Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum. December 9, 2010

Size: px
Start display at page:

Download "Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum. December 9, 2010"

Transcription

1 Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum December 9,

2 Who is GPA? A not-for-profit corporation to support the utility industry The Grid Solutions Division of GPA is an open-source software development shop The openpdc was GPA s first product others are under development. GPA also provides installation and services business for its products 2 NYISO Vendor Workshop

3 Grid Solution Products openpdc Major improvements w/august & October releases openhistorian New product. Code posted w/august release PMU Connection Tester Improved functionality w/august release PMU Registry Application near production ready. Needs business driver and push from NERC and/or DOE. PDC Test Bench Alpha release eminent opendsr New product. Kernel posted based on C stream splitter openvisuals New product. Kernel posted based on Historian Data Viewer. openpg New product, targeted for 2011 Phasor Data Processor New product, final disaggregation of openpdc to provide SCADA-like calculation tools on phasor data points. 3 NYISO Vendor Workshop

4 Definition of a PDC From NERC RAPIR Report Draft, June NYISO Vendor Workshop

5 Generic Architecture with the need to scale to something big. 5 NYISO Vendor Workshop

6 Inputs Core PDC Functions Accommodates multiple inputs from PMUs and PDCs Parses the inputs, gracefully handing input anomalies Actions Aligns the data based on time-stamp during a configurable waiting period Outputs Produces a real-time, IEEE C output data stream Provides information about its operational status 6 NYISO Vendor Workshop

7 Core openpdc Functions Inputs PMUs PDCs F-NET Devices New or updated protocols Phasor Gateways and coming soon Actions Time alignment Calculated Values C streams SPDC Historian RTDMS Outputs Streams that contain only a subset of measurements Down-sampled data for SCADA and other tools 7 NYISO Vendor Workshop

8 openpdc Flexibility & Adaptability 8 NYISO Vendor Workshop

9 Scalability Options 9 NYISO Vendor Workshop

10 Reliability Options Fail Over Cluster Load Balanced Cluster 10 NYISO Vendor Workshop

11 Data Archive / Historian Full-resolution historical data is useful for planning studies and event analysis Can be built into the PDC or be a separate system Relational systems can be used for a small number of PMUs Since the openpdc is signal based, it can directly send data to a historian without the need for an intermediate interface. 11 NYISO Vendor Workshop

12 Built-in archive: The openhistorian High Speed Data Archival 12 NYISO Vendor Workshop

13 Integration with the WSU Oscillation Monitoring System Four minutes of oscillations 13 NYISO Vendor Workshop

14 Space Time Insight Integration Auto-identification of deviation events Visualization of serious deviations from a reference angle 14 Reference Angle Simultaneous line trend charts overlaid on multiple PMUs identifies departure from reference angle NYISO Vendor Workshop

15 Microsoft StreamInsight Integration 15 NYISO Vendor Workshop

16 Direct Integration with the EPRI Wide Area Visualization Tool 16 NYISO Vendor Workshop

17 Collected System Statistics Source Name Source Name InputStream Total Frames OutputStream Discarded Measurements InputStream Last Report Time OutputStream Received Measurements InputStream Missing Frames OutputStream Expected Measurements InputStream CRC Errors OutputStream Processed Measurements InputStream Out of Order Frames OutputStream Measurements Sorted by Arrival InputStream Minimum Latency OutputStream Published Measurements InputStream Maximum Latency OutputStream Downsampled Measurements InputStream Input Stream Connected OutputStream Missed Sorts by Timeout InputStream Received Configuration OutputStream Frames Ahead of Schedule InputStream Configuration Changes OutputStream Published Frames InputStream Total Data Frames OutputStream Output Stream Connected InputStream Total Configuration Frames InputStream Total Header Frames InputStream Average Latency Source Name InputStream Defined Frame Rate Device Data Quality Errors InputStream Actual Frame Rate Device Time Quality Errors InputStream Actual Data Rate Device Device Errors All statistics archived over time every ten seconds. 17 NYISO Vendor Workshop

18 New GUI application based Management System 18 NYISO Vendor Workshop

19 2010 openpdc Releases See for more info. January 2010 (Version 1.0) The first, fully tested openpdc release. Based on the TVA SuperPDC (a Visual Basic system) the openpdc was reengineered and converted to the more robust C# language. June 2010 (Version (1.1) The June release included numerous additions to the configuration system including wizards for setting up data bases and configuring the openpdc as well as security and performance monitoring improvements (see attached) August 2010 (Version 1.2) The web-based configuration tool was replaced with a faster, easier to configure windows-forms configuration system. Installation time for the openpdc and the openpdc Manager was reduced to less than 5 minutes. (see attached) October 2010 (Version 1.3) This release included tools to streamline the management of PMU configuration data in the openpdc. (see attached) Next production release: January 2011 Nightly build is always available for testing new features. 19 NYISO Vendor Workshop

20 GPA OpenPDC Services GPA provides open and free support. The openpdc web site is used for logging problems and improvement suggestions. GPA also offers additional services under a range of business arrangements for: Installation Maintenance Customization 20 NYISO Vendor Workshop

21 Customization Examples By GPA -- The magic A/B switch being added to the openpdc to select the best value in phasor data systems that incorporate redundancy. By Users Quick demonstration of a openpdc adapter 21 NYISO Vendor Workshop

22 PMU Registry 22 NYISO Vendor Workshop

23 What is the PMU Registry? The NASPI PMU Registry is the source of meta data on synchrophasor devices and the measurements collected by them throughout North America. Where is the measurement taken? What is the measurement? Who owns the measurement? and for gateways, where can I get it? 23 NYISO Vendor Workshop

