FACILITY COMPONENTS - MIDDLE SCHOOL

Similar documents
UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

DUKE UNIVERSITY CONSTRUCTION STANDARDS

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX

Site Level Deficiencies

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Orange County Public Schools

Tier IV Standards as Specified in the TIA 942 Document

SUB-CONTRACTOR PRE-QUALIFICATION FORM

Appendix Five-Year Facility Assessment 2009

Facilities Department Town of Duxbury, MA

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Orange County Public Schools

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

University of Missouri System Accounting Policies and Procedures

Installation. 9mm. Rear view showing cable header pins

Plumbing All plumbing 25 years B_Plumb25

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee

DESIGN GUIDELINES NOTES: MECHANICAL/ PLUMBING/ELECTRICAL/COMMUNICATIONS

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS

SCHENDT ENGINEERING PRIOR EXPERIENCE


OWNER PROPERTY DISCLOSURE

Design Integration Using Autodesk Revit 2020

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

Why WeWork. WeWork Ginza 6- Tokyo

50 Years of Facility Operations or Rebuilding from the inside out

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25

FACILITY SUMMARY OF APPROVED PROJECTS

WCB Wheeler Rd Hauppauge Room Data Sheets for OGS Project No. 4558

Lake Waccamaw Building Inspections Fees

Clark Atlanta University. Facilities Modification Request Form

Administration. Space Types WELLNESS CENTER WELCOME CENTER CONFERENCE OUTDOOR RECEPTION RECEPTION SECURED PERIMETER. Description and Goals

STANDARD PLAN RELEASE SUMMARY (SPR)

CAPITAL OUTLAY FUND PROPOSED ACCOUNT BUDGET BUDGET COMMENTS DESCRIPTION

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014

Design Integration Using Autodesk Revit 2017 Architecture, Structure and MEP

DRAWING INDEX UNIVERSITY OF NEW MEXICO VR - CLASSROOM UNIVERSITY OF NM CAMPUS MILTON HALL, ROOM 155

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 450 Columbus Blvd, Suite 901 Hartford, CT 06103

Design Integration Using Autodesk Revit 2015

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant

COMcheck Software Version Mechanical Compliance Certificate

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

FOOD INNOVATION CENTER. Nebraska Innovation Campus 2021 Transformation Dr Suite 2220 / Lincoln, NE innovate.unl.

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

Multi-Purpose Building

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

Ehresman Associates, Inc. architects engineers

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

New Wisconsin Energy Code: What it Means for Me?

CLASS A MANUFACTURING FACILITY

WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018

GlobalFoundries Santa Clara, California First generation tenant improvements totaling 140,000 SF on five floors of a new six-story office building. Se

Energy Engineering: Tools and Trends

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Five-Year Capital Plan Request FY through FY

MAYS LANDING CAMPUS SECURITY

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540)

equest Hands-On Example Example Plans: Mixed Use, Retail-Multi-Family Residential building plans courtesy of Driscoll Architects, Seattle, WA

New Certification & Training Structure

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage

MONTE VILLA FARMS MONTE VILLA PARKWAY BOTHELL, WASHINGTON

CARRIER edesign SUITE NEWS

Infrastructure Checklist

Section 7.I: Estimates Backup. 7.I Estimates Back-Up

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

DRAFT. Cascaded Plan Waypoint 1 1 July June Facilities Division of Infrastructure

HAYSVILLE USD 261 Preliminary Project Timeline

NOCCCD Cabling Infrastructure Standards - Page 1

GOVERNMENT FACILITIES FY 2017 FY 2016 CIP. Pages C-72 through C-115

BIM. The Fastest Way to Quickly & Easily Insert and Modify Elements that are used in Revit project

