NEW BUSINESS 1140 Lake Shore Blvd (L/LSHD)

Similar documents
R1 Variation Zones. CODE AMENDMENT Q&A UPDATE October 6, 2016 CPC CA ENV ND. Department of City Planning

ARLINGTON COUNTY, VIRGINIA

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

St. Helena Island 5-6 December,

ARLINGTON COUNTY, VIRGINIA

Building: Residential Instructions

Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012

CITADEL TERRACE 685 CITADEL DRIVE EAST, COLORADO SPRINGS, CO 80909

(SEE SECTIONS VII AND VIII OF THE COVENANTS)

2. An increase in the R1H1 Residential Floor Area Ratios to a range of (the column highlighted in lavender on the attached table).

FOR SALE Development Land

FR 5131 SAP Assignment

Variance Project Black Flag Attachments:

Timberline Office Preserve Trueman Boulevard Hilliard, Ohio 43026

PROJECT DESCRIPTION. Solar RV/Boat Storage and Solar Self-Storage Pittsburg-Antioch Highway and Arcy Lane, Pittsburg, CA 8/30/2017

PROJECT SUPPORT STATEMENT VERIZON WIRELESS SITE NORTH BERKELEY INTRODUCTION & FACILITIY DESCRIPTION

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

6500 Harry Hines Boulevard Dallas, TX 75235

CITY OF FORT COLLINS TYPE 1 ADMINISTRATIVE HEARING FINDINGS AND DECISION. Ryan Sagar 1196 Grant Street, Suite 313 Denver, CO 80203

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

CLUSTER MAILBOX REPLACEMENT GPC EVALUATION

Basic Tutorials Series: Navigating the Software. RenoWorks Support Team Document #HWPRO0002

Bremner Transformer Station and Cable Tunnel PROGRESS OF THE CLASS ENVIRONMENTAL ASSESSMENT STUDY

Wireless Telecommunication Facility. Project Narrative

Greater Philadelphia Innovation Cluster (GPIC) for Energy-Efficient Buildings

For Sale or Lease. I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina ±421,200 s.f. of Class A industrial space

SUB-CONTRACTOR PRE-QUALIFICATION FORM

REVIT BEGINNERS. BOOKLET D Revit Architecture 2016

ARLINGTON COUNTY, VIRGINIA

Roofline. Wakefield (Isabella) House No Integrity Compatible Addition

ARTS DISTRICT 2018 E. 8 TH STREET, LOS ANGELES, CA

CodeNEXT Overview August 19, Code Development Team

L-1. Free Metro Ride. Free Metro Ride. Light Rail. Light Rail. 16th Street Mall / Free Mall Ride. Skyline Park. Site.

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

ROCKSIDE WOODS BLVD. INDEPENDENCE, OHIO 44131

SUMMIT TECHNOLOGY CAMPUS 777 NW BLUE PARKWAY I 850 NW CHIPMAN ROAD LEE S SUMMIT MO 64086

EXISTING STRUCTURE 2252 THIRD AVENUE

MARINA PARK PUBLIC ART AT FLAG PLAZA

FORM-BASED CODES IN THE WEST. Rocky Mountain Land Use Institute March 2007

A G E N D A OLD TOWN DESIGN REVIEW COMMITTEE APRIL 10, 2017

DEPARTMENT OF PLANNING & ZONING COMPREHENSIVE PLANNING LAND PRESERVATION FOREST CONSERVATION GIS AGENDA

4800 HARRY HINES BLVD Dallas, TX REDEVELOPMENT OPPORTUNITY in the na on s busiest medical district

STAFF BRIEF. Project: 2018-COA-286 LPC Meeting: August 21, 2018 Address: 635 Downing Street Staff: Jessi White

8505 Baycenter Road Jacksonville, FL

Adding a roof space over several zones.

VILLAGE OF SOUTHAMPTON

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

Home Designer Update Notes

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 22, 2017

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1" = 20'-0" ADD-002 ISSUED FOR: MB/GSB PW/R

City of Ames Street Banner Policy

Approval of Navy Yard Chiller Joint Development Agreement

ATTACHMENT 3 ZAB Page 1 of 21

City Avenue District. City Avenue Rezoning Workshop January 25, :30 p.m. Board of Commissioners

August 10, Sacramento County Planning and Community Development 827-7th Street Sacramento, CA Tricia Stevens, Principal Planner

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CHAPTER 5. Special Cases

ARLINGTON COUNTY, VIRGINIA

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

Concept Mode Tutorial 5 Two Storey House (CDN)

HAYSVILLE USD 261 Preliminary Project Timeline

YATES IS COMPLETING CENTURYLINK S NEW TECHNOLOGY CENTER OF EXCELLENCE. BY RUSS GAGER

Urban Mailbox Installation Guidelines

Attachment 2 Project Plans and Materials Board

Updated April 28, 2010

8505 Baycenter Road Jacksonville, FL

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

NEWEST WESTSIDE PROJECT NOW FOR LEASE. Placentia Avenue, Costa Mesa, CA

5,952 SF - 172,012 SF

THE COLONY. AT MORTON GROVE 3 bedroom / 2 Bath Condos with Single-Car Garage Priced From $179,900

Introduction. We are excited about the possibility of bringing Google Fiber to your city and look forward to working with you.

HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 25, 2012

Planning Department Civic Center North 470 South Allison Parkway Lakewood, Colorado TTY/TDD Lakewood.

