ExL Petroleum, LP DAILY WELL COMPLETION REPORT (FRAC REPORT)

Similar documents
Drilling & Completion Summary - Ascending

REDEFINING PUMP DOWN PERFORATING

DEEP EXPERIENCE. STRONG REPUTATION.

Predicting Wellbore Dynamic-Shock Loads Prior to Perforating SPE

Long Gun Deployment Systems. Jim Gilliat BakerHughes Houston Texas Presentation Number: SLAP 06

ControlFire. June 2013

ControlFire. Titan Division Presentation

NR-TEC S2S SURFACE TO SANDFACE DATA LOGGER

Drillingsoftware Casing Design User Manual

Sponsors: AGENDA October 1, 2014 Toftrees Conference Center State College, PA. Welcome

A Logging, Perforating, Pipe Recovery & Pressure Control Service Company.

Hydraulic Fracturing: services & equipment Richard Spears Spears & Associates Tulsa. May 2018

Highly Successful Reservoir Surveillance and Production Enhancement in a North Sea Brown Field Asset

SPE Copyright 2006, Society of Petroleum Engineers

For more information about the Caliper Processing Software contact Scientific Data Systems.

WellCAM by Vision io Visual Logging Platform

A Soft Computing-Based Method for the Identification of Best Practices, with Application in the Petroleum Industry

I-Wheel Conveyance Technology Ultra-Flexible, Ultra-Reliable

ICSI Addressable Disconnect Tool (ADT) Overview

COPYRIGHT. Nodal Analysis Workshop. Horizontal and Fractured Wells. By the end of this lesson, you will be able to:

Digital Downhole Camera Technology

Optis Electric Line HD

The Society of Petroleum Evaluation Engineers SPEE Denver Chapter announces its July Luncheon Meeting.

NOTE ACCT #41211 MTR # ACCT #41212 MTR # ACCT #41210 MTR # ACCT #41213 MTR # ACCT #41209 MTR # ACCT #41214 MTR #728841

Standard Releasing Spear. Manual B215

Granite Shoals, TX San Antonio, TX 78251

Aberdeen Technical Centre. Jul Corporate Overview & Product Snapshot

Developing a Slim-bore Wellhead & DT- HXT system for deep-water installation savings. K.Buckle UTC Bergen 5 th Jun 08 Session I (09:00-09:30)

3D MULTIDISCIPLINARY INTEGRATED GEOMECHANICAL FRACTURE SIMULATOR & COMPLETION OPTIMIZATION TOOL

Frequently Asked Questions

SERIES 1300 Quality Design Features Assure Long, Trouble-Free Service

EDRS v1.10. New Features Guideline

Installation and Operating Instructions for Air-Bubbler Differential Pressure Aquagauge Tank Level Telemetry System.

EST Group Pop-A-Plug Tube Plugging System

Heavy Wall Gasketed Sewer Fittings SDR 26 Injection Molded in Sizes 4" 12" Fabricated in Sizes 15" 36"

Optimizing Well Completion Design and Well Spacing with Integration of Advanced Multi-Stage Fracture Modeling & Reservoir Simulation

Basic Well Code Conversion File

TUCKER WIRELINE OPEN HOLE WIRELINE LOGGING

TOV-1 OPERATION MANUAL TOWED VIDEO LIMITED WARRANTY

Henderson Mill Road 48 Water Line Issue. Thursday, July 23, 2015 Monday, July 27, 2015

Manzanita Pubic Works. 10/16/2018 Special Meeting

- For portable spray applications of architectural paints and coatings only - - Not approved for use in explosive atmosphere locations - WARNING

SC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. Phone: (407) Fax: (407) Vulcan Road Apopka, Florida 32703

VARIABLE SPEED BOOSTER SYSTEMS AURORA INTELLIBOOST WITH INTELLIMANAGER. Distributed by Flow-Tech Industries