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016

Moving Containment Inside the Enclosure. Jeff Markle Great Lakes Case & Cabinet

DEFERRED MAINTENANCE PLAN (DMP) FY

8505 Baycenter Road Jacksonville, FL

AN EMERGENCY OPERATIONS CENTER FIELD STUDY HENRICO COUNTY, VIRGINIA. by Anna M. McRay

BUILDINGS AND FACILITIES

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 165 Capitol Avenue Hartford, CT 06106

INVESTIGATIVE REPORT FOR BROWARD COUNTY 911 DISPATCH CENTERS. January 18, 2013

Franklin D. Roosevelt Four Freedoms Park by Louis Kahn, Constructed 2012

ADDENDA 1/LAST IN RESPONSE TO QUESTIONS

Definitions To understand the application of RST on restoration related services, it is important to understand the meaning of the following terms:

Computer Network Design Guide Existing Systems 1 / 6

ARCHITECTURAL GUIDELINES FOR INSTRUCTIONAL TECHNOLOGY

Options Overview. February 6, Ben Newell

Threat and Vulnerability Assessment Module 8 Part 2

8505 Baycenter Road Jacksonville, FL

1605 Lakes Parkway. Lawrenceville, Georgia Gwinnett County. 100,000 SF (Expandable) 17.7 Acres

PREFABRICATED SUBSTATIONS AND E-HOUSES. tgood.com. Energy, Fast!

OPERATIONS MANUAL. n.form I/O Expander (RACK MOUNT) Document Number: Rev B

CITY OF KENNER COMMENTS CONCOURSE A 100% CONSTRUCTION DOCUMENTS Permit Comments

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC ::

Transcription:

SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access - Events 4.0 2.0 0.59 Student Drop Off - Pick Up 1.0 1.0 0.07 Four fewer spaces than minimum standard. Street Frontage Sidewalks 4.0 1.0 0.30 On-Site Walkways 2.0 1.0 0.15 Stairs and Ramps 2.0 1.0 0.15 Exterior Courtyard 4.0 2.0 0.59 Hard Surface Play Areas 2.0 1.0 0.15 Lawns 3.0 2.0 0.44 Grass Athletic Fields 3.0 3.0 0.67 Athletic Surfacing 2.0 3.0 0.44 Dumpster Area 2.0 1.0 0.15 Portable Classroom Infrastructure 3.0 1.0 0.22 SITE IMPROVEMENTS Fences and Gates 2.0 2.0 0.30 Backstop Fencing 2.0 1.0 0.15 Pipe Rail Gates and Railings 2.0 1.0 0.15 Retaining Walls 2.0 1.0 0.00 Bicycle Racks 1.0 0.5 0.04 Quantity of bicycle racks does not meet minimum standard. Dumpsters 2.0 1.0 0.15 Exterior Benches 1.0 0.5 0.04 Quantity of benches does not meet minimum standard. Exterior Waste Receptacles 2.0 0.5 0.07 Exterior Bleachers 4.0 2.0 0.59 Flag Pole 3.0 0.5 0.11 Play Area Equipment 1.0 0.5 0.04 Quantity of basketball backboards does not meet minimum standards. Play Area Striping 1.0 0.5 0.04 Basketball courts are not striped. Pickleball court striping is worn. Reader Board 0.0 1.0 0.00 None. Site Sign 2.0 1.0 0.15 Traffic Control Signs 2.0 1.0 0.15 Pavement Markings 1.0 1.0 0.07 No bus lane striping or numbers. 11/21/2008 RA - Facility Component Assessment Page 1 of 7

