What do you want to do? Is the plot already defined? Yes. 3 Creating Survey Data (SURVEYS tab) Start in new row Choose Plot Label from dropdown list

Similar documents
Invasive Alien Plant Program. Part 2. Modules 2.2, 2.3 & 2.4. Prepared by Range Branch. Ministry of Forests and Range

Exercise One: Creating A Map Of Species Distribution For A Publication

Changes in the Phase 3 Indicator Field Guide Chapters from version 2.0 to version 3.0

Create CSV for Asset Import

3. Map Overlay and Digitizing

2. create the workbook file

1. Managing Information in Table

SPECIFICATIONS FOR G.I.S. DATA/INFORMATION PROVIDED TO ONE-CALL

FINAL DRAFT FIREMON Database User Manual Updated 04/04/2005. FIREMON Database. User Manual EXECUTIVE SUMMARY

Fields marked with an asterisk (*) are mandatory. 1. Click Listings on the left navigation menu. 2. Click Sale under Add a Commercial Listing.

Watch the video below to learn more about number formats in Excel. *Video removed from printing pages. Why use number formats?

Making Excel Work for Your Tribal Community

Excel 2010 Charts and Graphs

DOING MORE WITH EXCEL: MICROSOFT OFFICE 2013

Instruction Manual for SilvAssist for ArcGIS

SPECS FOR G.I.S. DATA PROVIDED TO ONE-CALL

= 3 + (5*4) + (1/2)*(4/2)^2.

Prosurv LLC Presents

SPECS FOR G.I.S. DATA PROVIDED TO ONE-CALL

SPECIFICATIONS FOR G.I.S. DATA/INFORMATION PROVIDED TO ONE-CALL

Gravity Data Correction in QCTool

Basic tasks in Excel 2013

Fields marked with an asterisk (*) are mandatory. 1. Click Listings on the left navigation menu. 2. Click Sale under Add a Residential Listing.

Exercise One: Estimating The Home Range Of An Individual Animal Using A Minimum Convex Polygon (MCP)

LECTURE TWO Representations, Projections and Coordinates

Working with Charts Stratum.Viewer 6

Chemistry 30 Tips for Creating Graphs using Microsoft Excel

SilvAssist 3.5 Instruction Manual Instruction Manual for the SilvAssist Toolbar For ArcGIS. Version 3.5

OziExplorer Training and Help Manual for Use with Soil Resource Stewardship Monitoring Checklist: Cutblock-Level

Biodiversity Interactive Map

DOING MORE WITH EXCEL: MICROSOFT OFFICE 2010

INTRODUCTION TO GIS WORKSHOP EXERCISE

SPECS FOR G.I.S. DATA PROVIDED TO ONE-CALL

Lastly, in case you don t already know this, and don t have Excel on your computers, you can get it for free through IT s website under software.

Homework 1 Excel Basics

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

DynacViews. User Guide. Version 2.0 May 1, 2009

Introduction. Thank you for purchasing SpecMaps.

Accessing AIM Data. Instruction Manual. Connecting to AIM Data: TerrADat: Terrestrial AIM Database LMF: Landscape Monitoring Framework Database

Pre-Lab Excel Problem

Rocky Mountain Vegetative Structural Stage Forest Vegetation Simulator Post Processing Users Guide. April 2013

CAPE. Community Behavioral Health Data. How to Create CAPE. Community Assessment and Education to Promote Behavioral Health Planning and Evaluation

Payment Function Exercise

Getting Started With Excel

Excel To KML - Display Excel files on Google Earth.

Excel Tips to help you with the PS477/577 Final Paper Project

Introduction to Solo Forest

IMAP. Edit Member Map. A complete guide to using the IMAP system. For KANSAS ONE-CALL. Rev. 12/16/08

Web Manual: Checkbox Surveys March 2014

Exercise 4: Import Tabular GPS Data and Digitizing

Table of Contents. Navigate the Management Menu. 911 Management Page

Survey Design, Distribution & Analysis Software. professional quest. Whitepaper Extracting Data into Microsoft Excel

A cell is highlighted when a thick black border appears around it. Use TAB to move to the next cell to the LEFT. Use SHIFT-TAB to move to the RIGHT.