PETROPHYSICAL DATA AND OPEN HOLE LOGGING BASICS COPYRIGHT. MWD and LWD Acquisition (Measurement and Logging While Drilling)

POLOS CPK WAFER SPINNER SOP

DESIGN & ENGINEERING DATA

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan

Heat Exchanger Condenser Expanders

ADVANTAGE+ SNOW & ICE SYSTEM

MULTI-LAYER COMPOSITE (MLC) PIPING SYSTEMS INSTALLATION GUIDE

APES-14 HD-6500 & HD-7000 Version Operator s Training Manual

id Marking US Page 1

paint AppLICATIONS - ROADpAK - FEATURES RoadLazer Roadpak paint AppLiCATiOns I 40

SB012-HA Unity - Removing and Installing a New SD Card

POTATO FIELD MOISTURE CONTENT

RL-H80 PARTS LIST # K

TBR Website & Database

PRODUCT OVERVIEW. Well Inspection Cameras & Systems. See what you re missing. Proudly made in the U.S.A.

Keywords: Coanda effect, perforations, wellbore, formation, etc.

Batch Tab pg.1. Mix Tab... pg.7. Job Tab. pg.9. Material Tab... pg.11. Utility Tab pg.16. Charge Tab.. pg.17. Customer Tab. pg.18

CF-38, CF-80 and CF-100 Gallon Models

DynaSelect System. Plug-n-Perf Optimized

User Manual. CSD - Completion String Design. Completion Services as, Fabrikkveien 9, 4033 Stavanger, NORWAY Phone

2nd High Elevation Pressure Loss. Low Pressure Incident at Bryant Street Pumping Station

Installation Note for Isocratic-to- Quaternary Pump Upgrade Kit G1352A

DEPENDABLE BY DESIGN EASE OF USE PERFORMANCE SERVICEABILITY DURABILITY

SmartSoft AES Operator s Guide

TAM Software and Wireless Well Monitoring Equipment*

Mounting DIGITAL DISPLAY

R & D SPECIALTIES SERIES 100 RO CONTROLLER USERS MANUAL. 2004, by R & D Specialties, Inc. All Rights Reserved.

NRIS DATA MANUAL 08/01/91

REFERENCE MANUAL. mobile. Reference Manual and User s Guide Version

UNIVERSAL MULTISHOT SYSTEMS CONVERT YOUR STANDARD PRESS TO A MULTISHOT MACHINE

OILFIELD EQUIPMENT RENTALS RENTAL PRICES 2016 ONE CALL GETS IT ALL

Total Control of Various Size Conveying Systems; Easily Expandable

Introduction. File preparation

SPE MS Multivariate Analysis Using Advanced Probabilistic Techniques for Completion Optimization

A Non-Revenue Water Tale of Five Cities

KCX series. Electronic. Counters B-32

Samsung Galaxy Note5 Battery Replacement

Stackable with all of Tucker Technologies Integra Suite Logging tools 1

SC100 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. (407) Phone: Website:

Model RFM. Model RFM. Materials and Specifications. Residential Fire Meter Sizes 3/4", 1", 1-1/2" and 2" Features 1" RFM 50 2" RFM 160

DG2100S Operating Instructions

FSXThrottle All Quadrants (all models) Notes*

Model 120D and Model 120CEX Wireline Data Recorder. Operation and Maintenance Manual

Samsung Galaxy S8+ Battery Replacement

INSTALLATION AND OPERATING INSTRUCTIONS DSST SYSTEM

Computational fluid dynamics flow comparison between openhole sleeve and plug-and-perf completion in a hydraulic fractured horizontal well

PRODUCT OVERVIEW. Well Inspection Cameras & Systems. See what you re missing. Proudly made in the U.S.A.

