Data Centre Monitoring. Nexans Cabling Solutions

Similar documents
Data Centre Solutions Expertly Engineered APC Management Software

MEASURE MONITOR UNDERSTAND

Remote Management of Data Center White Space: What to Manage and How? Ashish Moondra Sr. Product Manager Chatsworth Products

Repeatable IT Hub Rooms

Data Center Infrastructure Management (DCIM) Demystified

Power Monitoring in the Data Centre

Data Centre Energy & Cost Efficiency Simulation Software. Zahl Limbuwala

Polar PDUs POWER MANAGEMENT

Emerson Network Power Rack PDU Solutions Rack Power Distribution For Critical IT Equipment. AC Power For Business-Critical Continuity

Power Monitoring in the Data Centre: Is the Right Time Now? Jacarta Ltd

Repeatable IT Hub Rooms

Over IP Group. Data Centre Infrastructure Management (DCIM)

Best Practices for Managing Data Centres

White Paper How IP is impacting Physical Access Control

Data Centre & Colocation in Birmingham. Flexible. Secure. Accredited.

Product Brochure Eaton 93PR UPS kw

EDX DC-3 environmental monitoring solution

Case Study Automating Data Centre Infrastructure Diagrams

Verizon Perspectives on Smart Infrastructure. Anthony J. (Tony) DiMaso Advanced Energy Conference November 19, 2009

Metered Rack PDU Rack PDU, Metered, Zero U, 10A, 230V, (16) C13

:: While reducing energy costs remains a factor, the most commonly reported driver of DCIM investment plans is capacity planning -Gartner*

Innovative. Engineering. Power. structure source. Making the complex, simple. Structure Source PDU s

RF Code Delivers Millions of Dollars in Annual Power & Cooling Savings for CenturyLink

Power IQ for econnect

Cloud Computing Briefing Presentation. DANU

European Data Centre Infrastructure Standards EN series. Rob Cardigan, Senior Product Manager Nexans Cabling Solutions

CA ecometer. Overview. Benefits. agility made possible. Improve data center uptime and availability through better energy management

The Greening of Services

B&R Enclosures Pty Ltd. The Benefits of Intelligent PDUs White Paper

APC by Schneider Electric Elite Data Centre Partner

Increasing Energy Efficiency

dctrack Proactively Manage, Control Change and Reduce Costs In Your Data Center Overview Benefits Fastest and Easiest User Interface

David Palmer-Stevens System Integrator Manager EMEA Tel: Mob:

DS Series Solutions Integrated Solutions for Secure, Centralized Data Center Management

Engineering and Manufacturing Excellence in Data Centre Infrastructure

DCIM and how it helps deliver the InteropNet. Paul Goodison CEO, Cormant Inc CORMANT

Features and Benefits: Power IQ DCIM Monitoring Solutions

Physical Infrastructure Management Solutions

Managing The Infrastructure Of Data Centers

Tridium - Introduction

84 kw, Tier 3, Direct Expansion, 937 ft 2

San Francisco Chapter. What an auditor needs to know

Predictive Resilience: Leveraging Integrated DCIM to Reduce Data Center Downtime

DCIM Data Center Infrastructure Management Measurement is the first step

Welcome to a world where technology flows through the heart of your business environment. Welcome to CDC

Emergency Cooling Centres

Metered Rack PDU Rack PDU, Metered, Zero U, 20A, 120V, (24) NEMA 5-20R

DCIM Data Center Infrastructure Management

Features and Benefits: dctrack DCIM Operations Solution

Sept 29, Schneider Electric s Micro Data Center Solutions

Metered Rack PDU Rack PDU, Metered, Zero U, 5.7kW,208V,(36)C13& (6)C19; 10' Cord

Green IT and Green DC

Comprehensive Data Center Energy Management Solutions

Data Centre Solutions. Data Centre Solutions Expertly Engineered

2015 Best Practice Guidelines

IT S TIME FOR DATA CENTRE SUPPORT

Data Center Infrastructure Management (D.C.I.M.)

