Site Level Deficiencies

Size: px
Start display at page:

Download "Site Level Deficiencies"

Transcription

1 Level Deficiencies Walkways do not have shelter from rain. School lacks marquee or marquee in poor condition. Computer room lacks independent AC. School site lacks appropriate lighting. Specialties Other School Selected Enhancement The Mounted Building Lighting Is Damaged And Should Be Replaced Capital Renewal 2 Ea. 2 $1, The Pole Lighting Is Damaged And Should Be Replaced Capital Renewal 6 Ea. 2 $31, Reroofing Required (Broward CPS) Capital Renewal 82,813 SF 2 $868, GOB The Roof Requires Cleaning School requires computers to close accessibility gap Functional Deficiency 1 LS 2 $155, GOB School requires technology infrastructure (servers, racks, etc). Functional Deficiency 1 LS 2 $17, GOB School requires Wireless Access Point hardware Functional Deficiency 1 LS 2 $38, GOB CAT-6 wiring to WAP needs to be provided Functional Deficiency 63 Ea. 3 $49, GOB Sub Total for System 4 items $260,924 Computer room lacks appropriate furniture. Functional Deficiency 1 Ea. 4 $2, Sub Total for System 1 items $2,117 Sub Total for System 2 items $32, LF 2 $243, Ea. 4 $26, Sub Total for System 2 items $270,537 1 Ea. 2 $41, Sub Total for System 1 items $41, Ea. 3 $84, Sub Total for System 1 items $84,476 1 LS 2 $100, GOB Sub Total for System 1 items $100,000 Sub Total for School and Level 10 items $759, SF 4 $1, Sub Total for System 2 items $870,498 3 Ea. 3 $1,120 Rollup 25 Ea. 3 $4,277 Rollup Page 1 of 5

2 Room has insufficient writing area. Gypboard Walls Require Repair Room has insufficient tackboard area. Room lacks a changing table. Emergency Exit Signage Is Missing And Needed Room has insufficient electrical outlets. Plumbing The Class Room Lavatories Plumbing Fixtures Are Missing And Should Be Installed The Toilets Plumbing Fixtures Require Replacement Capital Renewal 49 Ea. 2 $108, The Urinal Plumbing Fixtures Require Replacement Capital Renewal 4 Ea. 2 $7, Prep room lacks a sink. Fire and Security Install Fire Sprinklers Code Compliance 36 SF 1 $317 Rollup Security Alarm Camera Is Missing And Needed Functional Deficiency 4 Ea. 2 $16, Ea. 3 $8,899 Rollup The Refrigerated Water Cooler Requires Replacement Capital Renewal 13 Ea. 3 $30, Non-Refrigerated Drinking Fountain Requires Replacement Capital Renewal 4 Ea. 4 $10, Room lacks a private shower area. Room lacks private toilets. Room lacks a drinking fountain. 6 Ea. 2 $6, Ea. 3 $56,333 Rollup The Incandescent Lighting Is Damaged And Should Be Replaced Capital Renewal 54 Ea. 3 $20, Room lacks controls to partially dim lights. 8 Ea. 3 $8,308 Rollup 12,700 SF Wall 4 $66, Ea. 4 $43,931 Rollup 157 Ea. 4 $94,957 Rollup 3,980 SF 4 $124,829 Rollup 2 Ea. 5 $4,977 Rollup Sub Total for System 8 items $349,052 5 Ea. 5 $2,428 Rollup 1 Ea. 5 $779 Rollup Sub Total for System 5 items $86,719 3 Ea. 2 $4,070 Rollup The Class Room Lavatories Plumbing Fixtures Require Replacement Capital Renewal 60 Ea. 2 $122, Ea. 4 $18,266 Rollup 1 Ea. 4 $11,217 Rollup 2 Ea. 5 $1,918 Rollup Sub Total for System 10 items $323,795 Sub Total for System 2 items $16,497 77,761 SF 3 $106, GOB Sub Total for System 1 items $106,401 Page 2 of 5

