LIFEBUOY RELEASE SYSTEM - TECHNICAL PRODUCT SPECIFICATION AND INSTALLATION MANUAL

Similar documents
Metham Aviation Design Limited Station Approach, Four Marks, Alton. Hants. GU34 5HN Tel +44 (0) Fax +44 (0)

Panorama rudder indicator TRI-2 Analogue or CAN input Approved according to MED Three extra large scales Long-life LED illumination Built-in dimmer

Nokeval. FD100 series. User Manual

INSTALLATION INSTRUCTIONS

Installation manual EVA Start and Protected

View Wall Interface. Dynamic Glass INSTALLATION GUIDE. Description. System Requirements. Installation Overview

Emergency Luminaire for Fluorescent Lamps Series EXLUX 6009

Megatouch FORCE Monitor Chassis Board Replacement

Adapter Kit - Remote QSI Electronics Installation Instructions

Conveyor Belt Alignment Switches from IDEM

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B.

Adapter Kit - QSI Electronics to G2 Meter Installation Instructions

NetCommWireless. Quick Start Guide NTC-30 Series - Outdoor WiFi Router

Adapter Kit - QSI Electronics to G-Series Meter Installation Instructions

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B.

Treadmill Embedded Touch Screen Won t Power Up

Adapter Kit - QSI Electronics to TM Meter Installation Instructions

Royal RVV-500 (B) Retrofit Kit

C5C Cross-Connect System

Phase Loss Protection Upgrade. Phase Loss Protection Upgrade. In this bulletin:

Power Supply (48Vdc, 2.5A)

Parts and Service Manual IMCO

Power Supply and Fan Module Installation

INSTALLATION INSTRUCTIONS

Ag Leader Technology Insight. Direct Command Installation Spra-Coupe 7000 Series

Incremental encoders Solid shaft with clamping or synchro flange pulses per revolution

FortiCam FD40 Mounting Guide

63 to 125 A. Functions. Conformity standards. General characteristics. Changeover switches SIRCO VM1 changeover switches.

Enhancing Business Performance

VE-53 Sensor Uniaxial / Triaxial Surface and Downhole Velocity Sensor. Operation Manual

Section. Service & Maintenance. - Core & Hard Disk Drive (HDD) - Amplifier - Monitor - UPS - Dollar Bill Acceptor - Fan Filter G - 1

Replacing the Power Supply

Installation Guide for America Solar Wholesale Photovoltaic Modules

EBC Mini-ITX Chassis for High Power Consumption Applications Version: 1.0. Quick Installation Guide ABOUT COMPATIBLE SBC/COOLING KIT

INSTALLATION INSTRUCTIONS

Print Mechanism Maintenance Kit

This guide provides basic information for Unitronics Models 230/260/280/290 (Non-color Screens).

B&W RearView Camera Installation & Operation

Outdoor PTZ. Mounting on the Ceiling Using Pendant Mount. Installation Guide. For Models: I93, I94, I95, I96, KCM /12/03

Mounting on the Ceiling Using Flush Mount (Face Down)

The identified danger could cause physical and property damage.

OPERATING INSTRUCTIONS 7 SERIES STATIC GENERATORS

ASI Systems ML5720A Series

Plexo IP 55/IP 66. Makes your day, rain or shine PLEXO / WEATHERPROOF PRODUCT GUIDE. For reference only.

INJ-24A Series Quick Installation Guide

Sidewinder Pumps Inc. AC C1D2 Timer/Controller

Removal and Installation8

W6222 US. Outer casing

GREISINGER electronic GmbH. D Regenstauf, Hans-Sachs-Straße 26. T-Logg 100. T-Logg 100 E

Environdata FA ma Converter Guide

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

C5 Series Stainless Steel Photoelectric

Upgrade Instructions Printer Terminal Holder

Installation and Maintenance

Installation RA5112-C-16A-C20. Basic Rack Power Distribution Unit

TARA CONTROLS AGC-5. UCI Random Start USER S GUIDE. With Optional Warning Flashes for the Hearing Impaired. TARA CONTROLS by Cartessa Corporation

Linear Luminaire with LED Series 6412/5

Inductive displacement measurement system model series IE25P with programmable analogue interface

INSOMNIAC CIA G-600 Gateway Installation Manual P/N CIA Revision 1.0 Date Code:

MASTERLINE Ultimate Hybrid High Voltage 4/12 (MLUH HV 4/12) blunt cut at BTS side

Tactical Weather Station Set-Up Guide 1

NightStar. Installation, Operation, & Maintenance Instructions M /04/2016

ICAO Low-intensity Type A Obstruction Light (10cd) with infrared ICAO Low-intensity Type B Obstruction Light (32cd) with infrared

Model HM-535 Power Supply Installation and Service Instructions

Do not open when energized or when an explosive atmosphere is present. Electrostatic hazard, clean only with damp cloth.

