1 Mitchell Hall Renovation US Air Force Academy, Colorado Corp. was the prime consultant for this project. The project generally consisted of replacing all of the air handling units, exhaust fans, air curtains, unit heaters, heat exchangers, fluid cooler, pumps, expansion tanks, and air separators. Project also included modifications to the air distribution systems, hydronic piping systems, refrigerant piping systems to the freezers and coolers, and replacement of one of the rack refrigeration units. The mechanical systems replacement consisted of 10 new air handling units, 23 new exhaust fans, two new air curtains, 2 new heat exchangers, 13 pumps, a fluid cooler, and a new 80 ton heat recovery chiller. The air distribution system replacement included installation of new variable air volume boxes with reheat coils and new supply, return, and exhaust air ductwork in several areas. The smaller air handling units consisted of standard modular air handling units. These units were variable air volume and constant volume units with direct evaporative cooling coils, heating hot water coils, economizer cycles, and variable frequency drives. The larger air handling units were custom units with multiple plug fans to allow the units to be assembled in place. These units had direct evaporative cooling coils, hot water heating coils, economizer cycles, and variable frequency drives. One of the units (AHU-3) had an indirect evaporative cooling coil served by a fluid cooler. Control drawings consisting of system schematics, ladder wiring diagrams, I/O summary tables, and a detailed sequence of operation were prepared for each system. The control system was upgraded throughout the entire facility to an Siemens Apogee Building Automation System. The electrical systems upgrades included replacement of the lighting systems in the locker rooms and conference rooms and replacement of electrical distribution panels and motor control centers within the building. The estimated cost of construction for this project is $11,000, Owner: US Air Force Academy Bryant Shea (719)

2 Central Chilled Water Plant Expansion Colorado College Colorado College is currently in the process of expanding their campus facilities to provide additional programs. As a result of this expansion, the campus cooling load is also increasing. At the present time they have a central chilled water plant and several satellite chilled water plants dedicated to specific buildings. While these satellite plants are interconnected with the central plant system, several of the chillers in these plants are nearing the end of their useful life and utilize CFC type refrigerants. Therefore a master planned approach was needed in order to determine the best long term method of meeting future cooling loads while phasing out CFC refrigerants. SEC provided a cooling load analysis of the existing facilities, a hydraulic analysis of the campus chilled water distribution system and master planning for its central chilled water plant. The plant is located in the central part of campus with extremely limited expansion capabilities. In addition the current cooling tower location is a source of frequent complaints from faculty members as it blocks the view of the front range mountains. From a master planning approach however, the most significant factor was the current layout and limited space within the central plant and the difficulty of installing the necessary equipment for future expansion. After much discussion, investigation and analysis, we proposed a bold new concrete cooling tower structure to blend in with the existing facilities on campus. The proposed cooling tower structure was designed to house the condenser water sump, condenser water pumps, and centrifugal separator thereby eliminating the space currently used for them in the central plant. The project provide master planning to increase the central plant capacity to 2,400 tons. The current construction project increased the central plant capacity to 1,400 tons and included installation of one new 900 ton chiller, a three cell 2,400 ton concrete cooling tower, three new condenser water pumps, three new chilled water pumps, a flat plate heat exchanger, a centrifugal separator and a combination air/dirt separator. The chilled water distribution system was converted from a primary pumped system to a primary/secondary pumped system. The design also required relocation of the existing electrical room to properly coordinate new and future equipment space requirements. The capacity of the new cooling tower structure eliminated the need for the existing cooling tower therefore eliminating complaints surrounding its location. Client: Colorado College Mr. Jim Cain Colorado Springs, CO (719) Contractor: RK Mechanical Year Completed: 2007 Construction Cost: $3,500,000.00