24 PMU Registry Objectives To be the one-stop-shop for information on PMUs in North America (vis-à-vis NERC ISN data definitions) To establish uniform naming conventions for PMUs and their measurement descriptors to facilitate the exchange of PMU data for analysis and display To set the stage for NASPInet to provide a measurement point name server. To support federal SGIG and industry investments in PMUs through collection and tracking of data on PMU equipment The registry software is being developed by NERC to serve all PMU owners across North America 24 NYISO Vendor Workshop

25 PMU Registry Overview Simple Data Hierarchy Regional concentration Corporate (TO) concentration PMU Measurement Descriptors Allows for multiple layers of data concentration and creation of virtual measurements Allows PMUs that do not provide data to external users to be a part of the registry Creates standard names for PMUs as well as measurement descriptors. The PMU Registry only holds meta data about configuration. 25 NYISO Vendor Workshop

26 Registry Data Elements PMU / PDC Physical Location Device Info Vendor, Protocol Operational Status Measurement Descriptors Phase Measured Units Reasonability Limits Network Element Electrical One-Line Location 26 NYISO Vendor Workshop

27 Registry Deployment Paths For tracking SGIG PMU deployment there is a single site: For registry deployment related to phasor gateways, many ISO are setting up their own internal databases and synchronizing with other systems much the way DNS works on the Internet today. 27 NYISO Vendor Workshop

28 A Wizard Simplifies Data Entry Upload a file 28 NYISO Vendor Workshop

29 Documentation Compiled Executable Source Code 29 NYISO Vendor Workshop

30 Registry Assess Hierarchy Under Development User Permission Roles Owning company (TO) Users Edit View Company Administrator (Manages company users) Regional Viewer Regional Administrator (Manages regional viewers) Global Viewer System Administrator 30 NYISO Vendor Workshop

31 To get PMU Registry Access Test Version or Production Version Contact: J. Ritchie Carroll 31 NYISO Vendor Workshop

32 Setting the stage for NASPInet To publish a signal on NASPInet, an entity must: Have a NASPInet Phasor Gateway Register the measurement (signal) with the NASPInet infrastructure. Configure the Phasor Gateway to designate the authorized receiving Gateways (this configuration can be all ) for this signal. To subscribe to a signal on NASPInet, an entity must: Have a NASPInet Phasor Gateway Discover the measurement (signal) needed through the NASPInet infrastructure Request authorization to receive this signal from the publishing Phasor Gateway owner. 32 NYISO Vendor Workshop

33 On the way to inter-utility data exchange 33 NYISO Vendor Workshop

34 An open synchrophasor gateway 34 NYISO Vendor Workshop

35 A general purpose data gateway ICCP with high-speed, time-stamped measurement values ICCP++ 35 NYISO Vendor Workshop

36 Sci-fi Transport Process Decomposition Fundamental Particles Recomposition Step 1 Step 2 Move to Destination Step 3 36 NYISO Vendor Workshop

37 Phasor Transport Process Decomposition Fundamental Signals Recomposition Unique ID IEEE C Data Frame Timestamp Value IEEE C Data Frame Quality Step 1 Step 2 Step 3 Move to Destination 37 NYISO Vendor Workshop

38 3-Step Processing Architecture 38 NYISO Vendor Workshop

39 Abstract Measurement Processing 39 NYISO Vendor Workshop

40 Current State of BES Data Exchange is Complex 40 NYISO Vendor Workshop

41 Current State of BES Data Exchange is Complex Multiple Regulated Business Processes Many entities Multiple protocols Piecewise development of supplemental information systems using the internet for transport 41 NYISO Vendor Workshop

42 and complexity is increasing Phasors moving beyond R&D SGIG has resulted in ~$300M in phasor system investments Over 850 new PMUs (6x the current installed base) and 10 new synchrophasor data hubs in the US. Application of phasor data is improving for situational awareness, event detection, system analysis, planning, and automated control. 42 NYISO Vendor Workshop

43 However, R&D paved the way Phasor measurement units (PMUs) are becoming a more mature technology. Protocols to efficiently bring phasor data to the control center have been standardized. Phasor Data Concentrators are commercially available for use in both Control Centers and Substations. The vision for phasor data exchange has been established by NASPInet. 43 NYISO Vendor Workshop

44 Information Gateway Progression openpg Version 1.0 late 2011 Entergy PG Appliance early 2012 openpg Version 2.0 late 2012 SIEGate (Beta Software) early 2013 SIEGate Appliance late NYISO Vendor Workshop

45 Generic Phasor GW Architecture 45 NYISO Vendor Workshop

46 Information Gateway Progression openpg Version 1.0 late 2011 Entergy PG Appliance early 2012 openpg Version 2.0 late 2012 SIEGate (Beta Software) early 2013 SIEGate Appliance late NYISO Vendor Workshop

47 openpg Version 1.0 A gateway architectural component that can be put in service as an element of SGIG project synchrophasor data architecture Available in 2011 Funded by NERC with help sought from SGIG projects 47 NYISO Vendor Workshop

48 FEATURES openpg Version 1.0 A gateway optimized for phasor data exchange Simple point-based data exchange (single precision floating point values) The owner of the sending openpg can select points (and a sample rate for that point) to be directed to specific receiving gateways Tightly integrated with the PMU Registry Security provided by the network layer Open source availability 48 NYISO Vendor Workshop

49 Entergy PG Appliance A tested, production-grade phasor gateway tailored to the needs of the Entergy PMU Hardening Project Operational in 2012 Developed by UIUC/GPA Funded by the Entergy SGIG Project 49 NYISO Vendor Workshop

50 FEATURES Entergy PG Appliance Features of openpg Version 1.0 plus additions to meet security and functional needs of Entergy SGIG project including Entergy specific: Networking and communication interfaces Input and output data formats Data security, authentication and access control features 50 NYISO Vendor Workshop

