Privacy Wall - Power & Data Box (Field Installed) Modular & Hardwire Versions

Similar documents
Answer Modular Power. Page 1 of Rev V. Power Kits. Change of Height Harness. Receptical Covers

Avenir & kick Powerway

V.I.A. - Monitor Shroud

Modular Table Power System Installation for Runner Non-folding Plug and Play Tables

B Y R N E 8 - T R A C O V E R V I E W. 1) Introduction. 2) Universally Recognized. 3) Circuitry/Keying

Installing Simplex and Duplex Receptacles into: Series 9000 Structural Panel Series 9000 Energy Management Panel and Worksurface Avenir Power Panel

Power/Data Instructions. Genius. Movable Walls. September

Virtual PUCK for media:scape Kiosk and Answer

electrics PRODUCT MAP / TABLE OF CONTENTS ELECTRICS & COMMUNICATIONS OVERVIEW POWER ENTRY BASICS PANEL-MOUNTED WORKSTATIONS..

DESCRIPTION PRODUCT CODE LIST PRICE DIMENSIONS/INCHES H L D

Morrison, Currents and Reff Raceways Morrison, Currents and Reff Raceways

KI WIREWORKS WIRE ELECTRICAL SYSTEM INTRODUCTION INFORMATION

Ratchet-Pro Slide Cover

lighting, electrics & communications

lighting, electrics & communications

lighting, electrics & communications

Phase Loss Protection Upgrade. Phase Loss Protection Upgrade. In this bulletin:

Installation/Operating Instructions 220V VCB Silhouette/Series E Electric Video Conferencing Background by Draper

Gateway Profile 4 service guide

lighting, electrics & communications

lighting, electrics & communications

SURFACE CONTROLTrack INSTALLATION INSTRUCTIONS

To connect the AC adapter:

Configurable Output Distribution. 120V / 208V / 240V 60Hz. User Manual English

A-dec 570L Dental Light on a DCS System INSTALLATION GUIDE

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

USBCNC USB Disk Key reader for CNC Controls Machine Mount instructions

Rack Installation Instructions

Removing and Replacing Parts

USBCNC-SW USB Disk Key reader for CNC Controls Machine Mount instructions for Universal Switcher Version

System Storage EXP3000 Rack Installation Instructions

If technical support is required, please contact Advent Technical Support at

ipod Classic Headphone Jack & Hold Switch Replacement

WINSTA. Full Line Catalog 2008/2009

Electrical Accessories

AP-120 Series AP Mounting Kit

User s Guide. Includes Mounting, Installation, and Product Registration nd Avenue NE Arlington, WA USA (+1)

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

Service & Maintenance

SAVE THESE INSTRUCTIONS

A-dec 584 Monitor Mount on a Central Cabinet

E1135C PDU and Pod Upgrade Procedure

ILC LightLEEDer MicroLite 1000P Retrofit Installation

Installing 6 Indexer: PRS Standard Tools

Lighting PowerPincher Installation Instructions

Trig Planning Guide. December 2012

Rack Mount Power Supplies

Home Automation, Inc. Model 53A00-1. OmniTouch 5.7 Touchscreen with Video

INSTALLATION INSTRUCTIONS

STC7D. Digital Time Clock for TRC500 & TRC800. Installation, Operation, and Maintenance Manual

PIX 515/515E. PIX 515/515E Product Overview CHAPTER

PXC Compact Unitary Equipment Controller (UEC)

Cone Beam Volumetric Tomography and Panoramic Dental Imaging System

ON-FLOOR WIREWAY PRICELIST AUGUST 1, 2017

Connector System for Fluorescent Lighting Fixtures. Connectors for In-Line Mounting of Fluorescent Lighting Fixtures. Fully Polarized Connectors

Emerald Cubicle System. Spec Sheet. Emerald 39,52, 65 H. skutchi.com cubicles.cc. Vol DESIGNS. inc.

Topic: TB No.: Date: Aug/2017. Model UC4, UC10 & UC45 twin pump variants Regulated 24V Pump Power supply upgrade OVERVIEW

Assembly Instructions for #5630 Medication PalWOW

Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

OnePlus 5 Screen and Digitizer Assembly Replacement

lighting, electrics & communications

3M Indoor Protected Building Entrance Terminal 4788V-QCS Series

Basketball Shot Clock Set LX2180 Manual

Temperature. Power requirements. Weight. Dimensions

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

PM Series Power Meter

Signal Adapter. Signal Output. Power Input. Modell-Zug Elektronix Signal Adapter U.S.A. Momentary. Auxillary. Switch. Outputs

4888 and 4988 Outdoor Protected Entrance Terminals

With its tamper-resistant design, the

Flat Screen Garage. Table System Planning Guide WORKING FOR YOU

1. Mount the echo and tremolo control switches under the keyboard shelf, in a position convenient for the organist.

Mac Mini Mid 2011 SSD Dual Drive Installation

READ COMPLETELY BEFORE INSTALLING!!!

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.

