Case Study Leicester City Council

Similar documents
Industry leading low energy evaporative fresh air cooling.

Case Study The University of Warwick

Evaporative free air cooling technology Providing evaporative free air cooling solutions.

Case Study Host Europe Group

Repeatable IT Hub Rooms

APC by Schneider Electric Elite Data Centre Partner

Repeatable IT Hub Rooms

Excool Indirect Adiabatic and Evaporative Data Centre Cooling World s Leading Indirect Adiabatic and Evaporative Data Centre Cooling

Data Centre Solutions. Data Centre Solutions Expertly Engineered

Survey and Audit Service Schedule. Airflow and Thermal Imaging Survey Service Schedule. Data Centre Solutions Expertly Engineered

Modular & Mobile Data Centre Solutions. Data Centre Solutions Expertly Engineered

Engineering & Support Services

Planned Preventative Maintenance Schedule. Raised Access Floor PPM Schedule

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Total Modular Data Centre Solutions

Defence Sector Solutions. Providing Next Generation Data Centre and Networking Infrastructure to the Defence and Security Sector

Data centre solutions - energy efficient by design

Overcoming the Challenges of Server Virtualisation

Data Centre Optimisation Services

Thermal management. Thermal management

Rack Colocation Hosting. Data Centre Solutions Expertly Engineered

Mission Statement & Company Overview

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

Data Centre Solutions Expertly Engineered APC Management Software

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS

Power Generation. Power Generation services deliver continuous and predictable power availability for 24/7 mission critical environments.

Server Room & Data Centre Energy Efficiency. Technology Paper 003

Data Centre & Colocation in Birmingham. Flexible. Secure. Accredited.

DATA CENTRE & COLOCATION

CASE STUDIES ENERGY EFFICIENT DATA CENTRES

84 kw, Tier 3, Direct Expansion, 937 ft 2

Planning a Green Datacenter

Taking The Heat Off University of East Anglia Data Centre

1.0 Executive Summary

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director

A separate CRAC Unit plant zone was created between the external façade and the technical space.

Beyond BREEAM Excellent DCs. Cobalt Data Centre Campus

INNOVATE DESIGN APPLY.

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Product Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres

Green Data Centers A Guideline

3300 kw, Tier 3, Chilled Water, 70,000 ft 2

AMS6, Amstel Business Park Campus. Highly connected, Energy efficient data centre. Duivendrechtse kade 80A 1096 AH Amsterdam Netherlands

INNOVATE DESIGN APPLY.

9.6 MW, Traditional IT and OCP-compatible, Indirect Air Economizer, m 2

Product Brochure Eaton 93PR UPS kw

Nominee: Riello UPS with The Rosebery Group

FREEING HPC FROM THE DATACENTRE

APPLIED SYSTEM AWS FAMILY FOR LARGE APPLICATIONS PRODUCT LEAFLET. Capacity from 600 to 2,010kWr. Engineered for flexibility and performance

MEASURE MONITOR UNDERSTAND

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer

Datacentre Reading East 2 Data sheet

SmartRow Intelligent, Integrated Infrastructure in a Self-Contained Line-Up. Solutions For Business-Critical Continuity

1.0 Executive Summary. 2.0 Available Features & Benefits

APC InfraStruXure Solution Overview

10G the Next Generation Structured Cabling. Technology Paper 002

New Zealand Government IBM Infrastructure as a Service

ICT Infrastructure Solutions. Real power for virtualisation

Data center cooling evolution. The hottest way to save energy. Lucio Bustaffa: Product Development Manager BlueBox Group

Switch to Perfection

Google s Green Data Centers: Network POP Case Study

18 th National Award for Excellence in Energy Management. July 27, 2017

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire

Data Center. Tai Po Data Center

Cooling on Demand - scalable and smart cooling solutions. Marcus Edwards B.Sc.

HIGH DENSITY DATACOM INTEGRATED COOLING SYSTEM.

Application of Green Technology For Data Centre

PROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES

Efficiency of Data Center cooling

5.2 MW, Pod-based build, Chilled Water, ft 2

MSYS 4480 AC Systems Winter 2015

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

Converged Power Solutions. Data center power reinvented

NetBotz Wireless Environmental Monitoring

Fact sheet FRANKFURT DATA CENTRE CAMPUS. Connect, transact and grow

How much power?! Data Centre Efficiency. How much Money?! Carbon Reduction Commitment (CRC)

Rittal LCP T3+ High-availability IT cooling with no compromise

Powering Change in the Data Center. A White Paper from the Experts in Business-Critical Continuity TM

Make the most of your Energy from Power Plant to Plug. Chris Simard, Regional Director Field Sales Group

FACT SHEET: IBM NEW ZEALAND DATA CENTRE

Power & Cooling Considerations for Virtualized Environments

brightsolid Data Hall 1 Keysource Technical Specifications

New Zealand Government IbM Infrastructure as a service

Scalable, Secure. Jason Rylands

APC APPLICATION NOTE #74

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation

Data Centre Energy Efficiency. Duncan Clubb EMEA Data Centre Practice Director CS Technology

Configurable power distribution

Ecotel Free Cool 5-15kW

DAX Directional Airflow exhaust system. Energy efficient heat removal and redistribution. Product overview and technical data

RiMatrix S Make easy.