Microsoft Word for Report-Writing (2016 Version)

Spreadsheet definition: Starting a New Excel Worksheet: Navigating Through an Excel Worksheet

Budget Exercise for Intermediate Excel

Introduction to StatKey Getting Data Into StatKey

Displaying Strike and Dip Measurements on Your Map in Surfer

1. Managing Information in Table

SAMLab Handout #5 Creating Graphs

Base Configurations Carlson SurvCE

Memphis Property Hub User Guide

Creating Charts in Office 2007 Table of Contents

Basics: How to Calculate Standard Deviation in Excel

Reporting Excel Tutorial

ArborCAD by CAD International. Reference Manual

Our Changing Forests Level 2 Graphing Exercises (Google Sheets)

Note: in order to successfully submit this subsequent event on a USDA tag, an imported event must have been applied first.

Doc #: IDI06-11F Rev: 1.3 Issued: 22/02/18. Well Seeker PRO How To Guide Rev 1.3. Page 1 of 26

Introduction to Microsoft Excel

Intermediate Excel 2003

Creating Automated Dashboard Excel 2013 Contents

Technical Specifications

OziExplorer Training and Help Manual for Use with Soil Resource Stewardship Monitoring Checklist: Cutblock-Level

First TUFMAN Training Workshop (TTW-1) 3-7 December 2012 SPC, Noumea, New Caledonia. Session 9.0

Main concepts of ILWIS 3.0

Miami s Quick Start Guide for Using. Snap 9 Professional. to Create a Paper Keyed Survey. Miami s Survey Solutions

addition + =5+C2 adds 5 to the value in cell C2 multiplication * =F6*0.12 multiplies the value in cell F6 by 0.12

New Perspectives on Microsoft Excel Module 1: Getting Started with Excel

Processing your Induced Polarization Data

COMPUTER TRAINING CENTER

Exercise 5: Import Tabular GPS Data and Digitizing

RECOMMENDATION ITU-R P DIGITAL TOPOGRAPHIC DATABASES FOR PROPAGATION STUDIES. (Question ITU-R 202/3)

Forestry Functions. Using Excel to Produce a Stocking Table. By David R. Larsen, March 14, Objectives:

Practice Exercises for Introduction to Excel

Excel 2013 Getting Started

My Locations help guide

Create a new form. To create a form from a new or existing spreadsheet: 1. Click the Tools drop down menu and select Create a form.

QUICK START GUIDE. SOLO Forest

Excel Part 2 Textbook Addendum

How to Remove Duplicate Rows in Excel

SAFE Home Inventory. Getting Started Guide

San Diego County Plant Atlas Project Parabotanist s Guide for data operations on the web site September 2008

Creating a Pivot Table

v TUFLOW-2D Hydrodynamics SMS Tutorials Time minutes Prerequisites Overview Tutorial

Chapter 3: Rate Laws Excel Tutorial on Fitting logarithmic data

3.1 Units. Angle Unit. Direction Reference

A Brief Word About Your Exam

Google FusionTables for Global Health User Manual

GY301 Geomorphology Lab 5 Topographic Map: Final GIS Map Construction

Transcription:

Vegetation Information System Saskatchewan Spreadsheet-based Data Loading Template Version 1.2 INSTRUCTIONS Table of Contents 1. Template Use Flow Chart 1a. General Overview (Plots/Surveys) 1b. Vegetation Sampling Tasks 2. Creating Projects 3. Creating Plots 3a. Creating Plot UTM Data 3b. Creating Plot LatLong Data 3c. Creating Plot Legal Description Data 3d. Creating Plot Dimension Data 4. Creating Survey Data 5. Creating VST Data 5a. Creating VST Sample Species Data (Grid Format) 5b. Creating VST Sample Species Data (Row Format) 5c. Creating VST Sample Structure Data (Grid Format) 5d. Creating VST Sample Structure Data (Row Format) 5e. Creating VST Plot Species Data (Grid Format) 5f. Creating VST Plot Species Data (Row Format) 5g. Creating VST Plot Structure Data (Grid Format) 5h. Creating VST Plot Structure Data (Row Format) 6. Creating Grassland Health Assessment Data Reference 1 Template Use Flowchart Due to the flexibility of the VegISS data model, collecting data outside the user inteface can seem rather complex. The following flow charts help walk the user through filling out this template. 1a General Overview (Plots/Surveys) Start What do you want to do? Define a Plot Enter a Survey Finished 2 Creating Plot Data (PLOTS tab) Is the plot already defined? Plot must be defined before survey is entered Save Work and Exit Excel Provide a unique project label 3 Creating Survey Data (SURVEYS tab) Stop Plot has Project Reference? Choose Plot Label from dropdown list Fill In Mandatory fields.

