1 The outline of the CONOPS CS#9 - Data Communication Services (DCS) Philippe Renaud CS9 Project Manager 25 Oct 2013
2 CS9 Context A/G datalink mandated by EC No 29/2009 More ANSPs to be connected More ATN/VDL Mode 2 stations New ANSPs implementing datalink need ATN & VDL Mode 2 expertise CPDLC processing in new ATC centers Accomodate legacy services (e.g. FANS1/A) Some current choices not optimal (e.g. A/C to know all ATC center addresses need for frequent avionics database update) Implementation of SESAR concepts (Initial 4D and full 4D trajectory management) - A/G data communication: a key enabler More data management resources (ADS-C, CPDLC) to be implemented - Investment and operating costs, 24/7 availability
3 CS9 Drivers Provide common contract and interface with main Communication Service Providers (e.g. for SATCOM services) Reduce costs One interface Share expertise Rationalise the VDL ground based infrastructure Reduce deployment costs Simplify the infrastructure management Pave the way for the future A/G technology deployment such as AeroMACS. Offer a platform for further deployment Facilitate the implementation of new technologies within the network Rationalise data processing (e.g. ADS-C) & associated management resources Reduce investment and operation costs Overcome current limitations Must not jeopardise current implementation (cf. D/L Implementing Rule)
4 CS9 Objectives Twofold objectives CS9-1: Centralised provision of A/G Telecommunication Infrastructure Services Enabling exchange of ATM D/L information between mobile & ground users Through a performance based contract (Service Level Agreement) Operated by a CS9 Service Provider under a contract managed by EUROCONTROL NM CS9-2: Data Communication Services Optimising European processing resources Based on Centralised European application servers Operated by a CS9 Service Provider under a contract managed by EUROCONTROL NM Note: CS9-1 and CS9-2 Service Providers may be different
5 CS9 in a nutshell CS9 Data Communication Services (e.g. CM server) Mobile user (e.g. aircraft) Telecom Infrastructure Services Fixe user (e.g. ANSPs) : Access Point (at which SLAs are defined) : Physical connection : Logical flow of data
6 CS9-1 Air/Ground Telecommunication Infrastructure Services
7 CS9-1 A/G Telecommunication Infrastructure Services Leading Principles Current avionics to be preserved Current Air/Ground D/L technologies shall be maintained Open to evolutions Future Air/Ground D/L technologies, SESAR validated and Standardised (ICAO, EUROCAE) SLA Performance-based contract
8 CS9-1 A/G Telecommunication Infrastructure Services Service provision SLA defines the service at the CS9-1 interfaces A Contract is established with the CS9-1 Service Provider through an open Call for Tenders based on the SLA The CS9-1 Service Provider has the responsibility to establish the necessary contracts with other service providers (e.g. SATCOM services) to fulfill the SLA obligations Different business models can be envisaged feasibility phase to verify viability
9 CS9-1 A/G Telecommunication Infrastructure Services Scope Mobile user A/G Router CS9-1 A/G Router CS9-2 Centralised server Ground infra e.g. CS8 PENS G/G Router Fixed user (ACC center, airport, NM, ) A/G Router G/G Router CS7 - Monitoring CS6 CNR : CS9-1 scope : Non CS9-1 Service Providers (e.g. ACSP, satellite operator, or ANSP) contracted by CS9-1 Service Provider : CS9-1 contractual service interface SLA applies : Internal service interface (between CS9-1 Service Provider and other service providers) under the responsibility of the CS9-1 Service Provider
10 CS9-1 A/G Telecommunication Infrastructure Services Supported Datalink Services CS9-1 contract will include FANS1/A, ATN-B1, and in the future ATN-B2 CS9-1 contract will not include AOC and non-atm services (such as passenger services (APC)) (1) 1: CS9-1 Service Provider could operate AOC and non ATM services (e.g. APC) over the infrastructure supporting CS9-1. However these services have to be fully segregated from the CS9-1 services
11 CS9-1 A/G Telecommunication Infrastructure Services Supporting technologies Connection of Mobile Users Current technologies VDL Mode 2, ACARS (for ATM), SATCOM Future Validated & standardised technologies (e.g. AeroMACS). Connection of Fixed users PENS (CS8)
12 CS9-1 A/G Telecommunication Infrastructure Services Possible Business Model scenario Different scenario can be envisaged Feasibility phase to verify viability ANSP1 being the CS9-1 provider e.g. 2 scenario (among others) ANSP1 to contract ACSP for VDLM2 resources ACSP1 being the CS9-1 provider ACSP1 to contract ANSPs for VDLM2 GS resources ACSP1 to contract Sat operator for SATCOM resources ACSP1 to contract ACSP2 for VDLM2 service ANSP1 to contract Sat operator for SATCOM resources : CS9-1 contractual service interface