LANDSCAPING Shrubs / Groundcover 2.0 2.0 0.30 Trees 2.0 2.0 0.30 Wetlands 4.0 2.0 0.59 Irrigation System 2.0 3.0 0.44 UTILITIES Water System 2.0 3.0 0.44 Sanitary Sewer System 3.0 3.0 0.67 Storm Drainage System 4.0 3.0 0.89 Natural Gas Service 2.0 2.0 0.30 Fuel Storage Tanks 4.0 1.0 0.30 Electrical Service 2.0 3.0 0.44 Telephone Service 2.0 3.0 0.44 Cable Television Service 2.0 1.0 0.15 Internet Connection 1.0 3.0 0.22 WAN connection less than minimum standard. Energy Usage - MBTUs / SF Building 4.0 5.0 1.48 Water Usage - Domestic Water / SF Bldg. 1.0 5.0 0.37 Water usage level does not meet minimum standard. Water Usage - Irrig. Water / SF Landscape 2.0 2.0 0.30 STRUCTURE Foundation 4.0 5.0 1.48 Floor Structure 4.0 5.0 1.48 Wall Structure - Bearing 2.0 5.0 0.74 Wall Structure - Non Bearing 4.0 5.0 1.48 Roof Structure 2.0 5.0 0.74 BUILDING ENVELOPE Floors 4.0 3.0 0.89 Exterior Wall Surface 4.0 3.0 0.89 Exterior Wall Insulation 4.0 1.0 0.30 Exterior Windows 2.0 3.0 0.44 Exterior Doors 2.0 1.0 0.15 Soffits 4.0 1.0 0.30 Flashing 4.0 1.0 0.30 Trim 4.0 1.0 0.30 Gutters and Downspouts 4.0 1.0 0.30 11/21/2008 RA - Facility Component Assessment Page 2 of 7

Roof Membrane 1.0 3.0 0.22 Shingle roof is beyond expected life. Roof leaks require frequent maintenance. Roof Insulation 3.0 1.0 0.22 Roof Accessories 2.0 1.0 0.15 Skylights 4.0 1.0 0.30 Fall Arrest System 0.0 1.0 0.00 None. Canopies NA 0.0 0.00 INTERIORS Floors - Classrooms 4.0 3.0 0.89 Floors - Corridors and Stairs 4.0 3.0 0.89 Floors - Gymnasiums 4.0 2.0 0.59 Floors - Kitchen 4.0 1.0 0.30 Floors - Library 4.0 1.0 0.30 Floors - Restrooms 4.0 1.0 0.30 Floors - Support Spaces 3.0 1.0 0.22 Walls - Classrooms 4.0 3.0 0.89 Walls - Corridors and Stairs 4.0 3.0 0.89 Walls - Gymnasiums 4.0 1.0 0.30 Walls - Kitchen 3.0 1.0 0.22 Walls - Library 4.0 1.0 0.30 Walls - Restrooms 4.0 1.0 0.30 Walls - Support Spaces 4.0 1.0 0.30 Asbestos-Containing Materials 4.0 1.0 0.30 Interior Doors 4.0 2.0 0.59 Door Hardware 3.0 2.0 0.44 Automatic Door Opener 2.0 0.5 0.07 Overhead Doors and Grilles 1.0 1.0 0.07 Fire doors located in Technology Lab and Kitchen are difficult to reset. Interior Windows 3.0 1.0 0.22 Operable Walls 4.0 1.0 0.30 Ceilings - Classrooms 4.0 3.0 0.89 Ceilings - Corridors 4.0 3.0 0.89 Ceilings - Gymnasiums 4.0 1.0 0.30 Ceilings - Kitchen 3.0 1.0 0.22 Ceilings - Library 4.0 1.0 0.30 Ceilings - Restrooms 4.0 1.0 0.30 11/21/2008 RA - Facility Component Assessment Page 3 of 7

