The Experts in Vacuum Solutions

Similar documents
The Experts in Vacuum Solutions

DEKKER KNOWLEDGE DATABASE KNOWLEDGE IS POWER

SC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. (407) Phone: Website:

Operator Interface Terminal Manual Standard Two or Three Pump VFD Booster

INSTRUCTION MANUAL STATION CONTROLLER SC1000 MOTOR PROTECTION ELECTRONICS, INC.

SC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. Phone: (407) Fax: (407) Vulcan Road Apopka, Florida 32703

EZ Series In-Site CL control panel EZ Connect Mobile ios User Guide

700 SERIES FLOAT OPERATED DUPLEX/TRIPLEX PUMP CONTROLLER INSTRUCTION MANUAL

pco 3 Controller User Manual ASPX Digital Scroll, Air Packaged Chiller For Version MCDSV_A02

SC1000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. Phone: (407) Fax: (407) Vulcan Road Apopka, Florida 32703

700 SERIES TPC TRIPLEX PUMP CONTROLLER INSTRUCTION MANUAL

Baltimore Aircoil Company

Parallel SelfSensing Modulating Pump Controller

700 SERIES DPC DUPLEX PUMP CONTROLLER INSTRUCTION MANUAL

Pump Station Controller. Quick Start

Vacon HVAC100 Commissioning Guide

PROGRAMMING MANUAL IM262R00. AQUAVAR Intelligent Pump Controller START-UP GENIE PROGRAMMING MANUAL

iqpump1000 AC Drive Multiplex Quick Start Procedure

SYSTEMAX 2014 MULTIVALVE ELECTRONIC CONTROLLER WITH DEMAND RECALL

WATLOW F4 KEYS. 1. If you ever reach a point on the controller where you do not want to be, press

Pump Controls for Water and Wastewater. PUMP Vision. UNIVERSAL PUMP CONTROLLER, RTU, and DATA LOGGER


Dryer. M720 Programming and Operation Manual. July 15, 2015 Revision 1.51

Optidrive Applications Support Library

M&M Refrigeration, Inc. Computer Control System. Screw Compressor Control Sullair Retro Fit Panel

VARIABLE SPEED BOOSTER SYSTEMS AURORA INTELLIBOOST WITH INTELLIMANAGER. Distributed by Flow-Tech Industries

Deaerator and Surge Tank Control

KTD-405/405A Keypad User Guide

Accord Builder. User Guide

AF-600 FP AC Drive AC Adjustable Frequency Drive Guide-Form Specification

Press the PEN HOME key to move the pen(s) to the outside of the chart. The pen(s) is automatically raised off the chart.

HN1000/HN2000 Product Manual

Introduction to operation

PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006

Pump-Down Controller MODEL mA Input Scalable 4-20mA Output Duplex Pump Alternation Hand-Off-Auto Controls Dual Run-time Meters

LINE BUTTONS LCD SCREEN

DFS Series User s Manual (5N-1000N Capacity)

PID Server. Table Of Contents 6/6/04

Pump Data Sheet - Patterson HVAC Pumps Company: Intermountain Hydron Name: Cache County Mountain Crest Date: 09/24/2018

FSIR-100. User Guide. Wireless IR Commissioning Tool CONTENTS USING THE FSIR-100 COMMISSIONING TOOL BATTERIES

Basic control panel. Features. Control panels 75

VLT 2800 DRIVE SPECIFICATIONS

PART 1: GENERAL PART 2: PRODUCT. Effective: 12/29/10 Page 1 of 6 FECA-TE-104D

DataNab it8: Intelligent Communicating Thermostat

RESISTANCE/CURRENT METER Model 863/6487

LAUREL. Laureate Pulse or Analog Input Batch Controller Automatic batch control for repetitive liquid fill operations ELECTRONICS, INC.

4. Setting parameters

Pulsafeeder Technical Bulletin

PROCESS CONTROL SYSTEMS LAP 4 Loop Controllers. Notes

USER'S GUIDE BARD-LINK TM LC /LC SOLID STATE DUAL UNIT LEAD/LAG CONTROLLER & TEC-EYE HAND-HELD DIAGNOSTIC TOOL

Intelligent Pump Drive

WARNING!!!!!!!!! IMPORTANT INFORMATION: READ BEFORE INSTALLATION!

DECEMBER 11, PLC-Based Waste Water Lift Station with Demo Box. by Lance McParlan Advisor & Instructor: Paul Lin. Outline

PART 1: GENERAL PART 2: PRODUCT. Phone: Fax: Web: -

PLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 30, 2006

ios App User Manual Fill in the serial number (case insensitive), login (used to recover password), and choose a password.

Omni + User Manual. Dual Setpoint Temperature Controller with Programmable Input & TIMER. Omni 96+ Omni 72+ Omni 48+ TMR TMR TMR

OK - Functions of the buttons. = "Arrow up" = ON / OFF. = Enter. = Temperature. ="Arrow down" = Preset time / Start time.

