1 PacifiCorp Transmission Energy Gateway Update John Cupparo Vice President, Transmission January 2010
2 Topics Overview and current status Rightsizing Challenges and opportunities Summary 2
3 Energy Gateway Overview Key Principles Secure capacity for the long-term benefit of customers Load service needs first, regional needs second Support multiple resource scenarios Secure regulatory and community support Build it Energy Gateway is a transmission strategy within the integrated resource plan Energy Gateway is an essential, reliability backbone for energy delivery Energy Gateway is under construction and progressing on several fronts 3
4 Energy Gateway Progress Update Gateway Central: Populus to Terminal (Segment B) 135 miles double-circuit 345kV construction In-service date Phase 1 June 2010 Phase 2 December 2010 Status Contract awarded October 2008 Commenced February 2009 On schedule and within budget 80% of foundations and structures installed 50% of conductor pulled All access roads built Three substations on schedule Regulatory recovery process underway 4
5 Energy Gateway Progress Update Populus substation (Downey, Idaho) Sized to integrate Populus to Terminal, existing Bridger West lines (from Wyoming) and future Gateway West 500kV line (from Wyoming) 5
6 Energy Gateway Progress Update Gateway Central: Mona to Oquirrh (Segment C) 114 miles double-circuit 345kV and single circuit 500kV construction In-service June 2013 Status Permitting and bid process underway Contract award target October 2010 Key risks/issues Federal and local permitting timing Sigurd to Red Butte (Segment G) 165 miles single circuit 345kV In-service June 2014 Status Federal permitting underway Key risks/issues Load growth timing 6
7 Energy Gateway Progress Update Gateway West: Windstar to Populus to Hemingway (Segment D & E) 1,050 miles single-circuit 500kV and single circuit 230kV In-service December 2014 December 2018 Status Permitting underway Key risks/issues Public resistance to wind and transmission development Policy conflicts with energy, environmental and land use Elongated permitting process Potential for increased federal participation 7
8 Energy Gateway Progress Update Gateway South: Aeolus to Mona (Segment F) 395 miles single circuit 500kV construction In-service December 2017 December 2019 Status Permitting initiated Westside: Hemingway to Captain Jack (Segment H), Walla Walla to McNary (Segment A) 431 combined miles single circuit 500kV and single circuit 230kV construction In-service 2019 or after Status Regional planning underway Negotiating joint development with other transmission providers 8
9 Rightsizing Phase 1 Load service needs Phase 2 Expanded for third parties 9
10 Single-circuit tower Rightsizing Constructability Double-circuit tower 10
11 Rightsizing Managing Rate Impacts Estimated Transmission Rates $/kw-year $150.0 $125.0 $100.0 $75.0 $50.0 $25.0 $ Current Wy-Ca Pancaked Rates Estimated Rates with Upsized Gateway Estimated PacifiCorp Rates w/ Gateway Est. Upsized w/ 3000 MW Wheeling Rates are indicative and should not be considered official 11
12 Challenges and Opportunities Regional and federal influence on planning, permitting and cost allocation Balancing environmental, energy and reliability policies Stakeholders balkanizing on resources and transmission Stakeholders unable to differentiate between multiple proposed transmission projects 12
13 Summary Energy Gateway is an essential, reliability backbone for energy delivery Delivery capability in place to deliver Energy Gateway Energy Gateway is under construction and progressing on several fronts Key principles have been consistently validated Indefinite delays will require alternatives to meet obligation to serve Regulatory recovery process underway Regional support required to deliver larger segments 13
RFP Attachment 13. January 2010
PacifiCorp Transmission Technical Workshop RFP Attachment 13 January 2010 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated t dresource Plan Attachment 13 Point of Receipt
More informationPacifiCorp Transmission Technical Workshop
PacifiCorp Transmission Technical Workshop RFP Attachment 20 February 22, 2012 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated Resource Plan Attachment 20 Point of Receipt
More informationTransWest Express and Gateway South
TransWest Express and Gateway South Co-developed by four leading entities: Arizona Public Service PacifiCorp National Grid Wyoming Infrastructure Authority Regional Stakeholder Meeting January 23, 2008
More informationRocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH
Exhibit RMP (RTL-1) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Rick T. Link May 31, 2017 Pre-Issuance Bidders Conference Presentation
More informationLC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update