Pueblo City-County Addressing Standards May 2010

RCMP Capital Improvements

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

DUKE UNIVERSITY CONSTRUCTION STANDARDS

Buyer is responsible for any follow up required for land use/compatability concerns

Household Information (Portal)

scaleglaze F x12 windows for Facade 1(x6) & 4(x6) G x5 windows for Facade 2 D x16 windows P x5 windows (two sizes)

Appendix C.6. Best Management Practices for Construction Activities

The Hip Roof Style We Customize Roof Styles to Match You Home Base Price Includes. Shingles

Request Conditional Use Permit (Colleges & Universities, public or private) Staff Planner Ashby Moss

Development Application Notice Sign

WAREHOUSE / DISTRIBUTION EXPERIENCE

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2

1605 Lakes Parkway. Lawrenceville, Georgia Gwinnett County. 100,000 SF (Expandable) 17.7 Acres

AMERICAN PKWY. FOR SALE CLASS A OFFICE HEADQUARTERS 4800 American Parkway, Madison, WI

Marshall & Swift SwiftEstimator

DATE: April 8, 2013 REPORT NO. CD TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ]

Unit 6: Triangle Geometry

100 SIMPLEX DRIVE WESTMINSTER, MA

CITY OF GRA DE PRAIRIE SUBDIVISIO A D DEVELOPME T APPEAL BOARD AGE DA

ENERGY SYSTEMS LABORATORY

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

Municipal Service Park 3 December Consolidation of City services to one centralized complex

BCA BUILDING CLASSIFICATIONS

APPLICATION SPECIFICATION

Transcription:

NEW BUSINESS 1140 Lake Shore Blvd (L/LSHD) Trust 8002368034, applicant. Application for major zoning relief to relocate a generator more than 2 from the principal structure where generators must be located within 2 of the principal structure, and a 0.5 street side yard setback where 4 is required for the generator, and major zoning relief for a 2 rear yard setback for one open parking space where 3 is required in the R1 Single Family Residential District. Applicable standards for zoning variations: A and C.

c c c c c c c c c c c c c

c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c

c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c c

Project Overview 1140 Lakeshore Boulevard (South Corner of Hamilton and Lakeshore Blvd) Application for variance for placement of 100Amp natural gas back-up generator Proposed location Parking Pad Location on West End of Lot

Issues and Resolutions Standard placement will place Backup Generator at North side of house View of generator will be seen from adjacent walk. Proposed location will be where AC units are located behind 12 thick brick wall to the west. Advantages of Brick Wall placement -protection from any potential combusion -complete obscurity from any view at any angle -clustering with existing AC units and relevant location

Location based on standard zoning allowance North side of house and east of brick wall

Proposed Location When is the next milestone? at are the expected deliverables? Known risks and issues o What is the investigation timeline for these issues? What are the immediate next steps?

Proposed location North View Slide 1 When is the next milestone? at are the expected deliverables? Known risks and issues o What is the investigation timeline for these issues? What are the immediate next steps?

Proposed location North View Slide 2

View of proposed back-up generator in proposed position but not connected

Top view of proposed generator location with generator in position but not connected

Parking Pad setback variance request showing trees that are adjacent to pad

NEW BUSINESS 717 University Place (L) John Shea, applicant. Replace 1 st and lower level windows with thermally broken narrow sight line aluminum windows that closely match existing steel windows. The proposed windows will match the windows that have been replaced in style and color. Some of the windows proposed to be replaced are not original and have been replaced with clad wood windows. Applicable standards: [Alteration] 1 6 and 10.

NEW BUSINESS 640 Judson Avenue (LSHD) Doug Pasma, applicant. Demolition of existing two story garage/coach house and construction of a new two level garage with storage above. Applicable standards: [Construction] 1-5, 7, 8, 10-13 and 16; [Demolition] 1-5.

Date: 21December2015 To: Carlos Ruiz Senior Planner, Preservation Coordinator From: Douglas Pasma Re: Harris Residence 640 Judson Avenue Evanston, Illinois The project calls for the removal of a two story garage/ coach house and the construction of a new two level garage with storage above at 640 Judson Avenue. As stated in the structural engineering letter, the existing garage/ coach house is un restorable. The proposed garage will have a slightly smaller footprint and be constructed on a concrete foundation wall/ footing down to frost line. The exterior walls will have a stucco finish, windows, and trim will be painted to match the existing residence. The roof slope and eave detail will generally match that of the existing residence in color and texture. The overall massing of the structure, which includes an 8:12 roof pitch that allows for a storage room above the garage, is compatible with the adjacent neighborhood structures in scale and proportion of exterior wall to exposed roof surface. The roof area is scaled down or de massed with the addition of three dormers which allow natural light into the storage area. They will be detailed to match the dormers and eaves as they appear on the existing residence. The intent of replacement garage is to create a structure that is comparable with existing residence and neighboring buildings in size, scale, color and texture.

NEW BUSINESS 2418 Lincoln Street (L) Chad Chovanec, applicant. New addition to the existing masonry residence to occupy the east side yard and rear (south) side yard without encroaching into existing setbacks. Design (including materials, proportion, etc.) shall seamlessly match existing. Applicable standards: [Construction] 1 5, and 7-15; [Demolition] 1-5.

EXISTING SITE PLAN SCALE: 1/16" = 1'-0"

54.25' 54.00' 90.49' 90.82' 93.51' PROPOSED STONE WALK PROPOSED STONE TERRACE PROPOSED ASPHALT DRIVE PROPOSED STONE WALK PROPOSED ADDITION 39.02' EXIST. RESIDENCE 39.03' 45.92' PROPOSED STONE TERRACE EXIST. STONE STOOP EXIST. ASPHALT DRIVE EXIST. GARAGE PROPOSED SITE PLAN SCALE: 1/16" = 1'-0"