Data and Voice Line Installation Procedure. Revision History

Similar documents
Marshall University Information Technology Council. Procedure ITP-16 IT INFRASTRUCTURE AUTHORIZATION PROCEDURE

Request for Proposal for Technical Consulting Services

Purchasing Department Finance Group INVITATION TO BID

WHAT S CHANGING IN PROCURE-TO-PAY

Policies & Procedures Effective Date: January 24, Key Control

2018 CANADIAN ELECTRICAL CODE UPDATE TRAINING PROVIDER PROGRAM Guidelines

REQUEST FOR PROPOSAL (RFP)

Communication

Housekeeping Items. 1. Sign in sheet and business cards. 2. Recording. 3. General Questions. 4. Technical Questions to City (Diana Chang)

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center

Anna Independent School District

ATTACHMENT A POLICES AND PROCEDURES REGARDING CELLULAR TELEPHONES AND MOBILE COMMUNICATION DEVICES

Bid Specification Process. Step 1. Obtain project specifications (minimum 7 weeks prior to anticipated project delivery date)

WIRELESS NETWORK: BID Montville Public Schools High School

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)

BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS

ADDENDUM #1 RFP # , Districtwide Network Refresh Design

Request for Proposal (RFP)

Bidding Document. Renewal and Maintenance Support of Intrusion Detection System / Intrusion Prevention System (IDS/IPS)

University Community (faculty and staff)

ATTACHMENT A FSD WLAN PROGRAM SCOPE OF WORK IFB I NETWORK EQUIPMENT AND RELATED SERVICES

Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION

Data Centers and Mission Critical Facilities Access and Physical Security Procedures

Request for Proposal George West Independent School District ERate

Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS

MOTT COMMUNITY COLLEGE. Procedure for Cellular Telephones

ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS #

Green Star Volume Certification. Process Guide

MT. PROSPECT PARK DISTRICT REQUEST FOR PROPOSAL REQUEST FOR STATEMENTS OF INTEREST, QUALIFICATIONS, PERFORMANCE DATA AND COST PROPOSAL

Request for Quotation Amendment #: 1

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

University Facilities Management (UFM) Access Control Procedure (non-residence areas)

ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP #

CCBC is equipped with 3 computer rooms, one at each main campus location:

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION. The National Quality Infrastructure Project for Nigeria (NQIP) Project ID

CSA STANDARDS W47.1, W47.2 & W186 CERTIFICATION GUIDE FOR APPLICANT COMPANIES TO. Congratulations and Welcome to the Certification Application Process

ADDENDUM #1. Date: 12/21/2018

SEALED BID REQUEST Quote for Broadband Equipment Joplin Schools WiFi Access Points and Switchgear

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS

Hewlett Packard Enterprise Company Public Sector - Federal

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES

INVITATION FOR BIDS For a Nutanix Hyper-Converged Platform (CIP# AHW1801)

Electronic Value Transfer Administrator Form EVTA-2, Key Merchant Services (KMS) Work Order Contract PS65792

October 13, From: Larry Snyder, Associate Director for Administrative Services. Subject: Solutions Center Facilities Emergency Response Plan

NETWORX PROGRAM INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN IDIQ TASK ORDER BASED

REQUEST FOR PROPOSALS

Addendum No. 1 January 7, 2015

Opportunity Lives Here

C-BPVCA ADMINISTRATIVE PROCEDURES DELEGATED TO ASME CONFORMITY ASSESSMENT STAFF

Indefinite Delivery, Indefinite Quantity (IDIQ)

E-RATE YEAR Request for Proposal Wireless Access Points and Control for Monson-Sultana Joint Union Elementary School District BEN#144060

Request for Proposal

Grant Parish School Board 512 Main Street P.O. Box 208 Colfax, LA 71417

<PROJECT NAME> IMPLEMENTATION PLAN

Enq. No. IIITMK/ 0612 /18 Date: 12/03/2018 Due on: 26/03/2018 4pm

Purchasing Department Finance Group INVITATION TO BID

Policy Document. PomSec-AllSitesBinder\Policy Docs, CompanyWide\Policy

Hosted VoIP Unified Communications Service

REQUEST FOR QUOTATION (RFQ)

Corrigendum: RFP by MAB IT Ops for procurement of SIM cards for use in PoS terminals RFP ref: SBI/GITC/MAB/2017/2018/418

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Administered by University of Maine System Office of Strategic Procurement Request for Bid (RFB) ecommerce Equipment & Licenses RFB #

PART III: SCOPE OF WORK (Revised )

IDAHO STATE UNIVERSITY POLICIES AND PROCEDURES (ISUPP) ITS Responsible Use of Telephone, Telecommunications, and Networking Resources ISUPP 2280

REQUEST FOR PROPOSAL (RFP) Issue Date: January 30, 2015 Wireless Network Infrastructure Upgrade

UPMC POLICY AND PROCEDURE MANUAL. 1. To establish procedures for obtaining a Voice Comm-issued UPMC corporate cellular phone.

