Travel Demand Modeling for Planners. Matt Grabau & Mike Davis Urban Transportation Planners
|
|
- Dana Goodwin
- 5 years ago
- Views:
Transcription
1 Travel Demand Modeling for Planners Matt Grabau & Mike Davis Urban Transportation Planners
2 GBNRTC s s Models - 4-Step Regional Model - Activity-based Model - Mesoscopic / Microscopic Model
3 Model Characteristics Regional Model Activity-Based Model Meso/Micro Model Regional-level Analysis Regional & Corridor-level Analysis Corridor & Intersectiondetailed analysis Long Term Forecasting Hour-specific forecasting TAZ network broken down into smaller sub zones Large-scale network, limited detail Not Operation Specific Traditional 4-step modeling Activity Point Locations Microsimulation capabilities Real-time simulation Vehicle movements Dynamic Traffic Assignment
4 Tiered Modeling Process 4-Step Regional Model Activity-Based Model Meso/Micro Model
5 GBNRTC s s Regional Model - 4 step travel demand model - TransCAD - Erie & Niagara Counties - Niagara Peninsula of Ontario, Canada Transportation Analysis Zones (TAZs) - Data Needs - Household Travel Survey - Census - Traffic counts - Transit Data - Truck Data
6 GBNRTC s s Regional Model TransCAD Network
7 GBNRTC s s Regional Model - TAZ Network Zones
8 GBNRTC s s Regional Model Transit Network (NFTA)
9 Useful Outputs from TDM - VMT/VHT - Traffic Volumes (Peak Period/Peak Hour/ADT) - Select Link Analysis - Shortest Path Analysis - Change in volumes by scenario or year - Use for Air Quality Conformity Analysis
10 Useful Outputs from TDM VMT & VHT Extracted from Model
11 Useful Outputs from TDM Modeled Link Volumes
12 Useful Outputs from TDM
13 Useful Outputs from TDM
14 Useful Outputs from TDM
15 Useful Outputs from TDM UB 2020 Master Plan
16 Useful Outputs from TDM UB 2020 Master Plan
17 Useful Outputs from TDM UB 2020 Master Plan
18 Useful Outputs from TDM Impact on network due to UB s investment in region Depicting increase in ADT
19 Useful Outputs from TDM Impact to ADT due to UB s investment in region Area ideal for Meso Network, further network refinements and microsimulation
20 GBNRTC s s Activity Model - TRANSIMS software (Los Alamos, Argon, FHWA) - Buffalo-Niagara Pilot Study (Volpe, FHWA) - Erie & Niagara Counties - Niagara Peninsula of Ontario, Canada - 18,136 activity locations - Sub-area analysis capabilities - Microsimulator - Data Needs - Same as 4-step + - Sensitive to time-of-day traffic counts - Street-level detail (signals, lane configuration, driveways, etc.)
21 Activity Locations Loading trips on to network: TDM vs. Activity Model Node Centroid Centroid Connector Links Travel Demand Model Network Activity Model Network Activity Location Driveway
22 Useful Outputs from Activity Model - Buffalo-Niagara TRANSIMS Pilot Study - Queues at bridges - Toll barriers / Border crossings - Can it be modeled/visualized?
