IT Transformation Through ESPCs

Similar documents
Predictive Resilience: Leveraging Integrated DCIM to Reduce Data Center Downtime

Leveraging DCIM to Increase Energy Efficiency and Savings

ESPC Overview. Definition and Need. Program Description. Questions and Answers. Curt Murdock & Rod Bridgeman August 6

DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE

Optimizing the Existing Building Cx Process:

ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update. Timothy D. Unruh PhD, PE, CEM.

Federal Data Center Consolidation Initiative (FDCCI) Workshop III: Final Data Center Consolidation Plan

Annual Report for the Utility Savings Initiative

GSA Deep Energy Retrofit Program

Kentucky Community and Technical College System ESPC Initiative

WORKSHOP REPORT; 360 PERSPECTIVE ON DEEP ENERGY RETROFITS

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work

Dell helps you simplify IT

Proven Integration Strategies for Government

Data Center Infrastructure Management (DCIM) Demystified

Data Center Lifecycle and Energy Efficiency

UNIX Server Optimization With TCO and ROI Analysis

siemens.com/dcim We are the trusted technology partner for energy-efficient, safe and secure buildings and infrastructure.

Accelerate Your Enterprise Private Cloud Initiative

Federal Data Center Consolidation Initiative (FDCCI) Workshop I: Initial Data Center Consolidation Plan

Energy Performance Contracting

Catch the Heat Avoid the Heat! How an integrated management approach helps to operate your data center energy efficient and reliable

Track 11, Session 4 -- Campus Utility Distribution Systems

Comprehensive Data Center Energy Management Solutions

Effective energy management services for all your needs

A Case Study in Fuel Cell Market Transformation

THE FUTURE IS HYBRID. Patrick Harr. Global Vice President, Cloud Strategy and Solutions Hewlett-Packard Company

Washington Headquarters Services Defense Facilities Directorate

Innovating with Less Across the Federal IT Portfolio: The Role of Shared Services and Enterprise Architecture

ROI CASE STUDY MAY Logicalis Achieves 159% ROI* with CA DCIM Solution

IBM Corporation. Global Energy Management System Implementation: Case Study. Global

DCIM Solutions to improve planning and reduce operational cost across IT & Facilities

Symantec Data Center Transformation

In 2017, the Auditor General initiated an audit of the City s information technology infrastructure and assets.

ENERGY SAVINGS PERFORMANCE CONTRACTING

PLAYBOOK. How Do You Plan to Grow? Evaluating Your Critical Infrastructure Can Help Uncover the Right Strategy

Sustainable Energy Management in the Converged Enterprise Network

Pave the way: Build a value driven SAP GRC roadmap March 2015

Government IT Modernization and the Adoption of Hybrid Cloud

Energy Solutions for Buildings

Supporting the Cloud Transformation of Agencies across the Public Sector

2012 Innovation Awards Application

The State of Data Center Health Management Strategy 2017

The Journey Towards Serving a Digital Government

THE JOURNEY OVERVIEW THREE PHASES TO A SUCCESSFUL MIGRATION ADOPTION ACCENTURE IS 80% IN THE CLOUD

Business Models and Capacity Development for Energy Efficient Cities in India

Factsheet. Power Generation Service Energy efficiency in power generation and water

Future of the Data Center

CIO Forum Maximize the value of IT in today s economy

Achieving Best in Class Software Savings through Optimization not Negotiation

2013 AWS Worldwide Public Sector Summit Washington, D.C.

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs

Getting Hybrid IT Right. A Softchoice Guide to Hybrid Cloud Adoption

SHARED SERVICES - INFORMATION TECHNOLOGY

Handling Economic Uncertainty While moving forward to a Smarter Planet

IT Modernization In Brief

NAC Institutional Committee Meeting

Data Center Infrastructure Management (DCIM) By Jesse Zhuo

siemensgovt.com Pocket Guide to Federal Contracts

DLA Energy Panel: Energy Resiliency and Assurance

Connecting an all-electric world. Intersolar Munich, June 20, 2018 Ralf Christian, CEO Siemens Energy Management Division

TD01 - Enabling Digital Transformation Through The Connected Enterprise

Agenda. What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI

Data Centre Optimisation Services

Predictive Insight, Automation and Expertise Drive Added Value for Managed Services

MDCSystems. MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer

Risk: Security s New Compliance. Torsten George VP Worldwide Marketing and Products, Agiliance Professional Strategies - S23

DATACENTER SERVICES DATACENTER

Security in Today s Insecure World for SecureTokyo

Architecting for Green

REALIZE YOUR. DIGITAL VISION with Digital Private Cloud from Atos and VMware

Track 4: Session 6 Cybersecurity Program Review

Web Page. Advertisement for SCADA System Manager post

Considerations on Evaluating a DCIM Solution

HP Software-Defined Infrastructure (SDI)

Smart Data Center From Hitachi Vantara: Transform to an Agile, Learning Data Center