Application program: description and examples

Time Mark Corporation Model 42A Pump Controller User s Guide

CBT LW BATCHING SYSTEM 25, 50, 100 & 200 OPERATION GUIDE

Omni. User Manual. Economic Self-Tune PID Temperature Controller. Omni 96. Omni 72 72X72. Omni ~ 265 V AC SUPPLY

MOTOR STARTERS & VARIABLE SPEED DRIVES Variable speed drives

TimerTools, v4.0 User s Manual. TimerTools 2006, 2011, 2017 Kagan Publishing

9120 System With Touch Screen Interface

Wake Up Calls. Overview

Commtech Wireless 6120 Alphanumeric Pager

Created by: Alarm System Store Quick Start Guide. for Interlogix NetworX NX4, NX6 & NX8

GETTING STARTED. Link Controller. Remote

Quick Start Guide For GVX9000 AF Drives

Features and Benefits of XeteX Controls. Other Unit Control Functions. Energy Recovery Functions

CX-1010 START UP GUIDE

PDS-100 Programmable Dispensing System

PLC LCD BA. SPS LCD SL /10.07 /US I SN

CS 550/150 Symmetry. Spreader and Joystick Controller Calibration Manual

Variable Frequency Drive Design Guidelines

LAUREL ELECTRONICS, INC.

CX-1200 STARTUP GUIDE

PLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL. Revision 1.0 April 18, 2006

MV2A User s Guide. Televac...The Finest In Vacuum Instrumentation. Instrument Part No

Operating instructions: STABILA Electronic-IP65

Operating Instructions Extended Cascade Controller MCO 101

Facial & Fingerprint Recognition Product

NE Explorer Information

i-alert2 General FAQ_ Communication

Home Manager System Model TS40B Wall Display Operating Instructions

Operating Instructions

Installation, Operation Instructions

FREQUENCY CONVERTER FC101 (QUICK GUIDE)

Metasys N2 Instruction Manual VLT Adjustable Frequency Drive. 12/ Revision B

AC Variable Speed Drive 0.75kW 250kW / 1HP 350HP Volt 1 & 3 Phase. Advanced User Guide Revision 1.10

CONTROLLER INSTALLATION OPERATION & QUICK START

TR150 DRIVE STANDARD FEATURES

Colour Graphic Terminal User Manual. Rev 3.1

PLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006

DIGITAL GEAR PUMP DRIVE OPERATING MANUAL: Model No.

IPS INTELLIGENT PUMP STARTER

TDC+ CONTROLLER. Programming Guide

PENKO Engineering B.V.

BACnet MS/TP Interface User s Guide

Transcription:

QUADPLEX QUADPLEX For use with Vmax VFD industrial vacuum systems equipped with VFD s and Sequencing Panel Each Vmax system is tested and checked at the factory prior to shipment to ensure trouble free-operation. In the unlikely event you encounter a problem, we recommend that you consult with your local distributor for parts/service. Remember, when calling for service, parts or system information, always have the pump or system model number and serial number ready. Click here to find your local authorized distributor. Industrial Duplex - Triplex - Quadplex Vacuum System Description The DEKKER Duplex - Triplex - Quadplex vacuum system can consist of two, three or four Vmax liquid ring vacuum pump systems. Each vacuum pump system has a separate VFD control panel. An additional sequencing panel includes a PLC and a PID process controller for sequencing, alternation and PI motor speed control. An intelligent PLC program monitors which pumps are available and which pumps adjusts the sequencing to accommodate changing status. If pumps are powered down for routine maintenance, or turned off at their HOA switches, the program will skip the unavailable pump(s). For example, a triplex system with any single pump powered off will function as a duplex. A quadplex system with any single pump powered off will function as a triplex. Alternation routines in the PLC program check elapsed run-time hours for each pump once every 24 hours at 1:00 a.m. Lead, Lag1, Lag2 and Lag3 status are re assigned based on usage. The available pump with the next fewest hours will be assigned as Lag1, etc. The PLC program also checks hours when first powered up. The PLC sequencing program recognizes an available pump as one whose panel is: Powered Not in alarm HOA switch is in the Auto position The Hand position starts the pump at full VFD speed (60 Hz). While in the Hand or Off position, a pump is considered unavailable to the PLC controller program and is taken out of the automatic sequencing. Typical Operation In normal operation, all pumps are in the HOA switch Auto position. After first powering up the sequencing panel, the PLC will initialize within 15 seconds. The program will assign Lead, Lag1, Lag2 and Lag3 status based on the run-time hours for each pump. The PLC program will continuously monitor actual vacuum level, which also appears on the red LED display of the process controller. The Lead pump will turn on when vacuum level falls to the Lead On threshold value. Pump speed is controlled by the VFD in each pump control panel and will slow the pump as vacuum setpoint is achieved. Minimum speed for the VFD is set at 37.5 Hz. If vacuum demand increases, and the vacuum level falls to the Lag1 On threshold, the program will start the Lag1 pump. PAGE 1