October 30, 2018 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: LC 67 PacifiCorp s Compliance Filing New Wind and Transmission
More informationLC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update
January 7, 2019 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: LC 67 PacifiCorp s Compliance Filing New Wind and Transmission
More informationTransWest Express Transmission Project Interregional Transmission Project Submittal
TransWest Express Transmission Project 2016 2017 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March
More informationBoardman to Hemingway Project Advisory Team
Boardman to Hemingway Project Advisory Team Central Project Advisory Team Meeting 5 Tonight s Objectives Review progress of the Community Advisory Process and discuss next steps Present analysis of revised
More informationLC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update
July 11, 2018 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: LC 67 PacifiCorp s Compliance Filing New Wind and Transmission
More informationNTTG 2019 Annual Interregional Information
NTTG 2019 Annual Interregional Information Annual Interregional Coordination Meeting Salt Lake City February 19, 2019 Topics NTTG s Planning Process Overview NTTG s 2018-2019 Draft Regional Transmission
More informationColumbiaGrid Planning Overview. Marv Landauer July 13, 2010
ColumbiaGrid Planning Overview Marv Landauer July 13, 2010 1 Overview The three levels of transmission planning Overview of ColumbiaGrid and its activities in the area of renewable generation integration
More informationProject Presentation April, 2017
Project Presentation April, 2017 Background and Summary Proposed 114 mile, series compensated 500 kv transmission line project Connects Arizona Public Service s Delaney Substation (Tonopah, AZ) to Southern
More informationMEMORANDUM. June 30, Council Members. Update on Transmission Planning Activities
Bruce A. Measure Chair Montana Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Dick Wallace Vice-Chair Washington Tom Karier Washington Melinda S. Eden Oregon Joan M. Dukes Oregon June 30,
More informationJuly 26, Dear Mr. Millar:
July 26, 2012 Mr. Neil Millar Executive Director Infrastructure Development California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Dear Mr. Millar: As you are aware, Clean
More informationFrom: Laura Manz, Vice President of Market & Infrastructure Development
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional
More informationEnergy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan
Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision
More informationIntegrated Resource Planning April 20, 2010
Integrated Resource Planning April 20, 2010 Judy Stokey, Executive Government and External Affairs Jack McGinley, Development Director, Renewables Gary Smith, Project Director-Smart Technologies Presentation
More informationWestern Interconnection
Transmission Planning in the Western Interconnection Supporting Resource Development NWCC/NCSL Transmission Policy Institute Byron Woertz, Senior Project Manager Denver, CO June 17, 2010 Overview A Few
More informationISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO
ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call
More informationNorth Gila-Imperial Valley #2 Transmission Project
North Gila-Imperial Valley #2 Transmission Project WECC 2015 Annual Progress Report Submitted by: Southwest Transmission Partners, LLC. ISSUED: March 4, 2015 Table of Contents I. Introduction---------------------------------------------------------------
More informationATC Zone 2 Projects Update U.P. Energy Summit
ATC Zone 2 Projects Update U.P. Energy Summit Brett French Regional Manager of External Relations Michigan October 16, 2012 Helping to keep the lights on, businesses running and communities strong Project
More informationSmall Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation
Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016
More informationMocuba The First Utility Scale PV Project in Mozambique
Scatec Solar ASA Mocuba The First Utility Scale PV Project in Mozambique October 26th, 2017 Scatec Solar - Integrated Independent Power Producer Scatec Solar develops, builds, owns & operates solar plants
More informationWestern Spirit Clean Line Project. Non Tariff Interconnection Facilities Study
Western Spirit Clean Line Project Non Tariff Interconnection Facilities Study September 2017 Work Performed by: Public Service Company of New Mexico Foreword This technical report is prepared for Clean
More informationINTERCONNECTION FACILITIES STUDY REPORT
INTERCONNECTION FACILITIES STUDY REPORT NORTHEAST WYOMING 250MW GENERATOR Prepared on Behalf of the Transmission Provider: Basin Electric Power Cooperative Transmission Black Hills Power Transmission December
More informationMemorandum. This memorandum requires Committee action.