3 Room has insufficient dataports. Room lacks Interactive White Board The Computer Closet Requires Fiber Optic Access to CER Functional Deficiency 400 LF 2 $9,000 Rollup Room lacks access to video distribution. Specialties Room lacks an appropriate refrigerator. Room lacks an appropriate stove. Room lacks the required demonstration table. Blinds are missing or in poor condition. Room does not have sufficient cubbies. Room has an insufficient number of coat hooks. Other Building: 02 - Physical Ed 1 Ea. 3 $373 Rollup 1 Ea. 3 $171 Rollup 2 Ea. 4 $1,210 Rollup 790 SF 4 $24,779 Rollup Sub Total for System 4 items $26,533 Room has insufficient electrical outlets. Adequac 10 Ea. 3 $3,658 Rollup Media Center requires renovation based on condition of room(s) Capital Renewal 1 LS 2 $101, GOB Provide renovation of restrooms associated with educational adequacy renovations Capital Renewal 1 LS 2 $96, GOB Renovate / Remodel Cafeteria Renovate / Remodel Music and Art Rooms 36 Ea. 2 $6,228 Rollup GOB 32 Ea. 2 $117,895 Rollup 25 Ea. 2 $68,042 Rollup 1 Ea. 5 $665 Rollup Sub Total for System 5 items $201,829 2 Ea. 3 $10,507 Rollup 1 Ea. 3 $7,171 Rollup 1 Ea. 3 $7,463 Rollup 12 SF Surf 4 $339 Rollup 634 Ea. 5 $26,418 Rollup 576 Ea. 5 $6,679 Rollup Sub Total for System 6 items $58,578 1 LS 2 $160, LS 2 $128, STEM lab requires renovation based on condition of room(s) Capital Renewal 1 LS 2 $25, Sub Total for System 5 items $512,323 Sub Total for Building 01 - Building 1 46 items $2,558,681 Reroofing Required (Broward CPS) Capital Renewal 750 SF 2 $7, GOB Sub Total for System 1 items $7,867 Page 3 of 5

4 Building: 02 - Physical Ed Building: 03 - Physical Ed Room has insufficient electrical outlets. Building: 04 - Media Center Room has insufficient tackboard area. Sub Total for System 2 items $4,144 1 Ea. 2 $3,684 Rollup Sub Total for System 1 items $3,684 Sub Total for Building 02 - Physical Ed 8 items $42,227 1 Ea. 3 $373 Rollup 1 Ea. 3 $171 Rollup 2 Ea. 4 $1,210 Rollup 668 SF 4 $20,951 Rollup Sub Total for System 4 items $22, Ea. 3 $3,658 Rollup Sub Total for System 2 items $4,144 1 Ea. 2 $3,684 Rollup Sub Total for System 1 items $3,684 Sub Total for Building 03 - Physical Ed 7 items $30,533 1 Ea. 4 $385 Rollup 1,464 SF 4 $45,918 Rollup Sub Total for System 2 items $46,303 Sub Total for System 1 items $486 8,209 SF 3 $10, GOB Sub Total for System 1 items $10,920 Page 4 of 5

5 Building: 04 - Media Center The Computer Closet Requires Fiber Optic Access to CER Functional Deficiency 400 LF 2 $9,000 Rollup Room lacks access to video distribution. Building: 80 - Classroom Duct Cleaning Required 48 Ea. 4 $29,031 Rollup Sub Total for System 1 items $29,031 8,064 SF 5 $6, Reroofing Required (Broward CPS) Capital Renewal 3,880 SF 2 $40, GOB The Roof Requires Cleaning 1 Ea. 5 $665 Rollup Sub Total for System 2 items $9,665 Sub Total for Building 04 - Media Center 6 items $67,374 The Mounted Building Lighting Is Damaged And Should Be Replaced Capital Renewal 16 Ea. 2 $15, Sub Total for System 1 items $15, SF 4 $3, Sub Total for System 2 items $44,426 8,064 SF 3 $10, GOB Sub Total for System 2 items $17,155 Sub Total for Building 80 - Classroom 6 items $105,750 Total for Permanent Buildings 83 items $3,563,659 Total for Portable Buildings $0 Total for Campus $3,563,659 Page 5 of 5

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

CIP # Category Bldg. / Room CIP15 PROJECTS as approved by the College Governing Council, September 2014 GOVERNMENT DESCRIPTION Estimated Cost 15.01 Safety & Security Building B [RENOVATIN] To improve Student

More information

Orange County Public Schools

Orange County Public Schools Engelwood Elementary School Replacement 100 Percent Design Community Meeting May 16, 2016 1 Meeting Agenda May 16, 2016 Welcome School Board Member Daryl Flynn Introductions Project Update - Architect:

More information

Orange County Public Schools

Orange County Public Schools 100 % Design/Construction Update Community Meeting May 23, 2016 Meeting Agenda May 23, 2016 Introductions Welcome School Board Member Kathleen Kat Butler Gordon Project Update Facilities Meeting Organizer

More information

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25 UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY2015-16 ---> FY204-25 *Lifecycles were estimated using industry standards. Some items may not need attention

More information

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014 Project Tasks Programming Interviews Fairbank Community Center Feasibility Study Recreation, Senior Center,

More information

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded Section Contents Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Critical Maintenance for Community Colleges bonded $235,000 Health and Safety bonded

More information

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P.