3 Colorado Springs Utilities East Service Center Colorado Springs, Colorado The East Service Center consists of approximately 64,000SF of which approximately 34,000SF was originally an elementary school built in 1952 that was remodeled into office space and the remaining 30,000SF is a 2-story addition built in approximately The original building was heated and cooled by 25 constant volume rooftop units while the 2-story addition was served by 2 variable air volume rooftop units. The facility had a higher energy usage that other CSU facilities. The goal of the project was to reduce the energy consumption of the building by 50 percent through a 3-phase renovation. (SEC) was retained to perform an annual energy analysis, prepare a master plan of the renovations required to achieve these goals, and provide construction documents for the first phase of the project. SEC performed extensive field investigation to develop existing as-built floor plans, mechanical plans, and lighting layouts. We then performed an annual energy analysis of the existing building which closely matched the existing utility bills. After development of the existing annual energy analysis we ran several alternate analysis based on alternative mechanical systems, insulation systems, glass types, and lighting systems in order to make recommendations and develop the final scope of the project. These recommendations included the following: Replace the constant volume rooftop mechanical systems with a chilled beam system. Installation of energy recovery units to provide ventilation air to the chilled beams. Install a central water cooled chiller, cooling tower and pumps to replace the air cooled equipment. Upgrade the roof insulation in the original building to R-30. Upgrade the building windows throughout. Upgrade lighting to lower wattage and higher efficiency. The central heating systems had previously been upgraded to high efficiency condensing boilers. The efficiency of the boilers will increased by approximately 7 percent with the use of chilled beams. The new central cooling system consisted of a centrifugal chiller with dual magnetic compressors, a plate and frame heat exchanger for free cooling, a cooling tower, and chilled and condenser water pumps. This system will operate with a chilled water setpoint temperature of 56 F most of the year due to our dry climate and reset to as low as 42 F as the dewpoint temperature rises. The energy recovery units are variable air volume type designed with heating hot water and chilled water coils and a heat recovery wheels. One of the units was equipped with a separate restroom exhaust duct to maximize energy recovery. The supply air to the chilled beams is controlled by VAV boxes to provide demand side ventilation based on occupancy. Hot water and chilled water control valves were also provided in each room for the chilled beams for independent temperature control in each room. Owner: Colorado Springs Utilities Thane LaBarre (719)

4 EDUCATION Bachelors of Science, Architectural University of Wyoming, 1995 PROFESSIONAL REGISTRATION Idaho 9783 Colorado Utah Montana PE Wyoming PE 9818 PROJECT TEAM RESUME L. SCOTT MACKAY, P.E. Mechanical Engineer EMPLOYMENT HISTORY 2012-Present : McKinstry : Incorporated : Wright Engineers : CTA Architects Engineers : CSHQA Architects Engineers : Fanning/Howey Associates, Incorporated ORGANIZATIONS o American Society of Heating, Refrigerating and Air Conditioning Engineers o National Council of Examiners for and Surveying PROFESSIONAL EXPERIENCE SUMMARY Mr. Mackay has 17 years of experience designing mechanical and plumbing systems for commercial, institutional, retail and governmental projects. Specialized design experience includes laboratory HVAC, fume hood and piped utility system design, hospital operating room HVAC design and medical gas system design. Scott has experience using computers and various engineering software packages including equest, Trane Trace and Pipe-Flow. He is also familiar with computeraided drafting and has been instrumental in developing CAD standards at most of his previous employers. KEY PROJECTS o Missile Procedure Training and Operation Facility Minot Air Force Base, North Dakota o USGS Facility Assessment 7 different facilities throughout the United States o HVAC Replacement Capitol Boulevard Mo-Tel, Boise, Idaho o Southwest District Health Facility, Pocatello, Idaho o Taylor Crossing Charter High School, Idaho Falls, Idaho o New Science Laboratory Building Northwest Nazarene University, Nampa, Idaho o Presidential Suite Tenant Improvement to Administration Building Boise State University, Boise, Idaho o McKenna Charter High School, Mountain Home, Idaho o HVAC Replacement Administration Building on campus at Boise State University, Boise, Idaho o New Biomass Boiler Council School District, Council, Idaho

5 EDUCATION Bachelors of Science, Mechanical University of Nebraska, 1984 PROFESSIONAL REGISTRATION Colorado Nebraska E-6517 Utah PROJECT TEAM RESUME THEODORE B. SCHENDT, P.E. Mechanical Engineer EMPLOYMENT HISTORY 1999-Present, Consulting Engineers : Farris, Consulting Engineers : Olsson Associates, Consulting Engineers ORGANIZATIONS o American Society of Mechanical Engineers o American Society of Heating, Refrigerating and Air Conditioning Engineers o American Society of Plumbing Engineers o National Fire Protection Association o National Society of Professional Engineers PROFESSIONAL EXPERIENCE SUMMARY Mr. has over 27 years experience designing mechanical systems for commercial, institutional, industrial and governmental projects. Specialized design experience includes central utility plants and distribution systems, utilities infrastructure, heating ventilating and air conditioning systems, plumbing systems, and control system design. Ted has extensive experience in the use of computers and various software packages including engineering design analysis programs and computer-aided drafting. KEY HVAC PROJECTS o Science Building Classrooms University of Colorado, Colorado Springs, Colorado o Dwire Hall Boiler Replacement University of Colorado, Colorado Springs, Colorado o University Hall RTU Replacement - University of Colorado, Colorado Springs, Colorado o Library Renovation Colorado College, Colorado Springs, Colorado o Campus ADA Compliance - Colorado College, Colorado Springs, Colorado o Boettcher Hall Auditorium Renovation - University of Denver, Denver, Colorado o Boettcher West HVAC Renovation - University of Denver, Denver, Colorado o Ritchie Center Natatorium HVAC Upgrade - University of Denver, Denver, Colorado o Library Heating System Retrofit Trinidad State Junior College, Trinidad, Colorado o Ammonia Chiller & Ice Rink Equipment Replacement Colorado College, Colorado Springs, CO

