Sub: Review of Performance of GRIDCO for the FY held on

Similar documents
Summary of ARR & BSP Filings. Submitted by. For FY

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR **********

BEFORE THE ODISHA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN PLOT NO. 4, CHUNOKOLI, SHAILASHREE VIHAR, CHANDRASEKHARPUR, BHUBANESWAR

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ************

CASE NO.76 OF Date of Hearing : Date of Order :

MEMORANDUM OF UNDERSTANDING

BSES Smart Grid Road Map

MEMORANDUM OF UNDERSTANDING (MoU) FOR LONG PRODUCTS:

Ascent ESS. User Manual. Ascent ESS. SKP Tricor Corporate Services Pvt. Ltd. Payroll Team

RULEBOOK ON NUMBER PORTABILITY FOR SERVICES PROVIDED VIA PUBLIC MOBILE COMMUNICATIONS NETWORKS

MEMORANDUM OF UNDERSTANDING (MoU) FOR PROJECTS/ CONSTRUCTION COMPANIES ETC.:

MEMORANDUM OF UNDERSTANDING (MoU) FOR PROJECTS/ CONSTRUCTION COMPANIES ETC.:

SPECIAL QUALITY ONLY: A.

2.0 EXECUTIVE SUMMARY

Cereal Hudson. Tariffs. Anthony S. Campagiorni, Esq. Vice President, Regulatory & Governmental Affairs. Requested Revenue Increases

The background. Industrializing regions Strategic areas focused upon Less focus on efficiency and performance. Employment

Management s Discussion and Analysis: CSL

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

Report Designer for Sage MAS Intelligence 90/200

STATE OF ALASKA THE REGULATORY COMMISSION OF ALASKA ORDER GRANTING REQUEST FOR APPROVAL OF THE INCLUSION OF GAS STORAGE FEES IN GAS COST ADJUSTMENT

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)

TWIN BUTTE ENERGY LTD. Stock Dividend Program FREQUENTLY ASKED QUESTIONS

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

Subject: Reformulation of existing Postpaid Broadband Plans and launch of a new Unlimited Broadband Plan reg.

MOU FY (Retailers & Manufacturers)

Compiling Data on International Mobile Money Transfer Services

FORUM LOAD DESPATCHERS (FOLD)

Tender No. : ITS/TNDR/AMC/17-18/02 dated 20/04/2017 AMC FOR 24 SERVERS, 2 STORAGES AND KVM SWITCHES AT LHO MUMBAI

Tender No. : ITS/TNDR/AMC/17-18/02 dated 16/04/2018

HIGHLIGHTS OF QUARTER S PERFORMANCE (STANDALONE)

1. How and where can I find the terms and conditions of my contract?

MOBILE TARIFFS ANALYSIS 1 APRIL TO 30 SEPTEMBER 2018

Use of Interactive Text Messaging (USSD) for data entry of Mandi prices and arrivals without internet

TABLE OF CONTENTS. Report Designer User Guide

ORDER NO * * * * * * * * On April 21, 2017, Baltimore Gas and Electric ( BGE ) requested that the

AUDIT & ADMINISTRATION COMMITTEE MEETING HELD IN ROOM #318 OF THE COUNTY OFFICE BUILDING CARMEL, NEW YORK 10512

Private D.Ed., Colleges Grant of Fresh /Renewal of Affiliation for the year in respect 163 Private D.EI.Ed colleges order issued.

INSTRUCTION Concerning the Operating Procedures for the Croatian Large Value Payment System

Reseller Partner Operational Guide Mobile & M2M July 2018

Yakin! Dealer General FAQs

p:.-:t\on OF: U, 0 '\ "-<- Cj ~ ~. 0'«, 8&, - ~.f"::> "TVlCE PRo\j\~ Association of Unified Telecom Service Providers of India

MAJOR PROJECTS STRATEGY

A.I Task Order 1 - Technical and Analytical Services 1. SCOPE OF WORK. Deliverablc(s): CPUC Implementation Plan Filed. EXHIBIT A: Scope of Services

KCCU Online Banking - For Members Use

MEMORANDUM. Robert Kreszswick, Director, Membership Services Department. Web CRD Electronic Procedures for Forms U4 and U5

SAFARICOM LIMITED ANNOUNCES AUDITED RESULTS FOR THE YEAR ENDED 31 MARCH 2016.