Choose Project from dropdown list Fill In Mandatory fields. Make sure Survey Label is generated 1 Creating Project Data (PROJECTS tab) Provide a unique project name 2 Creating Plot Data (PLOTS tab) Was Project in Dropdown list? Fill in remaining fields ensuring mandatory (green) cells are filled Enter Location Data? (at least one is required) Fill remaining fields Survey Includes Health Assessment? Which Assessment? Survey Includes Veg Sampling Tasks? UTM Lat/Long Legal Land Description Grassland Health Tame Health Vegetation Sampling Tasks (VST) 2a Creating Plot UTM Data (PLOT_UTM tab) Choose Plot Label from dropdown list Fill remaining fields 2b Creating Plot LatLong Data (PLOT_LATLONG tab) Choose Plot Label from dropdown list Fill remaining fields 2c Creating Plot Legal Description Data (PLOT_LEGAL tab) Choose Plot Label from dropdown list Fill remaining fields More? More? More? SK Lentic SK Lotic Forest Health Indicator Forest Health Quantitative More? Do you have plot dimension data? 2d Creating Plot Dimension Data (Plot_DIMENSIONS tab) Choose Plot Label from dropdown list Fill remaining fields More? 1b Vegetation Sampling Tasks

2 Creating Projects Projects are used to organize plots. Projects are defined using the PROJECTS tab. Projects are optional but users are strongly encouraged to group their plots into projects. Creating a project is like adding a code to a pick list so that duplicate project definitions are eliminated. - Open the PROJECTS tab - Find the first open row in the template and move to the Project Name field - Enter a unique Project name. Optionally, you can provide a more descriptive definition of the Project name but only the Project name field will be used to generate the dropdown in the PLOTS tab. - When a new record is added, an active flag will be set to "T ". You do not need to make any other entries - Repeat for as many projects as are required. 3 Creating Plots Plots are the basic units for any data in VegISS. A plot can be a point, a circle, a rectangle, a transect or any other defined area for which one or more surveys/assessments will be performed. Plot definition includes basic descriptions of the site, ownership, location, landform, soil, and other important information. - Open the PLOTS tab - Find the first open row in the template and move the Plot Label field - Enter a unique label name for the plot. This can be something as simple as P1, P2, etc. Please note that the name must be unique and cannot be repeated in the PLOTS tab. Validation will confirm this. Also, the length of the label is limited to 50 characters - Optionally, select a Project Name with which to logically group plots. This is very useful when organizing data for use with VegISS. Select a project name from the dropdown list. If there are no projects in the dropdown, then you must create one first. Please see Creating Projects above. Once created, go back to the PLOTS tab and select the appropriate project to attach to the plot. - Ensure that you provide the agency name with which the plots are associated. The template will automatically copy the agency in subsequent rows so you only need to provide the first row (in green). Agency is an important data organization attribute of the plot and must be defined. - Fill in the remaining attributes that are applicable to your plot. Most of the fields have dropdown values from which to select. All fields will provide a basic tooltip describing what the field is for. Please make sure to fill out all fields that are tagged as mandatory. Mandatory fields are green in the templates. - At the end of each row are a number of columns defined as Create By, Created On, etc. These are system attributes that are automatically generated. However, you must provide a name of the person loading the data into the template. This could be a short name, initials or other descriptive text (that does not exceed the maximum length listed in the column heading). Once the first value is entered, the value is automatically copied for all subsequent rows. If necessary, a different name can be defined and the built in formulas will copy from that point onward with the new name. - To add UTM location data for the plot, please see Creating Plot UTM Data. te, at least one entry for either UTM, LATLONG or Legal description must be provided for each plot.