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant Your Solution For Energy and Cost Savings McQuay Packaged Chiller Plant Innovative Solutions for Your Chiller Plant McQuay packaged chiller plants provide energy efficient chillers integrated with pumps,

More information

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO 6 CASE STUDIES Brevard Community College: Florida Power & Light City of Miami Beach: Johnson Controls, Inc. Cape Canaveral Air Force Station: NORESCO Arbor Shoreline Office Park: Progress Energy Solutions

More information

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire

More information

Comprehensive Energy Management & Utility Master Plan

Comprehensive Energy Management & Utility Master Plan Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach

More information

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is located

More information

Energy Engineering: Tools and Trends

Energy Engineering: Tools and Trends Energy Engineering: Tools and Trends AEE Northeast Ohio Chapter Meeting March 27, 2008 1 Introduction Background and Experience Energy Engineer for Trane 20 years in HVAC Industry Equipment design and

More information

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Driving Proactive Facility Operations with Automated HVAC Diagnostics Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system Fair City Plaza Task: Diagnose problems, recommend improvements for small municipal district cooling system The Fair City Plaza district cooling system provides chilled water to five buildings in a downtown

More information

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D

Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D Energy Efficient Commercial Building Tax Deduction Internal Revenue Code Section 179D May 5-6, 2016 Investment advisory services are offered through CliftonLarsonAllen Wealth Advisors, LLC, an SEC-registered

More information

DEDICATED HEAT RECOVERY UNIT (DHRC)

DEDICATED HEAT RECOVERY UNIT (DHRC) DEDICATED HEAT RECOVERY UNIT (DHRC) AHRI CERTIFICATION Air-Conditioning, Heating, and Refrigeration Institute Multistack is AHRI Certified and continues to certify products as they are developed AHRI Certification

More information

Advanced Rooftop Controller

Advanced Rooftop Controller Advanced Rooftop Controller Preliminary Seventh Power Plan Energy Efficiency Estimates Conservation Resources Advisory Committee Meeting December 17, 2014 Presentation Outline Advanced Rooftop Controller

More information

Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II

Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II Lesson 4: Sections Review of last class (0:20) Section 1: AHU: Discharge air temperature control (0:45) Break (0:10) Section 2: AHU: Heating

More information

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels 10.0 UTILITIES ELEMENT The purpose of this element is to ensure coordinated provision of utility services required to meet the future needs of the University, consistent with current efforts to address

More information

Final Thesis Presentation

Final Thesis Presentation Final Thesis Presentation Spring 2011 Advisor: Dr. Treado Building Overview Existing Conditions System Evaluation Building Overview Existing Conditions System Evaluation Building Overview Existing Conditions

More information

Commercial HVAC and Other Measures for 7P. Outline

Commercial HVAC and Other Measures for 7P. Outline Commercial HVAC and Other Measures for 7P Conservation Resource Advisory Committee January 28, 2014 Outline Commercial HVAC data from CBSA Overview of Commercial HVAC Measures A few other Commercial Measures

More information

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540)

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540) COMPANY RESUME MEIengineering, inc. mechanical electrical industrial consultants 1780 South Main Street, Harrisonburg, VA 22801 (540) 432-6272 www.meiengineeringinc.com 2018 About our Firm Founded in 1989,

More information

CARRIER edesign SUITE NEWS

CARRIER edesign SUITE NEWS Welcome Welcome to the premier issue of EXchange, offering timely, informative and interesting news on the Carrier edesign Suite of Software. Delivered quarterly, each issue will provide a wealth of information

More information

New Wisconsin Energy Code: What it Means for Me?

New Wisconsin Energy Code: What it Means for Me? 2018 Wisconsin Energy Efficiency Expo Hosted by the Wisconsin Association of Energy Engineers New Wisconsin Energy Code: What it Means for Me? May 17, 2018 Shana Scheiber, PE, LEED AP ID+C, WELL AP Building

More information

DEEM MECHANICAL AND ELECTRICAL COMPANY COMMERCIAL AND INDUSTRIAL 24 HOUR EMERGENCY SERVICE : DEEMFIRST.