Government of India Ministry of Railways (Railway Board) No. 2000/Tele/TN/1 New Delhi, dated

The Institute of Chartered Accountants of Sri Lanka

Wavelength Service Service Description

(Revenue by business segment) FY2018 (Nine Months Ended December 31, 2018) PQA Others Mobile. Electronics Infrastructure 53% 28% 19% 24% 8%

Model Legislation As approved by the NCSL Executive Committee Task Force on State & Local Taxation of Communications and Electronic Commerce

Revenue and earnings increase

Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.

From: Laura Manz, Vice President of Market & Infrastructure Development

Summary Statistics. Closed Sales. Paid in Cash. New Pending Sales. New Listings. Median Sale Price. Average Sale Price. Median Days on Market

Georgia Public Service Commission. Hot Topics and Current Issues Bill Edge Public Information Officer Georgia Public Service Commission

WIRELESS DEVICES: ACCEPTABLE USE AND GUIDELINES

GROSS REVENUE CHARGE AND OTHER WATER AGREEMENT COSTS REGULATED HYDROELECTRIC

Reliance Infrastructure Limited

WELCOME PACKAGE PARKWOOD ONTARIO HOMEOWNER S ASSOCIATION

ASSAM ELECTRICITY REGULATORY COMMISSION

Equipment Installment Plans for enterprise customers

FSC STANDARD. Standard for Multi-site Certification of Chain of Custody Operations. FSC-STD (Version 1-0) EN

Quote Cost = R Quote Cost = R750.00

Bradford Area Occupational Health and Safety Forum. Privacy Statement and Policy

WHO CAN BOOK Booking (T) 1200 A. All Consumers incl. SSIC s / NSICs - all thicknesses All customers incl. SSICs/ NSICs.

CUMBRE VISTA HOMEOWNERS ASSOCIATION, INC. RECORDS INSPECTION AND COMMUNICATIONS POLICY AND PROCEDURE. 1-Pl) ~ \ 1

Transatel DataSIM Terms & Conditions ( T&C s )

Oracle FLEXCUBE Direct Banking

How to understand a pdf file invoice

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

Wireless Services Allowance Procedure

Reply to queries raised for Procurement of Bulk Services

Terms and Conditions of on-line ticket sales for productions held at the Krakow Opera at ul. Lubicz 48 through the site

DRAFT FOR DISCUSSION Crackle Russia Business Plan

Mailbox Rental Terms and Conditions

Billing and Collection Agent Report For period ending January 31, To FCC Contract Oversight Sub-Committee. February 11, 2019

TABLE OF CONTENTS. General Information. I. Territory to Which the Rate Schedule Applies... 9

NOTICE OF THE 117TH ANNUAL GENERAL MEETING OF SHAREHOLDERS

NOTICE INVITING QUOTATION ADM/56/96/IXE

Critical Information Summary

Contact: Stacy Aitken Title:Account Manager Tel: Fax: Order Form ID #: WebEx Service.

Dutch-Bangla Bank Limited

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17

UPMC POLICY AND PROCEDURE MANUAL. 1. To establish procedures for obtaining a Voice Comm-issued UPMC corporate cellular phone.

LEVEL I - BRONZE STANDARD

University of Wyoming Mobile Communication Device Policy Effective January 1, 2013

Getting Started. AccountEdge. AccountEdge Plus. AccountEdge Plus Network Edition

Appendix: Illustrative Financial Statements Structure

Analyst Presentation Half year results July 2007

Crystal Clear Software Ltd. Customer Charter

FNB Connect Tap into Summer Free Data Promotion

Excel Reporting for Sage 200 Datasheet

Financials Module: General Ledger

Sunstar Americas, Inc.

Questionnaire For Company / LLP Registration

CTHE INSTIATUTE OF CHARTERED ACCOUNTANTS OF SRI LANKA

A checklist for the new 990 requirements:

Building Efficiency as a Service

Transcription:

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN, PLOT NO. 4, CHUNOKOLI, SHAILASHREE VIHAR, BHUBANESWAR-751021 TEL. No. 2721048, 2721049, FAX : 2721053/2721057 E-mail: orierc@gmail.com, Website: www.orierc.org ********* No. DIR (T)-373/09/827 Dated. 18.06.2018 To The Chairman-Cum-Managing Director, GRIDCO, Janpath, Bhubaneswar Sub: Review of Performance of GRIDCO for the held on 21.05.2018. Sir, In inviting a reference to the subject cited above, I am directed to send herewith the minutes of the review meeting on performance of GRIDCO for the (i.e. from April, 2017 to March, 2018) held at OERC on 21.05.2018 for your information and necessary actions. Yours faithfully, Encl: As above. Sd/- S E C R E T A R Y Copy to: The Commissioner-cum-Secretary, Department of Energy, Govt. of Odisha along with copy of the enclosure for information. 1