Information Technology Paul Kronberger, Chief Information Officer

Accelerate your Azure Hybrid Cloud Business with HPE. Ken Won, HPE Director, Cloud Product Marketing

Federal-State Connections: Opportunities for Coordination and Collaboration

UAE Space Policy Efforts Towards Long Term Sustainability of Space Activities Agenda Item 4; COPUOS June 2017 By: Space Policy and

HPE Flexible Capacity

Transformation in Technology Barbara Duck Chief Information Officer. Investor Day 2018

Your One Source for Federal Solutions

New Zealand Government IbM Infrastructure as a service

DHS Cloud Strategy and Trade Nexus. May 2011

Session 6: Data Center Energy Management Strategies

How vxchnge Centralized its Operations with the PI System and Datacenter Clarity LC

UAE National Space Policy Agenda Item 11; LSC April By: Space Policy and Regulations Directory

Unleash IT to Accelerate Radical Business Innovation. Hyperconverged Infrastructure Powered by Lenovo ThinkAgile HX Series with Nutanix

Virtustream Managed Services Drive value from technology investments through IT management solutions. Tim Calahan, Manager Managed Services

WIFIA, SRFs and Sustainable Water Strategies

Delivering Next Generation DCIM for a Mobile Workforce

Virtustream Cloud and Managed Services Solutions for US State & Local Governments and Education

The HITRUST CSF. A Revolutionary Way to Protect Electronic Health Information

The U.S. Manufacturing Extension Partnership - MEP

Total Building Solutions for Data Centers. The next generation of intelligence. usa.siemens.com/datacenters

EUROPEAN ICT PROFESSIONAL ROLE PROFILES VERSION 2 CWA 16458:2018 LOGFILE

The Three Big Questions in the Energy World (and Why They All Have the Same Answer)

Enterprise Private Cloud. Fully managed private cloud as a service in your data centre or ours.

Hybrid Cloud 1. ebookiness created by the HPE Europe Division of Ingram Micro

Transcription:

June 27, 2013 IT Transformation Through ESPCs Restricted Siemens AG 2013. All rights reserved. siemens.com/answers

Contents Integration of IT with Facilities ESPCs as Related to Data Centers Measurement and Verification Tools Q&As Page 2

Strategic Role of CIO Changing CIO becomes the builder and broker of services TRANSFORM legacy infrastructure and applications and processes CONSUME off-premises services securely BUILD on-premises cloud services MANAGE AND SECURE across legacy applications and cloud assets Page 3

IT and Facilities Often Misaligned Page 4

Energy Savings Performance Contracting (ESPC) A Federal Contracting Method under the Department of Energy and Army Corps Vehicles Requires no up-front cost to Government Pre-Contract Performance Post-Contract Period Period Period Budget Savings Requires no special appropriations from Congress Government retains excess generated savings Prime contractor guarantees savings to cover payments over the contract term Performance of projects installed through the ESPC contract is guaranteed Operating Expense ESPC O&M and Loan Repayment Budget Savings Measurement and verification of savings is required Stabilizes planning and budgeting of energy and project-related operating costs Operating Expense Operating Expense Source: Practical Guide to Savings and Payments in FEMP ESPC Task Orders, Rev. 3, January 2009 Page 5

Details of the ESPC Process Agency contacts FEMP or Army Corps POC & identifies internal stakeholders Agency conducts opportunity assessment Send NOO or RFQ to all eligible ESCOs Review responses and down selects ESCO(s) (Orals are optional) ESCO(s) performs preliminary assessment (PA) to identify target ECMs If viable, ESPC enters investment grade audit phase ESCO issues final proposal and implementation begins Performance measurement and verification begins Page 6

Siemens PRIME Siemens PRIME: ESPC Program Measurement & Verification, Finance, Performance Guarantees, Contract Negotiation, Safety & Risk Mgmt Siemens Project Manager IT Transformation and Cloud Vitalization/optimization of platforms and applications IT Infrastructure - Networking storage/servers CRAH/CRAC/PDUs Energy Engineers, Project Developers and Coordinators Utilities & Distribution Central Plant Optimization Alternative Energy Sources Building performance and sustainability Energy Conservation Measures Agency stakeholders drive requirements Agency Program Coordinator Page 7

Performance Contracting Basics Interest Service ESPCs are paid from savings as a utility expense Payment comes from reduction of energy bill No increase in government spending occurs Project Cost Page 8

Federal ESPC Guidelines Established under legislation in 1992 Energy Policy Act (EPAct) Bill Energy Independence Act of 2007 provides permanent authorization for ESPC ESPC legislation allows Federal agency to: Sign multiple year contract for up to 25 years Have ESCO finance the project's capital cost Government pays ESCO for project from Open to all Federal energy savings backed by ESCO guarantee agencies worldwide Allow ESPC to be an operating expense and (DOE) not score project as capital budget ESPC program closely follows commercial PC process to develop projects Page 9