13 CS9-1 A/G telecommunication Infrastructure Services Benefits Rationalisation of the infrastructure Simplification of deployment Common contract and interface with 1 CS9-1 provider Facilitate the implementation of future A/G technologies
14 CS9-1 A/G telecommunication Infrastructure Services Feasibility phase Example of points to be demonstrated Identification and Viability of business model SLA definition
15 CS9-2 Data Communication Services
16 CS9-2: Data Communication Services Service provision 3 added value centralised servers Context Management (CM) server CPDLC server ADS-C server
17 CS9-2: Data Communication Services High level architecture CS9-2 CM CPDLC ADS-C Mobile user Fixed user (ACC center, airport, NM, ) CS8 - PENS CS9-1 : physical path : virtual path : CS9-1 contractual service interface SLA applies
18 CS9-2: Data Communication Services Context Management (CM) centralised server Before establishing a CPDLC session with an ATC center, an aircraft needs to know the ATC center address Current situation: each aircraft hosts a database with all ACC & airport center addresses Resulting issue: If a new center implements D/L application each A/C database to be modified to include the new addresses (expensive, difficult to manage)
19 CS9-2: Data Communication Services Context Management (CM) centralised server Centralised service: one European CM server A/C database hosts only the European CM server address Before opening a CPDLC session with ACC 1, A/C requests the ACC 1 address (@) to CM server Benefit: no need to update all A/C database in case of address added or modified A/C Req 2 CS9-2 CM server CPDLC exchanges CS8 - PENS 3 ACC 1
20 CS9-2: Data Communication Services CPDLC centralised server Reg 29/2009: all ACCs shall implement CPDLC Current situation: each center implements CPDLC resources Resulting issue: Duplication of servers Duplication of expertise Slow down implementation
21 CS9-2: Data Communication Services CPDLC centralised server Centralised service: one or few European CPDLC server(s) Use of server left to the user Benefit: Speeding the CPDLC implementation Cost CS9-2 A/C CDPLC server CS8 - PENS ACC 1 CS9-1
22 CS9-2: Data Communication Services ADS-C centralised server i4d trajectory management: ADS-C reports sent to fixed Users managing the trajectory (ATC centers, NM) Current situation: each involved center implements an ADS-C report management function Resulting issue: Limited number of simultaneous ADS-C contracts (4) Same information transmitted several times over the bandwidth limited Air/Ground datalink (VDL Mode 2) Multiplication of acquisition, operation, & maintenance costs
23 CS9-2: Data Communication Services ADS-C centralised server Centralised service: one European ADS-C server Benefits: Preserving VDL Mode 2 capacity Unlimited number of centers accessing the ADS-C info Cost CS9-2 ADS-C Server A/C CS9-1 1 ADS-C report CS8 - PENS 2 ADS-C ADS-C report report ACC 1 ACC 2 NM
24 CS9-2: Data Communication Services Feasibility phase Example of points to be demonstrated Technical solutions Development and validation of the servers
25 Concluding Remarks DCS: 2 main threads Centralised provision of A/G Telecommunication Infrastructure Services Business model to be progressed Data Communication Services CM CPDLC ADS-C 25
Datalink performances
Datalink performances Outcome of the Datalink Performance Monitoring activities Jacky Pouzet Head of Communication and Frequency Coordination Unit WAC Madrid, March 2018 The Big Picture EC EASA Reminder:
More informationPENS Connectivity for Datalink Services
PENS Connectivity for Datalink Services by Jon Tallbacka 17 th October 2012 Introduction This aim of this proposal is to rationalise the network connectivity required for provision of Datalink services
More informationAir Navigation Service Providers
Air Navigation Service Providers ATN and FANS Data Link Solutions www.airtel-atn.com European Commission Data Link Mandate The implementation of Data Link is key to increasing Air Traffic Control efficiency,
More informationPresentation of Iris. ART-Workshop 'CNS and Infrastructure 13 th March 2018
Presentation of Iris ART-Workshop 'CNS and Infrastructure 13 th March 2018 1. Inmarsat Eco system 2. Aviation 3. SwiftBroadband - Safety (SB-S) 4. Iris 2 1. Inmarsat Eco system 2. Aviation 3. SwiftBroadband
More informationThe modernisation of ATM in Europe
The modernisation of ATM in Europe Gzim Ocakoglu European Commission DG MOVE/E2 AEE Conference, 26 April 2016, München 1 Air transport is a key component of the European transport system Generating benefits
