurnool

More information

International Journal of Current Research and Modern Education (IJCRME) ISSN (Online): & Impact Factor: Special Issue, NCFTCCPS -

International Journal of Current Research and Modern Education (IJCRME) ISSN (Online): & Impact Factor: Special Issue, NCFTCCPS - TO SOLVE ECONOMIC DISPATCH PROBLEM USING SFLA P. Sowmya* & Dr. S. P. Umayal** * PG Scholar, Department Electrical and Electronics Engineering, Muthayammal Engineering College, Rasipuram, Tamilnadu ** Dean

More information

Selection of a Scheduler (Dispatcher) within a Datacenter using Enhanced Equally Spread Current Execution (EESCE)

Selection of a Scheduler (Dispatcher) within a Datacenter using Enhanced Equally Spread Current Execution (EESCE) International Journal of Engineering Science Invention (IJESI) ISSN (Online): 2319 6734, ISSN (Print): 2319 6726 Volume 8 Issue 01 Series. III Jan 2019 PP 35-39 Selection of a Scheduler (Dispatcher) within

More information

Chapter 17 Further Practical Study of the Kanban System. Seoul National University Professor ILKYEONG MOON

Chapter 17 Further Practical Study of the Kanban System. Seoul National University Professor ILKYEONG MOON Chapter 17 Further Practical Study of the Kanban System Seoul National University Professor ILKYEONG MOON All rights reserved, 2013 17.1 17.2 17.3 17.4 Maximum number of production kanbans to be stored

More information

IMPROVEMENTS OF WORKSITE CONTROL FOR PULL SYSTEM

IMPROVEMENTS OF WORKSITE CONTROL FOR PULL SYSTEM IMPROVEMENTS OF WORKSITE CONTROL FOR PULL SYSTEM Jamaliah. M. S. 1, Mohamad Amin Mohd Hashim 2 and Azianti Ismail 1 1 Faculty of Mechanical Engineering, Universiti Teknologi Mara Johor Cawangan Pasir Gudang,

More information

Estimate the Routing Protocols for Internet of Things

Estimate the Routing Protocols for Internet of Things Estimate the Routing Protocols for Internet of Things 1 Manjushree G, 2 Jayanthi M.G 1,2 Dept. of Computer Network and Engineering Cambridge Institute of Technology Bangalore, India Abstract Internet of

More information

Withdrawal, Production, and Supplier; the Three Types of Kanban

Withdrawal, Production, and Supplier; the Three Types of Kanban Withdrawal, Production, and Supplier; the Three Types of Kanban Each is used for its own unique situation dealing with processes, supermarkets, outside suppliers or any combination of customers Production

More information

Optimization of Cutting Parameters for Milling Operation using Genetic Algorithm technique through MATLAB

Optimization of Cutting Parameters for Milling Operation using Genetic Algorithm technique through MATLAB International Journal for Ignited Minds (IJIMIINDS) Optimization of Cutting Parameters for Milling Operation using Genetic Algorithm technique through MATLAB A M Harsha a & Ramesh C G c a PG Scholar, Department

More information

AN EVOLUTIONARY APPROACH TO DISTANCE VECTOR ROUTING

AN EVOLUTIONARY APPROACH TO DISTANCE VECTOR ROUTING International Journal of Latest Research in Science and Technology Volume 3, Issue 3: Page No. 201-205, May-June 2014 http://www.mnkjournals.com/ijlrst.htm ISSN (Online):2278-5299 AN EVOLUTIONARY APPROACH

More information

Buffer_1 Machine_1 Buffer_2 Machine_2. Arrival. Served

Buffer_1 Machine_1 Buffer_2 Machine_2. Arrival. Served Modeling and Performance Evaluation of Production Lines Using the Modeling Language MOSEL G. Bolch, S. Greiner IMMD IV { University Erlangen-Nuremberg Martensstrae 1, D { 91058 Erlangen, Germany E-mail:

More information

A mixed integer program for cyclic scheduling of flexible flow lines

A mixed integer program for cyclic scheduling of flexible flow lines BULLETIN OF THE POLISH ACADEMY OF SCIENCES TECHNICAL SCIENCES, Vol. 62, No. 1, 2014 DOI: 10.2478/bpasts-2014-0014 A mixed integer program for cyclic scheduling of flexible flow lines T. SAWIK AGH University

More information

Improved Hierarchical Location Management Schemes to Locate Mobile Agents in Multi Agents Environment