51 OpenPG Version 2.0 A production-grade phasor data gateway with core security features that can be deployed in production as part of SGIG NASPInet demonstration projects Available in late 2012 Developed by GPA Funding TBD 51 NYISO Vendor Workshop

52 FEATURES OpenPG Version 2.0 The features of openpg version 1.0 plus improvements incorporated from the Entergy PG Appliance Gateway level access control and authentication Support for encrypted data exchange among gateways Alarming for missing data Published documentation on gateway-to-gateway protocols Open source availability 52 NYISO Vendor Workshop

53 SIEGate A generalized, security hardened appliance for the exchange of real-time grid operating information that is both open source and commercialized through a major vendor Available in 2013 Developed by UIUC/GPA Commercialization by ALSTOM Testing by PNNL Demonstration at ALSTOM and PJM Funded by DOE-CEDS with a major costshare contribution by NERC 53 NYISO Vendor Workshop

54 Secure Information Exchange Gateway 54 NYISO Vendor Workshop

55 FEATURES SIEGate (Beta Software) Early 2013 Supports exchange of many forms of operational data including phasor, SCADA, & SDX among others Architecture optimized for secure data exchange Hardened core code components Alarming based on data quality Data exchange triggering features (e.g., on-change, on-alarm) Leveraging of open data bus technologies Measurement-point level security Meta-data naming services to accommodate all realtime grid operating information 55 NYISO Vendor Workshop

56 FEATURES Late 2013 SIEGate Appliance Implements SIEGate software for a specific hardware and operating system Integration with OS security features and tools Integration with specialized hardware components for improved security Commercialization by ALSTOM Formalized security and performance testing 56 NYISO Vendor Workshop

57 Software Deployment Locations PJM, ISO-NE, TVA, Entergy, Dominion, AEP, Duke, PG&E, FP&L, OG&E, Manitoba Hydro Software Evaluation Locations WECC, NYISO, BPA, SCE 57 NYISO Vendor Workshop

North American SynchroPhasor Initiative NASPI & NERC Update and Initiatives. Alison Silverstein NASPI Project Manager March 30, 2011

North American SynchroPhasor Initiative NASPI & NERC Update and Initiatives. Alison Silverstein NASPI Project Manager March 30, 2011 North American SynchroPhasor Initiative NASPI & NERC Update and Initiatives Alison Silverstein NASPI Project Manager March 30, 2011 Overview NASPI & NERC Initiatives NASPI intro NASPI & NERC priorities

More information

Synchrophasor Project Updates

Synchrophasor Project Updates Synchrophasor Project Updates Typical Synchrophasor Data Architecture Grid Protection Alliance Solutions 2 GSF Grid Solutions Framework http://gsf.codeplex.com/ 3 Grid Solutions Framework v2.1.90 The Grid

More information

GEP vs. IEEE C37.118

GEP vs. IEEE C37.118 GEP vs. IEEE C37.118 Results from Testing at Peak RC Ritchie Carroll Dan Brancaccio NASPI Meeting October 2016 Why a test? PEAK SEEKS TO IMPROVE PHASOR DATA AVAILABILITY 2 The Project SOPO Task 7.0 Data

More information

North American SynchroPhasor Initiative (NASPI) Overview

North American SynchroPhasor Initiative (NASPI) Overview North American SynchroPhasor Initiative (NASPI) Overview Data Exchange Panel ipcgrid 2013 hosted by Pacific Gas & Electric March 28, 2013 Jeff Dagle, PE Chief Electrical Engineer Advanced Power and Energy

More information

Applications and Analysis Tools for Monitoring Dynamics on the Grid

Applications and Analysis Tools for Monitoring Dynamics on the Grid 1 Applications and Analysis Tools for Monitoring Dynamics on the Grid Phil Overholt Program Manager Office of Electricity Delivery and Energy Reliability (OE) Energy Infrastructure Modeling and Analysis

More information

Dr. Yi Hu, Dr. Damir Novosel Quanta Technology LLC

Dr. Yi Hu, Dr. Damir Novosel Quanta Technology LLC Brazil CIGRE B5 PDC Workshop Considerations and Requirements of PDCs for WAMPAC Systems Dr. Yi Hu, Dr. Damir Novosel Quanta Technology LLC Rio de Janeiro, Brazil April 6, 2010 Presentation Outline Global

More information

Entergy Phasor Project Phasor Gateway Implementation

Entergy Phasor Project Phasor Gateway Implementation Entergy Phasor Project Phasor Gateway Implementation Floyd Galvan, Entergy Tim Yardley, University of Illinois Said Sidiqi, TVA Denver, CO - June 5, 2012 1 Entergy Project Summary PMU installations on

More information

Version Major Deployments. TVA Entergy PG&E Dominion Every openpdc installation (via stats and/or active phasor archive)

Version Major Deployments. TVA Entergy PG&E Dominion Every openpdc installation (via stats and/or active phasor archive) Version 1.0 - Major Deployments TVA Entergy PG&E Dominion Every openpdc installation (via stats and/or active phasor archive) 2 Version 1.0 - Current State Stable, mature product optimized to store time-series

More information

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated

More information

Global Synchronized Phasor Measurement Standards

Global Synchronized Phasor Measurement Standards Global Synchronized Phasor Measurement Standards Vahid Madani and Farnoosh Rahmatian March 30, 2011 i-pcgrid Workshop 2011 Phasor Measurement System GPS Timing standards IEEE 1588 PTP C37.238 Profile Communication

More information

Synchrophasor Technology and Systems

Synchrophasor Technology and Systems PNNL-SA-106051 Synchrophasor Technology and Systems Jeff Dagle, PE Chief Electrical Engineer and Team Lead Electricity Infrastructure Resilience Pacific Northwest National Laboratory Richland, Washington

