Approval Block. Prepared by: Signature Date Evan Parnell 08 NOV Reviewed by: Signature Date. Approved by: Signature Date

Similar documents
Approval Block. Prepared by: Signature Date. Evan Parnell 08 NOV Reviewed by: Signature Date. Approved by: Signature Date

Approval Block. Prepared by: Signature Date Evan Parnell 08 NOV Reviewed by: Signature Date. Approved by: Signature Date

Approval Block. Prepared by: Signature Date. Evan Parnell 17 NOV Reviewed by: Signature Date. Brian Flynn 17 NOV 2014

SECTION CLEANROOM CERTIFICATION

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES

HARBEC Inc Ontario, NY

Specific Accreditation Criteria

Cleanroom Standards CLEANROOM TUTORIAL PROGRAMME CLEANROOM CLASSES ISO CLEANROOM STANDARDS (SEP 05)

Cleanroom Certification Report

HOW TO SELECT A CLEANROOM: MODULAR CLEANROOMS FOR NEW BUSINESSES, NEW PRODUCT DEVELOPMENT

ISO INTERNATIONAL STANDARD. Cleanrooms and associated controlled environments Part 4: Design, construction and start-up

APRIL 2010 VOL. 13 NO. 4. Modular Cleanrooms for Business Startups and New Product Development

From Standards to Practice: Sterile Respirator Hoods

CLEAN ROOM PROTOCOL AND WAFER HANDLING

Clean Room Certification Reports Interpreting and Acting on the Good, the Bad and the Ugly!

MECHANICAL CONTRACTORS ASSOCIATION OF AMERICA, INC. CLEANROOM PIPING AND PROCEDURES BASIC CONSIDERATIONS

CONNECT INPUT CABLE TO SQUID P0682 Rev -

I3 Consulting Clean rooms for Pharmaceuticals & Medical Device Manufacturing

Series 575. Vertical Flow Modular Softwall Cleanroom. Series 575 Vertical Flow Modular Softwall Cleanroom

This document is a preview generated by EVS

Obtaining the Weld Quality You Need. What to Look for in a Cleanroom Welding Contractor

October 21-23, 2013 Holly Springs, NC

MicroContamination Solutions, Inc. P.O. Box 6897, Incline Village, Nevada 89450

Soldier and Biological Chemical Command, AMSSB-REN, Aberdeen Proving Ground, MD

ISO INTERNATIONAL STANDARD. Cleanrooms and associated controlled environments Part 5: Operations

Reliable Protection with RABS. Restricted Access Barrier System Reliable Protection of Product and Process. Together always one step ahead

ISO INTERNATIONAL STANDARD

Airborne Particle Monitoring: Impact of ISO Calibration

Chemlock PFA and PP Filter Housings

CLEAN ROOM TECHNOLOGY

Cleanroom Design. Second Edition W. WHYTE. JOHN WILEY& SONS Chichester New York Weinheim Brisbane Singapore Toronto. Edited by

MOUNT PROBE ONTO PRECISION MANIPULATOR

Electronics + ESD Cleanroom Seating OPUS ESD. seating. ... chairs designed for work

Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme. Version 1.2

ISO INTERNATIONAL STANDARD. Cleanrooms and associated controlled environments Part 3: Test methods

Agenda. Scope ISO IS : Flowchart. IS : Flowchart. Onderbouwd inschatten en rekenen aan cleanrooms

Technovation Systems, Inc

Application of IBM s s Corporate Ventilation Process at a Semiconductor Facility

Australian/New Zealand Standard

ASSE PROFESSIONAL CERTIFICATION PROGRAMS PROCTOR GUIDE

10 COMMON TRAPS IN DESIGNING A CLEANROOM

Cleanrooms and associated controlled environments. Part 14: Assessment of suitability for use of equipment by airborne particle concentration

STR-3 STANDARD 3-PHASE 230 VAC TRANSFORMER CONTROLLER. Mounting and operating instructions