SLI Compliance ONC-ATL Testing Program Guide

Freedom of Information and Protection of Privacy (FOIPOP)

Managed WAN SLA. Contents

Contents. 1 General Terms. Page 1 of 8

1.0 Executive Summary. 2.0 Features and Benefits

SPECIAL EVENT PERMIT APPLICATION

INFORMATION SECURITY- DISASTER RECOVERY

Fairmarkit Quick Quotes. Sourcing & Procurement

BLACKSBURG. electronic village. Community Network Development Guidelines. Technical Report April, An outreach effort of

TENDER DOCUMENT NATIONAL INSTITUTE OF PUBLIC FINANCE AND POLICY. New Delhi SUPPLY OF LAN EQUIPMENTS AND INSTALLATION OF LAN IN THE CAMPUS

Tender Schedule No. Figure: Active-Active Cluster with RAC

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Cisco QuickStart Implementation Service for Tetration Analytics Medium

RFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service

BID. Electronically Submitting a Building Permit Application Using COJ s Building Inspection Division s Electronic Permitting and Plan Review System

Title: Construction Hazard Analysis and Job Safety Analysis

Request for Proposal (RFP) Contents

Invitation for Bids Amendment #1

Los Angeles County One Gateway Plaza 213.gzz.zooo Tel Metropolitan Transportation Authority Los Angeles, CA gooiz-2952 rnetro.net

RfP No. APSFL/CCTVPMA/231/2016, Dated:

Clemson University Procurement Services

Certified Commissioning Technician (CxT) Application

TENDER FOR RENEWAL OF EXISTING KASPERSKY ANTIVIRUS LICENSES FOR USE AT NIT, KARACHI

Request for Proposal Palos Heights School District 128 Network Infrastructure and WIFI E-Rate Form 470: Palos Heights, IL 60463

Request Conditional Use Permit (Colleges & Universities, public or private) Staff Planner Ashby Moss

Kingdom of Saudi Arabia. Licensing of Data Telecommunications Services

None at this time AMENDMENTS

National Information Assurance (IA) Policy on Wireless Capabilities

Survey on Patient Safety Culture Database Data Use Agreement

Scheme Document SD 003

WORK AUTHORIZATION NO. 4 CONTRACT FOR PROFESSIONAL ACCOUNTING SERVICES

Independent Contractor Questionnaire

MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014

Transcription:

Data and Voice Line Installation Procedure OBJECTIVE SCOPE Data and Voice Line Installation Procedure Information Services Technical Revision History Date Detail of Change Change Made By 1/14/11 Revision 1: Initial publication Nigel Robertson 1/27/11 Revision 2 Jesica Shin Location The IT Service Delivery & Customer Service division of the Information Services department manages all data and voice line installation at Downstate Medical Center. Three buildings make up the main campus at DMC: University Hospital, Basic Sciences Building, and Health Sciences Education Building. There are two student dormitories on Lenox Road across the street from Health Sciences Education Building, an Administrative trailer located on East 34 th Street, and Financial Administration located at 711 Parkside Avenue. DMC also has 5 satellite clinics throughout Brooklyn: Throop Avenue in Bedford- Stuyvesant; Lefferts Boulevard in Crown Heights; Nostrand Avenue in East Flatbush Midwood; and 710 Parkside Avenue in Flatbush. Downstate Hospital also recently acquired SUNY Downstate at Bay Ridge and Long Island College Hospital (LICH) in Downtown Brooklyn. Each location has a managed data and voice infrastructure that provides users access to both data and telecommunications services located at the main campus. All requests for additional data and voice resources are made utilizing DMC s Customer Support Services via Track- IT. Contract The Office of General Services, http://www.ogs.state.ny.us/, provides a listing of data and voice line installation vendors. Award Number 02135, Group 77007: http://www.ogs.state.ny.us/purchase/snt/awardnotes/7700702135pm.pdf The Customer Support center provides documentation outlining policy and procedure for the installation of data and voice lines infrastructure at Downstate Medical Center. This information is provided to all vendors that are awarded projects for the installation of both data and voice lines on DMC premises. The Office of Facilities Management and Development also provides a policy that must 1

be followed for all installations of cable infrastructure within Downstate Medical Center premises. This document can be obtained from either Customer Support Center or FM&D. Data and Voice Line Request 1. Request for data and/or voice lines are initiated by contacting the Customer Support Center with a work request using the Self Service site at http://is.downstate.edu/helpdesk, e- mailing HelpDesk@downstate.edu, or calling 718-270- HELP(4357). 2. Users should use the following template when submitting a work request: Example Subject: Install (1) Data Line in BSB 6-81 (the number of data lines enclosed with brackets; the building location e.g. UHB, BSB, or HSEB, followed by the room number). If voice lines are required, the user should follow the same format e.g. Subject: Install (1) Voice Line in BSB 6-81. 3. The same information from the subject should be duplicated in the body of the work request. Any special requirements or additional contact information that may be required for the installation should be included in the body. If installations are required in different locations throughout the campus, the initial location should be provided in the subject, duplicated in the body, followed by the other locations using the same format as the subject. 4. Users are provided with a Track- IT work order number. This work order number is required to reference any information located in the users request. 5. The installation of data and/or voice lines require 4 to 6 weeks from initial request after funding is approved and secured. Vendor Selection 1. The Office of General Services provides a How To document outlining the procedures used in obtaining quotes from contracted vendors. http://www.ogs.state.ny.us/purchase/snt/awardnotes/7700702135can.pdf 2. The Authorized User will review the list of discount rates from the vendors for products from the Contract Award Notification. The Authorized Users are encouraged to utilize product of the lowest bidder first whenever possible, consistent with the needs of Downstate Medical Center. 3. The Authorized User should contact all vendors to perform a mandatory site visit and provide a cost quote using the document provided by the Office of General Services. The cost quote should itemize the cost of installation based on the contract unit pricing. The contractor will enter a best and final quote on form CS68C that is equal to or less than the unit pricing total. 2