More information

MISO. Smart Grid Investment Grant Update. Kevin Frankeny NASPI Workgroup Meeting October 17-18, 2012

MISO. Smart Grid Investment Grant Update. Kevin Frankeny NASPI Workgroup Meeting October 17-18, 2012 MISO Smart Grid Investment Grant Update Kevin Frankeny kfrankeny@misoenergy.org NASPI Workgroup Meeting October 17-18, 2012 ARRA Disclaimer "This report was prepared as an account of work sponsored by

More information

Phasor Technology Research Roadmap for the Grid of the Future

Phasor Technology Research Roadmap for the Grid of the Future Phasor Technology Research Roadmap for the Grid of the Future Briefing for Secretary of Energy Samuel W. Bodman and OEDER Director Kevin Kolevar May 15, 2006 Briefing Summary EIPP started in 2002 to address

More information

Electric Transmission and Distribution Future R&D Needs

Electric Transmission and Distribution Future R&D Needs Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization The Center for Advanced Power Systems Florida State University, Tallahassee, Florida February 1,

More information

Alarming and Operations of openpdc at ISO-NE

Alarming and Operations of openpdc at ISO-NE A U G 1 4, 2 0 1 3 A T L A N T A, G A Alarming and Operations of openpdc at ISO-NE Qiang Frankie Zhang, Patrick Pentz (Developer) Outline Project Overview Project Status Development Challenges Discussion

More information

Advanced Real-Time Situational Awareness Sourced from Synchrophasor Data

Advanced Real-Time Situational Awareness Sourced from Synchrophasor Data Advanced Real-Time Situational Awareness Sourced from Synchrophasor Data Faster than the Eye, not faster than PI Presented by Kliff Hopson, Bonneville Power Administration Jeff Hopper, Casne Engineering,

More information

PMU Networking with IP Multicast

PMU Networking with IP Multicast White Paper PMU Networking with IP Multicast Overview This document proposes a network architecture which implements IP networking technologies, including IP multicast, to help enable efficient transmission

More information

NASPInet - The Internet for Synchrophasors

NASPInet - The Internet for Synchrophasors NASPInet - The Internet for Synchrophasors Paul T. Myrda Electric Power Research Institute pmyrda@epri.com Kris Koellner Salt River Project kmkoelln@srpnet.com Abstract NASPI is a collaborative effort

More information

Synchrophasor Data Communications Questionnaire. NASPI D&NMTT October Co-chairs Jim McNierney NYISO Dan Brancaccio Bridge Energy Group

Synchrophasor Data Communications Questionnaire. NASPI D&NMTT October Co-chairs Jim McNierney NYISO Dan Brancaccio Bridge Energy Group Synchrophasor Data Communications Questionnaire NASPI D&NMTT October 23 2013 Co-chairs Jim McNierney NYISO Dan Brancaccio Bridge Energy Group Survey says Purpose of survey was to get an idea of what networking

More information

PJM Interconnection Smart Grid Investment Grant Update

PJM Interconnection Smart Grid Investment Grant Update PJM Interconnection Smart Grid Investment Grant Update Bill Walker walkew@pjm.com NASPI Work Group Meeting October 22-24, 2013 Acknowledgment: "This material is based upon work supported by the Department

More information

Synchrophasor Standards and Guides

Synchrophasor Standards and Guides Synchrophasor Standards and Guides PSTT and IEEE PSRC Vahid Madani, Ken Martin, and Damir Novosel NASPI General Meeting February 23, 2011 Ft. Worth, TX Presentation Standards & guides related to synchrophasors

More information

Applications on openpdc platform at Washington State University

Applications on openpdc platform at Washington State University Applications on openpdc platform at Washington State University Mani V. Venkatasubramanian Washington State University Pullman WA WSU projects OMS - Oscillation Monitoring System Stand-alone system for

More information

Synchrophasors and Next Generation Energy Management Systems (EMS)

Synchrophasors and Next Generation Energy Management Systems (EMS) Synchrophasors and Next Generation Energy Management Systems (EMS) Manu Parashar Celebrating the Visions of Synchrophasor Pioneers: Arun Phadke and Jim Thorp May 9 th, 2013 Analog Data Acquisition Changing

More information

PJM Interconnection Smart Grid Investment Grant Update

PJM Interconnection Smart Grid Investment Grant Update PJM Interconnection Smart Grid Investment Grant Update Bill Walker walkew@pjm.com NASPI Work Group Meeting October 12-13, 2011 Acknowledgment: "This material is based upon work supported by the Department

More information

An EPRI Progress Report May 2011

An EPRI Progress Report May 2011 Smarter Transmission An EPRI Progress Report May 2011 ABOUT THE NEWSLETTER This is the first edition of the Smarter Transmission newsletter. The plan is to inform readers about what s happening in the

More information

OVERVIEW: KEY APPLICATIONS

OVERVIEW: KEY APPLICATIONS WECC Reliability Coordinator Website OVERVIEW: KEY APPLICATIONS presented by Kirk Stewart, Manager Applications Agenda WECCRC.org Website Wide-Area Views (WAV) Historical Data Archiving and Reporting My

More information

C Dr.-Ing. Abdalkarim Awad Informatik 7 Rechnernetze und Kommunikationssysteme

C Dr.-Ing. Abdalkarim Awad Informatik 7 Rechnernetze und Kommunikationssysteme C37.118 13.1.2016 Informatik 7 Rechnernetze und Kommunikationssysteme Measures Voltage, Current, phase PMU1 IEEE C37.118 WAN PDC Historian Phasor Data Concentrator HMI App1 PMU2 APn Bay1 Bayn LAN e.g.,

More information

NASPI and Synchrophasor Technology Progress. Alison Silverstein NASPI Project Manager NERC OC- PC Mee?ngs, December 2013