More information

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX 453.1 Scope: Public educational facilities X X X 453.2 Public schools and Florida colleges general requirements X X X 453.2.1 Owner X X X 453.2.2 Exemption from local requirements X X X 453.3 Code enforcement

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY18 Capital Project Request Presentation To The Board of Selectmen, Finance, & Fiscal Advisory Committee s Duxbury Senior Center November 14, 2016 Prepared and

More information

Mountain Lakes Infrastructure Projects and Investments. January 2017

Mountain Lakes Infrastructure Projects and Investments. January 2017 Mountain Lakes Infrastructure Projects and Investments January 2017 Presentation & Discussion of: Birchwood & Island Beach Renovations Sunset Lake Dam Restoration/Rehabilitation Project Borough Hall Administrative

More information

Section I: Submitting a Request

Section I: Submitting a Request UW-Whitewater Work Request Web Interface Section I: Submitting a Request You can access the website at: https://fpmtma.uww.edu:444/home.html Select Submit Request from the menu option on the left side

More information

Ehresman Associates, Inc. architects engineers

Ehresman Associates, Inc. architects engineers Architects 803 West Big Beaver, Suite 350 Troy, MI 48084 Wright & Hunter Technology Advisors 818 West 11 Mile Road Royal Oak, MI 48067 Peter Basso Associates Inc Mechanical/Electrical Engineers 5145 Livernois,

More information

DESIGN GUIDELINES NOTES: MECHANICAL/ PLUMBING/ELECTRICAL/COMMUNICATIONS

DESIGN GUIDELINES NOTES: MECHANICAL/ PLUMBING/ELECTRICAL/COMMUNICATIONS General Learning Se ngs MECHANICAL PLUMBING ELEC COMM General Learning Settings Neighborhood Learning Studio X X X X X X X X 4 Learning Hub X X X X X X X X X 4, Group Learning/Virtual Learning X X X X

More information

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Board of Regents Facilities and Operations Committee September 12, 2013 Agenda Program background Broadening our data

More information

Network Construction Guide Specification Telecommunications Infrastructure Standards V 2.6

Network Construction Guide Specification Telecommunications Infrastructure Standards V 2.6 Network Construction Guide Specification Telecommunications Infrastructure Standards 11-16-2018 V 2.6 Springfield Public Schools R12 Prepared by: Approved by: Released by: Springfield Public Schools R12

More information

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 CNM Master Plan Line # Master Plan Project Title Description Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18 Projected spending for FY18 Potential Funding Source

More information

INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES

INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES University of California, Riverside Computing and Communications April XX, 2001 R1V6 TABLE OF CONTENTS Introduction and Background...3 Outside

More information

Lake Waccamaw Building Inspections Fees

Lake Waccamaw Building Inspections Fees ` Lake Waccamaw Building Inspections Fees RESIDENTIAL BUILDING PERMIT SINGLE FAMILY DWELLING DUPLEX TOWNHOUSE MODULAR ( HOMES ) HOME ADDITION ACCESSORY BUILDING ALL UNHEATED AREA $0.20 per sq. ft. MINIMUM

More information

FACILITY SUMMARY OF APPROVED PROJECTS

FACILITY SUMMARY OF APPROVED PROJECTS Facility Name: Acworth Elementary School Facility No.: 278 Add HVAC to Gym Access Controls Add School Lettering to Building Replace Carpet and Tile in selected Areas IN ASSOCIATION WITH THE FACILITY GROUP

More information

Multi-Purpose Building

Multi-Purpose Building Multi-Purpose Building Description and Goals Multi-Purpose Rooms should be large enough to accommodate 400-500 students. The main multi-purpose will be acoustically designed primarily for musical performances

More information

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY Pathways to the Future Program As a result of the Board of Trustees Retreat in 1999, the District has been heavily engaged in a long-term

More information

The RA Role with Maintenance Direct/SchoolDude How to Log-in (for first time users) Direction on how to Enter a Request What happens after Work Order

The RA Role with Maintenance Direct/SchoolDude How to Log-in (for first time users) Direction on how to Enter a Request What happens after Work Order The RA Role with Maintenance Direct/SchoolDude How to Log-in (for first time users) Direction on how to Enter a Request What happens after Work Order submission? Examples of Vague Work Order Requests What

More information

Five-Year Capital Plan Request FY through FY

Five-Year Capital Plan Request FY through FY Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance Seniors bonded $690,706 Health and Safety bonded Facilities Preservation

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications

More information

LACCD IT Design Standards

LACCD IT Design Standards LACCD IT Design Standards March 1 2009 This document establishes a uniform standard for the design of IT Structured Cabling for LACCD. It ensures a secure, consistent, robust system with physical and low-voltage

More information

Plumbing All plumbing 25 years B_Plumb25

Plumbing All plumbing 25 years B_Plumb25 Assigned Asset Buildings and Building Components Building Structures Reinforced Concrete Buildings 40 years B_Bldg40 Building Structures Outdoor stadiums 40 years B_Bldg40 Building Structures Multilevel

More information

Computer Network Design Guide Existing Systems 1 / 6

Computer Network Design Guide Existing Systems 1 / 6 COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should