23 Activity Model Simulation - Queuing at Lewiston/Queenston Bridge L/Q Bridge Queuing of cars/trucks U.S. Customs Plaza
24 GBNRTC s s Meso/Micro Model
25 GBNRTC s s Meso/Micro Model Portion of network extracted from TDM for Mesoscopic Network
26
27 Scajaquada Project Study Area TransModeler
28 Scajaquada Microsimulation Project
29 Outer Harbor Project Study Area TransModeler
30 Outer Harbor Microsimulation Project SIMULATION
31 Individual Intersection Analysis
32 Origins & Destinations within Microsimulation Limits
33 3D Simulation Projects 3D
34 Things to Remember Know what you want to do What do you want to test? How is your project defined? Understand what your output will be Traditional output LOS is not always apparent in advanced simulation networks Demographics drives traffic Double check your forecasts Quality traffic data is essential! Understand future networks how/why are they different? TIP vs. LRP? May need to develop new scenarios Always document your assumptions Everyone needs to be on board with your assumptions
35 Comments? Questions? Matt Grabau Urban Transportation Planner x.323 Mike Davis Urban Transportation Planner x.313 Greater Buffalo Niagara Regional Transportation Council 438 Main St, Suite 503 Buffalo, NY 14202
MESO & HYBRID MODELING IN
MESO & HYBRID MODELING IN www.ptvgroup.com JONGSUN WON, P.E. www.ptvgroup.com I Slide 1 SOMETHING NEW WITH PTV NORTH AMERICA Portland, OR Arlington, VA www.ptvgroup.com I Slide 2 MULTIRESOLUTION MODELING
More informationIoannis Psarros Department of Civil Engineering and Intermodal Freight Transportation Institute, Memphis, TN
Ioannis Psarros Department of Civil Engineering and Intermodal Freight Transportation Institute, Memphis, TN CIVL 7904/8904: Traffic Flow Theory (Spring 2014) April 5, 2014 Transportation Research Increased
More informationSHRP2 C10: Jacksonville
SHRP2 C10: Jacksonville Partnership to Develop an Integrated Advanced Travel Demand Model and a Fine grained Timesensitive Network Presented by: Stephen Lawe Key Agency Partners: Florida Department of
More informationAn Integrated Model for Planning and Traffic Engineering
Ninth TRB Planning Methods Applications Conference Baton Rouge, Louisiana, April 2003 An Integrated Model for Planning and Traffic Engineering Wolfgang Scherr, Innovative Transportation Concepts, Inc.,
More informationAdd analysis of operations and traffic simulation modeling to the set of
D l t and d Development Application of a Traffic Simulation and dd Dynamic y i Traffic Assignment Model Framework f Centrall Phoenix h i for Purpose Add analysis of operations and traffic simulation modeling
More informationUniversity of Nevada, Reno. Linking Travel Demand Modeling with Micro-Simulation
University of Nevada, Reno Linking Travel Demand Modeling with Micro-Simulation A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science in Civil and Environmental
More informationData Collection and Uses at International Border Crossings
Data Collection and Uses at International Border Crossings Webinar - July 26, 2016 AUDIO MUTED E N T - PLEASE E R USE CHAT P BOX R FOR I S QUESTIONS E 1 Agenda Welcome ENTERPRISE Program and Project Overview
More informationTravel Demand Modeling and Project Coding Procedures
Travel Demand Modeling and Project Coding Procedures Revised July 2008 As described in the Final Transportation Conformity Rule (section 93.122), travel demand models used to generate emission estimates
More informationThe NITTEC-SUNY Buffalo Data Warehousing Project
The NITTEC-SUNY Buffalo Data Warehousing Project Adel W. Sadek, Ph.D. Associate Professor, CSEE Tom George NITTEC Director (formerly) & Director of Surface Transportation, NFTA Athena Hutchins NITTEC ITS-NY
More informationAgenda Overview. Process Update Overview of Revised Goals Transportation Trends Small Group Breakout Questions and Comments Next Steps Meeting Close
Agenda Overview Process Update Overview of Revised Goals Transportation Trends Small Group Breakout Questions and Comments Next Steps Meeting Close 2 1. Welcome and Meeting Overview 1. Process Update 3
More informationAn Analysis of TDM Impacts on a Corridor Segment
An Analysis of TDM Impacts on a Corridor Segment Phil Winters, CUTR TDM Program Director Liren Zhou, Graduate Research Assistant Sachin Rai, ITS Research Associate Nevine Georggi, TDM Research Associate
More informationThe need to combine different traffic modelling levels for effectively tackling large-scale projects adding a hybrid meso/micro approach