NASPI and Synchrophasor Technology Progress. Alison Silverstein NASPI Project Manager NERC OC- PC Mee?ngs, December 2013 NASPI and Synchrophasor Technology Progress Alison Silverstein NASPI Project Manager NERC OC- PC Mee?ngs, December 2013 1 Overview Intro why synchrophasors? Signs of progress Examples of synchrophasor

More information

SDG&E s Accomplishments and Future Plans

SDG&E s Accomplishments and Future Plans SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego

More information

Potential CIP decision tree for PMUs

Potential CIP decision tree for PMUs Potential CIP decision tree for PMUs Questions Is the PMU used to control and/or protect high or medium classified BES equipment? If Yes, device should be classified CIP JDK Comments If any type of automated

More information

Building a Topology Estimator for Large Inter-regional Networks

Building a Topology Estimator for Large Inter-regional Networks Building a Topology Estimator for Large Inter-regional Networks ETREP02.pdf Robin Podmore *, Margaret Goodrich**, David Becker***, Peter Hirsch***, Stephen Lee ***, Marck Robinson**** robin@incsys.com,

More information

PAP13 - Harmonization of IEEE C with IEC and Precision Time Synchronization

PAP13 - Harmonization of IEEE C with IEC and Precision Time Synchronization PAP13 - Harmonization of IEEE C37.118 with IEC 61850 and Precision Time Synchronization 12 July 2010 Use Cases Related to Mapping IEEE C37.118 with IEC 61850 as Proposed for Draft IEC 61850-90-5 Synchrophasor

More information

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused Keeping the Lights on for the Long Term The Basics Bonneville Power

More information

Digital Transformation of Power Delivery

Digital Transformation of Power Delivery Digital Transformation of Power Delivery Keynote Speech Professor Saifur Rahman, PhD Virginia Tech, USA IEEMA Engineer Infinite Conference, Delhi NCR, India, 14 March 2018 Traditional Electricity Delivery

More information

NASPI Reliability Coordinator Data Quality Survey Summary. Alison Silverstein NASPI Project Manager March 21, 2016

NASPI Reliability Coordinator Data Quality Survey Summary. Alison Silverstein NASPI Project Manager March 21, 2016 NASPI Reliability Coordinator Data Quality Survey Summary Alison Silverstein NASPI Project Manager March 21, 2016 Overview Improving data quality is essential to assure that synchrophasor technology can

More information

Multilin P30 Phasor Data Concentrator

Multilin P30 Phasor Data Concentrator Multilin P30 Phasor Data Concentrator Secure high performance Phasor Data Concentrator (PDC) for wide area monitoring and dynamic disturbance analysis KEY BENEFITS Reduce deployment and operation cost

More information

SPP PMU. Project Overview for NASPI. Cody Parker Supervisor Operations Support

SPP PMU. Project Overview for NASPI. Cody Parker Supervisor Operations Support SPP PMU Project Overview for NASPI Cody Parker Supervisor Operations Support Outline 1. Background 2. Project Overview 3. Working with our Members 4. Project Team 3 Background OUTLINE ITEM 1 4 Our Beginning

More information

A Virtual Smart Grid

A Virtual Smart Grid A Virtual Smart Grid Real-Time Simulation for Smart Grid Control and Communications Design IIT IS GENERALLY RECOGNIZED THAT A HIGH-BANDWIDTH and highly available networked communication system should overlay

More information

Cyber Security for Smart Grid Devices

Cyber Security for Smart Grid Devices Cyber Security for Smart Grid Devices Annarita Giani Electrical Engineering & Computer Sciences University of California at Berkeley agiani@eecs.berkeley.edu Trustworthy Cyber Infrastructure for the Power

More information

INTER-CONTROL CENTER COMMUNICATION PROTOCOL (ICCP)

INTER-CONTROL CENTER COMMUNICATION PROTOCOL (ICCP) INTER-CONTROL CENTER COMMUNICATION PROTOCOL (ICCP) 1 K.RAJA, 2 P.KAYALVIZHI 1 Assitant Professor, Dept.of.Computer science, Meenakshi Chandrasekaran College of Arts & Science Pattukkottai. 2 Research Scholar,

More information

RTDMS CAISO TRAINING SESSION

RTDMS CAISO TRAINING SESSION Consortium for Electric Reliability Technology Solutions Real-Time Dynamics Monitoring System (RTDMS ) RTDMS CAISO TRAINING SESSION January 31, 2006 Manu Parashar & Jim Dyer Electric Power Group (EPG)

More information

Using the Gateway Exchange Protocol

Using the Gateway Exchange Protocol Using the Gateway Exchange Protocol Session 2 Stephen C. Wills August 13, 2013 1 Subscribing to Measurements 2 Primary Data Flow Publication APIs Subscription APIs 3 Primary Data Flow (cont.) Publication

More information

A Case for Multi-Function PMU

A Case for Multi-Function PMU A Case for Multi-Function PMU Harish I. Mehta Mehta Tech, Inc. www.mehtatech.com NASPI Chattanooga, TN Meeting PMU Definition PMU is generally defined as: IEEE C37.118 compliant device Time synchronized

More information

NIST Interoperability Standards Update

NIST Interoperability Standards Update NIST Interoperability Standards Update Vahid Madani PG&E (PSTT) Damir Novosel Quanta Tech. (PSTT) Ron Farquharson EnerNex Corp. Ken Martin IEEE C 37-118 1 NIST Three Phase Plan PHASE 1 Identify an initial

More information

Time Synchronization and Standards for the Smart Grid

Time Synchronization and Standards for the Smart Grid Time Synchronization and Standards for the Smart Grid Tom Nelson National Institute of Standards and Technology 2011 NIST - ATIS - Telcordia Workshop on Synchronization in Telecommunication Systems (WSTS