More informationSpace for safe skies. ESA Iris Program. Satellite Communications for Air Traffic Management (ATM)
Space for safe skies ESA Iris Program Satellite Communications for Air Traffic Management (ATM) 23rd Ka-Band Broadband and 35th AIAA ICSSC Conference 18/10/2017 Slide 1 Satellite Communications for the
More informationData-link Services (DLS) implementation 2017 CEF Transport Calls for proposals
Data-link Services (DLS) implementation 2017 CEF Transport Calls for proposals Brussels, 17 th November 2017 EC Workshop on DLS Agenda Overview SDM activities for Path I and Path II Path I - implementation
More informationICB Industry Consultation Body
ICB Industry Consultation Body Evolution of network management 17/11/2016 Issue Position Paper Long-term evolution of Network Management This position paper is intended to form the basis of advice to the
More informationFuture COM Infrastructure (FCI): SESAR Activities
V1.0 Future COM Infrastructure (FCI): SESAR Activities Update Current Status Nikos Fistas Jacky Pouzet The European Organisation for the Safety of Air Navigation Agenda 1) FCI and SESAR activities: The
More informationNEWSKY Project. SAI Subcommittee Meeting, August 2008, Vienna
NEWSKY Project Mobile aeronautical communication network Based on Internet technologies For cockpit and cabin services Integrating satellite and terrestrial data links SAI Subcommittee Meeting, August
More informationDevelopment of the SPI Regulation
Development of the SPI Regulation EC Workshop on the implementation of SPI Luc TYTGAT Director Pan-European Single Sky 07 March 2014 Introduction The SPI regulation was developed in close collaboration
More informationFrom DLS Implementation Strategy to candidate Projects into the 2016 CEF Transport Calls
From DLS Implementation Strategy to candidate Projects into the 2016 CEF Transport Calls Workshop Agenda 09.30 09:45 -Welcome Address (Massimo Garbini) 09:45-10.00 SESAR Deployment Manager role (Nicolas
More informationTERMS OF REFERENCE Special Committee (SC) 214 Standards for Air Traffic Data Communication Services Revision 10
TERMS OF REFERENCE Special Committee (SC) 214 Standards for Air Traffic Data Communication Services Revision 10 REQUESTORS: Organization FAA ATC Communications Services Jim Eck Person SC LEADERSHIP: Position
More informationLINK Programme. Generic Interop Test Plan for Avionics - Part 1 Upper Layers and CM/CPDLC applications. Cooperative Network Design
Edition 2.3 Author: LINK Test Facility Edition date: 15.06.2010 Reference nr: LINK2000+/LIT/Avionics Test Plan LINK 2000+ Programme Generic Interop Test Plan for Avionics - Part 1 Upper Layers and CM/CPDLC
More informationEATM DAP/SPR LINK PROGRAMME
EATM DAP/SPR LINK 2000+ PROGRAMME Generic Requirements for a LINK 2000+ Air/Ground Communications Service Provider (ACSP) Abstract The Link 2000+ Programme has established a number of principles governing
More informationSafety Services Using the Internet Protocol Suite
ACSICG/3 IP/6 Agenda Item 7 03/05/16 Engineering, Operations & Technology Boeing Research & Technology Airspace & Operational Efficiency Safety Services Using the Internet Protocol Suite Greg Saccone,
More informationICAO Seminar/workshop on the Implementation of ground/ground and air ground data link applications in the SAM region
ICAO Seminar/workshop on the Implementation of ground/ground and air ground data link applications in the SAM region An overview on Pan European Network Service - PENS Lima, Peru 10 to 12 Septiembre de
More informationTERMS OF REFERENCE. Special Committee (SC) 223
REQUESTOR: TERMS OF REFERENCE Special Committee (SC) 223 Internet Protocol Suite (IPS) and Aeronautical Mobile Airport Communication System (AeroMACS) (Version 3) FAA ANG-B Organization Person ANG-B/Michelle
More informationREGULATORY APPROACH FOR
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL SINGLE EUROPEAN SKY (SES) REGULATIONS REGULATORY APPROACH FOR DATA LINK SERVICES May 2006 Edition 1.1 DOCUMENT CONTROL DOCUMENT CHANGE
More informationTERMS OF REFERENCE Special Committee (SC) 214 Standards for Air Traffic Data Communication Services Revision 11
RTCA Paper No. 009-19/PMC-1844 TERMS OF REFERENCE Special Committee (SC) 214 Standards for Air Traffic Data Communication Services Revision 11 REQUESTORS: Organization FAA ATC Communications Services Jim
More informationVDL MODE 2 DATALINK RECOVERY PLAN WORKSHOP
VDL MODE 2 DATALINK RECOVERY PLAN WORKSHOP WAC 2017 Tuesday 7th March 2017 ATM Theatre #SESAR 2 Workshop Agenda 1. Welcome Address (Nicolas Warinsko - SDM ) 2. Setting the scene (Gzim Ocakoglu DG MOVE)
More informationBoeing Communications Strategy
Boeing Communications Strategy Presentation to ATN2004 Rob Mead Date: September 15, 2004 Phone: 253-951-8447 Email: rob.mead@boeing.com Topics Data link in Boeing ATM concepts Boeing communications strategy