Available online at www.sciencedirect.com Procedia Social and Behavioral Sciences 20 (2011) 251 262 14 th EWGT & 26 th MEC & 1 st RH The need to combine different traffic modelling levels for effectively
More informationOPTIONS FOR INTEGRATION INTO THE PLANNING PROCESS
0-6657-P1 GUIDEBOOK ON DTA DATA NEEDS AND INTERFACE OPTIONS FOR INTEGRATION INTO THE PLANNING PROCESS Jennifer Duthie, PhD Natalia Ruiz Juri, PhD Christopher L. Melson C. Matt Pool Steve Boyles, PhD TxDOT
More informationCIE4801 Transportation and spatial modelling Beyond the 4-step model
CIE4801 Transportation and spatial modelling Beyond the 4-step model Erik de Romph, Transport & Planning 31-08-18 Delft University of Technology Challenge the future Multi disciplinary 2 Contents Input
More informationBus Circulator Feasibility Study Scope of Work March 12, 2018
The City of Hyattsville Comprehensive Transportation and Infrastructure Study Bus Circulator Feasibility Study Scope of Work March 12, 2018 Project Approach At the request of the City of Hyattsville, Toole
More informationAn Analysis of TDM Impacts on a Corridor Segment Research Findings
An Analysis of TDM Impacts on a Corridor Segment Research Findings Phil Winters, CUTR TDM Program Director Liren Zhou, Graduate Research Assistant Sachin Rai, ITS Research Associate Nevine Georggi, TDM
More informationAn Android Smartphone Application for Collecting, Sharing and Predicting the Niagara Frontier Border Crossings Waiting Time
An Android Smartphone Application for Collecting, Sharing and Predicting the Niagara Frontier Border Crossings Waiting Time Lei Lin 1, Qian Wang 1, Adel W. Sadek 1, Yan Li 2 1 Civil, Structural and Environmental
More informationPERFORMANCE EVALUATION OF MOHAKHALI FLYOVER BY USING VISSIM SIMULATION SOFTWARE
PERFORMANCE EVALUATION OF MOHAKHALI FLYOVER BY USING VISSIM SIMULATION SOFTWARE M. S. Mamun *, S. Mohammad, M. A. Haque & M. Y. A. Riyad Department of Civil Engineering, Ahsanullah University of Science
More informationAPPLYING THE TRANSIMS MODELING PARADIGM TO THE SIMULATION AND ANALYSIS OF TRANSPORTATION AND TRAFFIC CONTROL SYSTEMS
APPLYING THE TRANSIMS MODELING PARADIGM TO THE SIMULATION AND ANALYSIS OF TRANSPORTATION AND TRAFFIC CONTROL SYSTEMS Final Report KLK231 N07-05 National Institute for Advanced Transportation Technology
More informationData Hub and Data Bus for Improving the
Data Hub and Data Bus for Improving the Effectiveness of Integrated Modeling Applications Xuesong Zhou (Arizona State University), xzhou74@asu.edu -Pronounced as Su-song Joe Acronym for extending traffic
More informationTransportation Network Development and Algorithm
Chapter 5 Transportation Network Development and Algorithm Key words: network development, network properties, shortest path algorithms. 5.1 Transportation Networks In order to predict how the demand for
More informationAn Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model
An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model The Congestion Management Process Federal Regulations state that all metropolitan planning organizations must carry
More informationA New Framework for Development of Time Varying OD Matrices Based on Cellular Phone Data
A New Framework for Development of Time Varying OD Matrices Based on Cellular Phone Data Corresponding Author: Jingtao Ma, Mygistics Inc. 9755 SW Barnes Rd Suite 550 Portland, OR 97225 Phone +01-503-575-2191,
More informationENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS
ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1 STUDY
More informationAPPENDIX G. VMT Spreadsheet Tool. FINAL REPORT Improved Data & Tools for Integrated Land Use-Transportation Planning in California TOPICS:
FINAL REPORT Improved Data & Tools for Integrated Land Use-Transportation Planning in California APPENDIX G VMT Spreadsheet Tool TOPICS: 1. Overview of Tool 2. Code Documentation 3. User Guide 4. Validation
More informationTRAFFIC SIMULATION USING MULTI-CORE COMPUTERS. CMPE-655 Adelia Wong, Computer Engineering Dept Balaji Salunkhe, Electrical Engineering Dept
TRAFFIC SIMULATION USING MULTI-CORE COMPUTERS CMPE-655 Adelia Wong, Computer Engineering Dept Balaji Salunkhe, Electrical Engineering Dept TABLE OF CONTENTS Introduction Distributed Urban Traffic Simulator
More informationCITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES
CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic
More informationINTRODUCTION TO CUBE
INTRODUCTION TO CUBE 1 WELCOME TO CUBE... 2 1.1 OVERVIEW... 2 1.2 THE ARCHITECTURE OF CUBE... 3 1.3 THE CUBE USER ENVIRONMENT... 5 1.4 INTEGRATION WITH ARCGIS... 7 1.5 INTEGRATION OF THE CUBE EXTENSIONS...