DEEM MECHANICAL AND ELECTRICAL COMPANY COMMERCIAL AND INDUSTRIAL 24 HOUR EMERGENCY SERVICE : DEEMFIRST. DEEM MECHANICAL AND ELECTRICAL COMPANY COMMERCIAL AND INDUSTRIAL 24 HOUR EMERGENCY SERVICE : 866.288.2990 SERVICEREQUEST@DEEMFIRST.COM DEEMFIRST.COM Experience HIGHLY TRAINED TECHNICIANS, MULTI-TRADE ABILITY,

More information

CenterPoint Energy Retro-Commissioning Program Application

CenterPoint Energy Retro-Commissioning Program Application CenterPoint Energy Retro-Commissioning Program Application CenterPoint Energy Retro-Commissioning Program is offered to Commercial and Industrial customers in our service territory to enhance their facility

More information

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016 STATE DATA CENTER DRAFT PROPOSAL 1 PROJECT TEAM 2 SERA Architects, Inc George Hager Patrick Sullivan PAE Engineers Dave Williams Doug Nachtrieb Michael Yee JMB Consulting Group Jon Bayles MEETING GOALS

More information

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2013-14 through FY 2017-18 Project Funding Type Total ($ 000s) Replacement of Unit Ventilation System

More information

3300 kw, Tier 3, Chilled Water, 70,000 ft 2

3300 kw, Tier 3, Chilled Water, 70,000 ft 2 [Reference Design 22] 3300 kw, Tier 3, Chilled Water, 70,000 ft 2 DESIGN OVERVIEW Data Center IT Capacity 1100 kw per Data Hall 3 Independent Data Halls Design Application Range This design can be applied

More information

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds d Projects and/or 2012 Bluffsview Elementary Interior Painting 100 2012 Bluffsview Elementary Replace High Security Key system 100 2012 Bluffsview Elementary Exterior Tuckpointing and Paint 100 2012 Bluffsview

More information

DUKE UNIVERSITY DESIGN & CONSTRUCTION STANDARDS

DUKE UNIVERSITY DESIGN & CONSTRUCTION STANDARDS 1 25 95 00 Integrated Automation Control Sequences for HVAC GENERAL The HVAC operational sequences in this guideline are commonly used by Duke University. They are being provided as a preferred design

More information

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred.

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred. Location Beeville-Primary; All Campuses Hours 40 hours/week minimum Salary $40,000-$50,000 annual, based on KSAs Job Classification Exempt Security Sensitive Y e s Division Physical Plant Department Physical

More information

Optimiz Chilled January 25, 2013

Optimiz Chilled January 25, 2013 Optimiz zing Existing Data Center Chilled Water Plants January 25, 2013 This White Paper describes factors to be consideredd when optimizing an existing data center chilledd water plant. Authored by Michael

More information

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation Engineered Energy Solutions An Overview Controls, Automation and Energy Conservation Engineered Energy Solutions Independent Control System Integration and Engineering Firm specializing in the energy efficient

More information

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY Pathways to the Future Program As a result of the Board of Trustees Retreat in 1999, the District has been heavily engaged in a long-term

More information

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System A Data Center Heat Removal System That Saves... Infrastructure Power Water up to 40% up to 80% up to 85% Discover Inertech s Award-winning Data Center Heat Removal System A Cool Solution; A Breakthrough

More information

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America 7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

Data Center Energy Savings By the numbers

Data Center Energy Savings By the numbers Data Center Energy Savings By the numbers Chris Kurkjian, PE HP Critical Facility Services provided by EYP Mission Critical Facilities 2008 Hewlett-Packard Development Company, L.P. The information contained

More information

Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get *

Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get * Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get * Trane CenTraVac chillers: Designed and built to be the best; tested to prove it Ongoing innovation. Unmatched capabilities.

More information

Air-Cooled Series R Chiller

Air-Cooled Series R Chiller Air-Cooled Series R Chiller The next generation of Air-Cooled Helical Rotary Chillers ANOTHER RELIABLE SOURCE OF CHILLED WATER FROM TRANE The new industry standard f The next generation of the air-cooled

More information

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Project: Concord Hospital Infrastructure Upgrades Facility Size: 600,000+

More information

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS Cooling > Highly efficient cooling products for any IT application. DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com End-to-End Cooling Solutions from the Closet to the Data

More information

GlobalFoundries Santa Clara, California First generation tenant improvements totaling 140,000 SF on five floors of a new six-story office building. Se

GlobalFoundries Santa Clara, California First generation tenant improvements totaling 140,000 SF on five floors of a new six-story office building. Se Riverside County Law Building Indio, California The three-story, 90,000-square-foot facility provides offices for the district attorney, public defender, county counsel and the Indio branch of the Riverside

More information

Donald B. Snell, P.E. 1 Senior Forensic Consultant HVAC

Donald B. Snell, P.E. 1 Senior Forensic Consultant HVAC Donald B. Snell, P.E. 1 Senior Forensic Consultant HVAC Education B.S., Mechanical Engineering Technology (Minor: Mechanical Power Engineering Technology), Wentworth Institute of Technology (1986) Professional

More information

HVAC Energy Management System

HVAC Energy Management System HVAC Energy Management System Spotlight coordinates the complex tasks required by a building s heating, cooling, fresh air, humidification and lighting systems resulting in increased efficiencies. OVERVIEW

More information

Energy Efficient Large Commercial System Design.