More information

MONTE VILLA FARMS MONTE VILLA PARKWAY BOTHELL, WASHINGTON

MONTE VILLA FARMS MONTE VILLA PARKWAY BOTHELL, WASHINGTON 70,000 94,000 RSF AVAILABLE» High visibility landmark office, assembly and life sciences campus» Convenient freeway access to I-405» Abundant surface parking» High-end Russell s restaurant including catering

More information

Tririga / AMS Training. Table of Contents. AMS Access Test Environment. Module: Customer

Tririga / AMS Training. Table of Contents. AMS Access Test Environment. Module: Customer Tririga / AMS Training Module: Customer Table of Contents Submitting a Service Request Accessing Service Request History and Service Request Drafts Requesting Installation, Estimates and Services Uploading

More information

University of Missouri System Accounting Policies and Procedures

University of Missouri System Accounting Policies and Procedures University of Missouri System Accounting Policies and Procedures Policy Number: APM-20.16 Policy Name: Schedule of Depreciable Lives The following is a schedule of depreciable lives for those Capital categories,

More information

The Asia Pacific Center

The Asia Pacific Center The Asia Pacific Center A modern downtown building serving all of Calgary. Managed and Leased by Bow River Management Ltd. About our Building 100 Fourth Avenue SW Located at a prime corner at 4 th Avenue

More information

50 Years of Facility Operations or Rebuilding from the inside out

50 Years of Facility Operations or Rebuilding from the inside out 50 Years of Facility Operations or Rebuilding from the inside out National Optical Astronomy Observatory (NOAO) NORTH Kitt Peak National Observatory and Tucson Headquarters Facility Presented by John Dunlop

More information

FY 2016 Capital Budget Draft April 10, 2015

FY 2016 Capital Budget Draft April 10, 2015 Basic Revenue State Charter School Capital Outlay 5,470,110 5,470,110 5,470,110 CO & DS 1,212,173 1,212,173 1,212,173 PECO Bonds Maintenance 5,875,752 5,875,752 5,875,752 State Total 12,558,035 12,558,035

More information

DRAWING INDEX UNIVERSITY OF NEW MEXICO VR - CLASSROOM UNIVERSITY OF NM CAMPUS MILTON HALL, ROOM 155

DRAWING INDEX UNIVERSITY OF NEW MEXICO VR - CLASSROOM UNIVERSITY OF NM CAMPUS MILTON HALL, ROOM 155 3 4 5 OWNER: DRAWING INDEX UNIVERSITY OF NEW MEXICO COVER G-SHEETS CONTACT: NIVIA FRANCO G00 COVER SHEET CONSULTANTS: CIVIL ENGINEERING ARCHITECTURAL A D0 FIRST FLOOR DIMENSIONED PLAN & WALL PARTITION

More information

Programming Document. for: Knight Abbey Program Spring Semester 1 P age

Programming Document. for: Knight Abbey Program Spring Semester 1 P age Programming Document for: Knight Abbey Program Spring Semester 1 P age Administration/ Executive Division Reception Area Function: Serves as the main customer and employee entrance and provides the first

More information

LOUISIANA FLOOD RELIEF INVENTORY. (800)

LOUISIANA FLOOD RELIEF INVENTORY. (800) LOUISIANA FLOOD RELIEF INVENTORY SERIAL # DESCRIPTION RESTROOM 5235A/B 24x68 Doublewide 2 ADA 5237A/B 24x68 Doublewide 2 ADA 5337A/B 24x68 Doublewide 2 ADA 5338A/B 24x68 Doublewide 2 ADA 5339A/B 24x68

More information

Section 7.I: Estimates Backup. 7.I Estimates Back-Up

Section 7.I: Estimates Backup. 7.I Estimates Back-Up Section 7.I: Estimates Backup 1 7.I Estimates Back-Up March 29, 2013 Kathy Wallace, AIA Principal - Cuningham Group St. Anthony Main 201 Main Street SE, Suite 325 Minneapolis MN 55414 RE: Minnesota State

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from August 1, 2016 version to April 30, 2018 Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms 00 00 03 Modifications to General Requirements

More information

Building Programmes. Academies BSF Single School Pathfinders BSF Primary Capital Programme PFI and conventional funding FE and HE

Building Programmes. Academies BSF Single School Pathfinders BSF Primary Capital Programme PFI and conventional funding FE and HE O2 Learning Spaces Building Programmes Academies BSF Single School Pathfinders BSF Primary Capital Programme PFI and conventional funding FE and HE The Design Process Procurement timeline 30-50 months

More information

Data Cabling / Low Voltage Technology Specifications

Data Cabling / Low Voltage Technology Specifications P19-02- Forsyth County Schools Data Cabling / Low Voltage Technology Specifications 1. General requirements 1.1 On premise connectivity All building closets (IDF) aside from the main closet (MDF) shall