Rice PVC Water Well Casing Solutions for Water Well Drillers

M.R.P. Dt

Compact Bellows Pumps

Parallel SelfSensing Modulating Pump Controller

TABLE OF CONTENTS OVERVIEW 1 FEATURES AND BENEFITS 1 OVER-THE-AIR UPDATING 1 WEATHERTRAK OPTIFLOW COMMISSIONING PHASES 2 PHASE 1: ASSESS 2

SFC KOENIG Product Catalog

Nikon D610 Flash Capacitor Replacement

Models: QJD ( ) QJD ( )

CH142: Instructions for the Vernier LabPro

Transcription:

Date: 4/2/2017 Day: 10 5054' Stage 28Frac perfs 9,668'9,802' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 8,975 bbls of slickwater, 62,000# 100 mesh, 215,660# 40/70 Brady and 49,780# 40/70 SLC. Total Sand = 327,440# RIH w/ wireline (Pumped down w/ 65 BW) & set plug @9,653' MD. Shot perfs 9,504' 9,638' MD. Stage 29Frac perfs 9,504'9,638' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,035 bbls of slickwater, 63,600# 100 mesh, 216,060# 40/70 Brady and 51,612# 40/70 SLC. Total Sand = 331,272# RIH w/ wireline (Pumped down w/ 59 BW) & set plug @9,489' MD. Shot perfs 9,340' 9,474' MD. Stage 30Frac perfs 9,340'9,474' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,028 bbls of slickwater, 61,500# 100 mesh, 216,020# 40/70 Brady and 49,740# 40/70 SLC. Total Sand = 327,260# RIH w/ wireline (Pumped down w/ 46 BW) & set plug @9,325' MD. Shot perfs 9,176' 9,310' MD. Stage 31Frac perfs 9,176'9,310' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,518 bbls of slickwater, 61,500# 100 mesh, 216,040# 40/70 Brady and 51,420# 40/70 SLC. Total Sand = 328,960# RD&MO Cudd Energy Services, Capitan Wireline and CasedHole Pump Trucks. TOTAL JOB (31 Stages): 288,082 BLWTR 1,916,450# 100 mesh 6,699,260# 40/70 Brady 1,549,272# 40/70 PropStar Frac Plugs Located @ 14,081' 13,913' 13,753' 13,589' 13,425' 13,260' 13,099' 13,933' 12,769' 12,605' 12,442' 12,277' 12,113' 11,948' 11,788' 11,621' 11,457' 11,293' 11,129' 10,962' 10,804' 10,637' 10,473' 10,309' 10,145' 9,981' 9,814' 9,653' 9,498' 9,325' ALL MEASURED DEPTHS WAITING ON CLEANOUT 2,220,209.00 2,241,962.00

Date: 3/15/2017 Day: 1 TOE PREP Liner KB: 25 PBTD: Prod. Csg. 5 1/2" 20 HCP110 GBCD 14,292 11/22/2016 Supervisor(s): S. Everett MI&RU Capitan Wireline. RIH with 4.5" GR/JB to 8,792'. No issues. POOH. SDFN. ExL Petroleum, LP RIH with CNL, RNL, GR & CCL to 8,835'. No issues. Logged CBL to 5,800' and CNL to surface. Found top of cement @ 6,370' Found marker joints at 7,520' 7,541' WL Depth. 7 feet deep. Corrected to casing tally.