Energy Efficient Large Commercial System Design. Carrier Australia Pty Ltd Level 1, 34-40 Garden Boulevard Dingley, Victoria, 3172 Australia 29-3-17 RE: Carrier Australia Training Course Energy Efficient Large Commercial System Design. Carrier Australia

More information

Case Study: Energy Systems Integration Facility (ESIF)

Case Study: Energy Systems Integration Facility (ESIF) Case Study: Energy Systems Integration Facility (ESIF) at the U.S. Department of Energy s National Renewable Energy Laboratory (NREL) in Golden, Colorado OFFICE HIGH BAY LABORATORIES DATA CENTER 1 Case

More information

Optimizing Laboratory Controls through Fault Detection and Diagnostics Software. Laura Dyas, PE, LEED AP O+M, CEM Bryce Buchanan, PE, CCP, CEM

Optimizing Laboratory Controls through Fault Detection and Diagnostics Software. Laura Dyas, PE, LEED AP O+M, CEM Bryce Buchanan, PE, CCP, CEM Optimizing Laboratory Controls through Fault Detection and Diagnostics Software Laura Dyas, PE, LEED AP O+M, CEM Bryce Buchanan, PE, CCP, CEM Overview What are EIS & FDD Tools? Data Connection Methods

More information

ASHRAE CHAPTER TECHNOLOGY AWARD Illinois Chapter, Region VI

ASHRAE CHAPTER TECHNOLOGY AWARD Illinois Chapter, Region VI CHICAGO GRAND RAPIDS PHILADELPHIA DELHI AHMEDABAD ASHRAE CHAPTER TECHNOLOGY AWARD Illinois Chapter, Region VI Chinatown Branch Chicago Public Library 2100 South Wentworth Avenue Chicago, IL 60616 CHAPTER/REGIONAL

More information

REPORT. Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD. Prepared for:

REPORT. Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD. Prepared for: REPORT Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD Prepared for: San Diego Supercomputer Center 10100 John J Hopkins Drive San Diego, CA 92037 May 11, 2009

More information

Introducing the Heat Wheel to the Data Center

Introducing the Heat Wheel to the Data Center Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure Specialist KyotoCooling International Critical Facilities Round Table 1 A New Free Cooling Technique

More information

GP SERIES Packaged Chillers

GP SERIES Packaged Chillers Blending Conveying Drying Process Cooling Heat Transfer Size Reduction GP SERIES Packaged Chillers Comprehensive Flexible Versatile Compact unitary designs available in a variety of configurations from

More information

Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling

Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling CHILLER PLANT CONTROLS The challenges of producing chilled water are not the same as those a decade

More information

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management Name Doug Demian Title Application Engineer Date November 7 & 8, 2012 Rev 5058-CO900C Copyright 2012 Rockwell

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

ICS COOL ENERGY THE TEMPERATURE CONTROL SPECIALISTS

ICS COOL ENERGY THE TEMPERATURE CONTROL SPECIALISTS ICS COOL ENERGY THE TEMPERATURE CONTROL SPECIALISTS GLOBAL PRESENCE, LOCAL SERVICE WHERE WE MAKE IT WORK WHO WE MAKE IT WORK FOR ACCREDITATIONS i-chiller -10 C to 30 C 1.7 TO 505kW i-chiller COMPACT

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

Liebert Economizer Cooling Solutions Reduce Cooling Costs by up to 50% Without Compromising Reliability

Liebert Economizer Cooling Solutions Reduce Cooling Costs by up to 50% Without Compromising Reliability Precision Cooling for Business-Critical Continuity TM Liebert Economizer Cooling Solutions Reduce Cooling Costs by up to 50% Without Compromising Reliability DATA CENTER SOLUTIONS For More Information:

More information

Samuel Tepp Engineering Seminar Topics

Samuel Tepp Engineering Seminar Topics Samuel Tepp Associates 11 Leonard Street Metuchen, New Jersey 08840 Contact: Keith Miller, Cell: 201-638-6591, kmiller@samtepp.net Samuel Tepp Engineering Seminar Topics All topics are approved for New

More information

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification.

