Help your Cisco customers defend against downtime and reduce costs

Similar documents
Manage power your way

Infrastructure with intelligence

Building a power monitoring and management strategy Selecting the software and services needed to keep critical power systems continuously available

ICT Infrastructure Solutions. Real power for virtualisation

How to enhance hyperconvergence with infrastructure management

Product Brochure Eaton 93PR UPS kw

Power Quality Solutions. Powering your FlexPod environment

Hyper-Converged Infrastructure: Providing New Opportunities for Improved Availability

Data Protection for Cisco HyperFlex with Veeam Availability Suite. Solution Overview Cisco Public

DATA CENTRE SOLUTIONS

Protect Your Data At Every Point Possible. Reduce risk while controlling costs with Dell EMC and Intel #1 in data protection 1

Markus Kujala, Systems Engineering Manager

A Dell Technical White Paper Dell

POWERING NETWORK RESILIENCY WITH UPS LIFECYCLE MANAGEMENT

Logistics Company Improves IT Uptime and Management

TECHNOLOGY: THE COMPETITIVE ADVANTAGE FOR SUCCESSFUL RETAIL BUSINESS

The Business Case for Virtualization

Product brochure. Eaton 9PXM UPS. A scalable, modular, flexible solution for a wide range of applications. Plan > Grow > Manage

Ten things hyperconvergence can do for you

The FlashStack Data Center

02 Why Does My IT Infrastructure Need a UPS?

The Cisco HyperFlex Dynamic Data Fabric Advantage

TOP REASONS TO CHOOSE DELL EMC OVER VEEAM

Schneider Electric Critical Power & Cooling Services. Services to keep your mission-critical applications operating at optimal performance

Veeam Availability Solution for Cisco UCS: Designed for Virtualized Environments. Solution Overview Cisco Public

arcserve r16.5 Hybrid data protection

Data Centers: The Case For Energy Risk Management and Energy Reliability

Eaton 93PR UPS kw

Data Center Assessment Helps Keep Critical Equipment Operational. A White Paper from the Experts in Business-Critical Continuity TM

Cisco Virtual Experience Infrastructure for Government. Virtualize Your Desktop and Increase Agency Efficiency

vsan Disaster Recovery November 19, 2017

Carbonite Availability. Technical overview

Powering Transformation With Cisco

BREAK THE CONVERGED MOLD

Be a VDI hero with Nutanix

Why Converged Infrastructure?

Cisco VXI Smart Solution with VMware View

Cisco Start. IT solutions designed to propel your business

DELL EMC VALIDATED SYSTEM FOR VIRTUALIZATION

Kennisnet: A lesson in data center success

BUILD THE BUSINESS CASE

Data Sheet: High Availability Veritas Cluster Server from Symantec Reduce Application Downtime

Vblock Infrastructure Packages: Accelerating Deployment of the Private Cloud

Power Outages and the Hosted VOIP Option

vsan Management Cluster First Published On: Last Updated On:

Accelerate Your Enterprise Private Cloud Initiative

Hybrid Cloud 1. ebookiness created by the HPE Europe Division of Ingram Micro

A Digium Solutions Guide. Switchvox On-Premise Options: Is it Time to Virtualize?

VMware vsphere 4. The Best Platform for Building Cloud Infrastructures

Don t Jeopardize Your Business: 5 Key Business Continuity Use Cases for Cloud

Architectural overview Turbonomic accesses Cisco Tetration Analytics data through Representational State Transfer (REST) APIs. It uses telemetry data

REINVENT YOUR HARDWARE REFRESH CYCLE WITH HCI. A Process on the Cusp of Change

HP BladeSystem Matrix

Nimble/Cisco SmartStack Integrated Infrastructure for Enterprise-class Oracle Workloads

Cisco UCS Mini Software-Defined Storage with StorMagic SvSAN for Remote Offices

3/26/2018. Hyperconvergence. CreekPointe, Inc. Introductions Hyperconvergance Defined Advantages Use Cases Q&A Close. Mike Clarke, CreekPointe Inc.

Comstor Edge Conference Cisco Hyper FlexFlex

Cisco Software-Defined Access

DATA CENTER COLOCATION BUILD VS. BUY

Protecting Microsoft Hyper-V 3.0 Environments with Arcserve

Disaster Recovery Is A Business Strategy

Transforming your IT infrastructure Journey to the Cloud Mike Sladin

TOP 5 REASONS TO CHOOSE FLASHSTACK FOR HEALTHCARE

Ensuring business continuity with comprehensive and cost-effective disaster recovery service.