UNDERSTANDING DIFFERRENT ASPECTS OF PROTECTIVE GARMENT SOLUTIONS

A smart system with an easy touch APC SmartTouch. Airborne Particle Counter

Warning. Important. Always follow all local building electrical codes. PECCSUN3672DB46M PECCSUN3672EN46M

Environmental Monitoring Systems for critical applications

ISO INTERNATIONAL STANDARD. Cleanrooms and associated controlled environments Part 4: Design, construction and start-up

ISO INTERNATIONAL STANDARD. Cleanrooms and associated controlled environments Part 5: Operations

TRANSFER THE QB/T FROM THE OPTICAL TABLE TO VERTICAL MANIPULATOR

WHITEPAPER CLEAN ROOM DESIGN AND THE ROLE OF FLOORING. An overview of cleanroom design and flooring considerations to ensure regulatory compliance.

TSI AEROTRAK REMOTE WITH PUMP PARTICLE COUNTERS INSTALLATION CONSIDERATIONS

Modular CLEANROOM Solutions

PREPARE PROBE FOR CLASS 10 CLEANROOM

The modular application of the cleanroom solutions for manufacturing facilities

FS209E and ISO Cleanroom Standards

A course entitled. Particle counting to ISO Parts 1& 2

Cleanroom manufacture and online supplies

Cleanroom Performance

The Effectiveness of Air Showers in the Contamination Control Process

Cleanroom Performance

Hardwall & Softwall Cleanrooms

POST-INTEGRATION CHECKOUT OF SUSPENSION CABLES

Qualified Partner Programme QPP. Installation Practice Felice Guarna Wetzikon, July 2001

CLEANROOM TECHNOLOGY CERTIFICATION -EXAMINATION

PARTICLE MEASUREMENT IN CLEAN ROOMS.

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

INSTALLATION INSTRUCTIONS ECOHPRS Series Horizontal Economizer for York PRESTIGE for ZX 04-07; ZY 04-06

AEROTRAK PORTABLE AIRBORNE PARTICLE COUNTER MODEL 9310/9350/9510/9550/9500 QUICK START GUIDE

OLS Series Light Sources, OPM Series Optical Power Meters, and Related Test Kits User s Guide

Proline Prowirl 72, 73

Product Family Fendall Porta Stream II

Operational Safety Procedure (OSP) For The. Laser Bay. At the. Texas Center for High Intensity Laser Science. Document Number TPW-D-0011-A

CSS1 Contractor Series Light Sources and CSM1 Contractor Series Optical Power Meters User s Guide

DSTHM-2 COMBINED T AND RH DUCT TRANSMITTER. Mounting and operating instructions

Automotive Electronics Council Component Technical Committee

Solarlok PV BAR Junction Box Assemblies

Program ROAD Manager MAP Certification

AEROTRAK HANDHELD AIRBORNE PARTICLE COUNTER MODEL 9306 QUICK START GUIDE

Test report. Evaluation of particle generation from a chair for use in cleanrooms

DustTrak Presentation

FS209E and ISO Cleanroom Standards

Before starting the system, please carefully read this manual and keep it safely for future reference.

Filter Fan Unit LIGHT

Karl Suss SB6 Bonder Operation Tool Id: Rev 01, 09/24/10

Cleanrooms and Standards The Road Ahead

RI AND RF CRITERIA AND FORMATS

Modified SterilGARD Class II type A2 Biosafety Cabinet with BD FACSMelody Cell Sorter Installed

IMO TEST STANDARDS FOR EXTENDED SERVICE INTERVALS OF INFLATABLE LIFERAFTS

RPR CRITERIA AND FORMATS

Air Technology Division

Application of Modular, Rapidly Deployable CBR Filtration and Environmental Conditioning Systems for Building Collective Protection

CHANGES TO THE STANDARD FOR ISO ISO Cleanrooms and Associated Controlled Environments

Reducing Data Center Cooling Costs through Airflow Containment

Handheld Laser Particle Counter. Model: P311. Operation Manual. Ver: 1.50 AIRY TECHNOLOGY INC

Mobrey Hydratect 2462

NOTE: All facility requirements must be met before 3D Systems Customer Support can schedule a trip to your facility to install the printer.