Minutes of the Review Meeting held on 21.05.2018 on the Performance of GRIDCO for the Date of Review : 21.05.2018 at 02.30 PM Period of Review : For the (i.e. from April, 2017 to March, 2018) Persons present : Shri H. Sharma, CMD, GRIDCO Shri B. P. Mahapatra, Director (Finance), GRIDCO Shri M.K. Das, Director (Commercial) and other Officials of GRIDCO. 1. At the outset of the review meeting, CMD, GRIDCO made a presentation on the performance of GRIDCO for i.e. from April, 2017 to March, 2017. He stated that GRIDCO has purchased 26030.63 MU of energy (inclusive of the import of 176.45 MU through Power Banking and 211.73 MU through power Trading) at a cost of Rs.6832.34 Cr. at an average rate of 262.47 P/Kwh. This is OERC approval of 26051.63 MU with a cost of Rs.6419.57 Cr. at an average rate of 246.28 P/Kwh for the. However, out of the total purchase of 26030.63 MU, GRIDCO has supplied 153.20 MU towards power banking for availing the same during the summer season in 2018. Further, GRIDCO has sold 306.91 MU through trading, 127.25 MU towards Unscheduled Interchange (deviation) and 85.95 MU to CGPs and others and earned an amount of Rs.223.36 Cr. in total. Out of the total power purchase cost of Rs. 6832.34 Cr. GRIDCO has made payment of Rs. 6796.62 Cr. to the generators during the. The balance outstanding amount of Rs.35.71 Cr. is to be paid to OHPC before 01.06.2018. 2. He further stated that, during, DISCOMs have underdrawn 568.78 MU than the OERC approval which is 38.82 MU more than the energy scheduled to them during that period. The details of energy drawl by the DISCOMs are given in the table below. DISCOMs OERC Approval Energy Drawal (in MU) by DISCOMs during the Scheduled for Drawal Actual Drawal 2 Over (+)/Under (-) Drawal than OERC Approval Over (+)/Under (-) Drawal than the Schedule CESU 8850.00 8386.36 8465.73 (-) 384.27 (+) 79.37 NESCO 5680.00 5427.13 5464.80 (-) 215.20 (+) 37.67 WESCO 7090.00 7230.80 7152.30 (+) 62.30 (-) 78.50 SOUTHCO 3520.00 3488.11 3488.39 (-) 31.61 (+) 0.28 TOTAL 25140.00 24532.40 24571.22 (-) 568.78 (+) 38.82

3. GRIDCO has shown a revenue shortfall of Rs. 370.35 crore during the as a surplus of Rs. 6.18 crore as approved by OERC and during presentation CMD, GRIDCO stated that considering the payment of Rs. 894.23 Cr. towards past losses (principal loan repayment), GRIDCO has shown a revenue shortfall of Rs. 1264.58 crore during the as shown in the table below: Revenue Approval Vis-à-vis Actual (Prov.) during (Rs. Crore) Sl Approval Actual (prov.) Description No MU Amounts MU Amounts 1. Power Purchase Cost 26051.63 6419.57 26030.64 6832.33 2. Establishment & Interest Cost - 315.22-572.92 3 Pass through Cost - 231.66 - - 4. Total Revenue requirement 26051.63 6966.45 26030.64 7405.25 (1+2+3) 5. Revenue realized from sale of 25140.00 6969.15 24571.21 6811.54 power to DISCOMs 6. Revenue from Trading - - 306.91 142.64 7. Revenue from UI - - 127.35 31.41 8. Revenue from CGPs & Others 5.00 3.48 85.95 49.31 9. Total Revenue Realization 25145.00 6972.63 25091.42 7034.90 (5+6+7+8) 10. Surplus / (Gap) (9-4) - 6.18 - (370.35) 11 Previous Losses (Principal Repayment) - (894.23) 12 Surplus / (Gap) (including Previous Losses ) (10+11) (1264.58) 4. The CMD, GRIDCO stated that due to delay in payment of monthly Bulk Supply dues to GRIDCO, the DISCOMs have not availed any rebate during the. The details of BSP bills raised, amount received, adjustment previous year BSP dues, adjustment current year BSP dues and outstanding amount of review year 2017-18 are given in the table below: DISCOMs BSP Bills raised by GRIDCO for Amount Received by GRIDCO during FY 2017-18 3 outstanding FY 2016-17 Current (Rs. Crore) Outstanding of current 1 2 3 4 5=3-4 6=2-5 WESCO 2,152.84 2,112.73 688.54 1,424.19 728.65 NESCO 1,644.91 1,698.48 324.19 1,374.29 270.62