HITACHI UNIFIED COMPUTE PLATFORM

Why Continuity Matters

Take a Confident Step towards Migration to Microsoft Skype for Business

Maximizing Availability With Hyper-Converged Infrastructure

MODERNIZE INFRASTRUCTURE

Your Data Center is Everywhere. Unified Computing System Data Center Campaign Overview Marketing Cheat Sheet

Cisco CloudCenter Use Case Summary

Integrated Switching: Cisco Blade Switch Modules for HP BladeSystem Enclosures. Reduce data center complexity

UPS system failure. Cyber crime (DDoS ) Accidential/human error. Water, heat or CRAC failure. W eather related. Generator failure

Whitepaper. 10 Reasons to Move to the Cloud

Integrated DHCP, DNS & IP Address Management

ROI CASE STUDY MAY Logicalis Achieves 159% ROI* with CA DCIM Solution

APPLYING DATA CENTER INFRASTRUCTURE MANAGEMENT IN COLOCATION DATA CENTERS

CLOUD COMPUTING PRIMER

Accelerate AI with Cisco Computing Solutions

Power Management Solutions Maximise the reliability and efficiency of your power critical facility

7 Things ISVs Must Know About Virtualization

Hospital IT and Facilities Special Report Top concerns in the hospital include budget, power requirements

Veritas Cluster Server from Symantec

Enabling Fast IT. In the IoE era. Alberto Degradi DCV Sales Leader. November 2014

PLAYBOOK. How Do You Plan to Grow? Evaluating Your Critical Infrastructure Can Help Uncover the Right Strategy

Deploy a Next-Generation Messaging Platform with Microsoft Exchange Server 2010 on Cisco Unified Computing System Powered by Intel Xeon Processors

Increase Efficiency with VMware Software and Cisco UCS

IBM Resiliency Services:

Protecting Your Investment in Java SE

How SD-WAN will Transform the Network. And lead to innovative, profitable business outcomes

CIO s Guide to Make $ense of Data Center Modernization

V-PWR Data Center Program Guide

Cisco 4000 Series Integrated Services Routers: Architecture for Branch-Office Agility

Cisco Unified Computing System Delivering on Cisco's Unified Computing Vision

IBM Cloud IBM Cloud for VMware Solutions Zeb Ahmed Senior Offering Manager and BCDR Leader VMware on IBM Cloud VMworld 2017 Content: Not for publicati

Dell Fluid Data solutions. Powerful self-optimized enterprise storage. Dell Compellent Storage Center: Designed for business results

Deployment case study: Cisco HyperFlex system

EVERYTHING YOU NEED TO KNOW ABOUT NETWORK FAILOVER

Whitepaper. 10 Reasons to Move to the Cloud

Water Provider Relocates, Modernizes Data Center

Transcription:

Help your Cisco customers defend against downtime and reduce costs Why and when to sell Eaton Power Management solutions Incorporating power management with Cisco solutions boosts your sales revenue, while providing better account control on the way to increasing customer satisfaction. Eaton solutions position you above your competitors by enabling you to deliver a key component missing from their offering: proactive power management. Why Eaton Power Management solutions Eaton simplifies power management and helps ensure a customer s business continuity through solutions designed to organize, protect, and manage Cisco solutions. Eaton Power Management solutions are a comprehensive suite of power protection, power distribution, rack enclosures, monitoring systems, cable management, and power management software. They re designed to not only protect against downtime and potential damage, but also to reduce power consumption. Customer benefits: Preserve system uptime Simplify power management Enable remote management of the entire power infrastructure Slash electrical consumption rates Decrease implementation and deployment time Eaton solutions include: Intelligent Power Manager (IPM) software Uninterruptible Power System (UPS) Power Distribution Unit (PDU) Rack enclosure Cable management Environmental monitoring In collaboration with:

In the U.S., power interruptions cost the economy $96 billion annually. When selling Cisco solutions, include Eaton Power Management Power management is a critical and often overlooked component of infrastructure management when deploying new systems. Overprovisioning is a waste of immediate budget and can lead to unnecessary battery purchase, maintenance, and replacement. On the other hand, under-provisioning leaves systems under protected, increasing the risk of downtime. Eaton Power Management solutions protect a wide range of Cisco platforms, including: Cisco Switches Cisco UCS Servers Cisco Integrated Infrastructure Cisco HyperFlex Cisco Unified Access Cisco Meraki Cloud-managed switches and routers Easier than ever to select the appropriate power solutions Eaton and Cisco have made it simple to select the right power management solutions through reference designs and sales guides. When talking with a customer, you can offer to set up a call with your Eaton counterpart to further discuss solutions and to initiate a power assessment.

