BACnet PTEC Terminal Box (VAV) Controller. Control Applications. Product Numbers. Product Description. Warning/Caution Notation

Similar documents
BACnet PTEC Heat Pump Multi-Stage Controller. Control Applications. Product Description. Product Numbers. Warning/Caution Notation

TEC VAV with 0-10V AO Heat. Modulation and CO2 Monitoring. Controller. Control Applications. Product Description. Accessories.

Siemens TEC Extended I/O Controller

TEC Heat Pump Multi-Stage Controller. Control Applications. Accessories. Product Description. Product Numbers. Warning/Caution Notation

TEC Terminal Box (VAV) Controller

TEC Unit Conditioner Controller

BACnet PTEC Unit Conditioner/Fan Coil P. Controller. Control Applications. Accessories. Product Description. Warning/Caution Notation

Room Pressurization Controller Electronic Output

Room Pressurization Controller Pneumatic Output

TRUNK TX RX + - S + - S DO LEDS FLN TRUNK TERMINATIONS INPUT/OUTPUT TERMINATIONS TRANSMIT LED

PXC Compact Unitary Equipment Controller (UEC)

LTEC Heat Pump DDC Controller

LTEC Unit Ventilator DDC Controller

Siemens BACnet Programmable TEC VAV with Series Fan and 3-Stage Electric Heat Controller

Siemens BACnet Programmable TEC Unit Conditioner Controller

Siemens BACnet Programmable TEC Constant Volume

Siemens BACnet Programmable TEC Dual Duct Two Air Velocity Sensors Controller

Siemens BACnet Programmable TEC Unit Conditioner (Fan Coil) Controller for Smoke Control

Siemens BACnet Programmable TEC Unit Conditioner (Fan Coil) Controller

Siemens BACnet VAV Actuator

Application MC User Guide

OpenAir Electronic Damper Actuator GDE/GLB Rotary Non-spring Return

Powermite 599 MT Series SAS Electronic Valve Actuator 24 Vac or 24 Vdc, Proportional Control

Free Energy Band RCC30U Room Temperature Controller for Four-pipe Fan Coil Unit

Actuator Commissioning Tool

Power Open Processor/Open Processor

Terminal Equipment Controller Enclosure

599 Series Zone Valve Actuator SF Series Electronic Valve Actuator, 2-position Control

Siemens BACnet Programmable TEC Unit Vent Controller

Open Processor with Square D Driver

RWD68U Universal Controller

Siemens BACnet Programmable TEC Unit Vent Controller for Smoke Control

BACnet Terminal Box (VAV) Controller

599 Series Zone Valve Actuator SF Series Electronic Valve Actuator, 2-position Control

Launch Pad User Guide

TEC Controller Extended I/O Application 2497 with Slave Mode Application Application Note Building Technologies

Open Processor with Carrier CCN DataLink Driver

BACnet Lab and Pressurized Room Controllers with Off-board Air Modules

Actuating Terminal Equipment Controller (ATEC) VAV with Reheat. Start-up Procedures Building Technologies Restricted

Airflow Pressure Sensor

BACnet PTEC Controller Constant Volume - Cooling Only, Application Application Note Building Technologies

Siemens BACnet Programmable TEC Dual Duct Two Air Velocity Sensors Controller

Powermite 599 MT Series SSC Electronic Valve Actuator, 24 Vac Floating Control

VAV Modular Assembly (VMA) 1410/1420

BACnet VAV Actuator Start-up Guide IM 1040

UNT1100 Series. Binary Output Jumpers AO2 AO1 AO3 AO4 AOCM AOCM AOCM AOCM AO1. AI Switches Job Information N2 Address. Ref N2+ N2- ADDR 0 = ALL OPEN

RDF Series Room Temperature Controllers

Replacing the Power Supply

MS/TP Point Pickup Module Owner's Manual

TALON Network Manager- 2 & 6 Express

TX-I/O Product Range. Description. Technical Specification Sheet Document No July 18, 2013

AC300/AC400 SERIES DYNAMIC BRAKING and ADDITIONAL FORM C RELAY. INSTALLATION INSTRUCTIONS Document Number:

Dual Duct Controller - One Air Velocity

Unit Vent Controller 0-10 V Output

Output Signal Active Note DC V. Electrical Data Power Supply DC V, ±10%, 1.4 W

SED2 VFD NEMA Type 3R Bypass/Air Conditioner

TX-I/O Product Range. Description. Technical Specification Sheet Document No February 20, 2018

Electrical Actuators

T7560A1036 Digital Wall Module

Room Temperature Controller

Electrical Actuators

DESIGO RX Individual room controllers. for fan-coil systems, chilled ceilings and radiators, with LONMARK-compatible bus communications