- To add Latitude/Longitude-based location data for the plot, please see Creating Plot LatLong Data. te, at least one entry for either UTM, LATLONG or Legal description must be provided for each plot. - To add Legal Location data for the plot, please see Creating Plot Legal Description Data. If a plot is located within 1 or more legal locations (such as multiple sections) they each should be listed in a new row (you cannot bundle multiple legal descriptions into a single entry ). te, at least one entry for either UTM, LATLONG or Legal description must be provided for each plot. - To define dimensional information for the plot, please see Creating Plot Dimension Data. This is optional - Repeat for as many plots are required. TIP: Work in one tab at a time rather than hopping from one tab to the other. Jumping from tab to tab between plots will slow down your data entry 3a Creating Plot UTM Data Universal Transverse Mercator (UTM) coordinates can be attached to plots. One or more coordinate pairs (easting and northing) can be added to describe plot location. - Make sure the plot for which the coordinates are to be entered has already been created in the PLOTS tab. - Open the PLOT_UTM tab - Find the first open row in the template and move the Plot Label field. Select a plot from the dropdown list. If the desired plot does not exist, check the PLOTS tab and confirm the plot label defined on that tab. If the plot does not yet exist, it must first be created (see Creating Plots ). Selecting the Plot Label will link the entry in the PLOT_UTM tab with the information in the PLOTS tab. Additional ID codes will also be - Define the coordinate Location Type from the dropdown. You can enter many coordinate pairs for a single plot or a single set of coordinates. Location Type describes the kind of coordinates being listed. - Provide Datum, Zone, Easting and rthing values. All fields are required. Please note that coordinate values are in whole numbers in VegISS (no decimal places) - Repeat for additional coordinates to describe the plot - Repeat for as many plots are required 3b Creating Plot LatLong Data Geographic coordinates can be attached to plots. One or more coordinate pairs (longitude and latitude) can be added to describe plot location. Please note that longitude values are negative "-" numbers. You cannot enter degree-minute-second coordinates. They must be converted to decimal-degree format. - Make sure the plot for which the coordinates are to be entered has already been created in the PLOTS tab. - Open the PLOT_LATLONG tab - Find the first open row in the template and move the Plot Label field. Select a plot from the dropdown list. If the desired plot does not exist, check the PLOTS tab and confirm the plot label defined on that tab. If the plot doesn't yet exist, it must first be created (see Creating Plots ). Selecting the Plot Label will link the entry in the PLOT_LATLONG tab with the information in the PLOTS tab. Additional ID codes will also be - Define the coordinate Location Type from the dropdown. You can enter many coordinate pairs for a single plot or a single set of coordinates. Location Type describes the kind of coordinates being listed. - Provide Datum, Longitude (negative number) and Latitude values. All fields are required. Please note that coordinate values are in decimal degrees. - Repeat for additional coordinates to describe the plot - Repeat for as many plots are required 3c Creating Plot Legal Description Data Legal land descriptions can be attached to plots. One or more entries of LSD/Qsection/Section/Township/Range/Meridian can be added to describe plot location. If locations are generic, fields like LSD and Qsection can be omitted. If a plot covers multiple legal land descriptions, multiple entries can be used to describe it. - Make sure the plot for which the legal land descriptions are to be entered has already been created in the PLOTS tab. - Open the PLOT_LEGAL tab - Find the first open row in the template and move the Plot Label field. Select a plot from the dropdown list. If the desired plot does not exist, check the PLOTS tab and confirm the plot label defined on that tab. If the plot doesn't yet exist, it must first be created (see Creating Plots ). Selecting the Plot Label will link the entry in the PLOT_LEGAL tab with the information in the PLOTS tab. Additional ID codes will also be - You can enter one or many descriptions for a single plot. You cannot include a range of sections/quarter sections unless they are listed, one per row in the tab for the plot.

