RELIABILITY OF THE BULK POWER SYSTEM

Similar documents
History of NERC January 2018

History of NERC August 2013

History of NERC December 2012

RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO

NERC Overview and Compliance Update

Electric Transmission Reliability

NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018

MRO s Regulatory Philosophy

Grid Security & NERC

NERC History, Mission and Current Issues Southern States Energy Board. October 16, 2011

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Grid Security & NERC. Council of State Governments. Janet Sena, Senior Vice President, Policy and External Affairs September 22, 2016

Standard CIP Cyber Security Critical Cyber As s et Identification

Essential Reliability Services NERC Staff Report

Standard CIP Cyber Security Critical Cyber As s et Identification

BPA and NERC, WECC, ERO

Blackout 2003 Reliability Recommendations

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program

Comments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference

NERC Management Response to the Questions of the NERC Board of Trustees on Reliability Standard COM September 6, 2013

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document

Physical Security Reliability Standard Implementation

Cyber Attacks on Energy Infrastructure Continue

SPP RTO Compliance Forum Western Area Power Administration March 11, 2015

Standards Authorization Request Form

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013

Introduction to the NYISO

2017 MRO Performance Areas and an Update on Inherent Risk Assessments

Standards Authorization Request Form

Standards Authorization Request Justification

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Compliance Enforcement Initiative

Québec Interconnection Approach to BES

MAINE STATE LEGISLATURE

NERC Request for Data or Information: Protection System Misoperation Data Collection August 14, 2014

CIP Cyber Security Security Management Controls. Standard Development Timeline

Critical Cyber Asset Identification Security Management Controls

Misoperations Information Data Analysis System (MIDAS)

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13

Cyber Threats? How to Stop?

Cyber Security Reliability Standards CIP V5 Transition Guidance:

Standard Authorization Request Form

NERC CIP Information Protection

Standard Development Timeline

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

Standard Development Timeline

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

CIP Cyber Security Systems Security Management

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Cybersecurity for the Electric Grid

ERO Enterprise IT Projects Update

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Standards Development Overview

CIP Version 5 Evidence Request User Guide

A. Introduction. B. Requirements and Measures

Standard Development Timeline

GridEx IV Initial Lessons Learned and Resilience Initiatives

Standard EOP Disturbance Reporting

requirements in a NERC or Regional Reliability Standard.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Reliability Standard Audit Worksheet 1

Misoperation Information Data Analysis System

CIP Cyber Security Incident Reporting and Response Planning

Standard Development Timeline

Project Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives

Low Impact Generation CIP Compliance. Ryan Walter

PIPELINE SECURITY An Overview of TSA Programs

Cyber Security Incident Report

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

CIP Cyber Security Recovery Plans for BES Cyber Systems

Written Statement of. Timothy J. Scott Chief Security Officer The Dow Chemical Company

Geomagnetic Disturbances

The North American Electric Reliability Corporation ( NERC ) hereby submits

2 ESF 2 Communications

CIP Cyber Security Personnel & Training

2018 MRO Regional Risk Assessment

Project Physical Security Directives Mapping Document

CIP Version 5 Transition. Steven Noess, Director of Compliance Assurance Member Representatives Committee Meeting November 12, 2014

Cyber Security Standards Drafting Team Update

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

Telecommunications Network Reliability

Québec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan Annual Implementation Plan

John P Buechler NYISO Executive Regulatory Policy Advisor. NPCC Governmental and Regulatory Affairs Advisory Group Meeting Albany, NY

Background. Impacts of Blackouts

New Brunswick 2018 Annual Implementation Plan Version 1

Additional 45-Day Comment Period September Final Ballot is Conducted October/November Board of Trustees (Board) Adoption November 2014

Warrenton Wheeler Gainesville 230kV Reliability Project

136 FERC 61,187 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Parts and 40. [Docket No. RM ]

CIP Cyber Security Security Management Controls. A. Introduction

Standard CIP Cyber Security Security Management Controls

Standard Authorization Request Form

Registration & Certification Update

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra

Unofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols

Drinking Water Emergency Management Ministry of the Environment 2012 Drinking Water Leadership Summit October 25, 2012

Project Retirement of Reliability Standard Requirements

Transcription:

RELIABILITY OF THE BULK POWER SYSTEM Jim Burley, VP of Compliance, Mitigation and Standards October 26, 2011 Promoting RELIABILITY and Mitigating RISKS to the Bulk Power System

Context In the Beginning-2003 Blackout The Heat outage played On left a Aug. part telephone 14, as an 2003, initial circuits 55 overloaded trigger of million the and outage. networks people It took were down. four Cellular days for service power without to was power be interrupted fully for restored. as mobile Parts of networks Ontario suffered too, were rolling hours in the cities of overloaded blackouts for with more the than increased a week Baltimore, Cleveland, volume before full of calls. power was restored. New York, Toronto and Water Estimates systems of total in several costs in cities the United lost others in the U.S. and pressure, States range forcing between boil water $4 billion and advisories $10 billion Canada. to (U.S. be dollars). put More into effect. In than Canada, 508 generating units at Television gross domestic and radio product stations was down remained 0.7% August, 265 on the power there air, with plants was the a net shut help loss of backup of 18.9 million generators, down work during although hours, the and some stations manufacturing were outage. knocked shipments off in the Ontario air for periods were down ranging $2.3 from billion several (Canadian hours to dollars). the length of the entire blackout. 2