Improved Hierarchical Location Management Schemes to Locate Mobile Agents in Multi Agents Environment Improved Hierarchical Location Management Schemes to Locate Mobile Agents in Multi Agents Environment Swati Aggarwal 1, Dr. Heman Pathak 2 1 Research Scholar, Department of Computer Science, GKV Haridwar

More information

EVALUATING EMBEDDED DECISION PROCESSES OF MANUFACTURING SYSTEMS THROUGH SIMULATION. S. Cem Karacal

EVALUATING EMBEDDED DECISION PROCESSES OF MANUFACTURING SYSTEMS THROUGH SIMULATION. S. Cem Karacal EVALUATING EMBEDDED DECISION PROCESSES OF MANUFACTURING SYSTEMS THROUGH SIMULATION S. Cem Karacal Southern Illinois University Mechanical & Industrial Engineering Edwardsville, IL 62026, U.S.A. ABSTRACT

More information

A Case Study on Earliness/Tardiness Scheduling by Constraint Programming

A Case Study on Earliness/Tardiness Scheduling by Constraint Programming A Case Study on Earliness/Tardiness Scheduling by Constraint Programming Jan Kelbel, Zdeněk Hanzálek Department of Control Engineering, Faculty of Electrical Engineering Czech Technical University in Prague

More information

Modified Order Crossover (OX) Operator

Modified Order Crossover (OX) Operator Modified Order Crossover (OX) Operator Ms. Monica Sehrawat 1 N.C. College of Engineering, Israna Panipat, Haryana, INDIA. Mr. Sukhvir Singh 2 N.C. College of Engineering, Israna Panipat, Haryana, INDIA.

More information

COMPARATIVE EVALUATION OF BIG DATA FRAMEWORKS ON BATCH PROCESSING

COMPARATIVE EVALUATION OF BIG DATA FRAMEWORKS ON BATCH PROCESSING Volume 119 No. 16 2018, 937-948 ISSN: 1314-3395 (on-line version) url: http://www.acadpubl.eu/hub/ http://www.acadpubl.eu/hub/ COMPARATIVE EVALUATION OF BIG DATA FRAMEWORKS ON BATCH PROCESSING K.Anusha

More information

Achieving Stability in the Round Robin Algorithm

Achieving Stability in the Round Robin Algorithm International Journal of Computer Applications (975 8887) Volume 172 No.6, August 217 Achieving Stability in the Algorithm Kamal ElDahshan Dept. of mathematics, Computer science Division Faculty of science,

More information

Performance Evaluation of Virtualization and Non Virtualization on Different Workloads using DOE Methodology

Performance Evaluation of Virtualization and Non Virtualization on Different Workloads using DOE Methodology 2009 International Conference on Computer Engineering and Applications IPCSIT vol.2 (2011) (2011) IACSIT Press, Singapore Performance Evaluation of Virtualization and Non Virtualization on Different Workloads

More information

ABHINAV NATIONAL MONTHLY REFEREED JOURNAL OF RESEARCH IN SCIENCE & TECHNOLOGY AN ANALYSIS OF COMPUTER HARDWARE EXPORTS OF INDIA

ABHINAV NATIONAL MONTHLY REFEREED JOURNAL OF RESEARCH IN SCIENCE & TECHNOLOGY   AN ANALYSIS OF COMPUTER HARDWARE EXPORTS OF INDIA AN ANALYSIS OF COMPUTER HARDWARE EXPORTS OF INDIA Dr. B. Lilly Grace Eunice 1 and G.V.Vijayasri 2 1 Assistant Professor of Economics, Andhra University, Visakhapatnam, Andhra Pradesh, India Email: lillygrace@gmail.com

More information

Mathematical Modelling of Mixed-Model Assembly Line Balancing Problem with Resources

Mathematical Modelling of Mixed-Model Assembly Line Balancing Problem with Resources Home earch Collections Journals About Contact us My IOPscience Mathematical Modelling of Mixed-Model Assembly Line Balancing Problem with Resources Constraints This content has been downloaded from IOPscience.