More information

SHIED IP Camera RSCM-13601B/W

SHIED IP Camera RSCM-13601B/W Getting to know your RSCM-13601B/W 1 2 7 12 3 6 4 5 8 9 10 11 1. Infrared LEDs: Active while encountering conditions such as lower lights, generating black and white image even in entire darkness. 2. Illumination

More information

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Kern Community College Safety, Repair & Improvement District Bond Oversight Committee Facilities Report 2011-12 2 nd Quarter KCCD Facilities Planning & Construction February 1, 2012 Overview Facility Report

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FOR LEASE 100 SIMPLEX DRIVE WESTMINSTER, MA WAREHOUSE SPACE 198,788 SF ON 95 ACRES As the exclusive listing agent, The Stubblebine Company is pleased to present Route Commerce Park for lease. With robust

More information

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013 El Camino Community College CAPITAL CONSTRUCTION PROJECTS 2013 FACILITIES MASTER PLAN 2003 SCIENCE COMPLEX The Science Complex Building Project was completed in Spring 2005 for a total cost of $24,211,755.

More information

WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018

WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018 Watertown Elementary Schools Building Project DesignWatertown WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018 Schools Project Website: www.watertownschoolsproject.com

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical

More information

3D EDUCATORS. Page # 1

3D EDUCATORS. Page # 1 3D EDUCATORS Invest in People the Only Asset that Appreciates Certified Plumber Training Program LIVE ONLINE INSTRUCTOR LED ONE TO ONE FACILITY AVAILABLE BUILDING NATIONS A Professional Development Institute

More information

8505 Baycenter Road Jacksonville, FL

8505 Baycenter Road Jacksonville, FL Your Company Name Here 8505 Baycenter Road Jacksonville, FL OFFERING SUMMARY Newmark Grubb Knight Frank is pleased to offer 8505 Baycenter to the market for purchase or master lease. This Robert C. Broward

More information

ADDENDUM NO. 1. RFB Plumbing Supplies

ADDENDUM NO. 1. RFB Plumbing Supplies LONG BEACH UNIFIED SCHOOL DISTRICT ADDENDUM NO. 1 to RFB 38-1617 ISSUED: 4/5/17 NOTICE TO ALL PROSPECTIVE BIDDERS: This Addendum and any attachments are hereby incorporated and made part of the above referenced

More information

Art and Science of Building NUS Data Centres

Art and Science of Building NUS Data Centres Art and Science of Building NUS Data Centres DATA CENTRE @ NUS Contents I. Nostalgia II. III. IV. Science of Elements in a Data Centre NUS DC Live Migration the Art and Challenges Milestones in Pictures

More information

8505 Baycenter Road Jacksonville, FL

8505 Baycenter Road Jacksonville, FL Your Company Name Here 8505 Baycenter Road Jacksonville, FL Procuring broker shall only be entitled to a commission calculated in accordance with the rates approved by our principal only if such procuring

More information

WCB Wheeler Rd Hauppauge Room Data Sheets for OGS Project No. 4558

WCB Wheeler Rd Hauppauge Room Data Sheets for OGS Project No. 4558 WCB - 455 Wheeler Rd Room Data Sheets for OGS Project No. Sheet Name Date 1 Summary List 2 Typical Space Requirements (sheet 1 of 2) 3 Typical Space Requirements (sheet 2 of 2) 4 Waiting Area 5 Customer

More information

Run a Smart Workplace Introducing the Digital Building. Digital Building Solutions

Run a Smart Workplace Introducing the Digital Building. Digital Building Solutions Digital Building Solutions Run a Smart Workplace Introducing the Digital Building Maximize efficiency and productivity Enhance infrastructure flexibility & network security Reduce installation and operating

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M Landscape 1,340 acres, 66 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

16903 RED OAK RED OAK DRIVE, HOUSTON, TX 77090

16903 RED OAK RED OAK DRIVE, HOUSTON, TX 77090 DRIVE, HOUSTON, TX 77090 PROPERTY DETAILS BUILDING DETAILS Property Size: 49,796 SF FM 1960 / Champions, North Houston Submarket Snacks & Drinks (Cash and Credit Cards Accepted) Marquee Signage Lush Green

More information

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds d Projects and/or 2012 Bluffsview Elementary Interior Painting 100 2012 Bluffsview Elementary Replace High Security Key system 100 2012 Bluffsview Elementary Exterior Tuckpointing and Paint 100 2012 Bluffsview

More information

Administration. Space Types WELLNESS CENTER WELCOME CENTER CONFERENCE OUTDOOR RECEPTION RECEPTION SECURED PERIMETER. Description and Goals

