PENS The New Information Highway

Similar documents
ICAO Seminar/workshop on the Implementation of ground/ground and air ground data link applications in the SAM region

PENS Symposium SESAR Project Overview

Datalink performances

Mastering the future of Air Traffic Management A conference on the European ATM Master Plan

PENS Symposium 17 th & 18 th October AMHS Transition to PENS Use Case

Cyber security in European ATM

AEFMP a long-lasting inter-regional cooperation for ASBU implementation in Western Mediterranean

EUROCONTROL SWIM Specifications. NM B2B Tech Forum June 2018

Development of the SPI Regulation

SESAR Deployment and upcoming CEF Transport Calls ANS Consultative Board. Helsinki, 12 October 2015

The modernisation of ATM in Europe

AMHS/Third Party Interconnection Architecture

CEF ehealth DSI 2018 Technical Boot Camp State of Play

Final Project Report. Abstract. Document information

ICB Industry Consultation Body

Freedom of Information Act 2000 reference number RFI

EUROCONTROL SWIM Standards Evolution Workshop

Pan-European Contribution of EUROCONTROL to the Single European Sky

Centralised service 6-7: Ensuring the resilience of centralised services cyber-security and sharing cyber intelligence

Towards collaborative governance of the Digital Backbone for the SES White Paper

SWIM System Wide Information Management

Air Traffic Management. Defence. vitalsphere. ATM-grade network references. Public Transport. Public Safety. Maritime

CIMA Asia. Interactive Timetable Live Online

ICAS Workshop 3rd October 2005 Single European Sky Implementation Plan - SESAME

AMHS Implementation Issues. Julio C. Siu Regional Officer/ Communication, Navigation and Surveillance

New Concept for Article 36 Networking and Management of the List

NEWSKY Project. SAI Subcommittee Meeting, August 2008, Vienna

Data-link Services (DLS) implementation 2017 CEF Transport Calls for proposals

CIMA Asia. Interactive Timetable Live Online

Stakeholder consultation process and online consultation platform

CLARIFICATION OF DOC 9896 INTERNET PROTOCOL SUITE IPv6. (Presented by USA)

EUROMED GNSS II/MEDUSA project

SME License Order Working Group Update - Webinar #3 Call in number:

World ATM Congress 2017 ANSP COLLABORATION: BENEFITS OF CROSS-BORDER ATM SYSTEMS HARMONIZATION. Gonzalo Martín Herrero

How a global industry player addresses the Cybersecurity challenges of Air Transport

Energy Step Code Implementation Strategy. March 26, 2018

ATFM. Planning in Complex Operations. Stu McBride Future ATM and Network Services Manager. ICAO ATFM GLOBAL SYMPOSIUM 20 TH November 2017.

MISO PJM Joint and Common Market Cross Border Transmission Planning

Report on Service Areas and DLS overall architecture FPA No MOVE/E /SESAR FPA - Programme and Support Actions

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

White paper: ATM-grade networks

Traffic Types and Growth in Backbone Networks

International Civil Aviation Organization

Final Project Report. Abstract. Document information

App Economy Market analysis for Economic Development

e-sens Nordic & Baltic Area Meeting Stockholm April 23rd 2013

System Wide Information Management (SWIM) PENS Symposium Brussels, 17 October 2012

N4 Design Options. Andy McAnaney DHID VDNS (Voice and Data Networks Services) Team

Final Project Report

Final Project Report. Abstract. Document information

Making Global Air Traffic Surveillance a Reality!

TWELFTH AIR NAVIGATION CONFERENCE

European Developments

SESAR technical workshops SWIM becoming a reality (demonstration)

USGv6: US Government. IPv6 Transition Activities 11/04/2010 DISCOVER THE TRUE VALUE OF TECHNOLOGY

CMMI Version 1.2. Josh Silverman Northrop Grumman

Presentation of Iris. ART-Workshop 'CNS and Infrastructure 13 th March 2018

Government of Canada IPv6 Adoption Strategy. IEEE International Conference on Communications (ICC 12) June 14 th, 2012

International Civil Aviation Organization. MID ATS Message Management Center Steering Group. MIDAMC and AMHS Implementation in the MID Region