More information

Task allocation model for Balance utilization of Available resource in Multiprocessor Environment

Task allocation model for Balance utilization of Available resource in Multiprocessor Environment IOSR Journal of Computer Engineering (IOSR-JCE) e-issn: 2278-0661,p-ISSN: 2278-8727, Volume 17, Issue 4, Ver. I (July Aug. 2015), PP 94-99 www.iosrjournals.org Task allocation model for Balance utilization

More information

O&M Service for Sustainable Social Infrastructure

O&M Service for Sustainable Social Infrastructure O&M Service for Sustainable Social Infrastructure Hitachi Review Vol. 62 (2013), No. 7 370 Toshiyuki Moritsu, Ph. D. Takahiro Fujishiro, Ph. D. Katsuya Koda Tatsuya Kutsuna OVERVIEW: Hitachi is developing

More information

Modified Procedure to Solve Fuzzy Transshipment Problem by using Trapezoidal Fuzzy number.

Modified Procedure to Solve Fuzzy Transshipment Problem by using Trapezoidal Fuzzy number. International Journal of Mathematics and Statistics Invention (IJMSI) E-ISSN: 2321 4767 P-ISSN: 2321-4759 Volume 4 Issue 6 August. 216 PP-3-34 Modified Procedure to Solve Fuzzy Transshipment Problem by

More information

JOB SHOP RE- SCHEDULING USING GENETIC ALGORITHM A CASE STUDY

JOB SHOP RE- SCHEDULING USING GENETIC ALGORITHM A CASE STUDY JOB SHOP RE- SCHEDULING USING GENETIC ALGORITHM A CASE STUDY P.ChithtraiSelvam, S.Vignesh, K.Mandharasalam, Sathiesh kumar, C.Sowmya Danalakshmi 5,,, Department of Mechanical Engineering, P.A.College of

More information

The application of EOQ and lead time crashing cost models in material with limited life time (Case study: CN-235 Aircraft at PT Dirgantara Indonesia)

The application of EOQ and lead time crashing cost models in material with limited life time (Case study: CN-235 Aircraft at PT Dirgantara Indonesia) IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS The application of EO and lead time crashing cost models in material with limited life time (Case study: CN-235 Aircraft at PT

More information

Simulation and Analysis of Impact of Buffering of Voice Calls in Integrated Voice and Data Communication System

Simulation and Analysis of Impact of Buffering of Voice Calls in Integrated Voice and Data Communication System Simulation and Analysis of Impact of Buffering of Voice Calls in Integrated Voice and Data Communication System VM Chavan 1, MM Kuber 2 & RJ Mukhedkar 3 1&2 Department of Computer Engineering, Defence

More information

Métro service disruptions

Métro service disruptions Métro service disruptions Carl Desrosiers Chief Executive Officer Dominique Lemay Executive Director, Métro services May 30, 2013 A few figures for 2012 412.6 million passenger rides in 2012, a 1.9% increase

More information

The Kanban Course. Workbook

The Kanban Course. Workbook The Kanban Course Workbook In this module you'll learn what kanban are and how they can be used to control the production and movement within any facility. You'll also learn what many of the most common

More information

Feasibility of Establishing a Toner Cartridge Refilling Station

Feasibility of Establishing a Toner Cartridge Refilling Station STAFF REPORT August 8, 2005 To: From: Subject: Administration Committee Treasurer Feasibility of Establishing a Toner Cartridge Refilling Station Purpose: The purpose of this report is to respond to the

More information

OPTIMIZATION OF TURNING PROCESS USING A NEURO-FUZZY CONTROLLER

OPTIMIZATION OF TURNING PROCESS USING A NEURO-FUZZY CONTROLLER Sixteenth National Convention of Mechanical Engineers and All India Seminar on Future Trends in Mechanical Engineering, Research and Development, Deptt. Of Mech. & Ind. Engg., U.O.R., Roorkee, Sept. 29-30,

More information

ADAPTIVE AND DYNAMIC LOAD BALANCING METHODOLOGIES FOR DISTRIBUTED ENVIRONMENT

ADAPTIVE AND DYNAMIC LOAD BALANCING METHODOLOGIES FOR DISTRIBUTED ENVIRONMENT ADAPTIVE AND DYNAMIC LOAD BALANCING METHODOLOGIES FOR DISTRIBUTED ENVIRONMENT PhD Summary DOCTORATE OF PHILOSOPHY IN COMPUTER SCIENCE & ENGINEERING By Sandip Kumar Goyal (09-PhD-052) Under the Supervision

More information

PATH OPTIMIZATION ALGORITHM FOR NETWORK PROBLEMS USING JOB SEQUENCING TECHNIQUE

PATH OPTIMIZATION ALGORITHM FOR NETWORK PROBLEMS USING JOB SEQUENCING TECHNIQUE PATH OPTIMIZATION ALGORITHM FOR NETWORK PROBLEMS USING JOB SEQUENCING TECHNIQUE Punit Kumar Singh 1 and Dr. Rakesh Kumar 2 1 Department of Computer Science and Engineering, M.M.M Engineering College, Gorakhpur-273010,