More informationSH 288 Express Lanes Stated Preference Survey Report. Appendix A: Survey Questionnaire
SH 288 Express Lanes Stated Preference Survey Report Appendix A: Survey Questionnaire DATA ANALYSIS SOLUTIONS TABLE OF CONTENTS 1.0 INSTRUCTIONS... 1 2.0 SCREENER AND TRIP CHARACTERISTIC QUESTIONS... 2
More informationG. Computation of Travel Time Metrics DRAFT
SHRP 2 Project L03 G. Computation of Travel Time Metrics Introduction The key principles for constructing reliability metrics for use in Project L03 is that the metrics must be based on the measurement
More informationTrip Assignment models in TransCAD. Murtaza Haider Tel: , ext. 2480
Trip Assignment models in TransCAD Murtaza Haider murtaza.haider@ryerson.ca Tel: 416.979.5000, ext. 2480 Trip Assignment Procedures Goal: understand how to use TransCAD to: Generate inputs for trip assignment
More informationINDOT Air Quality Post- Processor Training Webinar. December 12, 2011
INDOT Air Quality Post- Processor Training Webinar December 12, 2011 Agenda Project History and Background Post Processor Development Methodology Directory Structure Input Files Live Demonstration Questions
More informationUsing GPS Based Origin-Destination Data to Improve Traffic Studies. Michael R. Wahlstedt, PE, PTOE OTEC October 11, 2017
Using GPS Based Origin-Destination Data to Improve Traffic Studies Michael R. Wahlstedt, PE, PTOE OTEC October 11, 2017 Overview Benefits of using O-D data for traffic analysis, particularly for operational
More informationMulti-Modal Inter-Regional Travel Demand Estimation
90 th TRB Annual Meeting, Jan 25 th, 2011, Washington, DC Multi-Modal Inter-Regional Travel Demand Estimation A Review of National-Level Passenger Travel Analysis Methodologies and Their Implications on
More informationAppendix-A: Usage of EventFilter Utility Program
The present the usage of the utility programs developed for the purpose of the subarea focusing study in TRANSIMS. The running method of the program in a command line is shown first, followed by the explanation
More informationFrom Integrated Corridor Management To Integrated Regional Mobility
From Integrated Corridor Management To Integrated Regional Mobility Agenda Regional Mobility Dallas ICM Operational Needs Expansion and Enhancements Transit Improvements MPO s Leadership Future Direction
More informationBellevue s Traffic Adaptive Signals
What we ll cover Bellevue s Traffic Adaptive Signals SCATS Phase 1 Implementation SCATS Operations Responsiveness New Features Some Initial Results 2011 Program and Beyond Final Thoughts ITE Quad Mtg April
More informationManaging DC Work Zones via a Citywide Transportation Management Plan. ITE Mid-Colonial District Annual Meeting May 20, 2014
Managing DC Work Zones via a Citywide Transportation Management Plan ITE Mid-Colonial District Annual Meeting May 20, 2014 Presentation Outline The Team The Challenge The Approach Project Diagram Work
More informationDevelopment of the Next Generation Metro-Wide Simulation Models for the Twin Cities Metropolitan Area: Mesoscopic Modeling
Development of the Next Generation Metro-Wide Simulation Models for the Twin Cities Metropolitan Area: Mesoscopic Modeling Final Report Prepared by: Henry X. Liu Adam Danczyk Xiaozheng He Department of
More informationCreating transportation system intelligence using PeMS. Pravin Varaiya PeMS Development Group
Creating transportation system intelligence using PeMS Pravin Varaiya PeMS Development Group Summary Conclusion System overview Routine reports: Congestion monitoring, LOS Finding bottlenecks Max flow
More informationDevelopment of Next Generation Simulation Models for the Twin Cities Freeway Metro-Wide Simulation Model Phase 1
Development of Next Generation Simulation Models for the Twin Cities Freeway Metro-Wide Simulation Model Phase 1 Final Report Prepared by: John Hourdos Minnesota Traffic Observatory Department of Civil
More informationAPPENDIX E TRANSPORTATION
APPENDIX E TRANSPORTATION 2011 PATRON SURVEYS VISSIM MODEL CALIBRATION AND VALIDATION Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax:
More informationDiscover Cube 6.4 Tutorial