CONTROL PANEL WIRING SPECIFICATIONS

GREISINGER electronic GmbH. D Regenstauf, Hans-Sachs-Straße 26. T-Logg 120 W -... T-Logg 120 K -...

MCx-xxxAx Installation. Contents. Mounting: Short Instruction MCx-xxxAx Connecting Power and Signal

Quick Start Guide. Mounting the Essential Plus and Elite

MODEL SW6000 & SM6100 CENELEC INSTRUCTIONS

GREISINGER electronic GmbH D Regenstauf, Hans-Sachs-Straße 26

RCL-I 001)'" MANUAL. MOTE CONTROL SEARCHLIGHT with POINT PAD

DST550 Digi-Stem Thermometer

Vision OPLC. General Description. Standard Kit Contents. Installation Guide Vision120. This guide provides basic information for Unitronics Vision120.

MAXIMA + Series ROTARY LEVEL CONTROL

To connect the AC adapter:

AC-43 Accelerometer. User Manual

ASI Systems ML5740A Series

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

Next Gen Sarix Enhanced IBE Series Bullet Cameras

Seeburg JCU-DEC Kit Convert Your Seeburg DEC Wallbox Into a Jukebox

Autoranging True RMS Multimeter User Manual

Installing 6 Indexer: PRS Standard Tools

MAXIMA + Series ROTARY LEVEL CONTROL

Push Buttons and Operator Interface New Product Catalog XAL Control Stations

RSA5100B Series Real-Time Signal Analyzers RSA5BUP Option 300 High Performance Real Time Upgrade Instructions

INSTALLATION AND OPERATING INSTRUCTIONS DSST SYSTEM

PoE/FPR Kit for Auto-Sync Time Clock. The Auto-Sync Time Clock is a validated time system with a Web interface and auto discovery.

Linear Luminaire with LED Series 6012/5

TRC-190 User s Manual

FDS / FDS-R / FDS-PS

SERIE 59. Rear clamp. Frontal clamp HIGH RESOLUTION HOLLOW SHAFT INCREMENTAL ENCODER FOR INDUSTRIAL APPLICATIONS

Oracle <Insert Picture Here>

National Light Sources Pty Ltd Electrical Accessories - Date 8th April, Coombes Drive, Penrith, NSW, 2750 Australia

Bulletin 800Z Zero-Force Touch Buttons

ZC-OH5 TAMPER-RESISTANT INDOOR/OUTDOOR HOUSING INSTRUCTION MANUAL FOR USE WITH GANZ ZC-D5000 SERIES MINIDOME CAMERAS

User manual. LITAS headlight flash controller

PIPE & WALL INSPECTION SYSTEMS ASSEMBLY AND OPERATING INSTRUCTION

Mounting Accessory Guide

Smart Battery Box Owner s Manual & Safety Instructions

Transcription:

LIFEBUOY RELEASE SYSTEM - TECHNICAL PRODUCT SPECIFICATION AND INSTALLATION MANUAL The LifeBuoy Remote Release System standard HM-0600 consists of the following parts: One GRP holder with pre-installed metal spring holder. The GRP holder can be mounted on port or starboard side of the ship and no change of the metal spring holder is needed. Measurements and hole positions - please check enclosed drawing. One ERU (electric remote unit) with cord pre-installed on the metal holder. The ERU cable is 1,5m long and shall be well strapped to the GRP holder in order to avoid any damage by weather or wind. One Release Switch in protective box to be mounted at the wheelhouse or bridge, IP66 class. Colour: silky grey. If mounted outside it shall be protected by an outer protective enclosure. Maximum diameter for cable 12mm. If the Release Switch shall be mounted flush in a bridge control panel please specify in the order - HM-0451 Release Switch for flush mounting. Measurements and hole position - please check enclosed drawing. One connector box in marine grade plastic, IP66 class. Colour: steel grey. Maximum diameter for cable 12mm. Measurements and hole positions - please check enclosed drawing.