Administration. Space Types WELLNESS CENTER WELCOME CENTER CONFERENCE OUTDOOR RECEPTION RECEPTION SECURED PERIMETER. Description and Goals Administration Description and Goals he administrative office suite will oversee and coordinate all activities at the school. he public reception and welcome center should be near the drop-off and guest

More information

1605 Lakes Parkway. Lawrenceville, Georgia Gwinnett County. 100,000 SF (Expandable) 17.7 Acres

1605 Lakes Parkway. Lawrenceville, Georgia Gwinnett County. 100,000 SF (Expandable) 17.7 Acres Sandy Springs Downtown Atlanta FULTON 400 Alpharetta 675 Sugar Hill GWINNETT Grayson Conyers Dacula Lawrenceville Loganville WALTON Oxford Covington Gwinnett County Office / WAREHOUSE for SALE - lender

More information

NOTE ON PERFORMANCE TESTING

NOTE ON PERFORMANCE TESTING NOTE ON PERFORMANCE TESTING Permance Profile Sheet(s) are included in a mat that can be easily photocop ied trainee. Permance tests are designed to mea sure competency in s taught in module. Please e number

More information

BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS

BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS All noted standards apply to the current revisions applicable at the time of construction or intended construction. NO SUBSTITUTIONS

More information

Utility System Infrastructure

Utility System Infrastructure Utility System Infrastructure THE COLLEGE OF 2015 Campus Master Plan WILLIAM & MARY SUPPORTING DOCUMENTATION TABLE OF CONTENTS 3 4 4 4 4 5 Electrical Utility Infrastructure Emergency Power Generators

More information

UC Santa Barbara Projects & Progress 2010 A brief look at some of the things we ve been working on this past year.

UC Santa Barbara Projects & Progress 2010 A brief look at some of the things we ve been working on this past year. UC Santa Barbara Projects & Progress 2010 A brief look at some of the things we ve been working on this past year. Financial Information System A move to a new Financial Information System is necessitated

More information

Security Integrator. Solutions. Your One Source for Physical Security, Network & Electrical. Solutions

Security Integrator. Solutions. Your One Source for Physical Security, Network & Electrical. Solutions Your One Source for Physical Security, Network & Electrical Solutions Security Integrator Solutions WESCO best-in-class supply chain solutions The latest technology from all industry-leading manufacturers

More information

Trinity ISD 2015 E-Rate RFP Frequently Asked Questions

Trinity ISD 2015 E-Rate RFP Frequently Asked Questions Trinity ISD 2015 E-Rate RFP Frequently Asked Questions Trinity ISD is seeking bids for the following items as part of the E-Rate bidding process for E-Rate Funding Year 2015. This FAQ should answer most

More information

One audio source: a music player Emergency muting by the fire alarm panel. DIP Switch Settings ON 100V. 70V REAR 4 dbu SOFTWARE CONFIG.

One audio source: a music player Emergency muting by the fire alarm panel. DIP Switch Settings ON 100V. 70V REAR 4 dbu SOFTWARE CONFIG. 00V PS60/PS60P/ adaptable power amplifier Two-Zone Retail Example Asymmetrical zone wattage Wall-mounted volume control per zone One audio source: a music player Emergency muting by the fire alarm panel

More information

Ashland Center, 25 N. Third Street, Suite 100 Geneva, IL Medical/Office/Retail Suite For Lease. 12,686 SF available

Ashland Center, 25 N. Third Street, Suite 100 Geneva, IL Medical/Office/Retail Suite For Lease. 12,686 SF available 12,686 SF available, 25 N. Third Street, Suite 100 Geneva, IL 60134 www.ashlandcenter.com 630.444.0444 630.444.0444 kevin@odcre.com meredith@odcre.com 40W222 LaFox Rd, Suite N2, St. Charles, IL 60175 www.odcre.com

More information

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services Report to the Board TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent Steve Dickinson, Assistant Superintendent Administrative Services 2016-2017 Routine Restricted Maintenance

More information

SECTION 12.0c CONSTRUCTION SYSTEMS AND ASSEMBLIES STANDARDS AND GUIDELINES ADDENDUM C: CLASSROOMS AND AUDITORIA BEST PRACTICES

SECTION 12.0c CONSTRUCTION SYSTEMS AND ASSEMBLIES STANDARDS AND GUIDELINES ADDENDUM C: CLASSROOMS AND AUDITORIA BEST PRACTICES SECTION 12.0c CONSTRUCTION SYSTEMS AND ASSEMBLIES STANDARDS AND GUIDELINES ADDENDUM C: CLASSROOMS AND AUDITORIA BEST PRACTICES INTRODUCTION The following list of classroom and auditorium features was compiled

More information

Tier IV Standards as Specified in the TIA 942 Document

Tier IV Standards as Specified in the TIA 942 Document S No Architectural Proximity of visitor parking to data 18.3 m / 60 ft minimum separation with physical barriers to prevent vehicles from 1 center perimeter building walls driving closer 2 Building Construction

