North Gila-Imperial Valley #2 Transmission Project

Similar documents
TransWest Express Transmission Project Interregional Transmission Project Submittal

P. O. Box 52025, MS POB100 Phoenix, Arizona (602) Feb 9, 2018

SRP Ten Year Transmission Plan

Project Presentation April, 2017

Arizona Public Service Company Ten-Year Transmission System Plan Docket No. E-00000D

Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Updates and Modifications to Report

149 FERC 61,157 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING STIPULATION AND CONSENT AGREEMENT

Q44 Generation Interconnection

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

Alberta Electric System Operator Secord 2005S Substation Needs Identification Document

Competitive Solicitation Process Enhancements. Status Update / Issue Paper

Standards Authorization Request Form

SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS

Presentation to Local/State/Federal Agency Mtg November 10, 2015

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company

ATC Zone 2 Projects Update U.P. Energy Summit

Reston Town Center North Development. Community Update

Public Service Company of New Mexico

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Standard CIP Cyber Security Critical Cyber As s et Identification

Updates and Modifications to Report

Executive Summary. City of Goodyear. Prepared for: Prepared by: November, 2008 Copyright 2008, Kimley-Horn and Associates, Inc.

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Arizona Public Service ) Docket No. ER Company )

Stem Beach Solar 1041 Application

History of NERC January 2018

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update

Physical Security Reliability Standard Implementation

TransWest Express and Gateway South

ITC HOLDINGS, CORP. Edison Electric Institute 9

Rocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Mountain West Transmission Group. WECC MIC Update October 17, 2017

SUNZIA SOUTHWEST TRANSMISSION PROJECT PROJECT UPDATE NEW MEXICO RETA David Getts General Manager SouthWestern Power Group

ADDENDUM # 3. To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar at JFK Long-Term Parking Lot:

WECC Criterion INT-001-WECC-CRT-3

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update

Standard CIP Cyber Security Critical Cyber As s et Identification

Western Interconnection

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

INTERCONNECTION FACILITIES STUDY REPORT

Western DSW Planning St k er eeti ting (Western OATT Attachment P) June 9, 2011

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Compliance Enforcement Initiative

ATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study

Corridor Management Committee. January 12, 2017

Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused

Interconnection and Transmission

National Load Despatch Centre Power System Operation Corporation

July 1, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

GROUND FAULT CIRCUIT INTERUPTERS

Standard CIP Cyber Security Incident Reporting and Response Planning

TSR A & B - FACILITIES STUDY REPORT

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

Workshops. 1. SIGMM Workshop on Social Media. 2. ACM Workshop on Multimedia and Security

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

North American Energy Standards Board

Los Angeles County One Gateway Plaza 2i3.g Tel Metropolitan Transportation Authority Los Angeles, CA metro.net

Mountain West Transmission Group. Tim Vigil RT Merchant Manager Western Area Power Administration

Memorandum. This memorandum requires Committee action.

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

OPPD Board Committee Meeting April 13, 2017 Transmission Right of Way Acquisition & Routing, Siting and Public Involvement Stakeholder Engagement

APPENDIX E: DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION COMMENT LETTERS AND RESPONSES

1200 West 7th Street, Los Angeles, CA Smart.

Year Assessment Preliminary Needs

Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Standard COM-002-2a Communications and Coordination

Critical Asset Identification Methodology. William E. McEvoy Northeast Utilities

History of NERC December 2012

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Standard CIP-006-4c Cyber Security Physical Security

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Standard Development Timeline

February 25, Subject: Southern California Edison 2015 Annual Progress Report

Dallas City Council August 2, Jody Puckett, Assistant City Manager (I) City Manager s Office

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service

PacifiCorp Transmission Energy Gateway Update. John Cupparo Vice President, Transmission January 2010

Executive Summary Primary Statements

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

ENMAX Power Corporation

Ells River Substation Telecommunication Tower

GMLC Planning and Design Tools John Grosh GMLC Planning and Design Tools Technical Area Lead

Planning Department Civic Center North 470 South Allison Parkway Lakewood, Colorado TTY/TDD Lakewood.