Context Energy Policy Act of 2005 Responds to 2003 Blackout Created Electric Reliability Organization (ERO) to operate internationally (2005) North American Electric Reliability Corporation (NERC) designated as the ERO subject to oversight by the Federal Energy Regulatory Commission (FERC) and Canadian and Mexican governmental authorities (2006) Provides mandatory compliance with reliability standards and failure to comply is subject to fines of up to $1M per day (MRO) is one of six Regional Entities (REs) in the Eastern Interconnection and is one of eight REs that enforce compliance with the mandatory standards on behalf of NERC * Section 215 and FERC Orders Numbers 672 and 693 are the foundational reliability legislation and regulation. 3

Regional Entities In their respective regions, each Regional Entity is responsible for: Developing and implementing reliability standards; Enforcing compliance with those standards; Providing seasonal and long term assessments of the bulk power system s ability to meet demand for electricity; and Providing an appeals and dispute resolution process. 4

NERC Interconnections 5

About MRO Michigan MRO Region 8 States 2 Canadian Provinces 1M Square Miles 140 Registered Entities serving 20M people 3 Reliability Coordinators and 6 Planning Authorities 450 Registered Functions Total net energy to load is 300M MW hours Long distances from generation to load creates unique stability and technical issues in the MRO region Mix of organized and bi lateral markets Large public power many shared facilities History of cooperation on reliability matters 6

About MRO Governance Matters: Role Clarity, By Design Delegated authority means MRO steps in the shoes of government MRO carries a public trust obligation in its work MRO has zero affiliations with Registered Entities or registered functions MRO has a balanced industry sector stakeholder board Advantages: technical insights from industry very valuable and improves quality Disadvantages: overcoming and perception of potential conflicts necessitates extra vigilance to assure there are no conflicts or discriminatory determinations Industry Sectors Canadian Utility Cooperative Federal Power Marketing Agency Generator and/or Power Marketer Investor Owned Utility Large End Use Municipal Utility Small End Use Transmission System Operator 7

About MRO Unique Aspects of the Region Region dates to 1940 s (regional planning and economic reserve sharing) Many shared and jointly owned facilities have resulted in joint registrations MRO takes a strict line of sight approach to registration; must be precise as to who does what (2003 Blackout Report); emphasizes an accurate inventory of bulk electric system facilities Large element of public power in the Region Canada is an important trading partner to the Region Many registered entities in MRO also in other Regions due to physical /geographic locations of assets 8

Mandatory Reliability Standards Electric Reliability Standards Applies to Bulk Power System Facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof) Bulk Power System (BPS) does not include facilities in the local distribution of electric energy Governs Registered Entities are those owners and operators of the bulk power system and include IOUs Cooperatives Municipals Government Entities RTOs ISOs Transmission Owners Generation and Other facilities owners Other arrangements with Canadian and Mexican governments 9

Mandatory Standards Registration Criteria Registered Entities are subject to mandatory reliability standards if they meet a bright line criteria, which includes: Load serving entity peak load is > 25 MW and is directly connected to the bulk power (>100 kv) system, or; Load serving entity is designated as the responsible entity for facilities that are part of a required under frequency load shedding (UFLS) program designed, installed, and operated for the protection of the bulk power system Distribution provider system serving >25 MW of peak load that is directly connected to the bulk power system. Distribution provider is the responsible entity that owns, controls, or operates facilities that are part of any of the following protection systems or programs designed, installed, and operated for the protection of the bulk power system: a required UFLS program, special protection system, transmission protection system Individual generating unit > 20 MVA (gross nameplate rating) and is directly connected to the bulk power system 10

Mandatory Standards Scope NERC Reliability Standards cover a wide variety of topics 1 Response and demand balancing Communications Critical infrastructure protection Emergency preparedness and operations Facilities design, connections and maintenance Interchange scheduling and coordination Interconnection reliability, operations and coordination Modeling data and analysis Nuclear Personnel performance, training and qualifications Protection and control Transmission operators Transmission planning Voltage and reactors 1 http://www.nerc.com/page.php?cid=2/20 11

Key Challenges Informal arrangements no longer practical Formal and written agreements Relationships among utilities Relationships between utilities and large customers Line of sight for all facilities and systems that impact the bulk electric system Owner Maintainer Operator Managing complex risk across a network Networked system results in many interdependencies Load shedding Generators and other facilities tied to the bulk electric system 12

Key Challenges The wake of re regulation resulted in fragmented, swiss cheese markets (bilateral, Midwest ISO, SPP RTO, MAPP) Alignment/Changes in Reliability Coordinators and Planning Authorities geography (ex. Midwest ISO, SPP RTO, MAPP) Understanding and managing seams is vital; who does what for whom registration Transmission Planning Map 13

Future Outlook FERC Order 1000 Designed to support efficient and cost effective transmission planning and fair allocation of new transmission facility costs to provide increased access to low cost electricity. MRO s initiatives Simplifying and lowering the cost of compliance with standards Streamline and reduce adminstrivia fire drills to maintain focus on essential purpose: Reliability Provide more certainty, sooner on expectations Leveraging industry experts to develop guidance, best practices, and framework to improve reliability and address risks 14

Questions For more information: Website: http://www.midwestreliability.org Membership information: (651) 855 1733, Jessica Mitchell External Affairs and Communications: (651) 855 1721, Miggie Cramblit 15