Central Maine Power AMI Program: Building a Stronger, Smarter Grid for Maine Contact: Laney Brown;

VDL MODE 2 DATALINK RECOVERY PLAN WORKSHOP

Rural Intersection Collision Avoidance System (RICAS)

2018 IT Academy Program. December 2017

AIMMS Function Reference - Date Time Related Identifiers

Council, 8 February 2017 Information Technology Report Executive summary and recommendations

DATE OF BIRTH SORTING (DBSORT)

Space-enabled 5G services

On the road with 3GPP. 3GPP s Long Term Evolution and System Architecture Evolution projects

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION

Report of the activities carried out to date since the last meeting of the Coordination Committee

Much more than Rules need to be in place by 2014

Countermeasures against Mobile spam

The outline of the CONOPS

European Sky ATM Research (SESAR) [5][6] in Europe both consider the implementation of SWIM as a fundamental element for future ATM systems.

Mobile Broadband and benefits with harmonized UHF spectrum

Space for safe skies. ESA Iris Program. Satellite Communications for Air Traffic Management (ATM)

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

Third SafeSeaNet Data Quality quarterly report (October, November and December 2009)

GSMA Embedded SIM 9 th December Accelerating growth and operational efficiency in the M2M world

Third public workshop of the Amsterdam Group and CODECS European Framework for C-ITS Deployment

TERMS OF REFERENCE Special Committee (SC) 214 Standards for Air Traffic Data Communication Services Revision 11

EC (DG SANTE) The ehealth DSI , Solution Provider

HSCN Technical & Security working group

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017

Regional telecommunication Networks for Integrated Telecommunications for Air Navigation Services

EGNOS and ESSP Certification. ESESA Aviation Workshop 26 th - 27 th October 2010

San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015

BMVIT-CSJU Workshop Clean Sky TAKE OFF Intro to Clean Sky

Actions taken by Morocco Jamal KAITER ATC Study, Planning & Air traffic Coordination Division Chief

Undergraduate Admission File

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

TCCA White Paper PPDR Roadmap for evolution from LMR/PMR to 4G/5G

Transition Implementation Status Reporting. 31 March 2016

13174/15 AT/tl 1 DGE 2B

TOOP Introducing The Once-Only Principle project

INTRODUCING CISCO SECURITY FOR AWS

NOAA N-Wave Update N-WAVE V. NOAA Research Network. Joint Techs Columbus 13 July 2010

IPv6 Deployment in Africa

International Civil Aviation Organization

Transcription:

PENS The New Information Highway ATSEP - Workshop October 2018

Speaker Michael Rauff Hansen Manager of CNS Systems at Naviair 24 years at the Danish ANSP Member of PENS management steering group PSSG Vice-chairman of NewPENS management steering group ATSB Member of CNS-T technical management group at EUROCONTROL

NAVIAIR Danish ANSP HQ in Copenhagen Airport 630 FTE 92 FTE in Technical organization Equipment in Denmark, Faroe Islands and Greenland 600.000 operations Enroute EKDK FIR 260.000 operations in Copenhagen Indsæt billede hen over denne kasse Den grønne streg til højre må ikke dækkes af billede

Agenda History What is PENS Services Operations Next step Future Indsæt billede hen over denne kasse Den grønne streg til højre må ikke dækkes af billede

But first - What are we talking about Pan European Network Services PENS

The beginning. EC IPAX Trials 2004 Planning for PENS 2008 PENS in operations 2010 Indsæt billede hen over denne kasse Den grønne streg til højre må ikke dækkes af billede

Why PENS. PENS network model PENS enabler PENS key services Indsæt billede hen over denne kasse Den grønne streg til højre må ikke dækkes af billede

What did we gain with PENS Data communications in the air traffic management was heavily relying on X.25, a technology that is about to be phased out (OLDI, ASTERIX, AFTN/CIDIN ) Most inter-ansp links was bilateral point to point circuits, managed on a bilateral basis Eurocontrol NM Flow Management and EAD had separate networks with different providers Future air traffic management will require tighter collaboration between all stakeholders Supporting seamless operations and interoperability Business case demonstrated that overall costs could be reduced by 15%. The technical enabler for this is a common shared network: PENS

The PENS Community.

