400GBASE-ER8 40km SMF PMD Preliminary Specification Proposal*

Similar documents
400GBase-LR8: A Proposal for 10 km Objective Using 50 Gb/s PAM4 Signaling

Path forward for 100G SMF objectives in 802.3cd

Consensus building discussion on next-generation MMF PMDs. Presented by Robert Lingle, Jr. IEEE Interim Huntington Beach, CA January 9 th, 2017

Overview: IEEE Next Generation Enterprise / Campus / Data Center Ethernet Industry Connections Activity

Technical Feasibility of optical PMDs with RS FEC

CFI Consensus - Beyond 10km PHYs

Timeline Implications

CFI Consensus - Beyond 10km Optical PHYs

Ethernet Adoption: SERDES Rates & Form Factors

Next-gen 200 and 400 Gb/s PHYs over Fewer MMF Pairs Call For Interest Consensus Presentation

100GE 10km SMF WDM Grid Alternatives

Ethernet The Next Generation

Further considerations on objectives for PHYs running over point-to-point DWDM systems

Maximizing the cost advantage of Ethernet by considering future generations of 400GE

CFI - 100GbE Beyond 10km Optical PHYs

Super-PON Call For Interest Consensus Deck

IEEE New Ethernet Applications Ad Hoc

Call For Interest Bidirectional 10Gb/s and 25Gb/s optical access PHYs. Mar 2018

MMF Objective for 400GbE

Optical Trends in the Data Center. Doug Coleman Manager, Technology & Standards Distinguished Associate Corning Optical Communications

100G SWDM4 MSA Technical Specifications Optical Specifications

IEEE P802.3ba 40 GbE and 100 GbE Standards Update

Proposal for a PMD for 100GBASE-SR10 and 40GBASE-SR4 and Related Specifications

Next-gen 200 and 400 Gb/s PHYs over Fewer MMF Pairs Call For Interest Consensus Presentation

Next-gen 400 and 200 Gb/s PHYs over Fewer MMF Pairs Call For Interest Consensus Presentation. IEEE Draft 0.3

SMF PMD MPI Penalty Investigation. 400 Gb/s Ethernet Task Force SMF Ad Hoc Conference Call 9 December 2014

Update on technical feasibility for PAM modulation

Agenda and General Information

Next-gen 200 and 400 Gb/s PHYs over Fewer MMF Fiber Pairs than in Existing Ethernet Projects and Standards CFI Consensus Presentation

Unified Evolution-Ready 25/50/100 Gbps-EPON Architecture Proposal

100 Gb/s SMF Standard Broad Market Potential Observations

Beyond 10km reach objective discussion

Is 1Tb/s Ready for Prime Time? Engineering Reality Check

Sensitivity definition and TDP in 802.3ca discussion

25 Gb/s Ethernet Over Single Mode Fiber Call For Interest Consensus Presentation

IEEE P802.3ba 40 GbE and 100 GbE Standards Update

Technical Feasibility of 50 Gbit/s PAM4 using VCSELs from 850nm to 1060nm

Pivotal Issues for 400 Gb/s Ethernet

In Support of a 500m objective for 200G Ethernet: Part II

Beyond 10km Optics Strawman (CFI) The Need. John D Ambrosia, Futurewei IEEE New Ethernet Applications Ad Hoc January 9, 2017

Objectives for Next Generation 100GbE Optical Interfaces

Terminology. John D Ambrosia Futurewei, Subsidiary of Huawei Jan 24, 2018

Higher Speed Ethernet

IEEE Working Group July 2018 Plenary Week

Building Tomorrow s Networks Session #1: New High-Speed and Long Reach Optical Interfaces. January 20, 2018

Path forward for 100G SMF objectives in 802.3cd

50 GbE 40km Objective 5C Study Group Discussion

Considerations for 25GbE

100G and Beyond: high-density Ethernet interconnects

Higher Speed Ethernet Update

Optical Transceivers for 100GE

TDM vs. WDM co-existence with 10G EPON: update

Mr. Lingle welcomes attendees to the IEEE Next-generation 200 Gb/s and 400 Gb/s MMF PHYs Study Group meeting.