Discover Cube 6.4 Tutorial Copyright 2007 2016 Citilabs, Inc. All rights reserved. Citilabs is a registered trademark of Citilabs, Inc. All other brand names and product names used in this book are trademarks,
More informationThe Freeway Performance Measurement System (PeMS) (PeMS Version 3)
The Freeway Performance Measurement System (PeMS) (PeMS Version 3) Table of Contents Background Capabilities Your Feedback Appendix 1 Background What is PeMS? The Freeway Performance Measurement System
More informationOR 217,I-5 Experience Portland, OR
OR 217,I-5 Experience Portland, OR By: Abby Caringula Parsons Brinckerhoff July 8th, 2011 Presentation Outline Background VISUM Network Adjustment Model Origin-Destination(O-D) Demand Development ANM Export
More information2045 DEMOGRAPHIC FORECAST SURFACE TRANSPORTATION TECHNICAL COMMITTEE APRIL 28, 2017
2045 DEMOGRAPHIC FORECAST SURFACE TRANSPORTATION TECHNICAL COMMITTEE APRIL 28, 2017 BACKGROUND The demographic forecasts provide a common base for regional planning and resource allocations. The forecasts
More informationNorth Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009
North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10, 2009 1 Welcome & Introductions 2 3 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor
More informationFinal Model Users Guide
32 } þ 99 } þ 70 } þ Paradise Chico 32 } þ 1 } þ91 1 } þ49 Oroville 1 } þ62 1 } þ62 1 } þ62 99 } þ Biggs Gridley 70 } þ BCAG Travel Demand Forecasting Final Model Users Guide Prepared For: Prepared By:
More informationTwo scenarios are presented to illustrate updating the future year 2040 network. They are:
Appendix C: Practice Scenarios Two scenarios are presented to illustrate updating the future year 2040 network. They are: 1) Roadway attribute change 2) Geographic layout change First, some background
More informationConnecting a Mobile York Region
Connecting a Mobile York Region Presentation to ITS Canada Victoria 2014 Gregg Loane, P.Eng. June 1, 2014 Connecting a Mobile York Region Overview Who is York Region? York s ITS Program Background Data
More informationXXE Version 2.0. Users Guide 11/23/2009. by Fred L. Mannering (Purdue University) Scott S. Washburn (University of Florida) and
XXE Version 2.0 Users Guide 11/23/2009 by Fred L. Mannering (Purdue University) and Scott S. Washburn (University of Florida) After starting the program, you will be presented with the splash screen, as
More informationKing County Ombudsman Whistle-Blowers Office Complaint
King County Ombudsman Whistle-Blowers Office Complaint Filed by: Ho-Chuan Chen, Ph.D., P.E., Supervisor, Travel Forecasting and Data Management Group (TFDM) Hossein Barahimi, Transportation Planner III,
More informationDATE: September 2014 Project Sponsors Rachel Schuett and Transportation Team Transportation Demand Management (TDM) Data Collection
DATE: September 2014 TO: FROM: RE: Project Sponsors Rachel Schuett and Transportation Team Transportation Demand Management (TDM) Data Collection The San Francisco Planning Department and the San Francisco
More informationHonorable Mayor and Members of the City Council. Memorandum of Understanding: Interstate 80 Integrated Corridor Mobility (I-80 ICM) Project
Office of the City Manager CONSENT CALENDAR May 1, 2012 To: From: Honorable Mayor and Members of the City Council Christine Daniel, Interim City Manager Submitted by: Andrew Clough, Director, Public Works
More informationReal-time Adaptive Control System. Technical White Paper. September 2012 Trafficware SynchroGreen Technical White Paper
SynchroGreen SynchroGreen Real-time Adaptive Control System Technical White Paper Trafficware 522 Gillingham Sugar Land, Texas 77478 (281) 240-7233 sales@trafficware.com www.trafficware.com www.synchrogreen.com
More informationUnderstanding the Potential for Video Analytics to Support Traffic Management Functions
Understanding the Potential for Video Analytics to Support Traffic Management Functions Project Summary Slides November 2014 ENTERPRISE Program Program Goals Facilitate rapid progress in the development
More informationSouth Central ROP Projects
Pennsylvania Department of Transportation ROP Overview and Summary South Central ROP Projects November 2007 77 INCIDENT MANAGEMENT (IM) Draft Version 1 July 2007-40 - IM 1: SOUTH CENTRAL PA ITS DEPLOYMENT