California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure
More informationPublic Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM
Public Service Company of New Mexico Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities
More informationAPPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:
APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: New 240 kv Montana Alberta Tie Ltd. (MATL) Substation 120S and Reconfigure 240kV Transmission Line 923L AltaLink Management Ltd. 2611 3 rd
More informationRocky Mountain Power Docket No Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER
Rocky Mountain Power Docket No. 17-035-36 Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Direct Testimony of Kelcey A. Brown August 2017 1 2 3 4
More informationQ44 Generation Interconnection
A subsidiary of Pinnacle West Capital Corporation Q44 Generation Interconnection Interconnection Facilities Study APS Contract No. 52129 By Arizona Public Service Company Transmission Planning August 19,
More information1200 West 7th Street, Los Angeles, CA Smart.
Overview 1200 West 7th Street, Los Angeles, CA 90017 West 7 Center is conveniently located at 1200 West 7th Street in downtown Los Angeles near the 10 and 110 freeway. This tier III datacenter facility
More informationEntergy Arkansas, Inc. Transition Plan Technical Conference #1
Entergy Arkansas, Inc. Transition Plan Technical Conference #1 May 5, 2010 1 Why Technical Conferences? Complex subject matter Venue for stakeholders to develop an awareness and understanding of the issues
More informationMountain West Transmission Group. WECC MIC Update October 17, 2017
Mountain West Transmission Group WECC MIC Update October 17, 2017 Agenda Overview Mountain West Activities Mountain West Analyses Mountain West Next Steps 2 Mountain West Overview 3 What is the Mountain
More informationSTATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD In re The Narragansett Electric Company : : Docket No. SB-2017-01 () : Pre-Filed Testimony of Daniel Ewan, Clear River Energy
More informationThe Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.
d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No. 0 Testimony of Todd G. Kopoyan, P.E. February 0, 00 0 0 INTRODUCTION Q. Please state your name and business address. A. My name is
More informationBudget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017
2017-18 Budget Review Process (BRP) Preliminary List of Business Initiatives Stakeholder Meeting April 10, 2017 Purpose / Agenda The purpose of this presentation is to: Provide stakeholders with a BRP
More informationPublic Service Company of New Mexico
Public Service Company of New Mexico Open Transmission Planning Meeting November 2, 2017 Albuquerque, NM INTRODUCTION Public Stakeholder Meeting Order 890 Objective to improve transparency and stakeholder
More informationNew England Telehealth Consortium. Healthcare Connect Fund Network Plan
New England Telehealth Consortium Healthcare Connect Fund Consortium Overview The (NETC) is a regional healthcare consortium developed in 2007 in response to the creation of the FCC s Rural Health Care
More informationNortheast Coordinated System Plan and Other Interregional Activities
Northeast Coordinated System Plan and Other Interregional Activities IPSAC10 November 6, 2009 Michael I. Henderson and John Buechler Background on Interregional Planning Order 890 requires regional coordination
More informationPresentation to Local/State/Federal Agency Mtg November 10, 2015
Presentation to Local/State/Federal Agency Mtg November 10, 2015 Summary Proposed 114 mile 500 kv transmission project that will connect with Delaney Substation near Palo Verde Nuclear Generating Station,
More informationCorridor Management Committee. January 12, 2017
Corridor Management Committee January 12, 2017 1 Today s Topics Chair s Remarks 2017 Project Activity Overview Updated Corridor Flyover Video: Preview 2017 Meeting Schedule 2 3 Chair s Update 2016 Major
More informationLADWP POWER INFRASTRUCTURE PLAN
LADWP 2017-18 POWER INFRASTRUCTURE PLAN Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million
More informationKent Wind Energy Networking Event. Wednesday 26 th September
Kent Wind Energy Networking Event Wednesday 26 th September Consortium partners Dong Energy is a leading offshore wind developer, having built around half of all offshore wind farms globally. (50%) E.ON
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2016 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2017 Introduction The
More informationDecision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement
Decision 21617-D01-2016 Crystal Lake 722S Substation October 5, 2016 Alberta Utilities Commission Decision 21617-D01-2016 Crystal Lake 722S Substation Proceeding 21617 Application 21617-A001 October 5,
More informationSmall Generator Interconnection System Impact Study Report. Completed For Q0047
Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection
More informationENMAX Power Corporation
Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L September 15, 2017 Alberta Utilities Commission Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L Proceeding 22769 Application
More informationATCO Electric Ltd. Dawes Substation and Telecommunications Tower Project Facility Application
Decision 2014-039 Dawes Substation and Telecommunications Tower Project Facility Application February 19, 2014 The Alberta Utilities Commission Decision 2014-039: Dawes Substation and Telecommunications
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: January 30, 2019 Re: Decision on
More informationSmall Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility
Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS
More informationExpanding Transmission Capacity: Options and Implications. What role does renewable energy play in driving transmission expansion?