Modular data centres in containers

Datacentres & Colocation

Rack & Enclosure Systems

Data Center Infrastructure Management (D.C.I.M.)

Ecolibrium. Cloud control. Keeping data centres cool. OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001

Data Center Integrated solutions

Data Center Integrated solutions

DATA CENTER AIR HANDLING COOLING SOLUTIONS

COLOCATION SERVICE DESCRIPTION

Transcription:

Data Centre Solutions...energy efficient by design Case Study Leicester City Council Leicester City Council Deploys New Sub 1.1 PUE3 Data Centre Infrastructure. Designed & Installed by Workspace Technology

Leicester City Council Deploys New Sub 1.1 PUE3 Data Centre Infrastructure. Designed & Installed by Workspace Technology. Leicester City Council is a unitary authority responsible for local government in the East Midlands city of Leicester. As a unitary authority, the council is responsible for running the majority of local services in Leicester and with a population of over 330,000, the highest in the region, Leicester is the tenth largest city in the United Kingdom. 1

Client Situation Leicester City Council s legacy data centre was located in the New Walk Centre an obsolete 1960 s concrete building which was condemned and due for demolition during 2014. The council identified an out of use training facility within the city boundary which was ideal to support not only the City Council ICT demands but also to provide the capability for the council to offer shared resource services for local public sector organisations in the wider Leicestershire and Nottinghamshire areas. Leicester City Council s ambition was to create a centre of excellence, combined with exceptional energy performance, to help provide a significant and meaningful contribution to the council s carbon reduction commitments. As part of a rigorous tender process Workspace Technology clearly demonstrated their expertise and leadership in energy efficient data centre design, build & management. The Council commented, Workspace Technology s bid was outstanding, without a doubt they clearly demonstrated their understanding of the council s needs and it was obvious that Workspace Technology have unrivalled extensive knowledge and expertise in low carbon data centre design. Design Overview The city council wished to deliver direct fresh air cooling with a closed loop backup to mitigate any local air quality issues. Energy efficiency was central to the data centre requirements. Not only was an annualised PUE3 of sub 1.1 demanded, but also the implementation of renewable energy technology and the utilisation of waste heat. Summary Requirements: Tier 3 data centre architecture Sub 1.1 annualised PUE3 performance Implementation of renewable energy Waste heat recovery 250kW I.T Load 2

Workspace Technology s Total Carbon Commitment A A A PUE PUE = = 1.1 1.2 B C D E F G measure reduce design renew recovery Workspace Technology s Total Carbon Commitment Workspace Technology s Total Carbon Commitment delivers a unique holistic approach to data centre designs. By taking a much broader view when engaging in the design process, Workspace Technology ensures every aspect relating to the data centre efficiency is explored and not just those that directly relate to the data centre power and cooling. The holistic approach encompasses:- Measure Measurement is the key to unlocking our understanding of energy consumption and energy utilisation. Reduce Reduction in demand through maximising useful work per watt in turn reducing infrastructure overhead. Design Deployment of Best Practice Data Centre Design reduces infrastructure overhead relative to the critical load. Renew Implementation of renewable energy sources lowers the carbon content of the energy profile. Recovery Heat recovery enables waste heat to be put to productive use reducing downstream energy costs. 3

Freecool Workspace Technology is an established industry leader in data centre direct fresh air cooling deployments. Freecool was the technology of choice and the only technology on the market that could fulfil the PUE design requirements of the council. Freecool Evaporative Free Air Cooling by Workspace Technology delivers innovative low energy cooling for a range of applications including data centre environments. The implementation of the Cool Wall module delivers mechanical backup or top up cooling for all modes of system operation. installations are designed and built from scalable standardised modules that can be interconnected in a bespoke arrangement supporting real world customer applications. The Leicester City Council project was no exception, the solution was designed to support a maximum critical load of 250kW N+1 with a deployment of nine 30kW Freecool units. Freecool Design Features for Leicester City Council Include: Double Filtration delivered through a combination of G3 and G4 air intake filtration systems eliminate data centre contamination. Atemperation accurately mixes the percentage of hot exit air with cold intake air to produce a stable equipment intake temperature irrespective of external ambient conditions. Dynamic Mode Temperature Control allows cold aisle temperatures of 18 C for the vast majority of the operating period without any compromise in energy efficiency. Reduced Fan Power utilising energy efficient EC fans that use significantly less energy than conventional fan technology. 4