QUADPLEX QUADPLEX (continued from page 1) Pumps are sequenced off in a similar manner, but in reverse order. As vacuum level increases, pumps will turn off at their respective Off thresholds. When an Off threshold is reached, that pump will continue to run for a preset minimum time of 10 minutes. During this time, the PLC display will indicate MIN for that pump. At the end of the minimum run time, that pump will shut off and its display will change to RDY to indicate the pump is in a Ready mode. If the vacuum level falls again below the On threshold, the PLC display for that pump will change back to Ld, LG1, LG2 or LG3. The pump will automatically turn back on. Screen Definitions PLC Main Screen Definitions NR = Not Ready / The VFD HOA switch is either in Hand position or the Off position, or the VFD panel is powered off, or the VFD panel is in alarm status. RDY = Ready / The VFD HOA switch is in the Auto position but the pump is not running. HND = Hand / The VFD HOA switch is in the Hand position. LD = Lead / The VFD HOA switch is in the Auto position and the pump is running as the Lead pump. LG1 = Lag 1 / The VFD HOA switch is in the Auto position and running as the first Lag pump in the sequence. LG2 = Lag 2 / The VFD HOA switch is in the Auto position and running as the second Lag pump in the sequence. LG3 = Lag 3 / The VFD HOA switch is in the Auto position and running as the third Lag pump in the sequence. MIN = Minimum Run Time / The VFD has reached its threshold vacuum and is running a preset minimum run time before shutting off. Top Right Corner of Main Screen Q = Quad Mode / The system is running as a quadplex system with four pumps. T = Triplex Mode / The system is running as a triplex system with three pumps. D = Duplex Mode / The system is running as a duplex system with two pumps. S = Simplex Mode / The system is running as a simplex system with one pump. * = No VFDs are available in Auto mode. PAGE 2

QUADPLEX QUADPLEX Setting Date and Time (continued from page 2) Before running the system, the date and time should be checked and set if needed. Press the Right arrow key on the keypad. While still holding the Right arrow key, press the Left arrow key. Enter the current date by using the keypad. As you change the date, the cursor will move to the next position. After entering the date, press Enter to move to the next line and enter the time. When finished, press Enter again to save the settings. Press Enter once more to go back to the main screen. Date Format = dd/mm/yy Time Format = HH:MM:SS Military (example: 10:00 p.m. = 20:00:00) Changing Lead / Lag Setpoints The On and Off thresholds for Lead, Lag1, Lag2 and Lag3 are factory set on the Unitronics PLC at the most efficient values and should not be changed. Lead On = 302 Torr = 18 HgV Lead Off = 226 Torr = 21 HgV Lag1 On = 315 Torr = 17.5 HgV Lag1 Off = 239 Torr = 20.5 HgV Lag2 On = 328 Torr = 17 HgV Lag2 Off = 252 Torr = 20 HgV Lag3 On = 340 Torr = 16.5 HgV Lag3 Off = 264 Torr = 19.5 HgV PAGE 3

QUADPLEX QUADPLEX (continued from page 3) Watlow PLC vacuum setpoint = 283 Torr = 18.75 HgV. Recommended range for the pump thresholds is 290 to 277 Torr (18.5 HgV to 19 HgV). Vacuum setpoint appears as a green LED readout on the process controller. Up/Down arrow keys can be used to adjust this value. If On/Off threshold changes are made in the PLC, the vacuum setpoint in the Watlow process controller may also require change and vice versa. PAGE 4

QUADPLEX QUADPLEX (continued from page 4) Lead To change the On and Off values for the Lead pump, press the Right arrow key; while still holding the Right arrow key, press the #1 key. Enter the value (in Torr) for the Lead pump to turn on, then press the Enter key. Enter the value (in Torr) for the Lead pump to turn off, then press the Enter key. Lag 1 To change the On and Off values for the Lag 1 pump, press the Right arrow key; while still holding the Right arrow key, press the #2 key. Enter the value (in Torr) for the Lag 1 pump to turn on, then press the Enter key. Enter the value (in Torr) for the Lag 1 pump to turn off, then press the Enter key. PAGE 5

QUADPLEX QUADPLEX (continued from page 5) Lag 2 To change the On and Off values for the Lag 2 pump, press the Right arrow key; while still holding the Right arrow key, press the #3 key. Enter the value (in Torr) for the Lag 2 pump to turn on, then press the Enter key. Enter the value (in Torr) for the Lag 2 pump to turn off, then press the Enter key. Lag 3 To change the On and Off values for the Lag 3 pump, press the Right arrow key; while still holding the Right arrow key, press the #4 key. Enter the value (in Torr) for the Lag 3 pump to turn on, then press the Enter key. Enter the value (in Torr) for the Lag 3 pump to turn off, then press the Enter key. Manual (Forced) Alternation To manually alternate the Lead and Lag pump sequence, regardless of actual hours used, press the +/ key. Each button press will advance the pump order sequence one step. To manually alternate the Lead and Lag sequence, based on actual hours used, press the Right arrow key and the +/ key. PAGE 6