Ceilings - Support Spaces 4.0 1.0 0.30 EQUIPMENT AND SPECIALTIES Marker Boards 4.0 1.0 0.30 Tackboards 1.0 1.0 0.07 Tackboard quantity in classrooms does not meet minimum standard. Interior Signage 2.0 1.0 0.15 Toilet Partitions 2.0 0.5 0.07 Toilet Accessories 4.0 0.5 0.15 Lockers 2.0 2.0 0.30 Residential Appliances 1.0 1.0 0.07 Foods classroom appliances are past life expectancy and it is sometimes difficult to obtain replacement parts. Projection Screens 2.0 0.5 0.07 Stage Curtains 4.0 1.0 0.30 Telescoping Bleachers 2.0 1.0 0.15 Window Covering 2.0 1.0 0.15 Cabinets - General Classrooms 3.0 2.0 0.44 Cabinets - Specialty Classrooms 3.0 1.0 0.22 Cabinets - Offices 3.0 1.0 0.22 Cabinets - Storage 3.0 1.0 0.22 Cabinets - Support Spaces 3.0 1.0 0.22 Display Cases 3.0 1.0 0.22 Equipment - Art 2.0 1.0 0.15 Equipment - General Classrooms 2.0 2.0 0.30 Equip. - Bus. Ed. / Computer Clrm. 2.0 1.0 0.15 Equipment - Food Service 1.0 2.0 0.15 Some additional and replacement equipment needed. Equipment - Gymnasiums 2.0 1.0 0.15 Equipment - Industrial Technology 3.0 2.0 0.44 Equipment - Library 3.0 1.0 0.22 Equipment - Offices / Workrooms 1.0 1.0 0.07 Insufficient quantity of printers and some printers past life expectancy. Equipment - Science 3.0 1.0 0.22 Equipment - Support Spaces 4.0 0.5 0.15 Equipment - Training Room 4.0 0.5 0.15 Furniture - Classrooms 4.0 3.0 0.89 Furniture - Library 4.0 1.0 0.30 Furniture - Offices / Workrooms 4.0 1.0 0.30 11/21/2008 RA - Facility Component Assessment Page 4 of 7

Furniture - Support Spaces 4.0 0.5 0.15 Artwork 2.0 0.5 0.07 Vending Machines 2.0 0.5 0.07 MECHANICAL Fire Suppression System 2.0 3.0 0.44 Plumbing Insulation 2.0 1.0 0.15 Domestic Water Equipment 2.0 3.0 0.44 Domestic Water Quality 2.0 3.0 0.44 Soil and Waste 2.0 3.0 0.44 Plumbing Fixtures 2.0 3.0 0.44 Compressed Air NA 0.0 0.00 Natural Gas Piping 3.0 1.0 0.22 Chemical Waste 2.0 1.0 0.15 HVAC Duct Insulation 2.0 1.0 0.15 HVAC Pipe Insulation 2.0 1.0 0.15 Hydronic Piping 2.0 3.0 0.44 Hydronic Pumps 2.0 1.0 0.15 Refrigerant Piping 1.0 1.0 0.07 Uninsulated refrigerant piping causing condensation in walls and ceiling. HVAC Ductwork 2.0 3.0 0.44 HVAC Fans 2.0 2.0 0.30 Heating / Ventilation System - Clrms. 2.0 3.0 0.44 Heating / Ventilation System - Gym 2.0 1.0 0.15 Heating / Ventilation System - Library 2.0 1.0 0.15 Heating / Ventilation System - Offices 2.0 1.0 0.15 Heating / Vent. System - Wkrms. 2.0 1.0 0.15 Heating / Vent. System - Support Spaces 2.0 1.0 0.15 Sawdust Collection 2.0 2.0 0.30 Air Terminal Units 2.0 1.0 0.15 Ventilation Hoods 2.0 1.0 0.15 Fume Hoods 2.0 1.0 0.15 Boilers NA 0.0 0.00 Furnaces 2.0 1.0 0.15 Heat Exchangers 2.0 1.0 0.15 Refrig. Compressors and Condensers 2.0 1.0 0.15 11/21/2008 RA - Facility Component Assessment Page 5 of 7