More informationEUROCAE ED-122 / RTCA DO-306 Oceanic SPR Standard
Oceanic SPR Standard ICAO NAT PBCS Workshop, Feb 2013 Presented by Jerome CONDIS RTCA SC-214 / EUROCAE WG-78 Co-chair 1 History SC189 / WG53 1 2 3 4 ED100 / DO 258 : Interoperability Requirements for ATS
More informationFunctional areas of the communications domain. List of example constituents and standards for the air-ground applications functional area
Air-ground communication applications Air-ground communication networks Air-ground datalink communication Air-ground voice communications Ground-ground communication applications Ground-ground communication
More informationEurocontrol ATN Trials End System
ATNP/WG3/WP 24 October 1997 EUROCONTROL AERONAUTICAL TELECOMMUNICATION NETWORK PANEL WORKING GROUP 3 (APPLICATIONS AND UPPER LAYERS) Redondo Beach, USA, 27-30 October 1997 Eurocontrol ATN Trials End System
More information5/4/2016 ht.ttlms.com
Order Template Screen 1 Free Form Lesson Overview 2 Free Form Performance Based CNS Requirements 3 Free Form Performance Based CNS Requirements 4 Single Answer Knowledge Check 5 Free Form Related ICAO
More informationAerospace Technology Congress 2016 Stockholm, Sweden
SESAR Aerospace Technology Congress 2016 Stockholm, Sweden Michael Standar, SESAR Joint Undertaking 2 ICAO projected global traffic scenario - 2040 The European ATM Master Plan SESAR - addressing global
More informationNext generation data link communication system for the Brazilian airspace
Next generation data link communication system for the Brazilian airspace World ATM Congress March 2016 AGENDA 1. The Brazilian airspace context 2. Deployment of VHF data link infrastructure 3. ATS data
More informationIMPLEMENTATION ISSUES, CHALLENGES, LESSONS LEARNED FOR DATA LINK MONITORING
IMPLEMENTATION ISSUES, CHALLENGES, LESSONS LEARNED FOR DATA LINK MONITORING OPERATIONAL DATA LINK WORKSHOP 8-12 August Accra Josiah BACKOBI Regional Manager Safety & Flight Operations Operational Data
More informationGround Based LISP For Multilink Operation
Ground Based LISP For Multilink Operation A SESAR 15.2.4 Solution ICAO WG-I Meeting 19 2016-01-22 FRQ Agenda Introduction Base Procedures Multilink Seamless Operation Seamless Handover Access Network Summary
More informationICAO Air-Ground Security Standards Strategy ICAO ACP WG M #21. Date: July 17 th 18 th Federal Aviation Administration
ICAO Air-Ground Security Standards Strategy Administration ICAO ACP WG M #21 Presenter: Vic Patel, FAA Date: July 17 th 18 th 2014 SENSITIVE SECURITY INFORMATION 0 Administration 0 Agenda Goals and objectives
More informationValidation Tool Descriptions for ATN Applications
ATNP/WG3/IP EUROCONTROL 12 April 1996 AERONAUTICAL TELECOMMUNICATION NETWORK PANEL WORKING GROUP 3 (APPLICATIONS AND UPPER LAYERS) Brussels, 15-26 April, 1996 Validation Tool Descriptions for ATN Applications
More informationNATS Service Development Strategy
NATS Service Development Strategy Mark Watson CNS/ATM Research NATS Ltd ATN 2005 slide 1 Contents NATS Strategy to meet future demand Impact on NATS Systems Consequence On Implementation of Data link services
More informationSummary of the ATN/OSI Doc Security Validation Report
International Civil Aviation Organization WORKING PAPER ACP-WGM16/WP-09 17 May 2010 AERONAUTICAL COMMUNICATIONS PANEL (ACP) 16h MEETING OF WORKING GROUP M Paris, France 17-19 May 2010 Agenda Item 3a: ATN/OSI
More informationDDS Interoperability in SWIM
DDS Interoperability in SWIM OMG Real Time and Embedded Workshop Paris - April 17 th, 2012 Outline SWIM a key enabler of future ATM SWIM thread within SESAR SWIM FO/IOP Profile Interaction Patterns SWIM
More informationData update on the Public Portal by mid-2016
Data update on the Public Portal by mid-2016 Document information Project Title Project Number Project Manager Deliverable Name Administrate ATM Master Plan Updates C.01. Edition 00.00.01 Task contributors
More informationEUROCONTROL SWIM Standards Evolution Workshop
EUROCONTROL SWIM Standards Evolution Workshop Introduction & SWIM Context Dennis Hart dennis.hart@eurocontrol.int Head of System Wide Information Management Unit 2 3 4 National Regulatory Authorities ISO
More informationSystem Wide Information Management (SWIM) PENS Symposium Brussels, 17 October 2012
System Wide Information Management (SWIM) PENS Symposium Brussels, 17 October 2012 THIS PRESENTATION IS ABOUT Introduction Principles & Definition Governance Logical models Technical infrastructure Open
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title Improved 1090 MHz ADS-B Ground station capacity and security Project Number 15.04.06 Project Manager Thales Deliverable Name Final Project Report