Expanding Transmission Capacity: Options and Implications What role does renewable energy play in driving transmission expansion? Beth Soholt Director, Wind on the Wires bsoholt@windonthewires.org Office:
More informationTSR A & B - FACILITIES STUDY REPORT
TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345
More informationColstrip Transmission System. Transmission Service and Interconnection Processes and Procedures
APPENDIX A COLSTRIP TRANSMISSION SYSTEM TRANSMISSION SERVICE AND INTERCONNECTION PROCESSES AND PROCEDURES Colstrip Transmission System Transmission Service and Interconnection Processes and Procedures
More informationOwner/Operator Forum 12 December
Owner/Operator Forum 12 December Steve Halsey DG Development Manager Today s Agenda Transition to DSO Breakout session What we do the role of the DNO Our vision Welcome and Introduction (DNO) Distribution
More informationNERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum
Transmission Availability Data System (TADS) Element Identifier Data Submission Addendum May 28, 2013 3353 Peachtree Road NE NERC Transmission Availability Data System (TADS): Element Identifier Data Submission
More informationProgress Report on the GCC Electricity Grid Interconnection in the Middle East
GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY Progress Report on the GCC Electricity Grid Interconnection in the Middle East by: Adnan Al-Mohaisen, GM, GCCIA Luc Chausse, Project Director, SNC-Lavalin
More informationWarrenton Wheeler Gainesville 230kV Reliability Project
Warrenton Wheeler Gainesville 230kV Reliability Project February 28, 2013 Key Messages Dominion Virginia Power and Northern Virginia Electric Cooperative (NOVEC) have been working together to address three
More informationSTATE OF MINNESOTA PUBLIC UTILITIES COMMISSION
STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION In the Matter of the Application of Getty Wind Company, LLC for a Site Permit for a Large Wind Energy Conversion System in Stearns County, Minnesota In the
More informationAppendix F Notices
Appendix F Email Notices 2015 2016 Scoping Period From: Sent: To: Subject: CoSu Line Project on behalf of CoSu Line Project Friday, December
More informationSilicon Valley Power:
Critical Facilities Roundtable Silicon Valley Power: Santa Clara s Hometown Advantage John Roukema Assistant Director Silicon Valley Power June 2, 2006 1 SVP: Santa Clara s Hometown Advantage High value
More informationMore Power to the Future. Frank Lambert VP Chapters IEEE PES Switchgear Committee October, 2017
1 More Power to the Future Frank Lambert VP Chapters IEEE PES Switchgear Committee October, 2017 IEEE 420,000+ members Founded 1963 PES Governing Board includes Vice Presidents which oversee IEEE PES 37,000+
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2015 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2016 Introduction The
More information13174/15 AT/tl 1 DGE 2B
Council of the European Union Brussels, 6 November 2015 (OR. en) 13174/15 ER 359 COEST 325 RELEX 833 INFORMATION NOTE From: General Secretariat of the Council To: Delegations Subject: External energy relations
More informationGSA Renewable Energy Purchasing Update
U.S. General Services Administration Northwest/Arctic Region GSA Renewable Energy Purchasing Update Indian Country Energy & Infrastructure Working Group George Northcroft, Regional Administrator & GSA
More informationAPI Best Practices and Standards. Glen Benge
API Best Practices and Standards Glen Benge 1 Topics API History API Standards and Standards Development API HF related standards and publications Use of API Standards Conclusions 2 API History 1919: API