Kako optimizovati operativni rad data

Welcome to a world where technology flows through the heart of your business environment. Welcome to CDC

Geist EMEA. Geist USA. Geist APAC

Documenting and Managing Infrastructure Connectivity

CLOUD ECONOMICS: HOW TO QUANTIFY THE BENEFITS OF MOVING TO THE CLOUD

Information Security Risk Strategies. By

DATA CENTRE & COLOCATION

The Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation

PIM Pretium Intelligent Management

SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER

Gallagher Vapour Recovery Monitoring

Metered Rack PDU Rack PDU, Metered, Zero U,12.5kW,208V,(30)C13, (6)C19; 10' Cord

Checklist for building an edge data center

Data Centre Energy Efficiency. Duncan Clubb EMEA Data Centre Practice Director CS Technology

Architecting for Data Center Agility. Ted Ritter Senior Research Analyst

SmartZone Rack Energy Kits Energy and Environmental Monitoring for Small Data Centers

BUILDING ENGINEERING SERVICES 2018/19

COMPTIA CLO-001 EXAM QUESTIONS & ANSWERS

<Insert Picture Here> Managing Oracle Exadata Database Machine with Oracle Enterprise Manager 11g

Fully managed Cloud-based business software solution

SALAMANDER. Automated Infrastructure Management

EU Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.1.0

Keeping the lid on storage

IBM Site Enablement Services

Windows Vista and the Optimized Desktop. Danny Beck Senior Enterprise Windows Manager Microsoft Australia

Rack Colocation Hosting. Data Centre Solutions Expertly Engineered

INNOVATE FASTER COMPETING FOR THE IT WORKLOAD BUSINESS. Hosted Cloud, Managed Service Providers & Colocation Data Centers

ROI CASE STUDY MAY Logicalis Achieves 159% ROI* with CA DCIM Solution

A Pragmatic Path to Compliance. Jaffa Law

01.0 Policy Responsibilities and Oversight

Architecting for Data Center Agility. Ted Ritter Senior Research Analyst

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

How Liquid Cooling Helped Two University Data Centers Achieve Cooling Efficiency Goals. Michael Gagnon Coolcentric October

Committed to Energy Efficiency

Next Generation Data Center Facilities Design. Presenter: Ping Lin

HeartSafe SMART Defibrillator Cabinet. HeartSafe SMART Outdoor Cabinet

Data Center Market Transformation from On Premises to Colocation & Cloud. Tom Kelly & Tom Walsh/ 6 March 2018

Schneider Electric Data Center Software

Cisco Prime for Enterprise Innovative Network Management

Measurement and Management Technologies (MMT)

EDGE LM XLMA Series Data Module

IT optimization White paper May Optimize energy use for the data center through enhanced measurement and management

WIRELESS ENVIRONMENTAL MONITORS

Transcription:

Data Centre Monitoring Nexans Cabling Solutions

Agenda Changes in LAN usage & management implications Business issues How LANsense can help

Traditional model Remote Access GSM CCTV Storage Wireless IT Facilities Fax Phones Switches Access Terminals Environmental Control

and now The IP World IT / Facilities more devices more applications more complexity

Business Issues Business issues: Compliance and Control in an increasingly complex environment Ease of Deployment of new services Asset Management and Utilisation Environmental Regulation Capacity Planning Business Goals: Reduced operational costs through business process improvement

Compliance and Control The ability to control change is without doubt, the major contributor to business value BCS Managing change manually is more challenging: More complex multiple services More sensitive to change Increased documentation overhead More sensitive to incorrect interconnection

Regulation & Compliance Regulatory and compliance requirements all emphasise the need for automated control Sarbanes Oxley BASEL II ITIL CRC, Green IT, EU Code of Conduct etc Standardisation changes ISO 14763-2, EN 50174 Part 1etc