Haworth Power Technical Sheets January 2018

U-SERIES SPECIFICATION GUIDE

Smartspace Benching System

PAR+ & MSC+ Controller. Installation Manual

AB-2D AB-2D SPEAKER A,B OR A+B SELECTOR INSTALLATION & OPERATION GUIDE

SM (SURFACE MOUNTED) WIREWAY: I SERIES

EcoFlex LED Neon Manual

Navigation interface for Jeep GC 5 RA2 NTV-KIT581

CableSmart Series Nonmetallic Raceway

ibook G3 14" Top Shield Replacement

- ELV OVERVIEW. InstallationGuide SUPPLIED PARTS RELATED PARTS. Brackets Fixtures. Other. 1 of 9 IG-STR9-ELV

for a perfect electrical installation. The range of rail-mounted terminal blocks

Secured Series: Hub Plus Kit Single Door Controller Package Installation Manual

RECOMMENDED TOOLS PERSONAL & VEHICLE PROTECTION MASKING TAPE

Upgrading LVDS Cables Instruction Sheet

4188, 4288, 4288-S and 4688 Protected Entrance Terminals

nls Product List 1st February, 2014 Tel: Fax: Coombes Drive, Penrith, NSW, 2750 Australia

CHANNEL LETTER LIGHTING UNIQUE LIGHTING SOLUTIONS RETROFIT INSTALLATION GUIDE

DOCKING STATION SPECIFICATIONS

ipod Classic Click Wheel Replacement Written By: irobot ifixit CC BY-NC-SA Page 1 of 25

Installing the PSU for the S50 and S50N

MCG Surge Protection

Power Base AI. Power Base AI. Technical Sheets

Instruction Manual. Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

Operation and Maintenance Manual

Transcription:

Privacy Wall - Power & Data Box (Field Installed) Modular & Hardwire Versions If you have a problem, question, or request, call your local dealer, or Steelcase Line 1 at 888.STEELCASE (888.783.3522) for immediate action by people who want to help you. (Outside the U.S.A., Canada, Mexico, Puerto Rico, and the U.S. Virgin Islands, call: 1.616.247.2500) Or visit our website: www.steelcase.com 2004 Steelcase Inc. Grand Rapids, MI 49501 U.S.A. Printed in U.S.A. NOTE: Unused modular electrical connector openings are not required to be capped. Page 1 of 15

Tools Table of Contents ELECTRIC SHEARS 2" WIDE MASKING TAPE Topic Determining the Opening 3 Page Removing the Skin 4-5 Removing the Acoustic Core Material 6 Installing Power 7 Installing the Modular Version 8 Mounting a Base Power Block 9 Chicago & New York City Hardwire Box and 10-14 Bracket Assembly Wiring Schematics 15 RAYBO FLOOR COVERING -WET/DRY- VAC Page 2 of 15

1b 6-3/8" 2 Determining the Opening 1. Find the center of the panel (1a) and mark the width of the opening. Determine the height you want the opening from the bottom of the panel and mark the height of the opening (1b). Use a straight edge to connect your marks (1c). 2. The size of the opening. 28-1/2" (DESK HT.) 16-1/8" (ADA HT.) BOTTOM OF SKIN 4" C L 8" 1a C L OF PANEL 1c Page 3 of 15

1 2b Removing the Skin 1. Masking tape is applied to protect surrounding surface material. NOTE: Tape should not be applied to wall for more than 1 hour. 2. For fabric and/or vinyl panel, cut the perimeter out with a utility knife (2a, b & c). TIP: Place cardboard around opening to protect outside surface from getting dirt or damage while using tools. 2a 2c Page 4 of 15

4 Removing the Skin (cont.) 3. Drill all four (4) holes slightly offset from the corners to help provide for a sharp 90 corner. 4. Use electrical shears on all four (4) sides to remove panel covering. 3a 5. Use a utility knife on all four (4) sides to cut through the acoustical core and remove. 5 3b CAUTION: Make sure utility knife blade is not to long, to damage opposite face. Page 5 of 15

1 Removing the Acoustic Core Material 1. File down the edges. 2. Remove acoustical core material 3" left & right from the cut side ONLY. If installing a Chicago & New York City hardwire box, you will need to remove 5" from the bottom edge of the cut side opening also. 3" CAUTION: It is very important to remove this material slowly and thoroughly. If using a hammer to apply force to any type of chisel or spatula, make sure the force used is minimal otherwise damage to the panel surfaces may occur. 5" Chicago & New York City Only 2 3" Page 6 of 15

4a Installing Power 4b 1. Feed power harness through opening (1a) and send downward to base of panel (1b & 1c) or upward to ceiling channel. 1c 1a 1b Single sided block shown. Same for double sided block. 4. Secure the entire assembly to the frame with the mounting clips (4a) and screws (4b) provided. Six (6) clips required. TIP: This is a good time to install a pull string for data/communication wires. 2 3 Page 7 of 15

3a Installing the Modular Version 1. Remove masking tape from panel. 2. Attach the receptacles to the power block. Snap the spacer onto the junction box. Attach the appropriate communication receptacle into the spacer then snap the face plate adaptor into position. 3. Attach the receptacle faceplate over the receptacles (3a & b). 2 3b SPACER COMMUNICATION RECEPTACLE RECEPTACLES FACE PLATE ADAPTOR Page 8 of 15