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification. Draft Senior HVAC Mechanic Central District Posting Date: December 14, 2015 Closing Date: December 28, 2015 Salary $18.91/hr to $30.41/hr Internal $18.91/hr to $20.88/hr Overview The Orange County, Florida,

More information

IN-DEPTH UNDERSTANDING OF HVAC EQUIPMENT & SYSTEM SPECIFICATIONS AND PERFORMANCE 11 & 12 JULY 2016 WISMA IEM

IN-DEPTH UNDERSTANDING OF HVAC EQUIPMENT & SYSTEM SPECIFICATIONS AND PERFORMANCE 11 & 12 JULY 2016 WISMA IEM IEM TRAINING CENTRE SDN. BHD. (127273-K) No. 33-1A (1 st Floor), Jalan 52/18, P.O. Box 224 (Jalan Sultan P.O.) 46720 Petaling Jaya, Selangor Darul Ehsan (GST ID No. 001525395456) Telephone No. 03-79586851

More information

Rack cooling solutions for high density racks management, from 10 to 75 kw

Rack cooling solutions for high density racks management, from 10 to 75 kw Rack cooling solutions for high density racks management, from 10 to 75 Superior efficiency, high reliability, low energy consumption Modern data center are characterized by 24/7 operation all year long.

More information

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P.

More information

The Basics of HVAC Operation and the Role of Automation. Mr. Jay Zaino GxP Automation, LLC

The Basics of HVAC Operation and the Role of Automation. Mr. Jay Zaino GxP Automation, LLC Welcome The Basics of HVAC Operation and the Role of Automation Mr. Jay Zaino GxP Automation, LLC Agenda Introduction / Overview HVAC Basics HVAC in Life Science Market Automation s role in it all 1 Introduction

More information

MSYS 4480 AC Systems Winter 2015

MSYS 4480 AC Systems Winter 2015 MSYS 4480 AC Systems Winter 2015 Module 12: DATA CENTERS By Satwinder Singh 14/05/2015 1 Data Centers Data Centers are specialized environments that safeguard your company's most valuable equipment and

More information

JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS. 5 Credit Hours. Prepared by William Kaune November 30, 2010

JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS. 5 Credit Hours. Prepared by William Kaune November 30, 2010 JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS 5 Credit Hours Prepared by William Kaune November 30, 2010 Revised by William Kaune April 25, 2012 Mary Beth Ottinger, Ph.D., Division

More information

TRACE 3D Plus Getting Started - Load Design and Energy and Economics Examples L E T S G O B E YO N D. Trane.com/TRACE3DPlus

TRACE 3D Plus Getting Started - Load Design and Energy and Economics Examples L E T S G O B E YO N D. Trane.com/TRACE3DPlus TRACE 3D Plus Getting Started - Load Design and Energy and Economics Examples L E T S G O B E YO N D. Trane.com/TRACE3DPlus Welcome to TRACE 3D Plus! You have purchased a next generation, comprehensive

More information

Retro-Commissioning Report

Retro-Commissioning Report 10 Retro-Commissioning Report Retro-Commissioning Retro-Commissioning is the process for identifying intrinsic operational and energy related issues in the facilities DDC system and providing a mechanism

More information

ASHRAE elearning Course Catalog

ASHRAE elearning Course Catalog ASHRAE elearning Course Catalog Web-based, On-Demand Training Corporate Discounts Available (see page 2) 5 Great Reasons to Use ASHRAE elearning: Easy Administration: No special software required. Transcripts

More information

38 Years Designing The Americas Green

38 Years Designing The Americas Green 38 Years Designing The Americas Green About Us INGEMEL S.A. is currently celebrating its 38th year of engineering excellence in providing the national and international market with professional engineering

More information

Engineering and Design Services Mechanical HVAC Plumbing Electrical Chemical/Process Structural Instrumentation

Engineering and Design Services Mechanical HVAC Plumbing Electrical Chemical/Process Structural Instrumentation Commissioning Profile + Services About Us Established in 1965, DEDC is a privately owned, full-service multidisciplined engineering and design firm. We offer in-house expertise in mechanical HVAC, electrical,

More information

Cooling Solutions & Considerations for High Performance Computers

Cooling Solutions & Considerations for High Performance Computers Cooling Solutions & Considerations for High Performance Computers White Paper 6 Revision 1 By Rich Whitmore Executive summary The recent advances in high performance computing have driven innovations not

More information

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013 El Camino Community College CAPITAL CONSTRUCTION PROJECTS 2013 FACILITIES MASTER PLAN 2003 SCIENCE COMPLEX The Science Complex Building Project was completed in Spring 2005 for a total cost of $24,211,755.

More information

Chiller Replacement and System Strategy. Colin Berry Account Manager

Chiller Replacement and System Strategy. Colin Berry Account Manager Chiller Replacement and System Strategy Colin Berry Account Manager Current Situation 4 Existing RTAA chillers All units 23 years old Limited service history One unit MUST be replaced immediately One unit

More information

MOLLIER DIAGRAM CAN BE IMPROVED!

MOLLIER DIAGRAM CAN BE IMPROVED! MOLLIER DIAGRAM CAN BE IMPROVED! IMPROVED BASIC COOLING CIRCUIT PERFORMANCE EFFICIENCY USING AN ECONOMISER Eng. Jonny Malachi, VP Operations, Mashav Refrigeration and Air Conditioning Engineering Ltd.