Mount Pleasant Waterworks. Cross-Connection Control Program Guidelines October 2010

This procedure applies to all Standard Operating Procedures and Protocols that are generated in the NCSBI Crime Laboratory Forensic Biology Section.

Transcription:

ATS-ATP-3440 Page: 1 of 6 Approval Block Prepared by: Signature Date Evan Parnell 08 NOV 2013 Reviewed by: Signature Date Brian Flynn 08 NOV 2013 Approved by: Signature Date Kristal Jewell 08 NOV 2013 Historical Reference Section: Section Name Section Number (i.e., 5.2.1) Revision Affected Explanation of Change Cover page N/A A Added Historical Reference Section, Changed Approval Block Format Footer N/A A Changed Fax# Document Control N/A B Review 1. Purpose This document provides instruction for the certification of bag in / bag out HEPA filters. 2. Scope This procedure shall be followed by personnel performing cleanroom certifications. Additional testing and or deviation from this SOP shall be agreed upon prior to the start of testing.

ATS-ATP-3440 Page: 2 of 6 3. References 1. Institute of Environmental Sciences Contamination Control Division Recommended Practice IES-RP-006.2 Testing Cleanrooms 2. International Organization for Standardization ISO 14644-1 Cleanrooms and associated controlled environments - Part 1: Classification of airborne particulates 3. International Organization for Standardization ISO 14644-2 Cleanrooms and associated controlled environments - Part 2: Specifications for testing and monitoring to prove continued compliance with ISO 14644 4. Material Safety Data Sheets (MSDS) located immediately outside the cleanroom. 4. Equipment and Materials Equipment: 1. Aerosol Generator Laskin nozzle compressed air operated DOP/Emery 3000 generator 2. Aerosol Photometer sampling flow rate of 1.0 cfm, linear readout. 5. Safety 1. Wear proper cleanroom gowning attire as specified by facility SOP or as instructed by facility point of contact. 2. Avoid lifting heavy equipment. Wait for help from another employee prior to lifting any heavy equipment. 3. Avoid reaching while working on a ladder. Move the ladder to ensure proper access to your concern. Do not step on the top two rungs of a step ladder. 4. Refer to manufacturer s safety precautions and Material Safety Data Sheet (MSDS) for appropriate protective equipment and safe handling procedures when using chemicals.

ATS-ATP-3440 Page: 3 of 6 6. Responsibility 1. It is the responsibility of the President to maintain this document and oversee these activities. 2. It is the responsibility of the individual(s) performing this task to follow this procedure. 7. Preliminary Operations 1. Collect all materials and equipment necessary to conduct the certification. 2. Ensure all equipment is within calibration prior to the start of use. 3. Wipe down all equipment in accordance with the facility SOP or use a 70% ethanol, 30% water solution unless otherwise instructed by the facility point of contact. 8. Cleanroom Operational Phases Testing may be performed at different stages as characterized by the completeness of the cleanroom installation and operational modes as defined below. Stage 1 Stage 2 Stage 3 NOTE: As-Built-Facility: A cleanroom which is complete and operating with all services connected and functioning, following initial clean down. There is to be no process equipment or operating personnel within the facility. At-Rest-Facility: A cleanroom with is complete and operating. The room is to be fully populated with process equipment staged in a nonoperational mode. There shall be no operating personnel present. Operating Facility: A cleanroom in normal operation fully populated with functioning process equipment and operating personnel. At times it will be necessary to take exception to strict compliance with the aforementioned testing stages. Deviation or interaction among the stages may be required due to availability or operational status of the