More information

SMART CAMPUS, BUILDING AND VENUES

SMART CAMPUS, BUILDING AND VENUES SMART CAMPUS, BUILDING AND VENUES Greg Deffenbaugh, Corporate Solutions Technologist SDS & Hospitality SDN Solutions and Strategy, Avaya @gregdeff gregdeff 1 Thank you Sponsors! Global Sponsors Gold Sponsors

More information

2016 COOLING THE EDGE SURVEY. Conducted by Vertiv Publication Date: August 30, 2016

2016 COOLING THE EDGE SURVEY. Conducted by Vertiv Publication Date: August 30, 2016 2016 COOLING THE EDGE SURVEY Conducted by Vertiv Publication Date: August 30, 2016 TWO STAGE POWER DISTRIBUTION Table of Contents Section I: Methodology Section II: Key Findings 1. Strategic Importance

More information

Introduction. Select Your LEA and School. Current School Wireless Networking

Introduction. Select Your LEA and School. Current School Wireless Networking Introduction The information gathered in this survey will be used to support statewide planning efforts for digital teaching and learning. This information will be shared with the NC General Assembly.

More information

98,000 sq. ft. Crescent Building For Sale. Sale Price: $5,500,000. Jim Koon, Managing Broker (208) or (208)

98,000 sq. ft. Crescent Building For Sale. Sale Price: $5,500,000. Jim Koon, Managing Broker (208) or (208) 10220 E. Sprague Ave Spokane Valley, Washington 99206 The Crescent building offers a unique opportunity to acquire a building for fraction of the replacement cost. The two story 98,000 square foot concrete

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M 1 Landscape 1,335 acres, 64 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites,

More information

CARRIER SELECTION AND FIXTURE ROUGHING-IN DIMENSIONS

CARRIER SELECTION AND FIXTURE ROUGHING-IN DIMENSIONS SELECTION AND ROUGHING-IN MODEL MODEL 01-03-16 ACORN OPTIONS OPTION DEFINITION ACORN 01-03-16 OPTIONS THAT AFFECT SELECTION ARE IN BOLD TYPE -1-3 -4-9 -BP -CFR -CN -DMS -G -GT -SW -T -TE -TT -W Fixture

More information

PoP ROOM: INSIDE AND OUTSIDE PLANT RULES & REGULATIONS

PoP ROOM: INSIDE AND OUTSIDE PLANT RULES & REGULATIONS PoP ROOM: INSIDE AND OUTSIDE PLANT RULES & REGULATIONS Version 14 November 19, 2014 Digital Realty Table of Contents INTRODUCTION... 3 ACCESS TO THE POP ROOMS, ISP & OSP... 3 PoP- MoP Forms... 3 Who must

More information

Coordination for Newly Constructed and Renovated Sites

Coordination for Newly Constructed and Renovated Sites Enterprise Communication Network Posted by Janette Martinez, Network Infrastructure and Communications Coordination for Newly Constructed and Renovated Sites Campus Network WiFi AP VoIP cutover Wells ES

More information

Retail Office Space For Lease ALMADEN VIA VALIENTE PLAZA Almaden Expressway San Jose, CA 95120

Retail Office Space For Lease ALMADEN VIA VALIENTE PLAZA Almaden Expressway San Jose, CA 95120 Retail Office Space For Lease ALMADEN VIA VALIENTE PLAZA MARK BIAGINI BRE #00847403 PEGGY OWEN BRE#01473666 Biagini Properties, Inc. 333 W. El Camino Real, Suite 240 Sunnyvale, CA 94087 1969 2/6/2018 Property

More information

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS May 1, 2016 Reviewers should - Be aware that these checklists are not allinclusive but only provide important review items. Reviewers should - Use Checklists

More information

9. CHILDREN AND PRETEENS 26,877 SF

9. CHILDREN AND PRETEENS 26,877 SF 9. CHILDREN AND PRETEENS 26,877 SF Subcomponents: a. Children's Entrance b. Children's Orientation Room c. Children's Services Desk d. Children's Nonfiction, Fiction Collections e. Children's Reference

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist TES A. Roads-Service, Lanes Common Items Trails and service roads provide adequate access to buildings for maintenance B. Testing Results-provided to the local government construction representative Data

More information

The Bow River Professional Center

The Bow River Professional Center The Bow River Professional Center A prime opportunity for your professional or medical needs. Managed and Leased by Bow River Management Ltd. About our Building 4411 16 th Avenue NW Maximum traffic exposure

More information

210' Room 34 to 1st floor. -Fiber enters building from street in Telco Room 34. -Utilized existing 4" conduit to run from closet 34 to closet 2.