More information

North American SynchroPhasor Initiative An Update of Progress

North American SynchroPhasor Initiative An Update of Progress North American SynchroPhasor Initiative An Update of Progress Jeff Dagle Pacific Northwest National Laboratory jeff.dagle@pnl.gov Abstract In 2007, the U.S. Department of Energy (DOE) and the North American

More information

Bob Braden Alison Silverstein Dick Willson Dan Lutter

Bob Braden Alison Silverstein Dick Willson Dan Lutter Bob Braden Alison Silverstein Dick Willson Dan Lutter USC/ISI NASPI Project Allied Partners Manager 1 In Nov 2014, the NASPI Data & Network Management Task Team (D&NMTT) surveyed networking practice in

More information

Real-time visualization for detecting and solving power system challenges

Real-time visualization for detecting and solving power system challenges SEL-5078-2 synchrowave Central Software Real-time visualization for detecting and solving power system challenges Automatically detect transients induced by renewable generation. Gain power system insight

More information

Expand Synchrophasor Capabilities With the Substation Phasor Data Concentrator

Expand Synchrophasor Capabilities With the Substation Phasor Data Concentrator WHITE PAPER Expand Synchrophasor Capabilities With the Substation Phasor Data Concentrator Greg Zweigle INTRODUCTION A minimal synchrophasor system consists of phasor measurement units (s) and integrates

More information

WISP. Western Interconnection Synchrophasor Program. Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 17-18, 2012

WISP. Western Interconnection Synchrophasor Program. Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 17-18, 2012 WISP Western Interconnection Synchrophasor Program Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 17-18, 2012 1 Acknowledgement and Disclaimer Acknowledgment: This material is based

More information

Disclaimer: SPP PMU Project Team and Synchrophasor Strike Team

Disclaimer: SPP PMU Project Team and Synchrophasor Strike Team SPP Members P MU Planni ng Approach SPP PMU Project Team and Synchrophasor Strike Team Disclaimer: This draft document is an unofficial reference guide on topics related to phasor measurement unit (synchrophasor)

More information

2012 EMS User's Group. MISO Synchrophasor Project

2012 EMS User's Group. MISO Synchrophasor Project 2012 EMS User's Group MISO Synchrophasor Project Dan s Background My primary focus has been centered around developing custom applications for energy companies. Illinois Power (10 years) Clinton Nuclear

More information

Lessons Learned Integrating Synchrophasors into EMS Applications

Lessons Learned Integrating Synchrophasors into EMS Applications SALT RIVER PROJECT - SYNCHROPHASOR TEAM Lessons Learned Integrating Synchrophasors into EMS Applications NASPI Working Group Meeting Scottsdale, AZ February 04, 2009 Dr. Naim Logic Bill Robertson Outline

More information

ASP Project: STTP Streaming Telemetry Transport Protocol

ASP Project: STTP Streaming Telemetry Transport Protocol J. Ritchie Carroll Grid Protection Alliance ASP Project: STTP Streaming Telemetry Transport Protocol NASPI Fall Meeting Philadelphia, PA October 23, 2018 DOE FOA 1492 DE- Project Partners 2 Schedule and

More information

Metering System and Communication Requirements

Metering System and Communication Requirements Metering System and Communication Requirements Andrew Levitt Sr. Market Strategist MIC Special Session on DER June 20, 2017 Definitions Metering system: includes all components from the meter location

More information

Always an eye to security

Always an eye to security Always an eye to security SIGUARD the perfect supervision of your power system www.siemens.com/siguard Answers for infrastructure and cities. Keeping the overview SIGUARD is a suite of innovative software

More information

Practical Uses of PI AF

Practical Uses of PI AF Practical Uses of PI AF Matt Rivett Sr. OSI PI Developer PJM Interconnection Date Forum Name Agenda About PJM PI AF Infrastructure AF Databases Generator AGC Synchrophasor Thunder Storm Alert Server Monitoring

More information

CIM Base PMU Registry

CIM Base PMU Registry The Standards Based Integration Company Systems Integration Specialists Company, Inc. CIM Base PMU Registry John Gillerman SISCO, Inc. Tel: +1-732-937-9745 Mobile: +1-732-979-9595 Email: johng@sisconet.com

More information

Gateway Design Challenges

Gateway Design Challenges What is GEP? Gateway Design Challenges Performance given system complexity Support multiple data types efficiently and securely Support multiple priorities Minimize latency and maximize throughput High

More information

Oscillation Monitoring System

Oscillation Monitoring System Oscillation Monitoring System Mani V. Venkatasubramanian Washington State University, Pullman, WA mani@eecs.wsu.edu Project Objectives Oscillation Monitoring System for WECC and Entergy Monitoring hundreds

More information

WISP. Western Interconnection Synchrophasor Program. Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 22-24, 2013

WISP. Western Interconnection Synchrophasor Program. Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 22-24, 2013 WISP Western Interconnection Synchrophasor Program Vickie VanZandt & Dan Brancaccio NASPI Work Group Meeting October 22-24, 2013 1 Acknowledgement and Disclaimer Acknowledgment: This material is based

More information

OPUC Workshop March 13, 2015 Cyber Security Electric Utilities. Portland General Electric Co. Travis Anderson Scott Smith

OPUC Workshop March 13, 2015 Cyber Security Electric Utilities. Portland General Electric Co. Travis Anderson Scott Smith OPUC Workshop March 13, 2015 Cyber Security Electric Utilities Portland General Electric Co. Travis Anderson Scott Smith 1 CIP Version 5 PGE Implementation Understanding the Regulations PGE Attended WECC

More information

Wide-Area Reliability Monitoring and Visualization Tools

Wide-Area Reliability Monitoring and Visualization Tools OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research