More informationThis report is printed on recycled paper
This 2015 Integrated Resource Plan Update Report is based upon the best available information at the time of preparation. The IRP action plan will be implemented as described herein, but is subject to
More informationCOMPANY PROFILE
COMPANY PROFILE www.khweza.co.za Introduction Khweza Imikhono Khweza Imikhono (Pty) Limited is a black woman-owned company which operates in the area of infrastructure expansion projects. The company implements
More informationNextgen Group Overview Destination Digital-Geraldton. 16 th October 2013
Nextgen Group Overview Destination Digital-Geraldton 16 th October 2013 WHAT WE DO We transport, house and secure critical data for Australian industry and government CORE BUSINESS STRATEGY Specialised
More information6 Version 1.0 (September 20, 2002) 0 days $0 0 days 01 Oct '02 01 Oct ' days $
1 Windstorm Power Ltd. 0 days $0 0 days 01 Oct '02 01 Oct '02 984 days $0 1 2 Canadian Wind Park 0 days $0 0 days 01 Oct '02 01 Oct '02 984 days $0 2 3 (40 Nordex N80 2.5 MW turbines) 0 days $0 0 days
More informationSECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES NOTICE TO COMMUNITY ORGANIZATIONS NOTICE IN UTILITY BILLS
SECTIONS II - VIII QUANTITY, FORM, AND FILING REQUIREMENTS APPLICATION FILING FEES PROOF OF SERVICE NOTICE TO COMMUNITY ORGANIZATIONS PUBLIC NOTICE NOTICE IN UTILITY BILLS NOTICE OF OWNERS OF PROPERTY
More informationEXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule
More informationNational Load Despatch Centre Power System Operation Corporation
Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average
More informationWestern States Power Crisis EPRI White Paper - An Overview -
Western States Power Crisis EPRI White Paper - An Overview - Dejan J. Sobajic July, 2001 Western States Power Crisis.1 Origins of the White Paper The roots of the document go back to several discussions
More informationAmerican Transmission Company U.P. Energy Summit
American Transmission Company U.P. Energy Summit John Flynn Vice President Strategic Planning & Business Development October 26, 2011 Helping to keep the lights on, businesses running and communities strong
More informationGULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY
GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY INTERCONNECTION PROJECT PHASE I STATUS & DEVELOPMENTS By: Adnan I. Al-Mohaisen - CEO Introduction Established in July 2001 by a Royal Decree No. M/21.
More informationGeorgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB)
Asian Development Bank Project Number: 2974-GEO Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB) Bi-Annual Land Acquisition and Resettlement Plan, November 2013
More informationGrid Interconnection of Renewable Generation
Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More informationThe EU OPEN meter project
Open Public Extended Network ing 7 TH FRAMEWORK PROGRAMME The EU project ERGEG workshop on Smart Metering Authors: Date: Nicolas Arcauz 14th December 2009, Brussels ENERGY 2008.7.1.1 Official Journal of
More information# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:
BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design
More informationTransmission Planning Update. Board Meeting August 18, 2010 Jeffrey Miller/Marv Landauer
Transmission Planning Update Board Meeting August 18, 2010 Jeffrey Miller/Marv Landauer 1 Contents 2010 System Assessment 2011 Biennial Transmission Expansion Plan Northwest Area Coordinator Study Team
More informationVERIZON TELEPHONE COMPANIES TARIFF FCC NO.