More information

2000 kw, Tier 3, Chilled Water, Prefabricated, sq. ft.

2000 kw, Tier 3, Chilled Water, Prefabricated, sq. ft. [Reference Design 64] 2000 kw, Tier 3, Chilled Water, refabricated, 23700 sq. ft. DESIGN OVERVIEW Data Center IT Capacity 2000 kw Target Availability Tier 3 Annualized E at 100% Load 1.64 in Miami, FL

More information

Built-in features Built-in simplicity Built for fans & pumps

Built-in features Built-in simplicity Built for fans & pumps GE Built-in features Built-in simplicity Built for fans & pumps AF-600 FP Fan & Pump Drives imagination at work Built for variable torque Specifically designed for fan and pump applications, the AF-600

More information

Validation and Uncertainty Characterization for Energy Simulation

Validation and Uncertainty Characterization for Energy Simulation Validation and Uncertainty Characterization for Energy Simulation Multi-Zone HVAC System using ORNL s Flexible Research Platform (FRP) For: ASHRAE SSPC140 June 26, 2016 PM: Joshua New PIs Piljae Im and

More information

Liebert DCW CATALOGUE

Liebert DCW CATALOGUE Liebert DCW CATALOGUE Chilled Water-Based High Density Cooling For The Data Center LIEBERT DCW Flexible Approaches For Energy Efficient Cooling Save up to 70% in cooling energy usage Data center managers

More information

Utility System Infrastructure

Utility System Infrastructure Utility System Infrastructure THE COLLEGE OF 2015 Campus Master Plan WILLIAM & MARY SUPPORTING DOCUMENTATION TABLE OF CONTENTS 3 4 4 4 4 5 Electrical Utility Infrastructure Emergency Power Generators

More information

Dykin Engineering Part & Services Sdn. Bhd.

Dykin Engineering Part & Services Sdn. Bhd. Dykin Engineering Part & Services Sdn. Bhd. CHILLED WATER SOLUTIONS Water chillers to custom air handlers to variable air volume terminal systems. We provide PM (Preventative Maintenance) and FM (Full

More information

where we are, where we could be, how we can get there. 12/14/2011

where we are, where we could be, how we can get there. 12/14/2011 Central Plant Optimization ASHRAE National Capitol Chapter - PES Wednesday, Nov 7, 2011 Dave Klee, LEED AP Director, Optimized Building Solutions Johnson Controls, Inc. 1 1 J o http://www.johnsoncontrols.com/cpo

More information

What s New for Data Centers in Title Jeff Stein, PE Taylor Engineering

What s New for Data Centers in Title Jeff Stein, PE Taylor Engineering What s New for Data Centers in Title 24-2013 Jeff Stein, PE Taylor Engineering SVLG Workshop November 14, 2013 About Jeff Stein Principal, Taylor Engineering 2000 - now Professional Experience Eley Associates,

More information

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net Digi-RTU WHAT IS THE DIGI-RTU The Digi-RTU is a Heating, Ventilation, and Air Conditioning (HVAC) rooftop unit control kit that is both a demand management and energy usage device. It is designed to improve

More information

LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL

LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: 15000 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 10-26-11 - Minor revisions to Data Sheets 04-08-10 - Allowed use

More information

ASHNuN. Fundamentals of HVAC Control Systems. Robert McDowell and Ross Montgomery are the authors of the

ASHNuN. Fundamentals of HVAC Control Systems. Robert McDowell and Ross Montgomery are the authors of the Fundamentals of HVAC Control Systems Robert McDowell and Ross Montgomery are the authors of the 2009 edition of Fundamentals of HVAC Control Systems. This book is a revision of an earlier edition authored

More information

Datacenter Efficiency Trends. Cary Roberts Tellme, a Microsoft Subsidiary

Datacenter Efficiency Trends. Cary Roberts Tellme, a Microsoft Subsidiary Datacenter Efficiency Trends Cary Roberts Tellme, a Microsoft Subsidiary Power Slashing Tools P3 Kill-A-WATT Measures min, max, and instantaneous voltage and current draw Calculates power (watts), kilowatt

More information

Advanced RTU Campaign Taking Action Toward Efficient RTUs Michael Deru February 25, 2014

Advanced RTU Campaign Taking Action Toward Efficient RTUs Michael Deru February 25, 2014 Advanced RTU Campaign Taking Action Toward Efficient RTUs Michael Deru February 25, 2014 RTUs cool over 60% of U.S. commercial building floor area Lots of 10 to 20 year old RTUs installed Why RTU s Are

More information

THE ADVANTAGE MISSION CRITICAL JOKAKE CONSTRUCTION. INSPIRE. BUILD. PARTNER. INSPIRE. BUILD. PARTNER.