20m cable from connector box to release switch, marine approved, screened 2 x 0,75mm2, diameter 8mm. Longer lengths can be supplied on request by additional meter price. Maximum length of the installation is 150m. The Hammar products are designed to handle any voltage drop, so there is no need to increase the cable dimensions more than our recommendation. Cable recommendations: 0-75m installation length - 2 x 0,75mm2 and 75-150m installation lenght - 2 x 1,5mm2. Cables with a diameter larger than 12mm can not be handled in the cable glands and terminal blocks. Electric power required is 24VDC emergency power. One manual safety pin in stainless steel. One pilot line for loading the lifebuoy. Installation manual, user guide, marking instruction and test of the Lifebuoy Release System document. Not supplied in the kit from CM Hammar: - Lifebuoy (any SOLAS approved lifebuoy will fit the GRP holder) - Mounting bolts and fittings for installation onboard. Options available: HM-0610 LifeBuoy Release system, only manual release. HM-0650 LifeBuoy Release System, vacuum pump operated system. ATEX approved products are available, please contact CM Hammar for further information.

Spare parts: HM-0620 Lifebuoy metal spring holder only. HM-0630 Replacement kit for Lifebuoy System MkII, ERU electric/water activation with release cord and installation manual in English. HM-0660 Replacement kit for Lifebuoy System MkII, MRU vacuum operated with release cord and installation manual in English. HM-0406 Replacement kit for LifeBuoy System MkI, ERU electric/water activation with release cord, metal ring, cable tie and installation manual in English. HM-0630 HM-0406 HM-0660 FAQ - Frequently Asked Questions: Can the GRP holder be mounted on either port or starboard side of the ship? Yes, and no change of the metal holder is needed, but you will need mounting bolts and fittings for the installation. Can you connect an MOB Signal/ Smoke to the Hammar LifeBuoy System? Yes, no problem to connect the MOB Signal/Smoke to the LifeBuoy System. Follow the instructions from the manufacturer of the MOB Signal/Smoke and make sure that the MOB Signal/Smoke can easily be pulled out from its holder. Is there a manual back-up? Yes, you have a manual safety pin that can be pulled in order to release the lifebuoy.

FAQ - Frequently Asked Questions continued: Can there be an accidental release of the system in case of a cable being damaged or an earth fault? No, there is no risk for an accidental release of the system. Can we test the function of the system? Yes, you can test the system with any of the following methods: - A/ Testing the mechanical release function remove the manual safety pin holding the release cord, but make sure that the lifebuoy is securely lashed before the activation. Rearm the LifeBuoy System afterwards. - B/ Testing the electronic remote release function please check the enclosed document Test of the Lifebuoy Release System. - C/ When the ERU is expired you can activate the ERU, but make sure that the lifebuoy is securely lashed before the activation. Rearm the LifeBuoy System afterwards.

HAMMAR LIFEBUOY RELEASE SYSTEM INSTALLATION MANUAL Specification: One GRP holder with pre-installed metal holder and bracket. One ERU (electric remote unit) with cord pre-installed on metal holder. One Release Switch One Connector box 20m cable from connector box to release switch, screened 2 x 0,75mm2, diameter 8mm One manual safety pin One pilot line for loading the lifebuoy Installation Manual, User Guide, Marking Instructions and Test of the Lifebuoy Release System Not supplied in the kit from CM Hammar: Lifebuoy Mounting bolts and fittings for the installation onboard Installation: 1. Mount the GRP holder in a position so that a released lifebuoy will easily fall into the water. 2. Follow the instructions for the mounting bolts in accordance with the pictures. Make sure that you mount double washers between frame or bulkhead and the GRP holder. 3. Mount the connector box close to the GRP holder. Make sure that the cable from the ERU is long enough to reach the connector box. The connector box shall be mounted with the cable glands horizontal in order to avoid water ingress. Always tighten the cable glands.

4. Mount the Release Switch in an easy to locate and manage position on the bridge. The Release Switch shall always be mounted inside the wheelhouse or bridge. 5. Install the screened cable from the connector box to the Release Switch and connect the black ERU cable to the connector box. 6. Connect 24V emergency power supply to the Release Switch. Ensure that you follow the enclosed connection drawing. Test the electrical installation according to instructions on the drawing or the enclosed document Test of the Lifebuoy Release System. 7. The ERU is pre-installed. The ERU must be marked with its expiry date 2 years from installation onboard. Follow the enclosed marking instruction. An ERU, which is not properly marked with its date of expiry, is not approved. 8. Put a lifebuoy 2/3 into the GRP holder and then secure it for the installation phase. Use the supplied thin white pilot line to pull the release cord through the ERU unit. Make sure that the lifebuoy line is not on the outward side of the release cord! This might entangle the lifebuoy in an activation situation.