More information

Adaptive Mechanism for Aggregation with fragments retransmission in high-speed wireless networks

Adaptive Mechanism for Aggregation with fragments retransmission in high-speed wireless networks Int. J. Open Problems Compt. Math., Vol. 4, No. 3, September 2011 ISSN 1998-6262; Copyright ICSRS Publication, 2011 www.i-csrs.org Adaptive Mechanism for Aggregation with fragments retransmission in high-speed

More information

Simulation of the effectiveness evaluation process of security systems

Simulation of the effectiveness evaluation process of security systems IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Simulation of the effectiveness evaluation process of security systems To cite this article: A V Godovykh et al 2016 IOP Conf.

More information

Foundations. The Golden Record is Not Enough: The Case For Data Orchestration. CPDAs Highly Recommend

Foundations. The Golden Record is Not Enough: The Case For Data Orchestration. CPDAs Highly Recommend Foundations Journal of the Professional Petroleum Data Management Association Print: ISSN 2368-7533 - Online: ISSN 2368-7541 Volume 2 Issue 3 4Q2015 The Golden Record is Not Enough: The Case For Data Orchestration

More information

Global In-Memory Database Market Research Report 2016

Global In-Memory Database Market Research Report 2016 Published on Market Research Reports Inc. (https://www.marketresearchreports.com) Home > Global In-Memory Database Market Research Report 2016 Global In-Memory Database Market Research Report 2016 Publication

More information

A Level-wise Priority Based Task Scheduling for Heterogeneous Systems

A Level-wise Priority Based Task Scheduling for Heterogeneous Systems International Journal of Information and Education Technology, Vol., No. 5, December A Level-wise Priority Based Task Scheduling for Heterogeneous Systems R. Eswari and S. Nickolas, Member IACSIT Abstract

More information

Optimization of Process Parameters of CNC Milling

Optimization of Process Parameters of CNC Milling Optimization of Process Parameters of CNC Milling Malay, Kishan Gupta, JaideepGangwar, Hasrat Nawaz Khan, Nitya Prakash Sharma, Adhirath Mandal, Sudhir Kumar, RohitGarg Department of Mechanical Engineering,

More information

Report Information China Portable Substations Market Research Report 2018 https://www.marketresearchnest.com/china-portable-substations-market-research-report-2018.html A Report Description Single User

More information

An Overview of Projection, Partitioning and Segmentation of Big Data Using Hp Vertica

An Overview of Projection, Partitioning and Segmentation of Big Data Using Hp Vertica IOSR Journal of Computer Engineering (IOSR-JCE) e-issn: 2278-0661,p-ISSN: 2278-8727, Volume 19, Issue 5, Ver. I (Sep.- Oct. 2017), PP 48-53 www.iosrjournals.org An Overview of Projection, Partitioning

More information

[Mahajan*, 4.(7): July, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785

[Mahajan*, 4.(7): July, 2015] ISSN: (I2OR), Publication Impact Factor: 3.785 [Mahajan*, 4.(7): July, 05] ISSN: 77-9655 (IOR), Publication Impact Factor:.785 IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY OPTIMIZATION OF SURFACE GRINDING PROCESS PARAMETERS

More information

Neuro-Fuzzy Approach for Software Release Time Optimization

Neuro-Fuzzy Approach for Software Release Time Optimization Int. J. Advance Soft Compu. Appl, Vol.9, No. 3, Nov 2017 ISSN 2074-8523 Neuro-Fuzzy Approach for Software Release Time Optimization Shubhra Gautam, Deepak Kumar, L.M. Patnaik Amity University, Uttar Pradesh,

More information

Parametric Investigation of Single Point Incremental Forming For Al 8011A H-14

Parametric Investigation of Single Point Incremental Forming For Al 8011A H-14 Parametric Investigation of Single Point Incremental Forming For Al 8011A H-14 Bhavesh Sonagra 1, Jayendra B. Kanani 2 1 Student M.E. CAD/CAM, A.I.T.S, Rajkot, Gujarat, India 2 Assistant Professor, A.I.T.S,

More information

Bengaluru Space Expo 2010

Bengaluru Space Expo 2010 Bengaluru Space Expo 2010 Notwithstanding the global economic meltdown, the space industry has been growing at a rapid pace. According to one estimate, governments across the globe have spent nearly US$90

More information

The Kanban Course. Workbook. The 6 Kanban Prerequisites In order to succeed with Kanban, there are 6 prerequisites that must be in place.