THE ADVANTAGE MISSION CRITICAL JOKAKE CONSTRUCTION. INSPIRE. BUILD. PARTNER.  INSPIRE. BUILD. PARTNER. THE ADVANTAGE JOKAKE CONSTRUCTION. INSPIRE. BUILD. PARTNER. INSPIRE. BUILD. PARTNER. MISSION CRITICAL WWW.JOKAKE.COM Everyone works from the Cloud. We work to maintain it. Over the last 31 years Jokake

More information

Energy Management of the Refrigeration Systems at Zurich Airport. Burkhard Bein. Schaffhausen,

Energy Management of the Refrigeration Systems at Zurich Airport. Burkhard Bein. Schaffhausen, Energy Management of the Refrigeration Systems at Zurich Airport Burkhard Bein Schaffhausen, 29.06.18 Overview Content: General Information Refrigeration concept EMS program CS program Three projects for

More information

Orange County Public Schools

Orange County Public Schools Engelwood Elementary School Replacement 100 Percent Design Community Meeting May 16, 2016 1 Meeting Agenda May 16, 2016 Welcome School Board Member Daryl Flynn Introductions Project Update - Architect:

More information

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical

More information

Modernizing Control Systems for Campuses

Modernizing Control Systems for Campuses Modernizing Control Systems for Campuses APPA 2018 Presented by: James Comte, Commissioning and Controls Manager University of California, San Francisco In November 2013, President Janet Napolitano announced

More information

Track 11, Session 4 -- Campus Utility Distribution Systems

Track 11, Session 4 -- Campus Utility Distribution Systems Track 11, Session 4 -- Campus Utility Distribution Systems ESCO Contract Vehicle approaches to implement VA requirements at VISN 21 Steven T. Smith, Senior Director, Engineering Federal Energy Systems

More information

Chillventa Specialist Forums 2018 Chillventa Fachforen 2018

Chillventa Specialist Forums 2018 Chillventa Fachforen 2018 Hall 9 Chillventa Specialist Forums 2018 Chillventa Fachforen 2018 NürnbergMesse, Arbeitstitel, Datum 1 Liquid to liquid Plate Heat Exchangers certification 17 October 2018 Nuremberg Marie-Clémence BRIFFAUD

More information

BSRIA Air Conditioning Worldwide Market Intelligence

BSRIA Air Conditioning Worldwide Market Intelligence 2013 BSRIA Air Conditioning Worldwide Market Intelligence Over 25 years experience researching key markets worldwide market intelligence in 94 Countries integrated technical and market expertise management

More information

Precision Cooling for Business-Critical Continuity. Liebert HPC-S. Designed for the Efficient Cooling of Small Data Centers

Precision Cooling for Business-Critical Continuity. Liebert HPC-S. Designed for the Efficient Cooling of Small Data Centers Precision Cooling for Business-Critical Continuity Liebert HPC-S Designed for the Efficient Cooling of Small Data Centers Liebert HPC-S: Enhanced Efficiency Freecooling Chiller Higher energy costs, limited

More information

Data Center Precision Cooling: The Need For A Higher Level Of Service Expertise. A White Paper from the Experts in Business-Critical Continuity

Data Center Precision Cooling: The Need For A Higher Level Of Service Expertise. A White Paper from the Experts in Business-Critical Continuity Data Center Precision Cooling: The Need For A Higher Level Of Service Expertise A White Paper from the Experts in Business-Critical Continuity Executive Summary Today s data centers are changing rapidly,

More information

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST SYSKA BOSTON provides full-range, high-performance MEP/FP engineering, vertical transportation, sustainable design and commissioning services

More information

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 . Lessons Learned - SMUD s East Campus Operations Center Jim Parks 7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016 Powering forward. Together.

More information

The challenge is that BAS are often very complex with 1000s of data points to review. EMS Optimization Software

The challenge is that BAS are often very complex with 1000s of data points to review. EMS Optimization Software EMS Optimization Software Often immediate energy savings can be achieved with proper set points, sequencing, scheduling and fault detection of the Building Automation System (BAS). The challenge is that

More information

Efficiency of Data Center cooling

Efficiency of Data Center cooling Efficiency of Data Center cooling Comparison of data room layouts and cooling systems Bohumil Cimbal Product manager for Cooling Systems in CONTEG Company Objective Basic questions between investor and

More information

Evaluation of Energy Conservation Measures by Model Simulation

Evaluation of Energy Conservation Measures by Model Simulation Evaluation of Energy Conservation Measures by Model Simulation Tim Giebler. Mingsheng Liu, and David Claridge Energy Systems Laboratory Texas A&M University Abstract Numerous energy conservation measures

More information