Date: 3/16/2017 Day: 2 TOE PREP Liner KB: 25 PBTD: Prod. Csg. 5 1/2" 20 HCP110 GBCD 14,292 11/22/2016 Supervisor(s): S. Everett Rig up Nine Pressure Control and Motley pump down pumps. Tested 71/16" 10K Frac Tree to 9,500 psi and charted for 5 minutes. Good Test. Opened frac valve pumped 10 bbls fresh water and 24 bbls of double inhibited 7.5% HCL acid. Pumped 368 bbl of fresh water behind the acid to flush well bore. Slowed rate in curve to 10 bpm through the lateral and picked up rate again for the last 50 bbls. RIH with plug and guns to 8,400'. Started pump down. Slowed down rate to pump acid. Once CIBP was on depth, slowed rate to 3 bpm to get acid on spot. Set CIBP at 14,270' MD. Pulled up to first perf depth. Tested CIBP, casing and frac stack to 9,000 psi and held for 15 minutes. Good Test. Bled down pressure to 7,000 psi. Shot first perf cluster @ 14,229' 14,230' MD 6 holes and broke down by pumping treated fresh water at surface. Break Pressure was 1800 psi. Contunue to perforate all clusters: (14,210' 14,211' MD, 14,191' 14,192' MD, 14,172' 14,173' MD, 14,153' 14,154' MD, 14,134' 14,135' MD, 14,115' 14,116' MD, 14,096' 14,097' MD) Pumped fresh water at 6bpm for 4 minutes to breakdown all clusters. POOH With Wireline logging collar strip. Shut down. RD&MO Capitan Wireline, Nine Pressure Control and Motley pump down trucks. WAITING ON FRAC.

Date: 3/26/2017 Day: 3 MI&RU Cudd Energy Services, Capitan Wireline, TRey water transfer and Casedhole pumpdown trucks. Loaded pumps and Tested Treating Lines to 9,500 psi and set pop off at 9,450 psi Stage 1Frac perfs 14,096'14,230' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,138 bbls of slickwater, 59,400# 100 mesh, 218,400# 40/70 Brady and 48,740# 40/70 SLC. Total Sand = 326,540# RIH w/ wireline (Pumped down w/ 250 BW) & set plug @14,081' MD. Shot perfs 13,932' 14,066' MD. Stage 2Frac perfs 13,932'14,066' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,156 bbls of slickwater, 61,400# 100 mesh, 213,700# 40/70 Brady and 48,360# 40/70 SLC. Total Sand = 323,460# RIH w/ wireline (Pumped down w/ 248 BW) & set plug @13,917' MD. Shot perfs 13,768' 13,902' MD. Stage 3Frac perfs 13,768'13,902' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,174 bbls of slickwater, 58,700# 100 mesh, 216,060# 40/70 Brady and 48,860# 40/70 SLC. Total Sand = 323,620# RIH w/ wireline (Pumped down w/ 241 BW) & set plug @13,753' MD. Shot perfs 13,604' 13,738' MD. Stage 4Frac perfs 13,604'13,738' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,207 bbls of slickwater, 60,500# 100 mesh, 216,120# 40/70 Brady and 48,100# 40/70 SLC. Total Sand = 324,720# RIH with wireline for Stage #5 @ Report Time ExL Petroleum, LP

Date: 3/27/2017 Day: 4 RIH w/ wireline (Pumped down w/ 240 BW) & set plug @13,589' MD. Shot perfs 13,440' 13,574' MD. Stage 5Frac perfs 13,440'13,574' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 10,049 bbls of slickwater, 59,500# 100 mesh, 216,600# 40/70 Brady and 48,120# 40/70 SLC. Total Sand = 324,220# RIH w/ wireline (Pumped down w/ 448 BW) & set plug @13,425' MD. Shot perfs 13,276' 13,410' MD. Down 21/2 hours during middle of Stage #5 Cudd (repaired discharge manifold). Down 2 hours wireline (misrun, plug did not set). Stage 6Frac perfs 13,276'13,410' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,183 bbls of slickwater, 62,500# 100 mesh, 216,120# 40/70 Brady and 49,880# 40/70 SLC. Total Sand = 328,500# RIH w/ wireline (Pumped down w/ 190 BW) & set plug @13,261' MD. Shot perfs 13,112' 13,246' MD. Stage 7Frac perfs 13,112'13,246' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,093 bbls of slickwater, 61,340# 100 mesh, 216,060# 40/70 Brady and 50,000# 40/70 SLC. Total Sand = 327,400# RIH w/ wireline (Pumped down w/ 168 BW) & set plug @13,097' MD. Shot perfs 12,948' 13,082' MD. Pumping Stage #8 @ Report Time