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

Recommendation to Board. Final Action

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Silicon Valley Power:

Discussion Guide. Benvoulin Substation Project.

ARRA State & Local Energy Assurance Planning & Implementation

MISO-PJM Cross-Border Planning. February 19, 2014 MISO-PJM JCM

Transcription:

North Gila-Imperial Valley #2 Transmission Project WECC 2015 Annual Progress Report Submitted by: Southwest Transmission Partners, LLC. ISSUED: March 4, 2015

Table of Contents I. Introduction--------------------------------------------------------------- 1 II. Project Description ------------------------------------------------------------------ 2 III. Plan of Service ----------------------------------------------------------------------- 3 IV Project s Current Status-------------------------------------------------------------- 4 V. Planned Project In-Service Date -------------------------------------------------- 4 VI. North Gila-Imperial Valley #2 Network Configuration------------------------ 5 List of Figures Figure 1: The North Gila-Imperial Valley #2 Network Configuration Figure 2: The North Gila-Imperial Valley #2 Potential Corridor i

North Gila-Imperial Valley #2 500 kv Project WECC 2014 Annual Progress Report I. INTRODUCTION The North Gila-Imperial Valley #2 Transmission Project ( Project ) is being proposed as a 500kV AC transmission project between southwest Arizona and southern California. The proposed in-service date for the project is Q4 2019. The Project is being proposed by Southwest Transmission Partners, LLC ( Project Sponsor ). On April 7, 2011, Project Sponsor initiated the WECC Project Coordination Review process for the proposed North Gila Imperial Valley #2 ( NG-IV #2 ) Project. The Project Sponsor solicited interest to WECC members in forming a Project Coordination Review Group ( PCRG ) to review the project as it conforms to the WECC PCR guidelines. The group was formed and a meeting was held in Phoenix, Arizona on June 24, 2011, subsequently to the Hassayampa North Gila #2 PCRG meeting. The results of that meeting and the subsequent comments from WECC members formed the basis of the NG-IV#2 PCRG report. On August 1, 2011, the Project Coordination Review Group Report for the Project was provided to PCC for a 30-day comment period. This comment period allowed WECC members the opportunity to review and comment on the project s conformity with the Project Coordination Review Guidelines. Only one comment related to the PCRG Participant list was received during the 30-day comment period, and has been incorporated in the final report and shared with the PCRG. On September 2, 2011, PCC accepted the North Gila Imperial Valley #2 Project regional planning compliance report as complete. The proposed addition of the Project is a major intertie expansion between the southern Arizona area and southern California area. This project will become an additional component of the West of Colorado River (WOR) path (WECC Path 46) and is expected to provide the benefit of increasing reliability and transfer capability between Arizona and load centers in southern California. The addition of this NG-IV#2 transmission project is also envisioned to increase the East of Colorado River (EOR), or WECC Path 49, transfer capability and the Project Sponsor is working closely with the sponsors of the Hassayampa-North Gila #2 (HA-NG #2) transmission project, Arizona Public Service and Imperial Irrigation District, to coordinate the respective projects in the Three Phase Rating Process. The HA-NG #2 Project is now in Phase 2 of the WECC rating process, and has required that the NGIV#2 Project revise its pre-project base case with the HA- NG #2 in service. 1

The project is envisioned to provide the following benefits: 1) Provides California additional access to export/import from generation resource zones where limited transmission access exists 2) Increases diversity of the regional energy resource zones 3) Increases the reliability and import capability to the Southern California Import Transmission system 4) Make efficient use of existing available transmission corridors In compliance with the WECC Procedure for Project Rating, a comprehensive progress report is anticipated to be prepared in October, 2015 and submitted to the WECC for approval according to the WECC Path Rating Process. II. PROJECT DESCRIPTION The 85 mile NG-IV #2 500kV project is a major intertie expansion between the North Gila area (southwest Arizona) and the Imperial Valley area (southern California); this line would parallel the existing North Gila-Imperial Valley line (also known as the Southwest Power Link, or SWPL), with an expected minimum separation of 250 feet from the existing SWPL. The potential for a second circuit would be proposed to be constructed on the same set of structures, and would potentially loop in and out of the existing Highline 230 kv substation along the Highline Canal. The second circuit could be operated at 230kV initially until the operational and scheduling need develops over the years to potentially operate at 500kV. An additional alternative that we have been asked to review by the PCRG is to have a single 500kV line and with the loop-in to the existing Highline 230kV station. Review is currently underway of this configuration. 2