- Legal Sub-division (LSD), Quarter Section (Qsection) and Section values are optional (but recommended). Range, Township and Meridian values are required fields. - Repeat for additional legal descriptions needed to describe the plot - Repeat for as many plots are required 3d Creating Plot Dimension Data A plot can also store dimensional measurements (eg. 100 x100m plot). The PLOT_DIMENSIONS tab collects plot dimensional information. Multiple dimension lengths (meters) can be defined for a single plot. Input of plot dimensions is optional, but useful if this data was collected. - Make sure the plot for which the dimension are to be entered has already been created in the PLOTS tab. - Open the PLOT_DIMENSIONS tab - Find the first open row in the template and move the Plot Label field. Select a plot from the dropdown list. If the desired plot does not exist, check the PLOTS tab and confirm the plot label defined on that tab. If the plot doesn't yet exist, it must first be created (see Creating Plots ). Selecting the Plot Label will link the entry in the PLOT_DIMENSIONS tab with the information in the PLOTS tab. Additional ID codes will also be - Define the Dimension Type from the dropdown. You can enter many dimension values for a single plot or a single dimension value. Dimension Type provides context to the dimension value being entered. - Provide the dimension distance in meters - Repeat for additional dimension values used to describe the plot - Repeat for as many plots as required 4 Creating Survey Data One ore more surveys can be associated with a plot; for example, if a particular plot was remeasured every five years, each remeasurement would constitute a survey. A single survey can only have one Health Assessment associated with it but can have multiple Vegetation Sampling Tasks (VSTs) associated with it. - Make sure the plot for which the survey is being entered has already been created in the PLOTS tab. - Open the SURVEYS tab - Find the first open row in the template and move the Plot Label field. Select a plot from the dropdown list. If the desired plot does not exist, check the PLOTS tab and confirm the plot label defined on that tab. If the plot doesn't yet exist, it must first be created (see Creating Plots ). Selecting the Plot Label will link the entry in the SURVEYS tab with the information in the PLOTS tab. Additional ID codes will also be - Define the Health Assessment Method from the dropdown. This indicates the type of health assessement being defined. Please note that only one health assessment may be associated with a survey. Upon selection of a health assessment method, the Assessment Year will be displayed automatically. If no health assessments are part of the survey (only Vegetation Sampling Tasks) then set the Health Assessment Method to NONE (assessment year is blank when set to ne). - Provide the date that the survey was created. Only a calendar date is allowed (not just a year). If the actual date is not known, enter January 1st of the year it was surveyed. - Once the plot label, assessment method and survey date are entered, a Survey Label will automatically be generated. This field is a concatenation of all the manadatory fields (separated by dashes) and acts like bread crumbs between tabs. While this field is automatically defined, you can enter your own custom label (e.g. S1, S2, etc.) into this cell. Just remember that when entering the vegetation survey tasks or health assessments, you will need to select the Survey Label to link the associated rows in the respective tabs. - Fill out the remaining fields as required. Make sure that all mandatory fields (in green) are filled out. - At the end of each row are a number of columns defined as Create By, Created On, etc. These are system attributes that are automatically generated. However, you must provide a name of the person loading the data into the template. This could be a short name, initials or other descriptive text (that does not exceed the maximum length listed in the column heading). Once the first value is entered, the value is automatically copied for all subsequent rows. If necessary, a different name can be defined and the built in formulas will copy from that point onward with the new name. - To create Vegetation Sampling Tasks (VSTs), please refer to Creating VST Data. - To create Health Assessments, please refer to Creating Health Assessment Data. Please note that only the Grassland Health Assessment is defined in this template at this time. - Repeat for as many surveys as required 5 Creating VST Data

A Vegetation Sampling Task (VST) is a sub-component of a Survey (e.g. one task might be quadrat sampling for percent biomass of herbs, another task might be line-intercept sampling for shrub cover). Tasks should be separated if different sampling methods were used, different numbers or sizes of quadrats were used, or different vegetation layers were targeted. - Make sure the plot/survey has already been defined in the PLOTS /SURVEYS tabs respectively before creating the VST. - Open the VEGSAMPLINGTASKS tab - Find the first open row in the template and move the Survey Label field. Select a survey from the dropdown list. If the desired survey does not exist, check the SURVEYS tab and confirm the survey label defined on that tab (or the PLOTS tab if the plot has not yet been created). If the survey doesn't yet exist, it must first be created (see Creating Survey Data ). Selecting the Survey Label will link the entry in the VEGSAMPLINGTASKS tab with the information in the SURVEYS tab. Additional ID codes will also be automatically generated for each new entry. - Define the applicable vegetation layers targeted by the task (e.g. tree layer, shrub layer, herbaceous layer, all layers). - The next field is very important. Make sure to specify the Data Level for the VST. This indicates whether the task is Sample-Level or Plot Level. With Sample-Level VSTs, you will need to specify the number of samples. Plot-Level tasks collect data over the entire plot, while Sample-Level tasks collect data in a number of individual samples within the plot. Please note that you can provide both Sample-Level and Plot-Level data (e.g. summary values based on the sample data) for Sample-Level VSTs but you cannot provide Sample-Level data for Plot-Level VSTs. - If the VST will be collecting species composition data as percentages, then make sure to define the Percent Type field. Percentage values for species composition can be everything from foliar cover to basal cover or even frequency. Select the appropriate code from the dropdown. - Once the Survey Label, Data Level and Percent Type are entered, a Task Label will automatically be generated. This field is a concatenation of all the manadatory fields (separated by dashes) and acts like bread crumbs between tabs. While this field is automatically defined, you can enter your own custom label (e.g. T1, T2, etc.) into this cell. Just remember that when entering the VST details, you will need to select the Task Label to link the associated rows in the respective tabs. - Fill out the remaining fields as required. Make sure that all mandatory fields (in green) are filled out. - To add Sample-Level Species Composition data, please see Creating VST Sample Species Data. - To add Sample-Level Structure data, please see Creating VST Sample Structure Data. - To add Plot-Level Species Composition data, please see Creating VST Plot Species Data. - To add Plot-Level Structure data, please see Creating VST Plot Structure Data. - Repeat for as many VSTs as required 5a Creating VST Sample Species Data (Grid Format) Species composition data for a sample-level tasks are stored in what is called a normalized format. Each record stores one species and the abundance value(s) for that species, per sample per task. The tab SampleSPECIESRows is set up in this structure. When entering data in the field, this works well. However, for bulk entry of data, entering the species-name over and over when the only thing that needs to be entered is the percentage slows down data entry. The SampleSPECIESGrid tab is provided as a simpler way of entering species composition data. The user defines a species once and that opens a new column in which to enter percentage data. Determine which format you wish to use for entering species composition data. If you only have species/percent values to enter, use the SampleSPECIESGrid tab. If you are going to enter things like cover class, weight, density, or other information, use SampleSPECIESRows tab instead. These instructions are for the use of the Grid format. entering species data. - Open the SampleSPECIESGrid tab. not exist, check the VEGSAMPLINGTASKS tab and confirm that the task is defined on that tab (or the SURVEYS /PLOTS tabs if the prerequisite data has not yet been created). If the task doesn't yet exist, it must first be created (see Creating VST Data ). Selecting the Task Label will link the entry in the SampleSPECIESGrid tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be - Define the Sample Number. This number should not exceed the number of samples identified in the VST. Each row of this tab is for one sample for one VST. - For reference, the Percent Type selected in the VEGSAMPLINGTASKS tab will be displayed.