Installation & Operation Guide

SLX Series. Application Specific Controllers (SLX-ASC-FCU-L, SLX-ASC-HPU-L, SLX-ASC-RTU-L, SLX-ASC-UV-L)

Junos WebApp Secure 5.0 Hardware Guide

BAC-9000 Series VAV Controller Installation Guide

EcoView 8 DO Module Installation and Commissioning

TX-I/O Product Range. Features. Description. Technical Specification Sheet Document No January 24, 2007

SQM5 Reversing Actuators, with Multiple Analog Control Input Signals

RXM39.1. PL-Link IO Block. Desigo TRA. Use with PXC3 series room automation station

S4112-ON Series. Setup Guide

oom Pressurization Con

Replacing the Gateway M305 Optical Drive

BT300 HVAC Drives. Designed for HVAC. Description. Technical Specification Sheet Document No March 4, 2013

BACnet Driver on the TC Series Platform

Firmware Revision 3.5 Release Notes

Actuating Terminal Equipment Controller (ATEC) VAV with Reheat - Cooling and Heating, Application Application Note

Unitary Controller. Features. Description. Technical Specification Sheet Rev. 6, March, 2000

XBR V3 INSTALLATION AND USER GUIDE Rev 03. xbr V3 Installation and User Guide Page 1 of 14. (preliminary)

LVN5200A-R2, rev. 1, Hardware Installation Guide

1. Unpacking the System

PLC-24V10AL(-PT/-TH) Quick Start Manual (Rev.1.10)

Non-communicating room controllers

XTM 1050 Replacement Parts Installation

RMB Peripheral Units Installation Guide

Modular Room Control (MRC) Series Expansion Board

Table of Contents. General Information. Document Sure-Aire Flow Monitoring System. User and Service Manual WARNING CAUTION

Installing a New Solo 1150 Hard Drive

Plasma Panel Replacement Guide DU-42PX12X

PS/IO Circuit Board Retrofit

Installing the Cisco MDS 9020 Fabric Switch

KIT INSTALLATION INSTRUCTION

ON/OFF HUMIDIFIER CONTROL (ROOM 0R DUCT SENSOR) WITH OUTDOOR TEMPERATURE RESET OVERVIEW WALL CONTROLLER INSTALLATION (TCY-BH-T-U)

COMFORT CONTROL CENTER SERVICE INSTRUCTIONS

Dell Networking S4100-ON Series. Set-Up Guide

HIMatrix Safety-Related Controller Maintenance Manual

PACSystems RX7i IC698CHS009/119

Replacing the Gateway M275 Keyboard

XBR V4 INSTALLATION AND USER GUIDE

Room Automation Station, BACnet/IP, AC 24 V

Transcription:

BACnet PTEC Terminal Box (VAV) Controller Generic Controller I/O Layout. See Wiring Diagram for application specific details. Control Applications 6600 through 6607 Product Description These instructions explain how to field install or replace a Siemens BACnet PTEC BACnet PTEC Terminal Box (VAV) Controller. Warning/Caution Notation WARNING Personal injury/loss of life may occur if you do not follow the procedures as specified. Product Numbers Siemens BACnet PTEC Terminal Box (VAV) Controller 550-495PA Shipping carton includes a controller assembly, a mounting rail, and two self-tapping/drilling screws. CAUTION Keep the unit in its static-proof bag until installation. Otherwise, you run the risk of damage to the printed circuit board from electrostatic discharge. CAUTION Equipment damage or loss of data may occur if you do not follow the procedures as specified. Item No. 550-144. Rev. CA Page 1 of 8

Accessories Low cost temporary temperature sensor, 10K thermistor with RJ11, that enables space control if the permanent room or duct sensor is not installed (pack of 25). Duct Temperature Sensor, NTC 10K Ω Type 2, 3" Probe for Commissioning only 540-658P25 QAM1030.008P50 Expected Installation Time New controller installation Replacement (old controller has removable terminal blocks) Replacement (old controller does not have removable terminal blocks) 10 Minutes 6 Minutes 16 Minutes You may require additional time for database work at the field panel. Required Tools and Equipment Small flat-blade screwdriver (1/8-inch blade width) Cabling and connectors Cordless drill/driver set ESD wrist strap Prerequisites Wiring conforms to NEC and local codes and regulations. For further information see the Wiring Guidelines Manual. Room temperature sensor installed (optional). 24 Vac Class II power available. Supply power to the unit is OFF. Any application specific hardware or devices installed. Air velocity sensors installed in ducts. If the controller is being installed on a box with 1 or more stages of electric heat, the 550-809 MOV with preterminated spade connectors must be installed across the manufacturersupplied airflow switch. MOVs can be installed at the time the controller is factory mounted; coordinate with the box manufacturer prior to order placement. For field installation, see Metal Oxide Varistor Kit Installation Instructions (540-986). A low-cost temporary RTS (540-659P50) is available that plugs into the RTS port on the controller, providing temperature input and actual space control until a permanent RTS is installed. All wiring must conform to national and local codes and regulations (NEC, CE, etc.). 1. Secure the mounting rail in the controller s desired location. 2. Place the ESD wrist strap on your wrist and attach it to a good earth ground. 3. Remove the controller from the static proof bag and snap it into place on the mounting rail. 4. Connect the FLN. Page 2 of 8 Siemens Industry, Inc.