PENS are still growing ACCESSION TO PENS in the last 2 years 34 PENS users Latest accessions: 1. IsrAA (Israel): accession amendment signed by Israel and 2. Morocco- accession amendment signed 4/12/2017 3. MATS Malta- accession amendment signed 22/12/2017 4. GREECE: accession amendment signed 15/11/2017 5. TUNISIA OACA: accession amendment signed 8/08/2017 6. NAV CANADA: accession amendment signed 15/03/2017 7. JERSEY: accession amendment signed on 15/03/2016 8. Oro Navigacija: accession amendment signed 14/11/2016 9. CYPRUS: accession amendment signed on 7/06/2016 10. EANS: accession amendment signed on 2/03/2016 Indsæt billede hen over denne kasse Den grønne streg til højre må ikke dækkes af billede

PENS Services PENS is a MPLS network supporting up to 16 different VPNs with Class of Services (CoS) at all sites. Connecting 134 sites across 46 countries 77 sites are class 1 sites dual access MCS, full diversity, no SPOF, Gold CoS. SITA maintains diversity certificates. Most class 1 sites carry more than one VPN. 28 of them support ANSP BB. 11 sites are configured with NM voice capabilities and 6 with ANSP voice capabilities ( Platinum Class of Services)

MPLS - Multi-protocol label switching MPLS is best summarized as a Layer 2.5 networking protocol. In the traditional OSI model: Layer 2 covers protocols like Ethernet and SONET, which can carry IP packets, but only over simple LANs or pointto-point WANs. Layer 3 covers Internet-wide addressing and routing using IP protocols. MPLS sits between these traditional layers, providing additional features for the transport of data across the network.

PENS Design Overview PENS ANSP Backbone Multicast Multicast SUR OPS MSG OPS SUR TEST IPv4 IPv4 IPv4 MSG TEST IPv6 IPv4 IPv6 SESAR Surveillance / radar (60%) Regional use (30%) Future use (10%) FMTP (60%) AMHS (30%) Future use (10%) IPv6 Multicast Data Link Voice NM VPN IPv4 EAD VPN IPv4

PENS Services The services are segregated over the MPLS network into different VPNs: NM : 93 Service Delivery Points across 46 countries EAD : 35 Service Delivery Points across 24 countries ANSP : 42 Service Delivery Points across 29 countries SESAR : deployment following the evolution of the SESAR projects The PENS operational VPN s in 2017 are: PENS_CFMUNET PENS_EADNET / PENS_TEST_EADNET Messaging OPS / Messaging TEST Radar OPS / Radar TEST ANSP Voice OPS / ANSP Voice Test Datalink_Trusted / Datalink_Not_Trusted SESAR B2B OPS / B2B TEST

ANSP VPN Usage (services per site) 20 18 16 14 12 10 8 6 4 2 0 19 16 14 13 13 13 13 10 10 8 8 7 7 7 6 6 5 5 5 4 4 3 3 2 NAVIAIR AUSTROCONTROL Eurocontrol NM ENAIRE (Madrid) Eurocontrol NM NATS (Swanwick) PANSA (Warsaw) NAV (Lisbon) SKYGUIDE (Geneva) BELGOCONTROL CROCONTROL DFS (Frankfurt) LFV (Malmö) LPS (Bratislava) LVNL (Amsterdam) SLOVENIACONTROL DSNA (Bordeaux) ENAV (Padova) ENAV (Rome) DFS (Karlsruhe) LGS (Riga) DFS (Bremen) NATS (Prestwick) ANS (Prague) Data from june 2016

Operational ANSP Services over PENS AMHS; 126; 56% AFTN; 8; 3% XMAN; 4; 2% Data from june 2016 FMTP; 76; 34% Surveillance; 12; 5%

Data Link Services

PENS Availability Management PENS availability measures assess the overall quality of the services. The measured availability is well above the target performance of 99,95% for all Class 1 Sites: PENS Availability - Class 1 sites Availability target Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Yearly Average 99.999 99.999 99.999 99.978 99.999 99.999 99.997 100 99.997 99.998 100 100 99.997 99.997 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95 99.95

The Day to Day operation. PENS Governance

PENS extension But every thing comes to an end The current PENS contract with SITA ended in 2018 PENS was extended by 18 th Months in line with the target transition time to a new infrastructure. (with an option to further extension) The extension period will last from June 1 st 2018 to November 30 th 2019. PENS extension grants continuity of operations on the existing PENS, with no discrimination on users, nor impact, due to the sequence of the transition. The sizing of the SITA Operations team will remain as today.