How Are Savings Verified? M&V Option Performance Factors Usage Factors Savings Calculation Option D Stipulated and Measured Factors Option A & B Measured Factors Combination of measured and stipulated factors: Measurements are spot or short-term taken at the component or system level. The stipulated factor is supported by historical or manufacturer s data. Spot or short-term measurements taken at the component or system level when variations in factors are not expected. Continuous measurements taken at the component or system level when variations in factors are expected. Engineering calculations, component or system models. Engineering calculations, component or system models. Option C Utility Long-term whole-building utility meter, facility level, or Based on regression analysis of Billing Data Analysis sub-meter data. utility billing meter data. Calibrated Computer Simulation N/A for most Siemens work Reasonable assumptions based on historical data gathered at facilities. Performance specifications of equipment or system being installed, engineering estimates, spot-, shortterm, or long-term measurements of system components. Long-term whole-building utility meter data. Based on computer simulation model calibrated with wholebuilding or end-use metered data or both. Page 10

ESPCs for IT 1. Identification, Education & Empowerment of Stakeholders 5. Planning & Managing Hyper- Dynamic ESPCs 2. Bridging the Gap Between IT & Facilities ESPCs for IT 4. Measurement & Verification Tools 3. Controlling Scope Page 11

Identifying Energy Conservation Measures through IT Transformation Operating Cost Optimization Slower ROI 8 ~ 5-10% per year Converged Incremental improvement Management 7 Consolidation o Physical and Logical 1 2 Automation 5 6 Virtualization 4 3 Transformation Investment Private cloud Application Rationalization Transformation Faster ROI 35-50% 50% for program New operating cost basis Hybrid cloud Transformed cost basis for operating Physical Growth Scale in IT Infrastructure Page 12

What is the IT Return on Investment? Green Grid Benchmark Cumulative Cost Simple payback Target PUE Highest rated customer: PUE 1.70 PUE 2.0-2.75 $300k - $400k 1.7 years PUE 2.8-3.0 $600k - $1M 2.5 years PUE 3.15-4.0 $2.5M-$3M 5.7 years Page 13

Considerations for Measurement & Verification Establishing an Accurate Asset Inventory Developing an Accurate Baseline Using Current State & Utilization Executing Measurement & Verifying Performance Data is often: Know what, when and Live by the risk & how long to monitor responsibility matrix Decentralized Use your ESPC Manage the baseline! Incomplete resources! Inaccurate Leverage your stakeholders! Page 14

Data Center Management HD 4D management Real-time data It will be important to utilize a data center infrastructure management tool (DCIM) in order to adequately manage data center performance Better decisions with CFD and virtual models Page 15 Siemens AG 2013. All Rights Reserved.

What is Datacenter Infrastructure Management (DCIM)? Data center infrastructure management (DCIM) software tools monitor, measure, manage and/or control data center performance, utilization and energy consumption Ideally, DCIM provides this functionality for all IT-related equipment (such as servers, storage and network switches) and infrastructure components (such as PDUs and CRACs). DCIM enables IT professionals to understand energy consumption from a holistic data center perspective DCIM tools integrate facets of system management with building management and energy management, with a focus on IT assets and the physical infrastructure needed to support them Source: Courtesy of Gartner Page 16

IT / Building / Fire Safety / Security Asset Lifecycle Management Data Center asset lifecycle management As planned, as built As operated / maintained As optimized (what-if scenario) Semantic / logical relationship management IT / mechanical yard / building assets Collaboration management Standard procedures and workflow Work orders Security management Planning and scheduling Enterprise systems integration Concept Planning As built As upgraded Page 17 Change Management Configuration Open API Collaboration

Datacenter Clarity LC Smarter Decisions Optimized Efficiencies Proven Technologies Page 18

Datacenter Clarity DCIM powered by Siemens PLM Software Landing on Mars is one of the hardest jobs on Earth. On August 5, the Mars rover Curiosity landed successfully on the surface of Mars. There was only one chance to get it right. For this unprecedented challenge, NASA employed Siemens PLM software solutions. The development team at NASA s Jet Propulsion Laboratory digitally designed, tested, assembled, and simulated the entire Mars rover before a single physical prototype was created..and all from a mission control data center consolidated by HP. Page 19

Summary ESPCs offer a practical solution to funding mandated data center consolidation and efficiency improvements ESPCs are a timely way to fund innovation in a time of flat and declining budgets Data Centers are one of the largest energy hogs PA phase due diligence helps to support FDCCI and PortfolioStat t initiative, long before implementation kickoff (i.e., solid inventory development, cost accounting, prioritizing/rationalization, etc ) ESPCs often help to enhance existing IT service management processes (Configuration Management, Change Mangement, etc.) ESPCs improve stakeholder alignment, both mission i and financiali DCIM measures, verifies and manages the entire solution Page 20

Questions? Questions? Page 21