Water Chillers NA 0.0 0.00 Exhaust Fans 2.0 2.0 0.30 Heat Pumps 1.0 2.0 0.15 Heat pumps are only 60% functional and cannot meet the heating needs during the months of Dec-Feb. Fan Coil Units 2.0 2.0 0.30 Unit Ventilators 2.0 3.0 0.44 Unit Heaters 2.0 3.0 0.44 Automatic Controls 1.0 3.0 0.22 Controls system is not connected to district network for remote access and does not meet minimum standards. ELECTRICAL Transformers 2.0 1.0 0.15 Switchgear 2.0 1.0 0.15 Panelboards 2.0 1.0 0.15 Power Distribution 2.0 3.0 0.44 Power Conditioning 2.0 1.0 0.15 Wiring Devices 4.0 1.0 0.30 Electrical Outlets - General Clrms. 2.0 2.0 0.30 Electrical Outlets - Specialty Clrms. 2.0 1.0 0.15 Electrical Outlets - Library 1.0 1.0 0.07 Insufficient quantity of electrical outlets at search stations. Electrical Outlets - Offices / Wkrms. 2.0 1.0 0.15 Electrical Outlets - Support Spaces 2.0 1.0 0.15 Electrical Outlets - Emergency Power 2.0 1.0 0.15 Circuit Protection Devices 2.0 1.0 0.15 Packaged Generator 2.0 2.0 0.30 Battery Equipment 2.0 1.0 0.15 Lighting - Exterior - Bus Loading 1.0 1.0 0.07 Lighting levels do not meet minimum standard. Lighting - Exterior - Main Entry 2.0 1.0 0.15 Lighting - Exterior - Parking 1.0 2.0 0.15 Lighting levels at some points in the north and west parking lots do not meet minimum standard. Lighting - Exterior - Pathways 1.0 1.0 0.07 Lighting levels do not meet minimum standard. Lighting - Exterior - Service / Delivery 1.0 1.0 0.07 Lighting levels do not meet minimum standard. Lighting - Classrooms 1.0 3.0 0.22 Lighting levels do not meet minimum standard. Lighting - Corridors 1.0 2.0 0.15 Lighting levels at some places do not meet minimum standard. Lighting - Emergency 1.0 1.0 0.07 Lighting levels at some places do not meet minimum standard. Lighting - Gymnasiums 2.0 1.0 0.15 Lighting - Kitchen 1.0 1.0 0.07 Lighting levels do not meet minimum standard. Lighting - Library 1.0 1.0 0.07 Lighting levels do not meet minimum standard. 11/21/2008 RA - Facility Component Assessment Page 6 of 7

Lighting - Restrooms 1.0 1.0 0.07 Lighting levels do not meet minimum standard. Lighting - Support Spaces 1.0 1.0 0.07 Lighting levels do not meet minimum standard. Lighting - Stage 4.0 1.0 0.30 Automatic Lighting Control 2.0 1.0 0.15 Exit Signs 2.0 1.0 0.15 Data Communications Cabling 3.0 3.0 0.67 Data Communications Equipment 1.0 2.0 0.15 Equipment other than UPS does not meet minimum standards. Data Comm. Outlets - General Clrms. 2.0 3.0 0.44 Data Comm. Outlets - Specialty Clrms. 2.0 1.0 0.15 Data Comm. Outlets - Commons 3.0 0.5 0.11 Data Comm. Outlets - Library 2.0 1.0 0.15 Data Comm. Outlets - Offices / Wkrms. 2.0 1.0 0.15 Data Comm. Outlets - Support Spaces 2.0 0.5 0.07 Wireless Data Communications 2.0 1.0 0.15 Telephone / Intercom / Clock System 1.0 3.0 0.22 No voice mail feature. Telephone Handsets 4.0 1.0 0.30 Sound System 2.0 1.0 0.15 Television System 2.0 1.0 0.15 Audio - Video System 2.0 1.0 0.15 Intrusion Detection 2.0 1.0 0.15 Video Surveillance 2.0 1.0 0.15 Fire Detection and Alarm 2.0 3.0 0.44 TOTAL 63.26 11/21/2008 RA - Facility Component Assessment Page 7 of 7