ATS-ATP-3440 Page: 4 of 6 process equipment. These situations shall be identified and acknowledged as part of the contractual agreement. 9. TEST PROCEDURES AND ACCEPTANCE CRITERIA A. HEPA and ULPA Filter Installation Leak Tests 1. Purpose These tests are performed to confirm that the HEPA or ULPA filter system is properly installed by verifying the absence of bypass leakage in the installation, and that the filters are free of defects and small leaks. The tests are performed by introducing an aerosol challenge upstream of the filters and scanning immediately downstream of the filters and support frame or sampling in a downstream duct. 2. Apparatus A total scattering aerosol photometer with a linear or expanded logarithmic scale, or equivalent, that is capable of detecting a 100% upstream concentration with an aerosol concentration of 10 ug/l of polydisperse dioctylphthalate (DOP) particles, or an equivalent fluid that produces the same particle size distribution when generated by a Laskin nozzle generator, or equivalent, and is capable of detecting an aerosol concentration of 1 x 10-3 ug/l of the same particles. The photometer is to have an air sampling rate of 1 cfm +/- 10%. Probe diameter is not to exceed 1 inch. A Laskin nozzle generator or equivalent. The aerosol is to be diluted with air flowing through the cabinet to a concentration not greater than 100 ug/l nor less than 10 ug/l upstream of the HEPA or ULPA filter undergoing the leak test. 3. Procedure 3.1 Aerosol Challenge and Aerosol Photometer Scan

ATS-ATP-3440 Page: 5 of 6 a) Introduce the aerosol into the air supplied to the filter or filters under test in a manner that will produce a uniform challenge concentration over each filter s surface. Where construction permits, means should be provided to challenge and test filters one at a time to minimize exposure of the filters to the challenge aerosol. Where construction dictates that multiple filters must be exposed to the challenge aerosol simultaneously, the aerosol should be introduced at a location that will provide uniform concentration to all of the filters. b) Measure the concentration of the challenge aerosol immediately upstream of the filters under test, using a photometer whose sensitivity is adjusted to a baseline of 100 ug/l in accordance with the manufacturer s instructions or calibration curve. A reading of 10% to 20% (which corresponds to 10 to 20 ug/l of air) on the photometer should be obtained for correct challenge concentration. Adjust the sensitivity, gain, or span for a reading of 100%, or full scale while sampling the upstream aerosol. c) Scan the entire face of each filter for leaks, using slightly overlapping strokes of the probe. Also scan the perimeter of each filter to locate leaks in the bond between the filter pack and the frame and leaks in the seal between the frame and the grid structure. The probe should be held approximately 1 inch from the filter face during scanning. The scanning rate should not exceed 2 inches per second. d) If the downstream face of the HEPA filter(s) is not accessible, perform a sample in the downstream plenum as close to the filter(s) possible. e) Any indication of a leak in excess of 0.01% (0.005% if the downstream side of the filter in not accessible and sampling is performed in the downstream plenum) of the upstream challenge aerosol concentration or the agreed upon limit for the filter being scanned should be cause for sustained residence time of the probe at the leak location. The size and location of the leak are identified by

ATS-ATP-3440 Page: 6 of 6 the position of the probe that maintains the maximum sustained reading on the photometer. f) Report all leaks exceeding 0.01% (0.005% if the downstream side of the filter in not accessible and sampling is performed in the downstream plenum) of the upstream challenge aerosol concentration or as otherwise agreed upon by the customer and ATS. Record the size and location of the leaks on a reflective ceiling layout of the cleanroom or cleanzone. g) Repairs for HEPA and ULPA filters may be performed providing access to the filters is available and the total size of the repairs do not block or restrict more than 3% of the filters face area and that the lesser dimension of any repair does not exceed 1.5 inches or as otherwise agreed upon by the customer and ATS. Repairs to filter installation leaks will be made in accordance with procedures acceptable to the customer and ATS. After the repair is complete and suitable cure time has been allowed for the patch to set, check for leaks in the vicinity of the repair. 3.2 Acceptance Acceptance for the air-generated aerosol challenge and aerosol photometer filter scan test shall be in accordance with the facility SOP or as agreed upon by the customer and ATS. B. Additional Testing Additional tests may be performed as agreed upon between the customer and ATS. All additional tests are to be in accordance with Reference 1.