Support for an objective of 25 Gb/s over MMF. September 2014, Kanata, ON, Canada (team of many)

10Gb/s on FDDI-grade MMF Cable. 5 Criteria Motions. 13 January 2004

Optical link budget compatibility

The Case for TDM Coexistence in O-Band

CFI for CFI: 1x50Gb/s and 2x50Gb/s EPON

MMF PMD for Short Distances in Data Center and High Performance Computing Environments

802.3bs PROJECT DOCUMENTATION CONSIDERATION. John D Ambrosia, Independent December 2, 2015

Objectives for NG 200G and 400G PHYs

VCSEL-Friendly 1310nm Serial PMD Specifications

Data Center architecture trends and their impact on PMD requirements

IEEE Liaison report (Oct ) T v000 Tom Palkert, Macom

Towards building a low cost 25G base PHY for 100G EPON

400GE at the Cost of 4 x 100GE

200GE&400GE application considerations in metro transport aggregation layer network

Considerations on objectives for Beyond 10km Ethernet Optical PHYs running over a point-to-point DWDM system

The Ethernet Rate Explosion John D Ambrosia

Proposed CSD Responses: Objectives Related to operation over DWDM System

Early Market PMD Types for: Core Router to Transport interconnect and Router to Router interconnect. Andy Moorwood, Infinera

Decoupling electrical and Optical Modulation Andre Szczepanek. Szczepanek_3bs_01a_0315.pdf Decoupling electrical and Optical Modulation 1

Transmitter testing for MMF PMDs

Path to Consensus on 400 GbE PMDs

IEEE P802.3ba 40Gb/s and 100Gb/s Ethernet

Insuring 40/100G Performance Multimode Fiber Bandwidth Testing & Array Solutions. Kevin Paschal Sr. Product Manager Enterprise Fiber Solutions

40GE SMF PMD Call for Interest. IEEE Working Group Atlanta, Ga Nov 15-20, 2009

NRZ-NFC for 28G-PON. Contribution to The IEEE NG-EPON Study Group Meeting, Nov , 2015

IEEE Criteria for Standards Development (CSD)

100 Gigabit Ethernet. An Industry Update. John D Ambrosia Chair, IEEE P802.3ba Task Force Senior Scientist, Force10 Networks October 8, 2009

IEEE Beyond 10km Optical PHYs SG - Discussion of Objectives / CSD

100 GBE - WHAT'S NEW AND WHAT'S NEXT

Five Criteria Responses

IEEE Working Group March 2019 Plenary Week

Standardization Activities for the Optical Transport Network

IEEE Working Group March 2018 Plenary Week

Considerations on X00 Gb/s 40-80km interfaces with appropriate support for DWDM systems. Peter Stassar HUAWEI TECHNOLOGIES CO., LTD.

25 Gb/s Ethernet Study Group CSD: Technical Feasibility. Joel Goergen - Cisco Matt Brown APM Version goergen_25ge_01_0914d

Disruptive Technologies Shaping Data Center Growth

IEEE P802.3ba 40Gb/s and 100Gb/s Ethernet

Technical Feasibility of 4x10G and 10x10G Electrical Interfaces

Category 8 paves the way for IEEE 40GBASE-T. David Hughes RCDD/DCDC/NTS Senior Technical Manager MEA CommScope

400GBASE-ZR PCS/PMA Baseline Proposal

400G PAM4 The Wave of the Future. Michael G. Furlong - Senior Director, Product Marketing

Kotura Analysis: WDM PICs improve cost over LR4

40G and 100G Products

50G and 100G Use Cases. Brad Booth Azure Networking, Microsoft

PSM4 Technology & Relative Cost Analysis Update

Two Backplane Markets, Two Backplane Channels, Two Signaling Schemes, Two PHYs

Lean Disaggregated Regional Optical Transport. Nick Plunket, Interconnection Engineer NANOG 74 October 2 or 3, 2018

Transcription:

400GBASE-ER8 40km SMF PMD Preliminary Specification Proposal* IEEE P802.3cn Task Force 12-14 November 2018, Source Photonics Xinyuan Wang, Huawei Technologies Hai-feng Liu, Intel *Special thanks to Pete Anslow for critical review and comments 1

Contributors & Supporters Xinyuan Wang, Huawei Xiang He, Huawei Xin Chang, Huawei, Source Ed Ulrich, Source Mark Heimbuch, Source Hai-feng Liu, Intel Phil Sun, Credo Mengyuan Huang, SiFotonics Dong Pan, SiFotonics David Li, Hisense Hua Zhang, Hisense Tongqing Wang, Alpine Optoeletronics Rang-Chen Yu, Molex Mizuki Shirao, Mitsubishi Electric Shuto Yamamoto, NTT Yoshiaki Sone, NTT Atul Srivastava, NEL Kohichi Tamura, Oclaro Zhigang Gong, O-Net Kevin Zhang, IDT Karen Liu, Lightwave Logic Kenneth Jackson, Sumitomo (TBC) Steve Swanson, Corning Robert Lingle Jr. OFS David Chen, AOI Greg LeCheminant, Keysight Pavel Zivny, Tektronix Angus Lai, Litrinium Rajesh Radhamohan, MaxLinear Mark Kimber, Semtech Jun Shan Way, ZTE TX Liquan Yuan, ZTE Rajiv Pancholy, Broadcom Vasudevan Parthasarathy, Broadcom Ilya Lyubomirsky, Inphi Arash Farhoodfar, Inphi John Wang, Nokia Paul Brooks, Viavi Solutions Thananya Baldwin, Keysight/Ixia Jerry Pepper, Keysight/Ixia Hongchun Xu, Accelink Shiyu Li, Accelink Junjie Li, China Telecom Wenyu Zhao, China Academy of Telecom Research (CATR) Jeffrey Maki, Juniper Networks Ruibo Han, China Mobile Qian Cai, China Mobile 2