- There are a series of Species columns with the entry fields grayed out. Near the top of each column are green boxes where a species can be defined. For each different species you encounter, access a new column and select the species acronym (i.e. species code) from the dropdown list. te that only the listed acronyms can be entered (for reference these are listed in the CODES2 tab); if your data use synonyms, common names, or other types of species names, you must convert them to the standard VegISS acronyms before you start entering data. The common name will automatically display when you select a new species and the grayed boxes will turn green. 30 of these columns have been pre-created but you can make more by copying the format of an existing column to create new ones. - Enter the corresponding percentage values corresponding the the appropriate species for the given sample. - Fill out the remaining fields as required. Make sure that all mandatory fields (in green) are filled out. - Repeat for as many samples/tasks as required 5b Creating VST Sample Species Data (Row Format) Species composition data for a sample-level tasks are stored in what is called a normalized format. Each record stores one species and the abundance value(s) for that species, per sample per task. The tab SampleSPECIESRows is set up in this structure. When entering data in the field, this works well. However, for bulk entry of data, entering the species-name over and over when the only thing that needs to be entered is the percentage slows down data entry. The SampleSPECIESGrid tab is provided as a simpler way of entering species composition data. The user defines a species once and that opens a new column in which to enter percentage data. Determine which format you wish to use for entering species composition data. If you only have species/percent values to enter, use the SampleSPECIESGrid tab. If you are going to enter things like cover class, weight, density, or other information, use SampleSPECIESRows tab instead. These instructions are for the use of the Row format. entering species data. - Open the SampleSPECIESRows tab. link the entry in the SampleSPECIESRows tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be - Define the Sample Number. This number should not exceed the number of samples identified in the VST. Each row of this tab is for one species per sample for one VST. - For reference, the Percent Type selected in the VEGSAMPLINGTASKS tab will be displayed. - Each row requires that the species be defined. Choose a Species Acronym from the dropdown list. - Enter the corresponding percentage value for the species defined in the sample. - Optionally fill out the other information in the row (Cover class, Biomass weight, etc.) - Repeat for as many species/samples/tasks as required 5c Creating VST Sample Structure Data (Grid Format) Vegetation structure data for a sample-level tasks are stored in what is called a normalized format. Each record stores one vegetation layer and a % cover value for that layer, per sample per task. When entering this information in the field, this works well. However, for bulk entry of data, entering the layer names over and over when the only thing that needs to be entered is the percent cover slows down data entry. The SampleSTRUCTUREGrid tab is provided as a simpler way of entering vegetation structure data. The user defines a layer once and that opens a new column in which to enter percent cover data. Determine which format you wish to use for entering sample structure data. If you only have layer/percent values to enter, use the SampleSTRUCTUREGrid tab. If you are going to enter things like cover class, weight and other information use SampleSTRUCTURERows tab instead. These instructions are for the use of the Grid format. entering structure/layer data. - Open the SampleSTRUCTUREGrid tab. link the entry in the SampleSTRUCTUREGrid tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be