5. Connect the point wiring (see Wiring Diagrams). 6. Plug the room temperature sensor cable into the RTS port. 7. Connect the power trunk. DO NOT apply power to the controller without first consulting the specialist. This TEC is designed to work with 2- wire AC power (Neutral and Phase (hot) at 24 Vac +/-20%. Use of the earth terminal is optional and if used it should be connected to the nearest earth ground (building steel, conduit or duct work (if earthed). Wiring Diagram CAUTION The controller s DOs control 24 Vac loads only. The maximum rating is 12 VA for each DO. An external interposing relay is required for any of the following: VA requirements higher than the maximum 110 or 220 Vac requirements DC power requirements Separate transformers used to power the load (for example part number 540-147, Terminal Equipment Controller Relay Module) CAUTION It is very important that the neutral that supplies the TEC be earth grounded at the source of the 24Vac power. Possible erratic equipment operation or damage if neutral is left floating. 8. Connect the tubing from the air velocity sensor pickup to the ports on the controller. Connect HI to HI and LO to LO. The installation is complete. Wiring for AI with a 4 to 20 ma Sensor. Siemens Industry, Inc. Page 3 of 8

If the voltage/current switch is set to current and a 4 to 20 ma sensor is connected to an AI, then special wiring requirements must be followed. When wiring any actuator that uses a 0 to 10V control signal and ties AC neutral to DC common, an additional wire must connect the actuator AC neutral to the DC common of the PTEC/TEC AO being used to control the actuator. 24 Vac Modulating Control. Actuator Symbol TEC Connection Function Terminal Connection Standard Color Application 6600 VAV Cooling Only. 1 H Supply (SP) G Red 2 C Neutral (SN) G0 Black 8 AO3 15 (+) -- C to AO3 16 (-) 0 to 10V input signal Common jumper Y Gray -- -- Page 4 of 8 Siemens Industry, Inc.

Application 6601 VAV Cooling or Heating. Application 6602 VAV with 3-Stage Heat. Siemens Industry, Inc. Page 5 of 8

Application 6602 VAV with Baseboard Radiation. Application 6603 VAV with Hot Water Heat. Page 6 of 8 Siemens Industry, Inc.

Application 6603 VAV with Hot Water Heat and 3 Motors. Application 6604 and Application 6606 VAV with Series or Parallel Fan and 3-Stage Electric Heat. Siemens Industry, Inc. Page 7 of 8

Cyber security disclaimer Products, solutions and services from Siemens include security functions to ensure the secure operation of building automation and control, fire safety, security management, and physical security systems. The security functions on these products, solutions and services are important components of a comprehensive security concept. Drafting, implementing and managing a comprehensive and up-to-date security concept, customized to individual needs, is nevertheless necessary, and may result in additional plant- or site-specific preventive measures to ensure secure operation of your site regarding building automation and control, fire safety, security management, and physical security. These measures may include, for example, separating networks, physically protecting system components, user training, multi-level defensive measures, etc. For additional information on security as part of building technology and our product, solution and service offerings, please contact your Siemens sales representative or project department. We strongly recommend to always comply with our security advisories on the latest security threats, patches and other related measures. http://www.siemens.com/cert/en/certsecurity-advisories.htm Application 6605 and Application 6607 VAV with Series or Parallel Fan and Hot Water Heat. Information in this document is based on specifications believed correct at the time of publication. The right is reserved to make changes as design improvements are introduced. Product or company names mentioned herein may be the trademarks of their respective owners. 2016 Siemens Industry, Inc. Siemens Industry, Inc. Building Technologies Division 1000 Deerfield Parkway Buffalo Grove, IL 60089-4513 USA Tel. 1 + 847-215-1000 Your feedback is important to us. If you have comments about this document, please send them to SBT_technical.editor.us.sbt@siemens.com. Printed in the USA Page 8 of 8