More information

Realization of Big Data Platform for PMU - Real-Time Data Processing & Historical Data Analysis -

Realization of Big Data Platform for PMU - Real-Time Data Processing & Historical Data Analysis - Realization of Big Data Platform for - Real-Time Data Processing & Historical Data Analysis - March 27, 2014 Yutaka Kokai Hitachi America, Ltd. Shinji Fujiwara Hitachi, Ltd. Contents 1.Technical requirements

More information

Digital Protection Past, Present, and Future

Digital Protection Past, Present, and Future Digital Protection Past, Present, and Future Eric A. Udren Quanta Technology, LLC Pittsburgh, PA Presentation for CIGRÉ Grid of the Future Symposium Boston, MA October 22, 2013 eudren@quanta-technology.com

More information

Report: A Comparison of Synchrophasor Protocols

Report: A Comparison of Synchrophasor Protocols J. Ritchie Carroll Grid Protection Alliance Report: A Comparison of Synchrophasor Protocols NASPI Fall Meeting Philadelphia, PA October 24, 2018 Abstract Paper compares three protocols used for continuous

More information

Synchrophasor Fact Sheet

Synchrophasor Fact Sheet Synchrophasors and SEL For more than 25 years, Schweitzer Engineering Laboratories, Inc. (SEL) has delivered reliable, high-quality solutions that lead the electric power industry in price, features, innovation,

More information

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security CERTS Briefing for Kevin Kolevar, Director Office of Electricity and Energy Assurance Department of Energy Washington,

More information

Performance and Standards Task Team

Performance and Standards Task Team Performance and Standards Task Team Progress Report Vahid Madani, PG&E / Damir Novosel, InfraSource Zhenyu Huang, PNNL NASPI Meeting, Montreal, CA September 6, 2007 Scope - Performance and Standards Task

More information

Using PMU Data to Increase Situational Awareness

Using PMU Data to Increase Situational Awareness Using PMU Data to Increase Situational Awareness Tom Overbye Fox Family Professor of Electrical and Computer Engineering University of Illinois at Urbana-Champaign December 2010 PSERC Webinar PSERC Project

More information

Evaluation of Latent Similarity Search in DSS4LA by Using Big PMU Data

Evaluation of Latent Similarity Search in DSS4LA by Using Big PMU Data Evaluation of Latent Similarity Search in DSS4LA by Using Big PMU Data i-pcgrid Workshop 2017 3/31/2017 Hitachi America, Ltd. Big Data Lab Mika Takata Panitarn (Joseph) Chongfuangprinya Contents Introduction

More information

Synchrophasor Implementation Experience and Integration Challenges in Indian Grid

Synchrophasor Implementation Experience and Integration Challenges in Indian Grid 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Synchrophasor Implementation Experience and Integration Challenges in Indian Grid P.

More information

Discovery Across Texas A Smart Grid Demo Grant Update

Discovery Across Texas A Smart Grid Demo Grant Update Discovery Across Texas A Smart Grid Demo Grant Update David Bogen Oncor Electric Delivery David.bogen@oncor.com NASPI Work Group Meeting October 5-6, 2010 1 Project participants Center for the Commercialization

More information

Virtualized Network Services SDN solution for enterprises

Virtualized Network Services SDN solution for enterprises Virtualized Network Services SDN solution for enterprises Nuage Networks Virtualized Network Services (VNS) is a fresh approach to business networking that seamlessly links your enterprise s locations

More information

User Interface for Situational Awareness for openpdc

User Interface for Situational Awareness for openpdc User Interface for Situational Awareness for openpdc Nickolas Gellerman, B.S.E.E Student Ranganath Vallakati, M.S.E.E Student Anupam Mukherjee, M.S.E.E Student Advisor: Dr. Prakash Ranganathan, Assistant

More information

Reviewed by CeemanB. Vellaithurai WSU ID:

Reviewed by CeemanB. Vellaithurai WSU ID: Reviewed by CeemanB. Vellaithurai WSU ID: 11253840 Introduction Smart Grid Communication Infrastructure/Communication Architecture Data Assumptions Simulation Assumptions Good contributions Drawbacks Research

More information

New York ISO - Dynamic Data Response. Copyr i ght 2014 O SIs oft, LLC.

New York ISO - Dynamic Data Response. Copyr i ght 2014 O SIs oft, LLC. 1 New York ISO - Dynamic Data Response Presented by Matthew Musto NYISO Dynamic Data Response As the amount of information system operators, engineers and business units face continues to grow, we are

More information

Industrial Defender ASM. for Automation Systems Management

Industrial Defender ASM. for Automation Systems Management Industrial Defender ASM for Automation Systems Management INDUSTRIAL DEFENDER ASM FOR AUTOMATION SYSTEMS MANAGEMENT Industrial Defender ASM is a management platform designed to address the overlapping

More information

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Industry: Transmission/Distribution/Smarts Presented by Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Agenda About the NYISO A New State-of-the-Art

More information

Testing and Calibration of Phasor Measurement Units

Testing and Calibration of Phasor Measurement Units Testing and Calibration of Phasor Measurement Units Richard Pirret Fluke Calibration NCSLI Conference National Harbor, MD August 25, 2011 2011 Fluke Corporation NCSLI PMU 20110825 1 Grids world s most

More information

PG&E ARRA Synchrophasor Project

PG&E ARRA Synchrophasor Project PG&E ARRA Synchrophasor Project End-to-End Testing June 9, 2011 Vahid Madani Proof of Concept Testing San Ramon 1 Proof of Concept Stage (POC) POC is a smaller scale synchrophasor system used to test,

More information

Next Generation Scada Architectures

Next Generation Scada Architectures Next Generation Scada Architectures Jan Vorrink TenneT at a glance Europe's first cross-border grid operator 2,813 employees EBIT 725 (EUR million) Assets 13.645 (EUR billion) Investments (2014-23) 20