- Define the Sample Number. This number should not exceed the number of samples identified in the VST. Each row of this tab is for one sample for one VST. - There are a series of Layer columns with the entry fields grayed out. Near the top of each column are green boxes where a vegetation layer can be defined. For each different layer you encounter, access a new column and select the Layer from the dropdown list. The descriptive name will automatically display when you select a new layer and the grayed boxes will turn green. 30 of these columns have been pre-created but you can make more by copying the format of an existing column to create new ones. - Enter the % cover value corresponding to the layer for the given sample. - Fill out the remaining fields as required. - Repeat for as many samples/tasks as required 5d Creating VST Sample Structure Data (Row Format) Vegetation structure data for a sample-level tasks are stored in what is called a normalized format. Each record stores one vegetation layer and a % cover value for that layer, per sample per task. When entering this information in the field, this works well. However, for bulk entry of data, entering the layer names over and over when the only thing that needs to be entered is the percent cover slows down data entry. The SampleSTRUCTUREGrid tab is provided as a simpler way of entering vegetation structure data. The user defines a layer once and that opens a new column in which to enter percent cover data. Determine which format you wish to use for entering sample structure data. If you only have layer/percent values to enter, use the SampleSTRUCTUREGrid tab. If you are going to enter things like cover class, weight and other information use SampleSTRUCTURERows tab instead. These instructions are for the use of the Row format. entering structure/layer data. - Open the SampleSTRUCTURERows tab. link the entry in the SampleSTRUCTURERows tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be - Define the Sample Number. This number should not exceed the number of samples identified in the VST. Each row of this tab is for one species per sample for one VST. - Each row requires that the layer be defined. Choose a Layer from the dropdown list. - Enter the % cover value corresponding to the layer for the given sample. - Optionally fill out the other information in the row (cover class, weight, etc.) - Repeat for as many layers/samples/tasks as required 5e Creating VST Plot Species Data (Grid Format) Species composition data for a plot-level tasks are stored in what is called a normalized format. Each record stores one species and abundance value(s) for that species, per plot per task. The tab PlotSPECIESRows is set up in this structure. When entering data in the field, this works well. However, for bulk entry of data, entering the species over and over when the only thing that needs to be entered is the percentage slows down data entry. The PlotSPECIESGrid tab is provided as a simpler way of entering species composition data. The user defines a species once and that opens a new column in which to enter percentage data. Determine which format you wish to use for entering species composition data. If you only have species/percent values to enter, use the PlotSPECIESGrid tab. If you are going to enter things like cover class, weight and other information, use PlotSPECIESRows tab instead. These instructions are for the use of the Grid format. entering species data. - Open the PlotSPECIESGrid tab. link the entry in the PlotSPECIESGrid tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be - For reference, the Sample Type selected in the VEGSAMPLINGTASKS tab will be displayed.