DISCOMs BSP Bills raised by GRIDCO for Amount Received by GRIDCO during FY 2017-18 outstanding FY 2016-17 Current Outstanding of current SOUTHCO 694.19 619.95 268.60 351.35 342.84 Sub-total 4,491.94 4,431.16 1,281.33 3,149.83 1,342.11 CESU 2,319.61 2,253.26 483.10 1,770.16 549.45 TOTAL 6,811.55 6,684.42 1,764.43 4,919.99 1,891.56 5. Further, GRIDCO submitted that it has received Rs. 907.72 Cr. during the period from 01.04.2018 to 10.05.2018 from DISCOMs (WESCO Rs.363.75 Cr + NESCO Rs.224.33 Cr. + SOUTHCO Rs.63.22 Cr. + CESU Rs.256.42 Cr.) which has been adjusted the above outstanding Rs. 1891.56 Crore of. 6. GRIDCO has submitted that the DISCOM Utilities have not paid any amount towards their past arrear dues. As reported by GRIDCO upto 31 st March, 2018 the following amounts are still outstanding from different DISCOM Utilities as depicted in table below: Outstanding Distribution Companies as on 31-03-2018 (Provisional) (Rs. Crore) Particulars WESCO NESCO SOUTHCO Sub-total CESU Total (A) Bulk Supply Price arrear dues as on 31.03.2018 1406.41 840.20 609.34 2855.95 827.25 3683.20 (B) SLDC UI Charges (as on 31.03.2017) 285.65 172.64 72.78 531.07 366.43 897.50 (C) Securitized dues (as on 31.03.2017) 294.70 303.37 259.98 858.05 1277.18 2135.23 (D) 12.5% Power Bond- Rs.400 Crore - 48.91 146.45 195.36-195.36 (E) Other dues including Transfer Scheme 12.10 6.74 29.91 48.75 118.85 167.60 Receivables (F) Deferred Credit - - - - 174.00 174.00 Total 1998.86 1371.86 1118.46 4489.18 2763.71 7252.89 7. GRIDCO stated that, during the financial year 2017-18, they had released an amount of Rs.1086.77 Crore to DISCOMs (WESCO - Rs.174.69 Cr., NESCO - Rs.240.41 Cr., SOUHTCO - Rs.244.48 Cr. & CESU Rs.427.19 Cr.) from the Escrow Account towards employees cost, R&M expenses and others. Out of which an amount of Rs.980.13 Crore 4

is relaxed towards employees cost, Rs.28.59 Crore towards R&M expenses and balance Rs.78.05 Crore towards other purposes. As stated by GRIDCO, DISCOMs are not able to pay the BSP bill within due date and defaulted current about three and half a month, causing cash deficit in escrow accounts. DISCOMs were not able to avail the escrow relaxation benefit towards R&M as approved by the Commission, because of poor cash inflow during the period under review. 8. For the, GRIDCO has shown a closing cash deficit of Rs.298.88 crore as opening cash deficit of Rs.328.41 crore. During the year total cash inflow was Rs. 8049.04 crore which includes Rs.6684.43 crore towards realisation from DISCOMs, Rs.1138.00 crore from loan and Rs.226.61 crore from other sources. Total cash outflow was Rs.8019.51 crore which includes Rs.6731.65 crore towards payment of power purchase cost, Rs.889.57 crore towards loan repayment, Rs.383.38 crore towards interest on loan and Rs. 14.91 crore towards establishment expenses. 9. GRIDCO has stated that the annual accounts for the FY 2016-17 has been adopted in the AGM on 28.02.2018 and the Annual Report is to be submitted to the Government by 30.06.2018. GRIDCO further submitted that the annual accounts of is to be authenticated in the Board on 20.06.2018 and expected to be adopted in the AGM by 27 th September, 2018. 10. Commission s Observation: i. During the, GRIDCO has purchased high cost power of 495.83 MU from FSTPS-III at an average rate of 508.50 p/u and 1160.80 MU from Barh STPS- II @ 510.69 p/u, which was not approved in the ARR of GRIDCO for that year. Further, GRIDCO has purchased 1343.04 MU from FSTPS-I &II at an average rate of 413.95 p/u the approval of 679.09 MU only. However, the fixed cost of FSTPS-I, II&III was allowed in the ARR of GRIDCO for the. In the tariff order, it was advised to trade the available power of these NTPC stations to bridge the past revenue gap subject to commercial viability. Therefore, GRIDCO should strictly adhere to merit order principle while scheduling the above costly sources of power with due weightage to the State requirement. GRIDCO should continue in its effort for de-allocation of the State share from Barh STPS as per the direction in the BSP Order. 5