The Kanban Course. Workbook. The 6 Kanban Prerequisites In order to succeed with Kanban, there are 6 prerequisites that must be in place. The Kanban Course Workbook In order to succeed with Kanban, there are 6 prerequisites that must be in place. A workbook intended to accompany the Facilitator s Guides for this course. This guide includes

More information

A Hybrid Genetic Algorithm for the Distributed Permutation Flowshop Scheduling Problem Yan Li 1, a*, Zhigang Chen 2, b

A Hybrid Genetic Algorithm for the Distributed Permutation Flowshop Scheduling Problem Yan Li 1, a*, Zhigang Chen 2, b International Conference on Information Technology and Management Innovation (ICITMI 2015) A Hybrid Genetic Algorithm for the Distributed Permutation Flowshop Scheduling Problem Yan Li 1, a*, Zhigang Chen

More information

Meta- Heuristic based Optimization Algorithms: A Comparative Study of Genetic Algorithm and Particle Swarm Optimization

Meta- Heuristic based Optimization Algorithms: A Comparative Study of Genetic Algorithm and Particle Swarm Optimization 2017 2 nd International Electrical Engineering Conference (IEEC 2017) May. 19 th -20 th, 2017 at IEP Centre, Karachi, Pakistan Meta- Heuristic based Optimization Algorithms: A Comparative Study of Genetic

More information

Batch Inherence of Map Reduce Framework

Batch Inherence of Map Reduce Framework Available Online at www.ijcsmc.com International Journal of Computer Science and Mobile Computing A Monthly Journal of Computer Science and Information Technology IJCSMC, Vol. 4, Issue. 6, June 2015, pg.287

More information

A Recursive Revised First Fit Algorithm for Cutting Stock Problem

A Recursive Revised First Fit Algorithm for Cutting Stock Problem International Journal of Information Systems for Logistics and Management Vol. 4, No. 1 (2008) 31-40 http://www.knu.edu.tw/academe/englishweb/web/ijislmweb/index.html A Recursive Revised First Fit Algorithm

More information

Efficient Resources Allocation in Technological Processes Using an Approximate Algorithm Based on Random Walk

Efficient Resources Allocation in Technological Processes Using an Approximate Algorithm Based on Random Walk Efficient Resources Allocation in Technological Processes Using an Approximate Algorithm Based on Random Walk M.M. Bayas 1,2, V.M. Dubovoy 1 1 Department Computer Control Systems, Institute for Automatics,

More information

Improved MAC protocol for urgent data transmission in wireless healthcare monitoring sensor networks

Improved MAC protocol for urgent data transmission in wireless healthcare monitoring sensor networks , pp.282-286 http://dx.doi.org/10.14257/astl.2015.116.57 Improved MAC protocol for urgent data transmission in wireless healthcare monitoring sensor networks Rae Hyeon Kim, Jeong Gon Kim 1 Department of

More information

A Study on Issues Associated with Mobile Network

A Study on Issues Associated with Mobile Network Available Online at www.ijcsmc.com International Journal of Computer Science and Mobile Computing A Monthly Journal of Computer Science and Information Technology IJCSMC, Vol. 3, Issue. 9, September 2014,

More information

The Kanban Applied Guide

The Kanban Applied Guide The Kanban Applied Guide Official Guide to Applying Kanban as a Process Framework May 2018 2018 Kanban Mentor P a g e 1 Table of Contents Purpose of the Kanban Applied Guide... 3 Kanban Applied Principles...

More information

Implementation & Throughput Analysis of Perfect Difference Network (PDN) in Wired Environment

Implementation & Throughput Analysis of Perfect Difference Network (PDN) in Wired Environment www.ijcsi.org 451 Implementation & Throughput Analysis of Perfect Difference Network (PDN) in Wired Environment Yogesh Golhar 1, R.K.Krishna 2 and Mahendra A. Gaikwad 3 1 Rajiv Gandhi College Of Engineering,

More information

Advanced Tutorial - Simulation-based Scheduling and Control

Advanced Tutorial - Simulation-based Scheduling and Control Advanced Tutorial - Simulation-based Scheduling and Control Brett A. Peters, Jeffrey S. Smith, James Curry, and Cynthia LaJimodiere Texas A&M University Glenn R. Drake Systems Modeling Corp. Abstract This

More information