Key Selling Points Eaton s simplified, proactive Power Management solutions are designed to organize, protect, and manage Cisco solutions. Ensures business continuity Increase system uptime, extend battery runtime, and minimize generator load by suspending non-critical virtual machines during power-sensitive periods. Avoid data loss and prevent server crashes by shutting down rack servers and blades during an extended outage. Synchronize primary and disaster recovery sites during a power event which ensures fast and reliable automatic failover and failbacks. Reduces capital expenses Reduce the batteries and hardware to be deployed. Using fewer batteries minimizes long-term battery maintenance and replacement costs. Manage the health, risk, and efficiency of power and environmental devices by extending the capabilities of VMware vrealize Operations. Minimizes operating expenses Slash electrical consumption rates with ENERGY STAR -qualified solutions. Reduce expenses for data recovery by synching primary and disaster recovery sites prior to power failures. Lower data center operating cost by doubling runtime with integrated load shedding and power capping capability. Simplifies power management Integrates with hypervisors to enable centralized management on a singular software platform. Shut down Cisco solutions gracefully to prevent data loss and save work in progress during a prolonged power disruption. Keep critical workloads running longer by capping server power consumption. Extend battery runtime through load shedding to keep mission-critical virtual machines running longer during power disruptions.

Prospects Opportunities for Eaton power management solutions exist across industries as the solutions ability to maintain uptime and ensure business continuity are fundamental business needs. 37% of IT professionals suffered an unplanned outage in the last 12 months. 1 Prospect Businesses in high-risk power loss locations. (i.e. utility interruptions, adverse weather conditions, aging infrastructure) Companies looking to lower utility costs. Why interested? Keep critical workloads running during a power event by load shedding and power capping servers to extend UPS battery runtime. Eaton UPSs and rack PDUs are designed for maximum efficiency and to reduce utility consumption and costs. Achieve the same battery runtime with fewer external battery modules (EBMs), saving money now and minimizing future expenditures on battery maintenance and replacement. Organizations with a goal to reduce energy consumption. Eaton IPM collaborates with Cisco UCS Manager to set power consumption limits to each UCS blade or rack server. By consuming less energy, the server will need less power during an outage, conserving battery runtime and maximizing system uptime. Additionally, the server will expend less heat which helps regulate rack temperature, further reducing cooling costs. Teams supporting remote locations and edge environments. 34% of IT professionals manage racks in multiple locations or in a colocation arrangement. With remote management capabilities, Eaton solutions provide real-time visibility of power status in the network and enable IT teams to manage their entire power infrastructure remotely from a single pane of glass.

Conversation Starters When discussing power management with your Cisco customer, use the following questions: How are you protecting your Cisco solutions from power disruptions? What would happen if there was a power outage at your facility right now? In your disaster recovery plan, how do you ensure your data has sufficient time to transfer from the primary to the backup site? How is power being distributed to the equipment in your rack? Would the ability to monitor how much power the rack and every device in the rack is drawing be beneficial? Would it be helpful to be able to remotely turn on and off devices in the rack? If you have VMware vcenter running in your data center, would you like to be able to control your UPSs, rack PDU, and environmental sensors from a tab in the vcenter dashboard the same way you already monitor and manage your compute, networking, and storage equipment? Where are you installing your new Cisco solutions? Will they be inside an existing rack or do you need a new enclosure for the equipment? Objection Handling Objection I already have a UPS solution. Response Let s look at UPS efficiency and expansion. How efficient are your existing UPSs? Most older models run at 80 percent efficiency. New UPS models operate at over 95 percent, which reduces energy consumption and costs. When were the UPS batteries last checked or replaced? Batteries on most models need to be replaced after three years. These are both areas that a power management solution could monitor and adjust to see that you were getting the best performance from your UPS array. Do you have enough UPSs to support growing IT needs? I can t afford power protection. Without a UPS, devices that are subjected to a hard system shutdown can lose data or have data corrupted. A power management system can help ensure business continuity through power outages, minimizing the loss of productivity. What s the total cost to get a machine up and running after a power outage? Consider machine repair, data recovery, overtime hours, and lost productivity time. Configuring UPSs and PDUs is too hard. Eaton provides selector tools to properly identify the right UPS and PDU for your application.

Success Stories Leading U.S. retailer optimizes Cisco networking across 800+ retail stores with IPM and UPSs. Remotely monitors and manages power devices through a single pane. Manages 3200 UPSs. Reduces cooling costs and consumption. Metered PDU for FlexPod Express systems used by a U.S. federal agency. 1% billing grade accuracy on 90 systems deployed around the world. Metered capabilities simplify remote control and management of racks. University enhances Vblock System performance with BladeUPS and IPM. Triggers live migrations for virtual machines during power outages. Provides support for a virtual desktop infrastructure (VDI), virtual environment for other applications, and a flexible disaster recovery solution. City s quest for continuous uptime answered by Cisco networking safeguarded by UPSs and monitoring service. Ensures highest level of reliability within its data center. Identifies potential power problems before they become load loss events. Resources Solutions overview Solution brief: Integrated Infrastructure Battlecard: Intelligent Power Manager Brochure: Intelligent Power Manager White paper: How to enhance hyperconvergence with infrastructure management 1. Eaton and Tech Target survey: How software defined is redefining the data center. Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this URL: www.cisco.com/go/trademarks. Third-party trademarks mentioned are the property of their respective owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company. (1110R)