- There are a series of Species columns with the entry fields grayed out. Near the top of each column are green boxes where a species can be defined. For each different species you encounter, access a new column and select the species acronym (i.e. species code) from the dropdown list. te that only the listed acronyms can be entered (for reference these are listed in the CODES2 tab); if your data use synonyms, common names, or other types of species names, you must convert them to the standard VegISS acronyms before you start entering data. The common name will automatically display when you select a new species and the grayed boxes will turn green. 30 of these columns have been pre-created but you can make more by copying the format of an existing column to create new ones. - Enter the percentage value for the species. - Fill out the remaining fields as required. Make sure that all mandatory fields (in green) are filled out. - Repeat for as many tasks as required 5f Creating VST Plot Species Data (Row Format) Species composition data for a plot-level tasks are stored in what is called a normalized format. Each record stores one species and abundance value(s) for that species, per plot per task. The tab PlotSPECIESRows is set up in this structure. When entering data in the field, this works well. However, for bulk entry of data, entering the species over and over when the only thing that needs to be entered is the percentage slows down data entry. The PlotSPECIESGrid tab is provided as a simpler way of entering species composition data. The user defines a species once and that opens a new column in which to enter percentage data. Determine which format you wish to use for entering species composition data. If you only have species/percent values to enter, use the PlotSPECIESGrid tab. If you are going to enter things like cover class, weight and other information, use PlotSPECIESRows tab instead. These instructions are for the use of the Row format. entering species data. - Open the PlotSPECIESRows tab. link the entry in the PlotSPECIESRows tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be - For reference, the Sample Type selected in the VEGSAMPLINGTASKS tab will be displayed. - Each row requires that the species be defined. Choose a Species Acronym from the dropdown list. - Enter the percentage value for the species. - Optionally fill out the other information in the row (Cover class, Biomass weight, etc.) - Repeat for as many species/tasks as required 5g Creating VST Plot Structure Data (Grid Format) Vegetation structure data for a plot-level task are stored in what is called a normalized format. Each record stores one vegetation layer and the % cover of that layer, per task. When entering data in the field, this works well. However, for bulk entry of data, entering the layer names over and over when the only thing that needs to be entered is the percent cover slows down data entry. The PlotSTRUCTUREGrid tab is provided as a simpler way of entering vegetation layer (structure) data. The user defines a layer once and that opens a new column in which to enter percent cover data. Determine which format you wish to use for entering sample structure data. If you only have layer/percent values to enter, use the PlotSTRUCTUREGrid tab. If you are going to enter things like cover class, weight and other information, use PlotSTRUCTURERows tab instead. These instructions are for the use of the Grid format. entering structure/layer data. - Open the PlotSTRUCTUREGrid tab. not exist, check the VEGSAMPLINGTASKS tab and confirm that the task is defined on that tab (or the SURVEYS /PLOTS tabs if the prerequisite data has not yet been created). If the task doesn't yet exist, it must first be created (see Creating VST Data ). Selecting the Task Label will link the entry in the PlotSTRUCTUREGrid tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be

- There are a series of Layer columns with the entry fields grayed out. Near the top of each column are green boxes where a vegetation layer can be defined. For each different layer you encounter, access a new column and define the layer. The descriptive name will automatically display when you select a new layer and the grayed boxes will turn green. 30 of these columns have been pre-created but you can make more by copying the format of an existing column to create new ones. - Enter the percent cover value for the layer. - Fill out the remaining fields as required. - Repeat for as many tasks as required 5h Creating VST Plot Structure Data (Row Format) Vegetation structure data for a plot-level task are stored in what is called a normalized format. Each record stores one vegetation layer and the % cover of that layer, per task. When entering data in the field, this works well. However, for bulk entry of data, entering the layer names over and over when the only thing that needs to be entered is the percent cover slows down data entry. The PlotSTRUCTUREGrid tab is provided as a simpler way of entering vegetation layer (structure) data. The user defines a layer once and that opens a new column in which to enter percent cover data. Determine which format you wish to use for entering sample structure data. If you only have layer/percent values to enter, use the PlotSTRUCTUREGrid tab. If you are going to enter things like cover class, weight and other information, use PlotSTRUCTURERows tab instead. These instructions are for the use of the Row format. entering structure/layer data. - Open the PlotSTRUCTURERows tab. link the entry in the PlotSTRUCTURERows tab with the information in the VEGSAMPLINGTASK tab. Additional ID codes will also be - Each row requires that the layer be defined. Choose a Layer from the dropdown list. - Enter the percent cover value for the layer. - Optionally fill out the other information in the row (Cover class, weight, etc.) - Repeat for as many layers/tasks as required 6 Creating Grassland Health Data The Grassland Health Assessment survey form is based on the Saskatchewan Field Worksheet: Grassland Range Health Assessment. It consists of a questionnaire that includes 5 main questions (two questions have 2 parts) along with other descriptive data. - Open the GrasslandHealth tab. - Find the first open row in the template and move the Survey Label field. Select a survey from the dropdown list. If the desired survey does not exist, check the SURVEYS tab and confirm that the survey label defined on that tab (or the PLOTS tab if the plot has not yet been created). If the survey doesn't yet exist, it must first be created (see Creating Survey Data ). Selecting the Survey Label will link the entry in the GrasslandHealth tab with the information in the SURVEYS tab. Additional ID codes will also be automatically generated for each new entry. - Fill in the question responses. All questions need to be answered - Repeat for as many surveys as required