More informationRequirements for Communication Systems in Future Passenger Air Transportation
Requirements for Communication Systems in Future Passenger Air Transportation Joe Zambrano École de technologie supérieure LASSENA AVIATION 2014, 16 20 June 2014, Hyatt Regency Atlanta, Atlanta, GA Agenda
More informationMCGILL UNIVERSITY/PEOPIL CONFERENCE DUBLIN OCTOBER 2018
Cyber Security: Airport risk and liability Jean-Michel Fobe Adrian Cioranu MCGILL UNIVERSITY/PEOPIL Conference on International Aviation & Liability DUBLIN 19-20 Airport cybersecurity concerns Airport
More informationATN Presentation. December 2001
ATN Presentation December 2001 The ATN Overview ATN (Aeronautical Telecommunication Network) ATN is a global aviation standard telecommunications network, and is intended to provide seamless ground-toground
More informationTechnical Developments Roundup. Tony Whyman Helios IS
Technical Developments Roundup Tony Whyman Helios IS Highlights ATN Technical Manual 4 th Edition PM-CPDLC IP SNDCF Consolidate editorial and minor technical revisions TCP/IP Report Start of Voice over
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE
INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE GUIDANCE MATERIAL FOR END-TO-END SAFETY AND PERFORMANCE MONITORING OF AIR TRAFFIC SERVICE (ATS) DATA LINK SYSTEMS IN THE ASIA/PACIFIC REGION
More informationWe are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors
We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists 3,800 116,000 120M Open access books available International authors and editors Downloads Our
More informationEUROCONTROL ATN Project Overview and Status
ATNP/WG1/IP- ATNP/WG2/IP- ATNP/WG3/IP- ATNP/WGW/IP- AERONAUTICAL TELECOMMUNICATIONS NETWORK PANEL WORKING GROUPS 2, 3 & WGW Phuket, 3 rd March - 14 th March EUROCONTROL ATN Project Overview and Status
More informationTowards collaborative governance of the Digital Backbone for the SES White Paper
Towards collaborative governance of the Digital Backbone for the SES White Paper Executive Summary This paper explores the establishment of an alliance, called SES Shared Services Alliance (3SA), and formed
More informationAir Traffic Management. Defence. vitalsphere. ATM-grade network references. Public Transport. Public Safety. Maritime
Air Traffic Management Defence ATM-grade network references Maritime Public Transport Public Safety ATM civil references 250,000 connected users 44+ countries of the world 33% of land mass connected by
More informationICAS Workshop 3rd October 2005 Single European Sky Implementation Plan - SESAME
ICAS Workshop 3rd October 2005 Single European Sky Implementation Plan - SESAME Jan Van Doorn EUROCONTROL Experimental Centre, France Director European 1 Organisation for the Safety of Air Navigation Demand
More informationWhite paper: ATM-grade networks
White paper: ATM-grade networks Achieving safe, efficient, future-ready air traffic control communications Frequentis was instrumental in introducing ATM-grade networks to the air traffic control industry,
More informationInternational Civil Aviation Organization. AIDC Review Task Force Meeting. Brisbane, Australia, March 2003
AIDC/R TF/IP/3 International Civil Aviation Organization AIDC Review Task Force Meeting Brisbane, Australia, 27-28 March 2003 Agenda Item 2: Agenda Item 4: Review of experience gained and lessons learned
More informationEUROCONTROL SWIM Specifications. NM B2B Tech Forum June 2018
EUROCONTROL SWIM Specifications NM B2B Tech Forum June 2018 Where do Specifications (Standardisation) come into play 2 Context Supporting: Coordinated by: Members and Observers: EUROCAE EUROCONTROL European
More informationThe Many Faces of Air-Ground Data Link
The Many Faces of Air-Ground Data Link It is widely recognized that data link or digital communication for air-ground communications is the cornerstone of the 21 st century aviation system. What is less
More informationPENS Symposium SESAR Project Overview
PENS Symposium SESAR 15.2.10 Project Overview Speaker Organisation Date and venue Boleslaw GASZTYCH EUROCONTROL 18 th October 2012, Brussels The European Organisation for the Safety of Air Navigation Agenda
More informationWORLD ATM CONGRESS
THANK YOU FOR YOUR INTEREST IN FREQUENTIS FREQUENTIS - COMMITTED TO END-TO-END BUSINESS- AND SAFETY-CRITICAL COMMUNICATIONS MARKET LEADING PER- FORMANCE SAFE & RELIABLE INNOVATION FOR TOMORROW S ATM FREQUENTIS
More informationSINGLE AISLE TECHNICAL TRAINING MANUAL MAINTENANCE COURSE - T1 INFORMATION SYSTEMS
SINGLE AISLE TECHNICAL TRAINING MANUAL INFORMATION SYSTEMS This document must be used for training purposes only Under no circumstances should this document be used as a reference It will not be updated.