Outline Adopted SMF objectives Introduction Selected references Baseline proposal for 400GBASE-ER8 Transmit characteristics Receive characteristics Illustrative link power budgets Recommendations 3

802.3cn Adopted Objectives From Objectives_180712 *** - Adopted by SG May 2018 Interim. Not approved by IEEE 802.3WG. Approved by IEEE802.3WG - July 2018 Plenary

Introduction This presentation aim to address the preliminary 400G-ER8 baseline proposal as compared with existing 400G-LR8 developed by P802.3bs task force. 400G-ER8 leverage industry investment on mature 50Gb/s PAM4 as low cost and low power solution to enable OSFP and QSFP. Major BOM difference from LR8 is to replace PIN by APD for higher sensitivity receiver. Provide upgrade path for 50G-ER and 200G-ER4 through shared components. Technical feasibility to support 200/400GbE 40km (4/8x50G) SMF PMD objective was investigated and demonstrated by multiple vendors. Multiple vendors offer high power EML and APD that can support 40km reach objective. 5

Selected References Sept 2018: 200G EML Fiber Propagation Results jackson_b10k_01_0918 Sept 2018: Single & quad channel APD receiver performance at 25GBd huang_b10k_01a_0918 July 2018: 400GBASE-LR8 measurement data for reaches >10km cole_b10k_01_0718 May 2018: Technical analysis to support 400GbE 40km objective wang_b10k_01a_0518 Mar. 2018: Technical feasibility to support 200GbE 40km objective yu_b10k_01c_0318 Jan. 2018: Investigation of technical feasibility for 200G/400G beyond 10km optical PHYs using high-power TOSA and APD-ROSA yamamoto_b10k_01a_0118 Jan. 2018: Technical feasibility to support 200GbE 40km objective xu_b10k_01a_0118 CFI, July 2017 CFI_01_0717; 100GbE-Beyond10km_CFI_D-final2 Plus many industrial papers & pre-sg ad_hoc presentations Chang OFC16, Th1G.2; Nada OFC15 M3C.2, Chan OFC15 Th3A.4 et al. 6

400GBASE-ER8: Position in 802.3 Layered Architecture* 400GBASE-ER8 *for PMD only ER8 = PMD FOR SINGLE-MODE FIBER - 40km 7

400GBASE-ER8: WDM Lane Assignments Based on LAN-WDM (800GHz) as 400GBASE FR8/LR8 8

400GBASE-ER8 Operating Ranges Leverage the same fiber installments by 100GBASE-ER4 9

400G-ER8 Exemplary Link Budget 10

400G-ER8 Transmit Characteristics (TP2) 11

400G-ER8 Receive Characteristics (TP3) 12

400G-ER8 30/40km Link Power Budget Suggested penalty: MPI: 0.3dB (by simulation @40km transmission DGD: 0.2dB (by simulation @ worst case) 13

400GBASE-ER8 Channel Specs G.652 40km worst case fiber loss and dispersion values Max positive dispersion remain unchanged (1310nm) ~ 38ps/nm Min negative dispersion shift (1295 to 1273nm) ~ -114 to -204ps/nm 14

Recommendation Adopt the proposed 400GbE PMD based on 8x50Gb/s PAM4 with LAN-WDM spacing in support of P802.3cn 400G 40km SMF PMD objective The proposed 400GbE PMD enables cost-effective solution for 40km reach by leveraging 400GBASE-LR8. The proposed 400GBASE-ER8 SMF PMD interoperable with 400GBASE-LR8. The 400GBASE-ER8 interoperable with 400GBASE-LR8 will enable common deployment, and economies of scale through shared component volume. The 400GBASE-ER8 will use the same FEC, PMA, and common specification/compliance methodology. All baseline parameters and specifications are open to further analysis and are subject to change by the Task Force. 15

Thank YOU 16