III. PLAN OF SERVICE The detailed plan of service for the proposed NG-IV#2 Transmission Project will be finalized by the NG-IV#2 participants over the next several months and documented in a more detailed Comprehensive Progress Report to be completed around October, 2015. SWTP anticipates that NG-IV#2 will consist of the following facilities: A. Double Circuit Configuration (500kV or 230kV or both): 1) Constructing a new 85-mile 500 kv AC up to a double-circuit line from the North Gila substation near Yuma, AZ to the Imperial Valley substation near El Centro, CA. One of the two circuits (north side of the structures) could initially be operated at 230 kv. Series compensation will be added to balance the flows on the two circuits, a minimum of 50% series compensation will be included. 2) Approximately 30 miles east of the Imperial Valley substation, one of the new circuits described above may loop into the existing IID-owned Highline 230 kv substation near Holtville, CA. This line will be approximately 8 miles long. If this circuit is built and operated as a 500 kv line, a new 500 kv substation would be constructed immediately adjacent to the existing Highline 230 kv substation owned and operated by the Imperial Irrigation District (IID). An electrical interconnection via a new 500/230 kv transformer would be utilized to interconnect the new substation with the existing IID substation. B. Single Circuit Configuration (initially could also be operated at 230kV): 1) Constructing a new 50-mile 500 kv AC single-circuit line from the North Gila substation near Yuma, AZ to the existing Highline 230kV substation near Holtville, CA. A new 500 kv substation would be constructed immediately adjacent to the existing Highline 230 kv substation owned and operated by the Imperial Irrigation District (IID). An electrical interconnection via a new 500/230 kv transformer would be utilized to interconnect the new substation with the existing IID substation. Series compensation will be added to balance the flows on the new circuit and the existing SWPL, a minimum of 50% series compensation will be included. 2) Constructing a new 35-mile 500kV AC single-circuit line from the Highline 500kV substation to the Imperial Valley substation near El Centro, CA. 3

IV. PROJECT S CURRENT STATUS The North Gila-Imperial Valley #2 Transmission Project is continuing to pursue completion of the WECC 3-phase rating process by the end of 2016. Currently, the Phase 1 Rating Study is in progress in conjunction with the Phase 1 Rating Study of the HA-NG#2 Project (led by APS). A comprehensive progress report is expected to be completed by the end of October 2015. It is anticipated that the Phase 2 simultaneous and sensitivity studies and achieve an Accepted Rating (Phase 3) would be completed by the end 2016. The Project is currently evaluating potential alternative routes and working with the responsible regulatory agencies to obtain the necessary Project approvals. V. PLANNED PROJECT IN-SERVICE DATE The North Gila-Imperial Valley #2 Transmission Project is anticipated to be in commercial service by the fourth quarter of 2019. 4

VI. NORTH GILA-IMPERIAL VALLEY #2 AC NETWORK CONFIGURATION A one-line diagram for the North Gila- Imperial Valley #2 Transmission Project is depicted in Figure 1. FIGURE 1: NORTH GILA-IMPERIAL VALLEY #2 500 kv ONE-LINE DIAGRAM 5

VII. NORTH GILA-IMPERIAL VALLEY #2 POTENTIAL CORRIDOR The following map, Figure 2, is the current potential corridor under evaluation for the North Gila Imperial Valley #2 Project. FIGURE 2: NORTH GILA-IMPERIAL VALLEY #2 500 kv POTENTIAL CORRIDOR 6