Date: 3/28/2017 Day: 5 Stage 8Frac perfs 12,948'13,082' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,073 bbls of slickwater, 62,200# 100 mesh, 216,060# 40/70 Brady and 49,780# 40/70 SLC. Total Sand = 328,040# RIH w/ wireline (Pumped down w/ 223 BW) & set plug @12,933' MD. Shot perfs 12,784' 12,918' MD. Stage 9Frac perfs 12,784'12,918' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,086 bbls of slickwater, 59,800# 100 mesh, 216,100# 40/70 Brady and 51,780# 40/70 SLC. Total Sand = 327,680# RIH w/ wireline (Pumped down w/ 203 BW) & set plug @12,769' MD. Shot perfs 12,620' 12,754' MD. Stage 10Frac perfs 12,620'12,754' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,170 bbls of slickwater, 62,900# 100 mesh, 216,100# 40/70 Brady and 49,340# 40/70 SLC. Total Sand = 328,340# RIH w/ wireline (Pumped down w/ 205 BW) & set plug @12,605' MD. Shot perfs 12,456' 12,590' MD. Stage 11Frac perfs 12,456'12,590' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,231 bbls of slickwater, 63,000# 100 mesh, 216,040# 40/70 Brady and 50,560# 40/70 SLC. Total Sand = 329,600# RIH w/ wireline (Pumped down w/ 205 BW) & set plug @12,441' MD. Shot perfs 12,292' 12,426' MD. Pumping Stage #12 @ Report Time

Date: 3/29/2017 Day: 6 Stage 12Frac perfs 12,292'12,426' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,091 bbls of slickwater, 60,600# 100 mesh, 216,020# 40/70 Brady and 51,040# 40/70 SLC. Total Sand = 327,660# RIH w/ wireline (Pumped down w/ 187 BW) & set plug @12,277' MD. Shot perfs 12,128' 12,262' MD. Stage 13Frac perfs 12,128'12,262' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,162 bbls of slickwater, 62,100# 100 mesh, 216,000# 40/70 Brady and 49,920# 40/70 SLC. Total Sand = 328,020# RIH w/ wireline (Pumped down w/ 186 BW) & set plug @12,113' MD. Shot perfs 11,964' 12,098' MD. Stage 14Frac perfs 11,964'12,098' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,085 bbls of slickwater, 61,100# 100 mesh, 216,000# 40/70 Brady and 50,080# 40/70 SLC. Total Sand = 327,180# RIH w/ wireline (Pumped down w/ 154 BW) & set plug @11,949' MD. Shot perfs 11,800' 11,934' MD. Stage 15Frac perfs 11,800'11,934' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,130 bbls of slickwater, 62,900# 100 mesh, 216,080# 40/70 Brady and 49,580# 40/70 SLC. Total Sand = 328,560# RIH w/ wireline (Pumped down w/ 133 BW) & set plug @11,785' MD. Shot perfs 11,636' 11,770' MD. Pumping Stage #16 @ Report Time

Date: 3/30/2017 Day: 7 Stage 16Frac perfs 11,636'11,770' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,183 bbls of slickwater, 63,000# 100 mesh, 215,840# 40/70 Brady and 49,920# 40/70 SLC. Total Sand = 328,760# RIH w/ wireline (Pumped down w/ 131 BW) & set plug @11,621' MD. Shot perfs 11,472' 11,606' MD. Stage 17Frac perfs 11,472'11,606' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 8,989 bbls of slickwater, 59,500# 100 mesh, 217,040# 40/70 Brady and 50,540# 40/70 SLC. Total Sand = 327,080# RIH w/ wireline (Pumped down w/ 144 BW) & set plug @11,457' MD. Shot perfs 11,308' 11,442' MD. Stage 18Frac perfs 11,308'11,442' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,100 bbls of slickwater, 62,090# 100 mesh, 216,100# 40/70 Brady and 49,780# 40/70 SLC. Total Sand = 327,970# RIH w/ wireline (Pumped down w/ 154 BW) & set plug @11,293' MD. Shot perfs 11,144' 11,278' MD. Down 7 hours repairing bottom valve on frac stack. Stage 19Frac perfs 11,144'11,278' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,153 bbls of slickwater, 63,500# 100 mesh, 215,000# 40/70 Brady and 51,540# 40/70 SLC. Total Sand = 330,040# RIH with wireline for Stage #20 @ Report Time