4. When a price quote is received from the vendor, it shall be attached to the Track- IT work order and forwarded to the requesting department via email. The requesting department is required to process the quote in preparation for obtaining a purchase order number for the work requested. Work Permit Request 1. Requirements for Issuance of Construction Permit for Installation of Utility Components - University Hospital (to be used in conjunction with SOP # S- 313) 2. Prior to construction, the contractor shall submit to the Office of Design & Construction the following: Small- scale drawings (1/32"=1') showing complete routing of all utility components being installed. Small scale drawings are obtainable by contacting the Office of Design & Construction (typical). Routing should indicate all locations where contractor is penetrating partitions (walls, floors, ceilings, shafts, closets etc.). Specification for each and every utility component being installed. Specification for all fire stopping, penetration sealants, masonry filler materials, etc. intended to be used to close penetrations. Name and pager or cellular phone number of the superintendent or foreman who will be present during contraction activities. NO CONSTRUCTION WILL BE PERMITTED WITHOUT FOREMAN PRESENT. Foreman and other personnel will be required to sign- in daily in logbook in the Office of Design & Construction Names of all personnel scheduled to work on this project required for Issuance of Temporary I.D. 3. Once all of these items are received and approved by the Office of Design & Construction, a construction permit will be issued for the project. Temporary I.D. cards will be issued for contractor s personnel. In addition, foreman shall be instructed on sign- in requirements for construction access. 4. Upon completion of project, the Customer Support Center shall arrange with the Office of Design & Construction through contracting department, a final walk- thru of the project. Contractor will be responsible to provide access for spot- checking of the following details by the Office of Design & Construction: 3

Fire stopping of a representative sampling of penetration locations indicated on small- scale drawings. It shall be the campus determination as to how many spots will be checked to determine the adequacy of fire stopping. Support of the utility components above ceiling. Contractor shall install all components in accordance with all requirements (support, placing in proximity to other conduits, pipes and wiring, etc.) of the applicable codes. Ceiling closure/replacement after the installation. Contractor shall repair or replace all ceilings in areas required to be opened for installation of cabling. 5. If all of these items are reviewed and deemed satisfactory by the Office of Design & Construction, contractor will be asked to provide a written certification to the campus stating that the utility components have been installed in accordance with the referenced code. NO PAYMENTS WILL BE AUTHORIZED TO CONTRACTOR PRIOR TO RECEIPT OF SUCH WRITTEN CERTIFICATION OF CODE COMPLIANCE. Upon receipt of contractor s certification, the Office of Design & Construction will authorize contracting department to process payment. Phase I - Pre- Construction 1. Data Cable Manager to develop scope of work for project, which must include FM&D Policy and Procedure. 2. FM&D to review scope of work, contract requirements and submit comments to Data Cable Manager. 3. Data Cable Manager to coordinate final scope of work with Contracts & Procurement and FM&D prior to issuance of P.O. by Contracts & Procurement. Phase II - Construction 1. Kick- off meeting with vendor to be scheduled by Data Cable Manager with FM&D inspector and other support staff. The following requirements are needed at the kick- off meeting to assess work schedule for the day and to ensure that all penetrations have been fire stopped at the end of each day. 2. Data Cable Manager to meet with contractor in morning and at the end of each workday. The vendor/contractor must fill out the daily sign in sheet, which is kept in the Design & Construction Office (BSB Room 1-15). The FM&D inspector must provide his comment at the 4

end of each workday. FM&D inspector to provide completion certification of project (Charles Reed). 3. At the completion of the outlined contracted work, a final site survey is required by the office of Facilities Management and Development to complete the data and/or voice line installation. When all criteria, as stated in (FMD document), have been fulfilled, recommendation for payment of invoices applied to the users request can be met. Reporting and Data Collection 1. All contracted vendors are required by Downstate Medical Center to provide, in electronic format, test results for all data and/or voice lines that are installed during the duration of the contracted work. Test results are property of Downstate Medical Center and are required to confirm and validate all work done by contracted vendors. 2. Requestors can obtain up- to- date status reports on the progress of all contracted projects by either accessing the Self Service site at http://is.downstate.edu/helpdesk or calling the Customer Support Center at 718-270- 4357 (HELP). 5