9. Pull up the release cord through the ERU hole with the pilot line. Secure it with the manual safety pin. 10. Connect the power to the Release Switch. 11. The safety cover on the Release Switch shall be secured with some kind of easy-tobreak seal, in order to avoid unintentional use of the system. 12. The system is now ready for use. The ERU shall be changed after two years of service.

TEST OF THE LIFEBUOY RELEASE SYSTEM H20 ERU with manual safety pin Emulator Connector box GRP Holder Release Switch Instructions how to perform a test to assure functionality of the Lifebuoy Remote Release system The test can be done in two steps; one mechanical and one electronic. The two different tests give a complete and sufficient functionality test of the system. Testing the mechanical release function 1. Remove the manual safety pin holding the release cord. 2. The Lifebuoy will be released and launched from the GRP holder. Testing the electronic remote release function by using the Emulator 1. Open the enclosure of the Emulator and attach two connection wires to the terminals on the Emulator. (Do not use to much torque on the terminal screws) 2. Push the push button on the circuit board to switch on the Emulator. The red and the green LED on the circuit board shall light up simultaneously. The green LED will start flashing green and the device is ready to be used. 3. Open the Connector box (mounted close to the GRP holder) and disconnect the flexible cable of the H20 ERU. Connect the two connection wires from the Emulator to the terminals on the Connector box, were the flexible cable was mounted. (The polarity is not important). The Emulator can be left without observation mounted to the Connector box, as the Emulator will hold the indication of the LED turning from green to red if activated until the device is reset manually. 4. Push the Release Switch (should be mounted on the bridge or inside the wheelhouse) to activate the output of the Lifebuoy Release unit. The Emulator s LED will change from LED flashing green to LED flashing red if the output has been activated and the system is functional. DO NOT FORGET TO RECONNECT THE H20 ERU AND THE SAFETY PIN AFTER THE TEST!

ERU EMULATOR - USER MANUAL The ERU Emulator is a device designed to be used at installation and test of CM HAMMAR s ERRS Electronic Remote Release Systems. With the Emulator it can be verified that an electric pulse sufficient to activate the HAMMAR H20 ERU Electric Release Unit is received at the connection point for the ERU Emulator. The emulator measure and checks the current and the duration for the electric pulse and compare this with settings stored in the device. Push button Red LED Green LED Specification Power supply Operating time Water ingress protection Dimensions (L x H x D) CR2032 (coin cell battery) Approx. 200 hours No 56 x 31 x 24 mm Instructions for use (DIP switches) First time of use Open the Emulator enclosure by gently twisting a screwdriver in the slot at the side of the enclosure. Insert a CR2032 battery in the battery holder. Attach two connection wires to the terminals on the Emulator. (Do not use to much torque on the terminal screws) Normal use Open the enclosure and push the pushbutton on the circuit board to switch on the Emulator. The red and the green LED on the circuit board shall light up simultaneously when the pushbutton is pushed. If the battery is ok the green LED will start flashing green and the device is ready to be used. Attach two connection wires to the terminals on the Emulator. (Do not use to much torque on the terminal screws) To test the system, connect the wires to the Electronic Remote Release System ERU output. (The polarity is not important) If mounted on the circuit board the DIP switches are not used in this application and shall be in off position. Test the Electronic Remote Release System Activate the output on the Electronic Remote Release System and check that the flashing green LED is turned off and that the red LED has started to flash. If the green LED is turned off and the red LED are turned on (flashing) the ERU output signal from the Electronic Remote Release System has been ok. NB! The ERU Emulator does not break the circuit when it is activated and it will be detected as an installed ERU by the ERRS system even if it has turned from green to red.