More informationYour Presenters Today:
Your Presenters Today: Traffic Operations Statewide Planning Environmental Resources Civil Rights & Affirmative Action Multimodal Services Capital Program Support Bridge Engineering & Infrastructure Management
More informationChattanooga Cell Phone External O-D Matrix Development
Chattanooga Cell Phone External O-D Matrix Development Process and Findings Presented to Tennessee Model Users Group (TNMUG) November 10, 2011 1 Background Chattanooga RPA/CHCNGA TPO wanted to update their
More informationCalipatria Solar Farm TIA
Calipatria Solar Farm TIA Prepared for: 7SM 8ME, LLC 71SM 8ME, LLC c/o 8minutenergy Renewables LLC Prepared by: Fehr & Peers March 25, 211 IE1-37 TABLE OF CONTENTS Executive Summary... i Project Trip Estimates...
More informationEl Dorado County Travel Demand Model 2012 Update. October 14, FINAL User s Manual. Prepared for: El Dorado County.
El Dorado County Travel Demand Model 2012 Update October 14, 2013 FINAL User s Manual Prepared for: El Dorado County Prepared by: Copyright 2013, Kimley Horn and Associates, Inc. TABLE OF CONTENTS 1. USER
More informationLooking Ahead. A Context for the Next Twenty Year Needs Assessment. July 2013
Looking Ahead A Context for the Next Twenty Year Needs Assessment July 2013 A Larger Context for Twenty Year Needs Growing transit demand and complexity of travel paths and times Growing economy changing
More informationData Storage and Dissemination Outline
Data Storage and Dissemination Outline Past/Existing data management overview Future data management: Goals Broad description of proposed solution Key details of proposed solutions Challenges and lessons
More informationGuidelines for Traffic Counting. May 2013
Guidelines for Traffic Counting May 2013 Guidelines for Traffic Counting Matthew Rodwell Hastings District Council Abbreviations ADT AADT HCV HPMV NZTA RAMM RCA TMS VKT Average Daily Traffic Annual Average
More informationApplying Analysis Tools in Planning for Operations
Applying Analysis Tools in Planning for Operations Case Study #2 Incorporating Highway Capacity Manual Procedures into Long-Range Transportation Planning Notice This document is disseminated under the
More informationTravel Time on the Highway 7 Corridor YORK REGION. Robert Bruce President TPA North America Inc.
Travel Time on the Highway 7 Corridor YORK REGION Robert Bruce President TPA North America Inc. Presentation Overview Introduction to vivanext project Project Description Bluetooth Traffic Monitoring Overview
More informationWorkshop on Traffic Assignment with Equilibrium Methods
Workshop on Traffic Assignment with Equilibrium Methods Presented by: David Boyce and Michael Florian Northwestern University and University of Montreal Sponsored by: Subcommittee on Network Equilibrium
More informationCORSIM User's Guide. Version 6.0
CORSIM User's Guide Version 6.0 Prepared by: ITT Industries, Inc., Systems Division ATMS R&D and Systems Engineering Program Team P O Box 15012 Colorado Springs, CO 80935-5012 Prepared for: FHWA Office
More informationActivity-Based Human Mobility Patterns Inferred from Mobile Phone Data: A Case Study of Singapore
Activity-Based Human Mobility Patterns Inferred from Mobile Phone Data: A Case Study of Singapore By: Shan Jiang, Joseph Ferreira, Jr., and Marta C. Gonzalez Published in: 2017 Presented by: Masijia Qiu
More informationTransportation Demand Management: The Mississauga Experience Lorenzo Mele TDM Coordinator
Transportation Demand Management: The Mississauga Experience Lorenzo Mele TDM Coordinator Transportation Resources TDM Primer Mississauga Experience What if we considered empty transit seats a perishable
More informationA New Implementation of WISE. Howard Slavin Jim Lam Srini Sundaram Rama Balakrishna Paul Ricotta Andres Rabinowicz Caliper Corporation
A New Implementation of WISE Howard Slavin Jim Lam Srini Sundaram Rama Balakrishna Paul Ricotta Andres Rabinowicz Caliper Corporation What is our other WISE? Reformulation of concepts and methods faithful
More informationManaged Lane owner decision needed San Mateo County s options Understanding revenues & costs Pros & cons of County s options Proposed next steps