Director-Tariffs 1st Revised Page 19-1 600 Hidden Ridge Cancels Original Page 19-1 Irving, Texas 75038 Issued: September 28, 2001 Effective: October 13, 2001 1 (A) INTERCONNECTION BETWEEN COLLOCATED SPACES
More informationModeling and Simulation in XENDEE
Modeling and Simulation in XENDEE IEEE 34 Node Test Feeder Shammya Saha Graduate Research Assistant Electrical Engineering Ira A. Fulton School of Engineering Arizona State University shammya.saha@asu.edu
More information345kV Transmission Line Thermal Uprating Using Connector Shunts
345kV Transmission Line Thermal Uprating Using Connector Shunts Douglas P. Harms, P.E. Sr. Consulting Engineer Transmission Engineering CenterPoint Energy (Ret.) Presented At The 46 th Annual Transmission
More informationPOWER INFRASTRUCTURE PLAN 2016
POWER INFRASTRUCTURE PLAN 2016 Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million people
More informationCommunity Update. May 31, 2011
Community Update May 31, 2011 Presented to: Leaside Community Presented by: Honourable Kathleen Wynne, Minister of Transportation Councillor Karen Stintz, Chair, Toronto Transit Commission Eglinton-Scarborough
More informationMarch 4, Mona Substation Line position & assoc relaying, communications & metering
700 N.E. Multnomah, Suite 550 Portland, OR 97232 March 4, 2004 Merrill Brimhall PacifiCorp Merchant 201 South Main, Suite 2200 Salt Lake City, Utah 84111 Dear Mr. Brimhall: PacifiCorp Transmission Systems
More informationDealing With a Disaster and Its Effect on the Utility Operation
Nashville Electric Service Dealing With a Disaster and Its Effect on the Utility Operation UTA Fall Conference Florence, Alabama October 12-14, 2011 Outline Who We Are Typical Emergency Response Challenges
More informationBOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER
Contact: Joe Verkennes, Director of Marketing, (734) 384-4207 January 24, 2011 FOR IMMEDIATE RELEASE BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER MONROE, Mich. At its
More informationUpdate from the European Audiovisual Observatory
0 Update from the European Audiovisual Observatory EPRA meeting Vienna, 11-13 October 2017 Maja Cappello Head of the Department for Legal Information Overview 1 1. The latest from the organisation 2. Market
More informationWIND. Representing clients across the renewable energy industry. Troutman Sanders LLP. troutman.com
WIND Representing clients across the renewable energy industry Troutman Sanders renewable energy attorneys offer innovative legal solutions to help clients succeed in the wind energy industry. Our deep
More informationMountain West Transmission Group. Tim Vigil RT Merchant Manager Western Area Power Administration
Mountain West Transmission Group Tim Vigil RT Merchant Manager Western Area Power Administration Mountain West Transmission Group* Basin Electric Power Cooperative (BEPC) Black Hills Energy s three electric
More informationSoutheast Florida Regional Climate Change Compact Update. Broward Climate Change Task Force February 16, 2017
Southeast Florida Regional Climate Change Compact Update Broward Climate Change Task Force February 16, 2017 Overview Recent Activities RCAP Update Forthcoming Efforts Regional Resilience Projects Summit
More informationDOE Initiatives in the U.S. Transmission Sector
DOE Initiatives in the U.S. Transmission Sector David Meyer Senior Advisor Office of Electricity Delivery and Energy Reliability Northeast Power Coordinating Council 2009 Annual Meeting Three Topics Today
More informationGeneration Interconnection Feasibility Study Report
Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection
More informationSpecific topics covered in this brief include:
April 2008 Summary Welcome to the Fifteenth National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 28, 2008, Transmission Update conference
More informationBenbow 397S Substation Upgrade Needs Identification Document
APPENDIX C AESO PIP Benbow 397S Substation Upgrade Needs Identification Document 1.0 Participant Involvement Program (PIP) From June to December 2015, the AESO conducted a Participant Involvement Program
More informationART CENTER AND SATELLITE PLANT
CSU The California State University Office of Audit and Advisory Services CONSTRUCTION California State University, Bakersfield ART CENTER AND SATELLITE PLANT Audit Report 15-09 May 7, 2015 EXECUTIVE SUMMARY
More informationINTERCONNECTION FACILITIES STUDY REPORT
Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
More informationMISO PJM Joint and Common Market Cross Border Transmission Planning
MISO PJM Joint and Common Market Cross Border Transmission Planning May 30, 2018 1 Coordinated System Plan Study 2 Using information from the March 30 Annual Issues Review, the JRPC has decided to perform