More informationEUROCONTROL AMHS Specification Workshop
EUROCONTROL AMHS Specification Workshop Speaker Organisation Date and venue Jacky POUZET EUROCONTROL 23 rd June 2009, Brussels European Organisation for the Safety of Air Navigation EUROCONTROL AMHS Specification
More informationHow a global industry player addresses the Cybersecurity challenges of Air Transport
How a global industry player addresses the Cybersecurity challenges of Air Transport ICAO Cyber Summit and Exhibition Making Sense of Cyber Dubai, United Arab Emirates 4 6 April 2017 thomas.hutin@thalesgroup.com
More informationASIA/PACIFIC REGIONAL AERONAUTICAL TELECOMMUNICATION NETWORK (ATN) GROUND-GROUND ROUTER DESCRIPTION
INTENATIONAL CIVIL AVIATION OGANIZATION ASIA AND PACIFIC OFFICE ASIA/PACIFIC EGIONAL AEONAUTICAL TELECOMMUNICATION NETWOK (ATN) GOUND-GOUND OUTE DESCIPTION Edition 1.2 May 2004 ISSUE 1.2- MAY 2004 Table
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title ATM Security Project Number 16.02._ Project Manager EUROCONTROL Deliverable Name Final Project Report Deliverable ID D04-011 Edition 00.01.00 Template
More informationMulticast and broadcast support in AeroMACS
EUROCONTROL AeroMACS Technical Support Version: Working draft Multicast and broadcast support in AeroMACS Note Identifier: Author Elaboration date: AT4_ECTL_TN#18 AT4 wireless (under contract with EUROCONTROL)
More informationFinal Project Report
16.04.02 Final Project Report Document information Project Title HP Tool Repository of SESAR standard HP methods and tools Project Number 16.04.02 Project Manager DFS Deliverable Name 16.04.02 Final Project
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE
INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE GUIDANCE MATERIAL FOR END-TO-END SAFETY AND PERFORMANCE MONITORING OF AIR TRAFFIC SERVICE (ATS) DATA LINK SYSTEMS IN THE ASIA/PACIFIC REGION
More informationFederal Aviation Administration (FAA)
Federal Aviation Administration (FAA) CHANG MAI - ATN SEMINAR CPDLC OVERVIEW December 2001 Federal Aviation Administration (FAA) William J. Hughes Technical l Center (WJHTC) Vic Patel, FAA/ACT-550 ISSP
More informationSWIM System Wide Information Management
Directorate Air Traffic Management Civil-Military Coordination Division EUROCONTROL CMAC CNS Technical Leaflet #10 Edition 28 April 2017 SWIM System Wide Information Management Civil-Military Reflections
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title Interface specifications and Services requirements Project Number 14.01.04 Project Manager Leonardo-Finmeccanica Deliverable Name Final Project Report
More informationJARUS RECOMMENDATIONS ON THE USE OF CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) IN THE RPAS COMMUNICATIONS CONTEXT
Joint Authorities for Rulemaking of Unmanned Systems JARUS RECOMMENDATIONS ON THE USE OF CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) IN THE RPAS COMMUNICATIONS CONTEXT DOCUMENT IDENTIFIER : JAR_DEL_WG5_D.04
More informationASIA/PACIFIC REGIONAL AERONAUTICAL TELECOMMUNICATION NETWORK (ATN) AIR TRAFFIC SERVICE (ATS) MESSAGE HANDLING SYSTEM (AMHS) DESCRIPTION
INTERNATIONAL CIVIL AVIATION ORGANIZATIONA ASIA AND PACIFIC OFFICE ASIA/PACIFIC REGIONAL AERONAUTICAL TELECOMMUNICATION NETWORK () AIR TRAFFIC SERVICE (ATS) MESSAGE HANDLING SYSTEM (AMHS) DESCRIPTION First
More informationAIDC and OLDI: gap analysis. AIDC SEMINAR Cairo, 03 March 2014
AIDC and OLDI: gap analysis AIDC SEMINAR Cairo, 03 March 2014 1 This analysis on 9 items 1. Both standards cover notification, coordination and transfer phases around FIR boundaries, defining messages
More informationCentralised service 6-7: Ensuring the resilience of centralised services cyber-security and sharing cyber intelligence
Centralised service 6-7: Ensuring the resilience of centralised services cyber-security and sharing cyber intelligence Patrick MANA CS6-7 Project Manager WAC 08 & 09 March 2016 enter your presentation
More informationAFTN Terminal. Architecture Overview
AFTN Terminal Architecture Overview Flight ATM Systems Ltd. Document Number AFTNTERM-ARCH Rev A0.01 Filename: GEN_AFTN_Terminal Architecture.doc Paper size: A4 Template: Flight ATM.dot persons, without