Repeat the test Push the pushbutton on the circuit to reset the Emulator. When the green LED is flashing, the device is ready to be used again. To turn of the Emulator If a test has been performed, the Emulator has to be reset to a flashing green status. Then again push the pushbutton and the device will be turned off and the LED s will stop flashing. The device will turn itself off automatically 30 minutes from the last push on the pushbutton. User guide Action LED Turn on the device Push the button Red and Green LED s light up simultaneously Reset the device after a test Push the button Red LED is turned off, Green LED starts flashing Turn off the device Push the button Green LED is turned off LED indications Emulator is operational (battery ok) Output has been activated Low battery voltage on Emulator Green LED is flashing Green LED is turned off, Red LED is flashing Red and Green LED will give alternating flashes and the device will be switched off again.

GRP HOLDER DRAWING 190 780 670 680 800 540 60 160 M8(x5) 958 60 650 510 Sideview Backview Frontview Topview

CONNECTOR BOX DRAWING 55 38 45 55 45 4,30 Front side Back Det. Number/ant. Designation/benämn. tor.c tor.c tor.c 1:1 10-07-2009 Drawn/Ritad Checked/Kontr. Appr./Godkänd Scale/skala Repl./Ersätter: Date/Datum: (dd-mm-yyyy) CM HAMMAR AB Tel.: +46 31 709 65 50 Fax.: +46 31 49 70 23 Material CONNECTOR BOX ERU Sheet1 of 1 Notes/noteringar Draw.No./Ritn.nr. Rev.: 1 A010007-01

RELEASE SWITCH DRAWING 102 102 MAXIMUM DIAMETER FOR CABLE 12 mm 82 Sheet1 of 1 Rev.: 1 Tel.: +46 31 709 65 50 Fax.: +46 31 49 70 23 CM HAMMAR AB RELEASE SWITCH - DIMENSIONS A010031 Draw.No./Ritn.nr. Drawn/Ritad Checked/Kontr. Appr./Godkänd Scale/skala Repl./Ersätter: Date/Datum: tor.c tor.c tor.c 1:1 10-07-2009 Det. Number/ant. Designation/benämn. Material Notes/noteringar 87 7 87

WIRING CONNECTION DIAGRAM ERU Note 1: When connecting the cable from the H20 -ERU to the CONNECTION BOX, the polarity of the wires is of no importance. Note 2: Connect the screen of the cables inside the Release switch enclosure Note 3: Connect the screen of the power supply cable to ships ground POS 1: HAMMAR ELECTRIC RELEASE UNIT (H20 ERU) POS 2: HAMMAR ERU CONNECTION BOX Cable glands, max cable diameter 10 mm Terminals: max cable area 2,5 mm2 POS 3: HAMMAR ERU RELEASE SWITCH with integrated push button Input voltage 18VDC - 32VDC, Max. intermittent load 3A Cable glands, max cable diameter 12 mm Terminals: max cable area 2,5 mm2 POS 4: Cable, 2 x min. 0,75 mm2 (screened). Outer diameter max.10 mm POS 5: Cable, 4 x min. 0,75 mm2 (screened). Outer diameter max.12 mm or Cable, 2 x min. 0,75 mm2 (screened). Outer diameter max.12 mm Note 1 4 3 Note 2 2 123456 7 1 Elect. module 1: +24VDC 2: + ERRS (optional) 3: +ERU outp. 4: 0VDC 5: - ERRS (optional) 6: - ERU outp. POWER SUPPLY, Terminal No: 1 to +24VDC EMERGENCY POWER SYSTEM 4 to 0VDC EMERGENCY POWER SYSTEM 5 Optional connection to ERRS System, Terminal No: Note 3 2 to + output ERRS System (upper terminals 1-10 in ERRS control box) 5 to - output ERRS system (Lower terminals 1-10 in ERRS control box) TESTING THE INSTALLATION: The correct function of the HAMMAR ERU RELEASE SWITCH can be tested by connecting a 200 maf 5x20 mm glass tube fuse to the ERU RELEASE SWITCH output instead of the pos. 1 ERU unit. The fuse blows off when the ERU RELEASE SWITCH push button is pressed if the system is correctly installed. Det. Number/ant. Designation/benämn. Material Notes/noteringar tc tc tc 03-10-2007 Drawn/Ritad Checked/Kontr. Appr./Godkänd Scale/skala Repl./Ersätter: Date/Datum: (dd-mm-yyyy) CM HAMMAR AB HAMMAR H20 ERU - RELEASE SWITCH 24VDC - CONNECTION DIAGRAM Tel.: +46 31 709 65 50 Fax.: +46 31 49 70 23 Sheet1 of 1 Draw.No./Ritn.nr. Rev.: 7 ERU1001