ii. iii. iv. It is observed that GRIDCO has purchased very less quantum of low cost power from the IPPs of the State. Replying to the queries of the Commission, CMD, GRIDCO stated that three numbers of IPPs are now operating in our State. Out of them M/s. GMR Kamalanga Energy Ltd. is supplying the quantum of power to the extent of State entitlement whereas M/s. Vedanta Ltd. and M/s. Jindal India Thermal Power Ltd. (M/s. JITPL) are not supplying the State share of power. During the the generation of M/s. Vedanta Ltd. was less due to some technical maintenance of its plant and there was more requirement of power for its industry. Further, M/s. JITPL, is not operating all of its generating units due to lack of demand of power other than the State entitlement, which is also not remunerative to them. The CMD, GRIDCO further stated that GRIDCO has long term agreements for availing power from the 3 rd & 4 th Units of OPGC and NTPC Power Station at Darliparli in Sundargarh district of Odisha, which are expected to be commissioned within one year. After commissioning of these power stations, GRIDCO may not require power from the IPPs for meeting the State demand. The Chairman, OERC stated that GRIDCO needs to initiate action for revisiting the Government policy and/or the existing Regulations, if any, to incentivize the IPPs in such cases so that the State can avail cheaper power. However, at present GRIDCO should take up the matter with the management of M/s. Vedanta Ltd. and M/s. JITPL for availing more energy from these IPPs towards State entitlement. GRIDCO should also co-ordinate with OHPC for maximum availability of hydro generating units, particularly in rainy seasons and avail the maximum possible low cost power from OHPC stations. GRIDCO is purchasing bundled solar power from NVVNL through New Project Scheme under JNNSM (Phase-I) and also from Dadri & Faridabad solar plant through NTPC at high cost. In present scenario the cost of such power should be reduced in view of reduction in coal price so also the price of solar power in the market. GRIDCO is directed to take up the matter with NTPC /NVVNL in this regard with detailed analysis and appraise the Commission from time to time. v. GRIDCO has failed to achieve even one third of the RPO target fixed by the Commission w.r.t. purchase of power from the renewable sources during FY 2017-18. This is a serious issue. It is observed that GRIDCO Ltd. has purchased 312.79 6

MU (1.27%) from non-solar renewable sources the target of 1109.57 MU (4.50%). Similarly, GRIDCO has purchased 226.52 MU (0.92%) of solar energy the target of 739.71 MU (3.00%). GRIDCO should take up the matter with the State Government proactively for development of long pending small hydro projects in the State and setting up of other renewable power plants in the State for availability of required quantum of renewable energy. Further, GRIDCO should take immediate steps to purchase renewable energy (both solar and non-solar) from other available sources meet the current RPO target as fixed by the Commission. vi. vii. Considering the BSP payment by the DISCOM Utilities as on 31.03.2018, it is observed that there is an outstanding of current about three and half months on all the four DISCOM Utilities (WESCO - 4 months, NESCO 2 months, SOUTHCO 6 months and CESU 3 months) for which GRIDCO is being forced to avail loan from difference sources to make payment to the generators. Ultimately, the burden is passed on to the consumers of the State. Therefore, the Commission directs GRIDCO to convene meetings with all DISCOM Utilities presided by the CMD, GRIDCO in regular intervals to enhance the collection of electricity dues from the consumers and payment of current as well as arrear dues of GRIDCO in time and appraise the Commission from time to time. It is observed that GRIDCO has caused much delay in finalizing its Annual Accounts for the FY 2016-17 which has also delayed the publication of Annual Report. GRIDCO is advised to complete the Annual Accounts of in the stipulated time. ******* 7