More informationWhite paper: Seamless migration
White paper: Seamless migration Moving towards the ATM networks of the future while maintaining today s quality of service The clock is ticking for air navigation service providers (ANSPs), with a combination
More informationInternational Civil Aviation Organization
CNS/MET SG/14-WP/55 International Civil Aviation Organization FOURTEENTH MEETING OF THE COMMUNICATIONS/NAVIGATION/SURVEILL ANCE AND METEOROLOGY SUB-GROUP OF APANPIRG (CNS/MET SG/14) Jakarta, Indonesia,
More informationDVB-S2/RCS Suitability for the Provision of Air Traffic Management Services
DVB-S2/RCS Suitability for the Provision of Air Traffic Management Services Cristina Párraga Niebla, Member, IEEE, Núria Riera Díaz, Sandro Scalise, Member, IEEE, Christian Kissling. Abstract Safe flying
More informationEuropean Directory Service (EDS) European Directory Service (EDS) a Follow-up. Florian Schmid, Product Manager IT Infrastructure Solutions
08 2013 European Directory Service (EDS) Florian Schmid, Product Manager IT Infrastructure Solutions European Directory Service (EDS) a Follow-up ATN Directory Status Quo ICAO Doc 9880 Flat structure Any-to-any
More informationTel.: +1 (514) ext Ref.: AN 7/ /39 22 June 2007
International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Ìåæäóíàðîäíàÿ îðãàíèçàöèÿ ãðàæäàíñêîé àâèàöèè Tel.: +1 (514) 954-8219
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 7/5/12 WORKING PAPER ANConf.12.WP.007.en.docx TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through
More informationANSP Perspectives on the usage of Surveillance Products
ANSP Perspectives on the usage of Surveillance Products Robert Guttman, Austro Control Surveillance Data Processing and Safety Nets 6 December 2017 1 CONTENT 2 Content Austro Control Environment and Configuration
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title ATM Security Coordination and Support Project Number 16.06.02 Project Manager EUROCONTROL Deliverable Name Final Project Report Deliverable ID D100
More informationSESAR Deployment and upcoming CEF Transport Calls ANS Consultative Board. Helsinki, 12 October 2015
SESAR Deployment and upcoming CEF Transport Calls Presentation @NEFAB ANS Consultative Board Helsinki, 12 October 2015 SESAR JU SESAR DM 2 entities, 1 project European ATM Master Plan R&D INDUSTRIALISATION
More informationResearch of Personnel. 9. Interface Manager (Class B - 60 months - Over 15 years experience with degree and professional qualification)
Research of Personnel 9. Interface Manager (Class B - 60 months - Over 15 years experience with degree and professional A manager with experience in the coordination of interfaces in complex large scale
More informationSystem Interface Requirements IRIS Precursor
System Interface s IRIS Precursor Document information Project BAFO III Iris Precursor Project Number 15.02.05 Project Manager Airbus Deliverable Name System Interface s IRIS Precursor Deliverable ID D04
More informationCYBER SECURITY AIR TRANSPORT IT SUMMIT
CYBER SECURITY AIR TRANSPORT IT SUMMIT SHARING GOOD PRACTICES VIVIEN EBERHARDT, SITA CYBER SECURITY CYBER SECURITY AIR TRANSPORT IT SUMMIT SHARING GOOD PRACTICES VIVIEN EBERHARDT, SITA CYBER SECURITY CYBER
More informationSESAR technical workshops SWIM becoming a reality (demonstration)
EUROPEAN UNION EUROCONTROL SESAR technical workshops SWIM becoming a reality (demonstration) 12-13 February 2013 - Rooms N109-110 WAY SESAR FORWARD SWIM services & technical infrastructure demonstration
More informationAERONAUTICAL COMMUNICATION PANEL WORKING GROUP N. PM-CPDLC Validation Report
ACP WGN/5 WP19 AERONAUTICAL COMMUNICATION PANEL WORKING GROUP N PM-CPDLC Validation Report SUMMARY This paper gives the results of the PM-CPDLC ATN Application (version 1) validation effort. Version: 0.1
More informationFinal Project Report. Abstract. Document information
Final Project Report Document information Project Title SWIM security solutions Project Number 14.02.02 Project Manager THALES Deliverable Name Final Project Report Deliverable ID D01 Edition 00.01.00
More informationThe SANDRA Communications Concept - Future Aeronautical Communications by Seamless Networking