ISO 14763-2 Documentation requirements Installation Fixed cable elements 2 to 200 201 to >20000 (for Cx divide by 4) 20,000 Office 2 2 3 Industrial 3 3 3 Home 1 1 1 Multi-tenant residential 2 2 3 Data Centre 2 2 3 Level 3 requires electronic records of fixed cables

ISO 14763-2 Documentation requirements Operation Administered Ports 2 to 100 101 to 5000 >5001 Office 1 2 3 Industrial 1 2 3 Home 1 1 1 Multi-tenant residential 1 2 3 Data Centre 2 3 3 Level 3 requires electronic records of fixed and moveable cables Enhanced level requires electronic records of fixed cables and AUTOMATED cord management

Ease of deployment of new services The challenge is one of coordination delays Systems, Operations, & Facilities teams involved Often uncoordinated Typical new deployment time maybe 90-180 days LANsense can significantly reduce these delays Assistance with planning and workflow Automated provisioning of some services

Asset Management and Utilisation What have I got? Where is it? Is it being used efficiently? Do I really need to upgrade? Increasing need for accurate, automated records. Self documenting in real time

Environmental Issues Green IT initiatives demand the ability to measure and potentially control power usage Carbon Reduction Commitment imposes penalties for inefficient usage of power EU Code of Conduct Potential Unbilled Revenue Stream in Co-Lo or Co-Host environment

Capacity Planning How much space to I have in my Data Hall? How much space do I have in my racks? How much spare power capacity do I have in my racks? How much additional heat output can my cooling absorb? What services or applications run on which servers? How can I ensure that planned changes are enacted correctly?

How can it help? Intelligent Infrastructure Management

LANsense IIM Solution IIM provides visibility of a physical network by automatically detecting, locating and alerting on any network 'event Integrated EMAC solution Works alongside existing network management tools Extends IT operational efficiency to the physical layer Forms a core part of your CMDB interoperates with other management systems to create an Intelligent Event Manager

What physically is IIM?

LANsense Software screen-shot LANsense displays CAD graphics of devices, connectivity and physical locations

IIM as a CMDB component Planning Change Control Monitor & Alert Records & Audit IIM Platform

IIM relationship to EMAC IIM Platform Monitor & Alert Physical Layer Network Layer Power Temp & Humidity

Why Do I Need It? TIA 942 Data Centre Infrastructure Standard Guidelines for cabling, HVAC, power etc. Green data centre initiatives Over provision/specification, leads to additional provision and running costs. Tax initiatives Carbon Trust, Enhanced Capital Allowances. http://www.eca.gov.uk/etl Accurate planning based on real data, not manufacturer plate ratings. Better use of expensive data centre space. Manufacturer rating often 150% of requirement.

Why Do I Need It? EMAC provides early warning of heat/humidity/power changes within the data centre. Proactive warnings by email/sms etc. Improved control PDU outlets turned off until required no unknown equipment powered from the racks Cabinet access managed who is doing what in the cabinets? Accurate power resource monitoring - physical capacity and power draw. Powerful add-on to IIM Information from EMAC displayed real-time in IIM

Platform based technology plug & play Nexans LRM SNMP Agent Humidity Sensor Monitored and controlled power strips Temperature Sensor Keypad/HID Card Reader Electronic Door Lock In Line Power Monitoring LCD Status Display 22

Meeting business goals Where to invest? 30% Assets & Innovation 70% Maintenance keeping the lights on Source: Gartner - IT Infrastructure, And The Shift To Real-Time Source: : IDC Virtualization 2.0 The next phase in customer adoption. Courtesy of IBM Maintenance costs increasing. LANsense ROI time progressively decreasing

Summary Networks becoming more complex More need to control More difficult to manage Maintenance costs increasing LANsense Helps manage change Simplifies new service deployment Improves asset management and utilisation delivers reduced operational cost

LANsense Take Control of Your Network Nexans Cabling Solutions