UNSTOPPABLE DEMAND

What to do Building on the Experience Learnt from operating an successful PENS Results of the EUROCONTROL CS 8 Feasibility Study cofinanced by the EC Results of the ANSPs of the A6 Alliance Study co-financed by the EC THE means of ground-ground communications for ALL connections between ALL ATM Stakeholders in Europe

The Future. New Pan European Network Services NewPENS SHARING data and information IS KEY to meet this challenge

The NewPENS project In January 2016 EUROCONTROL hosted a major meeting to move forward with the implementation of NewPENS. The decision was made by 41 EUROCONTROL Member States to entrust EUROCONTROL with a Common Procurement Agreement (CPA) The calls for tender was published in the first semester of 2016, with offers expected in December 2016. The aim was to have the contract in place by the end of 2017 so the migration to the new provider could start by the middle of 2018.

The CPTF The Common Procurement Task Force was established and the work making the tender material was started. After the initial tender it was decided to continue with 2 tender candidates. In beginning of 2018 the CPTF endorsed the company BT s Global Services division to the governance body of NewPENS as the contract partner. BT was approved and the final contract negotiation commenced

NewPENS Signing event on April 2018

Key statement NewPENS is an unparalleled common procurement contract in European Air Traffic Management. With air traffic on the rise, NewPENS will provide solid support to European aviation, securing cross-border network connections and underpinning safety-critical applications. The ultra-resilient network will connect more than 100 locations across the European / North Atlantic region.

NewPENS Transition Programme Goal: Achieve the decommissioning of the current PENS Network at the latest by end November 2019 Context: 40 ANSPs + EUROCONTROL, 117 Service Delivery Points, EASA, National Safety Authorities, BT, SITA, SITAONAIR and an extensive range of subcontractors Strong collaboration between the NewPENS Governance and the PENS Governance Newly introduced PENS Technical Center (PTC) provides network architecture guidance to the community; it is supported by the PENS User Group (PUG) for validation, deployment and operational coordination aspects.

NewPENS TWG Transition Strategy Transition Estimated Timeline April 2018 Contract Signature T 0 Today July 2018 October 2018 January 2019 April 2019 July 2019 December 2019 T 0+3 months T 0+9 months T 0+12 mont hs T 0+6 months T 0+15 mont hs T 0+20 mont hs TWG - Transition Activities NSP - Transition Programme Planning Service Management Framework Setup Preparation of network deployment (Site surveys, Last Mile Provider...) Freeze Periods Infrastructure deployment and SAT (On-site installation & service acceptance) Application Testing Service Migration from PENS to NewPENS Nov-17 Jan-18 Apr-18 Jul-18 Oct-18 Jan-19 Apr-19 Jul-19 Oct-19 Dec-19

BT High level design Removed from slide

BT High level design Copenhagen site

Pan European Network Services Integration

KEY ENHANCEMENTS Open to wider range of stakeholders (Mil, ATM providers, airlines, airports, MET as well as ANSPs) Increased flexibility in supporting applications Safety levels will be ATM-grade (able to support safety-critical applications) Sophisticated cybersecurity measures will protect users data Availability will be up to 99.999% (decimal point higher than before)

NewPENS Governance Indsæt billede hen over denne kasse Den grønne streg til højre må ikke dækkes af billede

A look into the Crystal PENS will be one of the main enablers for the Collaborative Decision Making (CDM) concept that is being developed in the context of SESAR. It will meet both current needs for the information exchange between ANSPs and ATM stakeholders, as well as those foreseen by the SESAR Programme for the System-Wide Information Management (SWIM). Eurocontrol and the ANSPs have been working together to evolve NewPENS to meet the future ATM requirements in Europe to enable significant cost savings for the ATM community in Europe. Today, PENS provides an operational communications network to over a dozen ANSPs and several other ANSPs are planning to join.

?!