The SANDRA Communications Concept - Future Aeronautical Communications by Seamless Networking Simon Plass 1, Christian Kissling 1, Tomaso de Cola 1, and Nicolas Van Wambeke 2 1 German Aerospace Center
More informationCentralised service 6-7: Ensuring the resilience of centralised services cyber-security and sharing cyber intelligence
Centralised service 6-7: Ensuring the resilience of centralised services cyber-security and sharing cyber intelligence Patrick MANA CS6-7 Project Manager WAC 08 March 2017 Why doing it? NIS Directive EC
More informationBroadband Satcom. SwiftBroadband. Inmarsat - 4. Inmarsat -3. Inmarsat - 2. ATN th &15 th September 2004, IEE London
Broadband Satcom Inmarsat - 2 Inmarsat -3 SwiftBroadband Inmarsat - 4 Contents History Inmarsat today The Classic Aero Heritage Trusted Operator - Safety Services Aero Product Evolution Bandwidth Requirement
More informationInternational Civil Aviation Organization. ATN Seminar and Third ATN Transition Task Force Meeting Singapore, March 2001
ATNS - 4/1 International Civil Aviation Organization ATN Seminar and Third ATN Transition Task Force Meeting Singapore, 26-30 March 2001 Agenda Item 4: ATN Air-Ground Application CONTROLLER PILOT DATA
More informationIris Event 11 THAUMAS
Iris Event 11 THAUMAS Tailored and Harmonised satcom for Atm Uses, Maximising re-use of Aero Swiftbroadband 10 th October, 2011 Agenda 1. Overview 2. Updates on Inmarsat progress and perspectives 3. Presentation
More informationBase of Aircraft Data (BADA) EUROCONTROL s Aircraft Performance Model
Base of Aircraft Data (BADA) EUROCONTROL s Aircraft Performance Model 1 What is BADA? BADA - Base of Aircraft DAta is an Aircraft Performance Model (APM) developed and maintained by EUROCONTROL through
More informationReport of the activities carried out to date since the last meeting of the Coordination Committee
RLA/03/901 RCC/19-WP/09 01/03/2016 International Civil Aviation Organization South American Regional Office - Regional Project RLA/03/901 REDDIG Management System and Satellite Segment Administration Nineteenth
More informationPresent Scenario. Multiple Network. Many agencies involved. Various type of Network. Overlapping Networks. Reliability not good continued
Present Scenario Multiple Network Many agencies involved Various type of Network Overlapping Networks Reliability not good continued Present Scenario Optimum Utilization of resources not possible Limited
More informationAEFMP a long-lasting inter-regional cooperation for ASBU implementation in Western Mediterranean
AEFMP a long-lasting inter-regional cooperation for ASBU implementation in Western Mediterranean ACAO-ICAO EUR/NAT and MID ASBU Symposium (Marrakech, Morocco, 10-13 December 2018) http://aefmp atm.org/
More informationMDS1 SESAR. The Single European Sky Programme DG TREN
MDS1 SESAR The Single European Sky Single Industrial and European Technological Sky ATM Research Programme Slide 1 MDS1 Marco De Sciscio; 21/01/2006 Europe facing development challenges Air Traffic in
More informationArchitecture of an IP-based Aeronautical Network
Architecture of an IP-based Aeronautical Network Serkan Ayaz 1, Christian Bauer 1, Christian Kissling 1, Frank Schreckenbach 1, Fabrice Arnal 2, Cedric Baudoin 2, Katia Leconte 2, Max Ehammer 3, Thomas
More informationValidating ATN with VDL
ATNP WG-2 WP 346 bis AERONAUTICAL TELECOMMUNICATIONS NETWORK PANEL (ATNP) Validating ATN with VDL Prepared by Nicholas Xenocostas and David Leahy Presented by H. Thulin SUMMARY This Working paper presents
More informationSWIM Standards Evolution Workshop
SWIM Standards Evolution Workshop SWIM Service Description Specification Supporting Material Walter Van Hamme EUROCONTROL 26 June 2018 Go to www.pigeonhole.at Enter Passcode SUPPORTMAT Objectives About
More informationReport on Service Areas and DLS overall architecture FPA No MOVE/E /SESAR FPA - Programme and Support Actions
Report on Service Areas and DLS overall architecture FPA No MOVE/E2-2014 717/SESAR FPA - Programme and Support Actions Deliverable 12.2 September 29 th, 2017 1 Report on Service Areas and DLS Overall Architecture
More information