Date: 3/31/2017 Day: 8 RIH w/ wireline (Pumped down w/ 139 BW) & set plug @11,129' MD. Shot perfs 10,980' 11,114' MD. Stage 20Frac perfs 10,980'11,114' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,080 bbls of slickwater, 60,600# 100 mesh, 215,000# 40/70 Brady and 52,400# 40/70 SLC. Total Sand = 328,000# RIH w/ wireline (Pumped down w/ 101 BW) & set plug @10,965' MD. Shot perfs 10,816' 10,950' MD. Stage 21Frac perfs 10,816'10,950' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,103 bbls of slickwater, 62,900# 100 mesh, 216,000# 40/70 Brady and 50,080# 40/70 SLC. Total Sand = 328,980# RIH w/ wireline (Pumped down w/ 94 BW) & set plug @10,801' MD. Shot perfs 10,652' 10,786' MD. Stage 22Frac perfs 10,652'10,786' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,113 bbls of slickwater, 62,400# 100 mesh, 216,000# 40/70 Brady and 49,920# 40/70 SLC. Total Sand = 328,320# RIH w/ wireline (Pumped down w/ 92 BW) & set plug @10,637' MD. Shot perfs 10,488' 10,622' MD. Stage 23Frac perfs 10,488'10,622' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 8,906 bbls of slickwater, 64,000# 100 mesh, 215,000# 40/70 Brady and 49,020# 40/70 SLC. Total Sand = 328,020# RIH w/ wireline (Pumped down w/ 154 BW) & set plug @11,293' MD. Shot perfs 11,144' 11,278' MD. RIH with wireline for Stage #24 @ Report Time

Date: 4/1/2017 Day: 9 RIH w/ wireline (Pumped down w/ 87 BW) & set plug @10,473' MD. Shot perfs 10,324' 10,458' MD. Stage 24Frac perfs 10,324'10,458' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 8,984 bbls of slickwater, 64,620# 100 mesh, 217,280# 40/70 Brady and 50,040# 40/70 SLC. Total Sand = 331,940# RIH w/ wireline (Pumped down w/ 91 BW) & set plug @10,309' MD. Shot perfs 10,160' 10,294' MD. Stage 25Frac perfs 10,160'10,294' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,140 bbls of slickwater, 62,000# 100 mesh, 216,160# 40/70 Brady and 49,780# 40/70 SLC. Total Sand = 327,940# RIH w/ wireline (Pumped down w/ 85 BW) & set plug @10,145' MD. Shot perfs 9,996' 10,130' MD. Stage 26Frac perfs 9,996'10,130' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 9,080 bbls of slickwater, 62,900# 100 mesh, 216,100# 40/70 Brady and 50,660# 40/70 SLC. Total Sand = 329,660# RIH w/ wireline (Pumped down w/ 74 BW) & set plug @9,981' MD. Shot perfs 9,832' 9,966' MD. Stage 27Frac perfs 9,832'9,966' MD; 8 clusters; 48 holes w/ 3000 gallons of 15% acid, 8,991 bbls of slickwater, 62,400# 100 mesh, 217,500# 40/70 Brady and 48,900# 40/70 SLC. Total Sand = 328,800# RIH w/ wireline (Pumped down w/ 65 BW) & set plug @9,817' MD. Shot perfs 9,668' 9,802' MD. Pumping Stage #28 @ Report Time