Mounting a Base Power Block 1. Remove the top mounting tabs by bending backwards until they snap off. 2. Insert bottom tabs of power block into key slots of bottom rail. 3. Slide power block toward the smaller opening until you hear a snap sound. 2 HOLES IN TRACK WHICH TABS ON POWER BLOCK ARE INSERTED TOP MOUNTING TABS 3 1 THESE TWO TABS ARE LOCATED UNDERNEATH THE POWER BLOCK Page 9 of 15

2a MOUNTING TABS Chicago & New York City Hardwire Box and Bracket Assembly 1. Remove knockouts in box prior to installing in frame. 2b NOTE: Chicago & New York City power/communication to be applied to wall system prior to final installation of wall to ceiling grid for maximum flexibility. 2. Without extension covers, feed box into the hole of the frame, making sure mounting tabs are facing upward and towards you. KNOCKOUT 1 HARDWIRE BOX Page 10 of 15

Chicago & New York City Hardwire Box and Bracket Assembly (cont.) MOUNTING BRACKET 3. Pre bend mounting bracket at stitching (3a) with end flanges facing outwards. 3a STITCHING END FLANGES Page 11 of 15

Chicago & New York City Hardwire Box and Bracket Assembly (cont.) 4. Feed the bracket into the hole of the frame, with the top of bracket facing up. The hardwire box will have to be moved out of the way (downwards) while the bracket is inserted. 5. Mate hardwire box with mounting bracket. The bracket sandwiches the hardwire box (5a). Secure the box to the bracket with mounting screws (5b). 4 5b 5a Page 12 of 15

Chicago & New York City Hardwire Box and Bracket Assembly (cont.) 6. Attach conduit to the box. The hardwire box will have to be shifted to make your connections. For easier assembly, power in and power out the same side of the box. 7. Secure the entire assembly to the frame with the mounting clips (7a) and screws (7b) provided. Six (6) clips required. 7a 7b 6 Page 13 of 15

Chicago & New York City Hardwire Box and Bracket Assembly (cont.) 8. Attach receptacle extensions to hardwire egress opening. Go to page 8 to complete installation. Note: For proper fit of receptacle remove all ears on receptacle 8 9 Page 14 of 15

3+1 Powered by Separate Panels 3+1 Powered by Single Panel Line 1 (Black) Line 2 (Red) Line 3 (Blue) L1/L2/L3 Neutral (White) Systems Ground (Green) LINE 1 (Black) LINE 2 (Red) LINE 3 (Blue) LINE 4 (Pink) L1/L2/L3 Neutral (White) L4 Neutral (Gray) WIRING SCHEMATICS: Line 4 (Pink) L4 Neutral (Gray) Isolated Ground (Gn/Yl) Systems Ground (Green) Isolated Ground (Gn/Yl) NOTE: L-4 may be connected to P-1, P-2, or P-3. NOTE: L-4 should alternate between P-1, P-2, and P-3 to balance circuit loading. ELECTRICAL DATA: 2+2 Powered by Separate Panels 2+2 Powered by 3-Phase Single Panel 2+2 Powered by Split-Phase Panel 120 V 60 HZ 20 Amp USA & CANADA Wiring schematics must be followed to prevent overloading of the neutrals. Line 1 (Black) Line 2 (Red) L1/L2 Neutral (White) System Ground (Green) Line 1 (Black) Line 2 (Red) Line 3 (Blue) Line 4 (Pink) P-1 P-2 Line 1 (Black) Line 2 (Red) Line 3 (Blue) Line 4 (Pink) WARNING: Risk of Fire or Electric Shock: This office furnishing system may be connected to more than one source of supply. All sources must be disconnected prior to any servicing. No single circuit may be powered by more than one source. Line 3 (Blue) Line 4 (Pink) L3/L4 Neutral (Gray) Isolated Ground (Gn/Yl) NOTE: Line 3 or 4 should alternate between phases to balance circuit loading. L1/L2 Neutral (White) L3/L4 Neutral (Gray) System Ground (Green) Isolated Ground (Gn/Yl) NOTE: L-4 should alternate between P-1 and P-2 to balance circuit loading. L1/L2 Neutral (White) L3/L4 Neutral (Gray) System Ground (Green) Isolated Ground (Gn/Yl) 3 SepN Powered by Separate Panels 3 SepN Powered by Single Panel 3 SepN Powered by Split-Phase Panel Line 1 (Black) Line 2 (Red) L1 Neutral (White) L2 Neutral (Gray) Systems Ground (Green) Line 3 (Blue) L3 Neutral (White/Gray) Isolated Ground (Green/Yellow) Line 1 (Black) Line 2 (Red) Line 3 (Blue) L1 Neutral (White) L2 Neutral (Gray) L3 Neutral (White/Gray) Systems Ground (Green) Isolated Ground (Gn/Yl) P-1 P-2 Line 1 (Black) Line 2 (Red) Line 3 (Blue) L1 Neutral (White) L2 Neutral (Gray) L3 Neutral (White/Gray) Systems Ground (Green) Isolated Ground (Gn/Yl) Page 15 of 15