More information

Chapter 2 State Estimation and Visualization

Chapter 2 State Estimation and Visualization Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation

More information

Big Data Access, Analytics and Sense-Making

Big Data Access, Analytics and Sense-Making Workshop on Data Analytics for the Smart Grid Pullman, WA August 28, 2017 Big Data Access, Analytics and Sense-Making Zhenyu (Henry) Huang, Ph.D., P.E., F.IEEE Laboratory Fellow/Technical Group Manager

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

Improving data quality in PSE&G s synchrophasor network PING YE PHD PSE&G ZACHARY HARDING PSE&G (IBRIDGE)

Improving data quality in PSE&G s synchrophasor network PING YE PHD PSE&G ZACHARY HARDING PSE&G (IBRIDGE) Improving data quality in PSE&G s synchrophasor network PING YE PHD PSE&G ZACHARY HARDING PSE&G (IBRIDGE) Synchrophasors at PSE&G PJM SynchroPhasor Project ~Circa 2008 DOE PJM AEP AP BGE ComEd DOM DUQ

More information

NIST Interoperability Standards Update

NIST Interoperability Standards Update NIST Interoperability Standards Update Vahid Madani PG&E (PSTT) Gerry Fitzpatrick - NIST October 5, 2010, Arlington, Virginia 1 The NIST Role Energy Independence and Security Act (EISA) of 2007 Title XIII,

More information

Sensing & Measurement Research Activities through DOE s Grid Modernization Initiative Tom King Sensing & Measurement Technical Area Lead

Sensing & Measurement Research Activities through DOE s Grid Modernization Initiative Tom King Sensing & Measurement Technical Area Lead Sensing & Measurement Research Activities through DOE s Grid Modernization Initiative Tom King Sensing & Measurement Technical Area Lead Oak Ridge National Laboratory i-pcgrid Workshop 2017, San Francisco,

More information

ERCOT Synchrophasor Data Quality Study

ERCOT Synchrophasor Data Quality Study ERCOT Synchrophasor Data Quality Study Bill Blevins, ERCOT Prashant Palayam, EPG David Bogen, ONCOR Carlos J Casablanca, AEP Bill Bojorquez, Sharyland March 11 th 2014 NASPI DATA QUALITY STUDY - OUTLINE

More information

ZL UA Exchange 2013 Archiving Configuration Guide

ZL UA Exchange 2013 Archiving Configuration Guide ZL UA Exchange 2013 Archiving Configuration Guide Version 8.0 January 2014 ZL Technologies, Inc. Copyright 2014 ZL Technologies, Inc.All rights reserved ZL Technologies, Inc. ( ZLTI, formerly known as

More information

Evolution of Control for the Power Grid

Evolution of Control for the Power Grid Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, Washington, USA University of Seville Seville, Spain June 17, 2016 THE INTERCONNECTED GRID Economics Transfer electric

More information

Secure Messaging Buyer s Guide

Secure Messaging Buyer s Guide Entrust, Inc. North America Sales: 1-888-690-2424 entrust@entrust.com EMEA Sales: +44 (0) 118 953 3000 emea.sales@entrust.com December 2008 Copyright 2008 Entrust. All rights reserved. Entrust is a registered

More information

Applications of PTP in non-telecom networks. Anurag Gupta November 1 st -3 rd 2011, ITSF 2011

Applications of PTP in non-telecom networks. Anurag Gupta November 1 st -3 rd 2011, ITSF 2011 Applications of PTP in non-telecom networks Anurag Gupta angupta@juniper.net November 1 st -3 rd 2011, ITSF 2011 Introduction PTP/ 1588 has grown from its initial objective of Synchronization of real-time

More information

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013 Mark W. Maher Chief Executive Officer Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013 Agenda WECC Overview WECC Strategic Planning Initiative Western Interconnection Synchrophasor

More information

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence.

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence. ENERGY MANAGEMENT SYSTEM ABB Ability Network Manager EMS Operational confidence. 2 ABB ABILITY NETWORK MANAGER EMS ABB Ability Network Manager Energy Management System The ever-increasing demand for power

More information

INFORMATION ASSURANCE DIRECTORATE

INFORMATION ASSURANCE DIRECTORATE National Security Agency/Central Security Service INFORMATION ASSURANCE DIRECTORATE Digital Policy Management consists of a set of computer programs used to generate, convert, deconflict, validate, assess

More information

Open. Programmable. Scalable.

Open. Programmable. Scalable. Open. Programmable. Scalable. Accelerating the industry s transition to open, programmable, scalable networks with the industry s most awarded* SD-Access solution, ADTRAN Mosaic. The ADTRAN Mosaic SD-Access

More information

Addressing Challenges Through Interconnection Wide

Addressing Challenges Through Interconnection Wide Addressing Challenges Through Interconnection Wide Transmission Analysis High Plains Regional Transmission Summit November 3, 2009 David A. Whiteley, Whiteley BPS Planning Ventures LLC 2 Challenge and

More information

Exposing vulnerabilities in electric power grids: An experimental approach

Exposing vulnerabilities in electric power grids: An experimental approach Exposing vulnerabilities in electric power grids: An experimental approach International Journal of Critical Infrastructure Protection Luigi Coppolino, S. D Antonio, and L. Romano (Tropea, 24-26 Settembre

More information

Operating Reliability Subcommittee Presentations. February 10-11, 2015

Operating Reliability Subcommittee Presentations. February 10-11, 2015 Operating Reliability Subcommittee Presentations February 10-11, 2015 Presentation 1 ORS February 10, 2015 EInet Transition Efforts All current RC nodes on NERCNet have placed orders for new network EIDSN

More information