Cool Wall As part of the deployment, Workspace Technology implemented the Cool Wall module which consists of a series of high efficiency chilled water coils, positioned within the Freecool Mixing Box, combined with an external mechanical cooler and buffer tank. The Cool Wall module is designed to deliver the council s data centre with an independent back up cooling circuit. Cool Wall activation is based on a range of configurable environmental conditions including fire, air quality, temperature and humidity. FlexAisle Vendor Neutral Aisle Containment As part of the managed airflow architecture and to help maximise temperature control and minimise fan energy consumption Workspace Technology deployed FlexAisle, their multivendor aisle containment system, as part of the data centre solution. A combined cold and hot aisle return plenum HARP was deployed for the Council. The complete arrangement was self-supporting allowing the simple installation and removal of equipment racks without the need to dismantle aisle containment systems. Renewable Technology Delivers True Carbon Neutral Cooling Photovoltaic (PV) technology delivering up to 35kW of power was installed as part of the project. The PV based kwh power contribution exceeds that of the Freecool kwh power consumption. As a direct result, the Council s data centre facility can truly describe it s cooling as carbon neutral. This is one of the first of its kind in the UK and it is hoped that this model will act as the template for future data centre deployments. 5

Heat Recovery Workspace Technology s team took every opportunity to further reduce energy consumption. The use of free air cooling for the UPS equipment is standard design for many plant rooms today. This was no exception for the councils new data centre, but Workspace Technology took this one step further by using waste heat from the UPS room to maintain temperature for the battery room during cooler periods thus eliminating the need for mechanical heating. The use of heat recovery will reduce the energy costs associated with maintaining UPS battery temperatures by us much as 80%. 6

Complete Electrical Design Workspace Technology s in house Data Centre Solutions Division designed and installed a complete end to end electrical installation including HV power feeds, transformers, LV Switchgear, critical and mechanical power distribution. High quality Form 4 Type 6 Schneider Electric switchgear was deployed throughout including Mains Intake, UPSLVP and Generator panels. In-Row CPDU Workspace Technology s deployment of their innovative rack based In-Row Critical Power Distribution Units incorporating Schneider Electric Acti9 sub pan assemblies mounted within APC Netshelter SX racks provided the perfect configuration for overhead power distribution. As with conventional perimeter PDU breakers, these are pre-wired to a terminal field to allow for safe and easy connectivity of distribution cabling. Schneider Electric PM750 meters were deployed throughout enabling power monitoring through the StruxureWare Power Management Expert energy management software. Workspace Technology s Power Generation Division relocated and refurbished an existing generator which was formally situated at the old data centre location. Works included installation of a new BS compliant fuel storage and distribution system, and a full engine overhaul. Technical Infrastructure As part of the installation Workspace Technology deployed 60 x Schneider Electric APC NetShelter SX multivendor equipment racks, intelligent metered rack PDUs and Belden Cat6A I/O rack to rack cabling links. Workspace Technology also installed ACT Access Control, intruder alarm systems and CCTV throughout the complex as well as e-established existing building fire alarm systems as part of the overall data centre project. 7

Technical Challenges As data centre floor space was at a premium, Workspace Technology s team cleverly created an external Freecool mixing box and plant room area which ensured all of the floor space was available for equipment racks. Detailed space planning within the power plant area also ensured that the data centre could be expanded to support the council s ambition to develop a local public sector shared resources ICT facility. Project Team Success A strict design review and agreement regime was implemented by Workspace Technology to ensure that the delivery team were able to engineer absolute levels of accuracy, which paid back many times over by ensuring first time success. Also, the implementation of risk analysis to every potential failure scenario enabled the team to eliminate the loss of customer service through engineering excellence and innovation. The project team left no stone unturned by implementing what if analysis strategy as part of the design phase, and by applying a getting back to basics method, Workspace Technology ensured electrical and cooling design principles were correctly applied with appropriate discrimination and safety margins to deliver a robust data centre design. Complete Integration & Support Services The complete data centre is supported by Workspace Technology s Engineering & Support Services Division via a comprehensive maintenance contract, which includes planned preventative maintenance, emergency callout and data centre optimisation services. Planned Preventative Maintenance Emergency Break Fit Response Data Centre Optimisation Services 8

About Workspace Technology Workspace Technology s Data Centre Solutions division is dedicated to delivering industry-leading service, support & optimisation for our customers across the UK. By engaging you and taking the time to understand the business and performance related issues Workspace Technology is able to effectively address the demands of your business. Workspace Technology welcomes this opportunity to connect with you as a valued customer. We would like to share our vision and expertise through a partnership approach. Our ability to deliver integrated, scalable, energy efficient solutions has made us the preferred choice for many public sector and commercial businesses today. Operating throughout the UK, Workspace Technology offers clients an enthusiastic and refreshing approach, combined with teamwork that takes performance and service to new levels of excellence. Further details of Workspace Technology s products and services can be found at www.workspace-technology.com. Approved Endorser EU Code of Conduct on Data Centre Efficiency APC Elite Partner Data Centre Certified Corporate Partner of the Data Centre Industry Association Workspace Technology s Commitment to help clients reduce their carbon footprint through the deployment of energy efficient technology and design. Technology House, 5 Emmanuel Court, Reddicroft, Sutton Coldfield, West Midlands B72 1TJ. Tel : 0121 354 4894 Fax: 0121 354 6447 email : sales@workspace-technology.com www.workspace-technology.com