San Mateo County Transportation Authority Meeting August 2, 2018 1 OVERVIEW Managed Lane owner decision needed San Mateo County s options Understanding revenues & costs Pros & cons of County s options
More informationTRANSPORT PLANNING AND
Tutorial TRANSPORT PLANNING AND MODELING Using TFTP (Teacher Friendly Transportation Program) WHAT IS MODEL? Ortusar and Willumsen, 1994, A simplified representation of a part of the real world the system
More informationM50 Demand Management Study
Study Briefing paper to the Strategic Policy Committees (Transport) of : Dun Laoghaire Rathdown County Council, Dublin City Council Fingal County Council South Dublin Co Council 5 th June 2013 December
More informationUsing Empirical (real-world) Transportation Data to Extend Travel Demand Model Capabilities
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 10-4-2013 Using Empirical (real-world) Transportation Data to Extend Travel Demand Model
More informationModifying TRANSIMS (Transportation Analysis and Simulation) to Include Dynamic Value Pricing and Departure Time Choice
Modifying TRANSIMS (Transportation Analysis and Simulation) to Include Dynamic Value Pricing and Departure Time Choice Kwang-Sub Lee Dissertation submitted to the Faculty of Virginia Polytechnic Institute
More informationEngaging Maryland toward CAV advancements Christine Nizer, Administrator
Engaging Maryland toward CAV advancements Christine Nizer, Administrator Maryland Department of Transportation Motor Vehicle Administration Maryland CAV activities Overall goal: Maryland is open for business
More informationTRansportation ANalysis SIMulation System
Volume Five Software 31 August 2004 1 TRANSIMS: TRansportation ANalysis SIMulation System Version: TRANSIMS-LANL 3.1 VOLUME FIVE SOFTWARE: INTERFACE FUNCTIONS AND DATA STRUCTURES 31 August 2004 LA-UR-00-1755
More informationBLUETOOTH TRAFFIC MONITORING. June 13 th, Robert Bruce TPA North America Inc.
BLUETOOTH TRAFFIC MONITORING June 13 th, 2013 Robert Bruce TPA North America Inc. www.tpa-na.com Corporate Overview Robert Bruce founder of TPA North America Inc. (Traffic and Parking Automation), ITS
More informationRutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual. New Jersey Highway Authority. Garden State Parkway
Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual Prepared for Garden State Parkway New Jersey Highway Authority April 2007 Developed by: Rutgers University Intelligent
More informationVersion 9 User Guide for. Developed for Omnitracs
Version 9 User Guide for Developed for Omnitracs Table of Contents Welcome to CoPilot Truck 4 Driving Screen 4 Driving Menu 5 GO TO MENU: Single Destination Navigation 6 Address 6 My Places 7 Points of
More informationUsing GPS-enabled Cell Phones to Improve Multimodal Planning and Facilitate Travel Behavior Change
Using GPS-enabled Cell Phones to Improve Multimodal Planning and Facilitate Travel Behavior Change Center for Urban Transportation Research (CUTR) Computer Science & Engineering (CSE) Overview Background
More informationTraffic Impact Study for the Girard Winery Project
October 16, 2014 Ms. Heather McCollister 1512 D Street Napa, CA 94559 Traffic Impact Study for the Girard Winery Project Dear Ms. McCollister; Whitlock & Weinberger Transportation, Inc. (W-Trans) has completed
More information2014 REPORT. Distracted Driving. on I-95 in Northern Virginia
2014 REPORT Distracted Driving on I-95 in Northern Virginia Distracted Driving on Interstate 95 The National Safety Council estimates that as of May 6, 2014 there have already been 354,913+ crashes this
More informationSIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT
SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT Principal Investigator Tom Maze Principal Contributor Ali Kamyab Sponsored by the Engineering
More informationDeployment of ITS Projects in Pasadena A Local Agency Perspective
Deployment of ITS Projects in Pasadena A Local Agency Perspective ITS California Annual Meeting October 2, 2013 Norman Baculinao, PE Pasadena and the Region Source: Census Transportation Planning Package,
More informationNCTCOG MTP Policy Bundle Application for TXDOT
MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.