210' Room 34 to 1st floor. -Fiber enters building from street in Telco Room 34. -Utilized existing 4 conduit to run from closet 34 to closet 2. 210' Room 34 to 1st floor -Fiber enters building from street in Telco Room 34. -Utilized existing 4" conduit to run from closet 34 to closet 2. Materials utilized on this floor All materials CORNING CCH-02U

More information

Communication

Communication 27 00 00 Communication 1.01 Scope of Standard A. These guidelines identify and define Texas State University requirements and policies for designing and installing telecommunications infrastructure and

More information

Creating, Completing, and Utilizing B3 Benchmarking

Creating, Completing, and Utilizing B3 Benchmarking Creating, Completing, and Utilizing B3 Benchmarking CERTs MN GreenCorps member Since you can t manage what you don t measure, begin measuring your energy use with B3 Benchmarking! Introduction to B3 &

More information

SMART CITIES. The Gateway to a New India

SMART CITIES. The Gateway to a New India SMART CITIES The Gateway to a New India Contents Urban India A Changing Landscape Smart Cities Mission Spotlight on BSNL BSNL Presence in Smart Cities BSNL Case Studies India is experiencing Rapid Urbanization

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FOR LEASE 100 SIMPLEX DRIVE WESTMINSTER, MA 203,000 SF WORLD-CLASS 18 CLEAR MANUFACTURING/DISTRIBUTION SPACE The Stubblebine Company is pleased to offer 100 Simplex Drive, Westminster, MA, a World-Class

More information

NEW BRUNSWICK PUBLIC LIBRARY SERVICE POLICY 1003 Page 1 of 20

NEW BRUNSWICK PUBLIC LIBRARY SERVICE POLICY 1003 Page 1 of 20 POLICY 1003 Page 1 of 20 Subject: Public and Public-School Library Facility Standards Effective: August 2015 Revised: January 2018 1.0 PURPOSE This policy is used to support the establishment of new libraries

More information

RCMP Capital Improvements

RCMP Capital Improvements Prepared by: D. R. Duckworth, Corporate Services and Community Safety Director Improvements_BUS_1.docx Executive Summary This business case seeks approval for additional funding of $1,000,000 for capital

More information

DESIGN-BUILD FOR MISSION CRITICAL FACILITIES

DESIGN-BUILD FOR MISSION CRITICAL FACILITIES DESIGN-BUILD FOR MISSION CRITICAL FACILITIES Case Study: California ISO Iron Point Facility Folsom, CA MISSION POSSIBLE Mission Critical Headquarters Design-Build Delivery Delivered Early Delivered Under

More information

HAYSVILLE USD 261 Preliminary Project Timeline

HAYSVILLE USD 261 Preliminary Project Timeline HAYSVILLE USD 261 Preliminary Project Timeline 2015 2016 2017 2018 Package J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D June 9th Election 1 Campus High School ##

More information

Membership Resolution Definitions of Key School-Facilities Data Elements

Membership Resolution Definitions of Key School-Facilities Data Elements Membership Resolution 2015-01 Definitions of Key School-Facilities Data Elements The National Council on School Facilities is the nonprofit association representing the 58 U.S. states, territories, and

More information

Carina Grega Food Network Space Final Thesis Report Electrical Overview. Electrical Overview. Existing System Overview

Carina Grega Food Network Space Final Thesis Report Electrical Overview. Electrical Overview. Existing System Overview Electrical Overview Existing System Overview Chelsea Market is served by Consolidated Edison, the electric utility for most of New York City. The Food Network space is supplied by two separate radial systems

More information

100 SIMPLEX DRIVE WESTMINSTER, MA

100 SIMPLEX DRIVE WESTMINSTER, MA FO R LEA SE 100 SIMPLEX DRIVE WESTMINSTER, MA 19,91 SF WORLD-CLASS 6 CLEAR DISTRIBUTION BUILDING Salient details include: Prominent Route visibility Institutional quality asset ensconced on a 95 acre pristine

More information

Los Angeles Community College District

Los Angeles Community College District MEMO Los Angeles Community College District 770 Wilshire Boulevard, Los Angeles, California 90017 (213) 891-2000 City. East. Harbor. Mission. Pierce. Southwest. Trade-Technical. Valley. West Administrative

More information

SCHENDT ENGINEERING PRIOR EXPERIENCE

SCHENDT ENGINEERING PRIOR EXPERIENCE Mitchell Hall Renovation US Air Force Academy, Colorado Corp. was the prime consultant for this project. The project generally consisted of replacing all of the air handling units, exhaust fans, air curtains,

More information

Monitoring and Oversight of General Obligation Bonds to Improve Broward County Schools:

Monitoring and Oversight of General Obligation Bonds to Improve Broward County Schools: Monitoring and Oversight of General Obligation Bonds to Improve Broward County Schools: SMART Program Quarterly Report Review for the Quarter Ending March 31, 2016 Presented to the Broward County Bond

More information