More informationLos Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework
Los Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework Anita Vandervalk-Ostrander Iteris, Inc. Santa Ana, California, USA Steven Gota, Deputy Executive
More information"In the Moment" Travel Study A GPS Smartphone Application Planning Applications Conference Atlantic City, New Jersey
"In the Moment" Travel Study A GPS Smartphone Application 2015 Planning Applications Conference Atlantic City, New Jersey Background What is rmove? A GPS-enabled smartphone application, written for ios
More informationI-35 FROM THE RED RIVER TO THE RIO GRANDE
I-35 FROM THE RED RIVER TO THE RIO GRANDE Commission Workshop Oct. 24, 2018 The Story of Congestion Relief Task Force made up of senior leaders of TxDOT challenged with developing a strategic plan to address
More informationWelcome! Presented by Paul Pearson National Corvette Museum, August 28, 2014
Welcome! Presented by Paul Pearson National Corvette Museum, August 28, 2014 Linking IP to Driver Mode Selector If your car IP gauges don t change when you turn the driver mode selector, you just need
More informationNJ Transit - Transit Signal Priority Intersection Evaluation Methodology A sketch planning approach to TSP prioritization
NJ Transit - Transit Signal Priority Intersection Evaluation Methodology A sketch planning approach to TSP prioritization presented to NJDOT Research Showcase presented by Jennifer Strasser Cambridge Systematics,
More informationU.S. System Summary: OHIO HUB
U.S. System Summary: OHIO HUB Ohio Hub High-Speed Rail System (Source: Ohio Hub Study, 2007) The Ohio Hub high-speed rail system is a system of proposed routes containing 864 miles in four segments with
More informationAcyclica Congestion Management. By Sarah King Regional Sales Manager Control Technologies
Acyclica Congestion Management By Sarah King Regional Sales Manager Control Technologies Overview 1. Goals 2. Data Collection 3. Measuring Congestion 4. Travel Time 5. Intersection Delay 6. Origin/Destination
More informationTransportation Impact Assessment Monitoring Report (TIAMR) Tool. User Manual
Transportation Impact Assessment Monitoring Report (TIAMR) Tool User Manual Table of Contents Introduction... 3 Compliance Requirements... 4 How to Use the Tool... 5 Tool Overview... 5 Using the Reporting
More informationWhat is Network Analyst?
What is Network Analyst? Extension for analyzing transportation networks Four network solvers Route Closest Facility Service Area Uses Network Datasets Origin-Destination (OD) Cost Matrix Specialized layers
More informationMicroscopic Traffic Simulation Model Calibration & Validation
Tutorial: Microscopic Traffic Simulation Model Calibration & Validation June 27, 2006 Instructors: Byungkyu (Brian) Park, Ph.D. Jongsun Won AGENDA Time 9:30 ~ 10:00 10:10 ~ 11:45 11:45 ~ 1:00 1:00 ~ 2:20
More informationDefining and Measuring Urban Conges on
Primer on Defining and Measuring Urban Conges on Introduc on Traffic congestion has become a major challenge in most urban areas. In recent years, the development of measures to mitigate traffic congestion
More informationValidation of Simulation Models Using Vehicle Trajectories. TRB Annual Meeting January 11, 2015
Validation of Simulation Models Using Vehicle Trajectories TRB Annual Meeting January 11, 2015 1 Overview Project Objectives and the Project Team State of Practice for Aggregate Calibration Trajectory
More informationIntelligent Transportation Systems (ITS)
Intelligent Transportation Systems (ITS) Systems Engineering (SE) Requirement Intelligent Transportation Systems (ITS) means electronics, communications, or information processing used singly or in combination