ELECTRICAL SAFETY INSPECTION REPORT

Similar documents
ELECTRICAL SAFETY INSPECTION REPORT

INITIAL ELECTRICAL SAFETY ASSESSMENT - EXPANSION

SECTION PANELBOARDS

Copper Riser And Intrabuilding Cabling

ICS Entrance Management Sign Installation Guide. Version 1.0

NEC Server Rack Configuration Guide

Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO

Computer Network Design Guide Existing Systems 1 / 6

A-100G6 - Basic frame assembly diagram

SPECIFICATION STANDARD COPPER RISER AND INTRABUILDING CABLING

IEC Installation Manual and User Manual for. BYD Photovoltaic Module

Electrical Demand Specification (Reference SOP: )

sonnen Installation Practical

BS EN Class H, BS 7430 UL467 (CR105) Tightening torque 15 Nm mm mm kg CR525

ANSI/TIA/EIA-568-B Cabling Standard NOTE

CCBC is equipped with 3 computer rooms, one at each main campus location:

References. References. Rating (A) Référence

Webb Core Cleanroom Wall System

ISOLATION RELAY RACK ISOLATION KIT 19 RACK MOUNT RELAY RACK ISOLATION KIT, SLOTTED UNEQUAL FLANGE RACK ISOLATION KIT 23 RACK MOUNT

Installation Guide for Mazak Mazatrol M - Plus, M-2, M32, T-Plus, T2

ATS-16 HV USER MANUAL. Automatic Transfer Switch 16A / 230Vac V090318

PV Module Installation Instructions

Application Guideline for BOP Business Support Coordinator BANGLADESH in FY 2013

User s Manual. ACS550-PD 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

EX- Documentation VA 450 / VA 452. thermal mass flow sensor

Installation Instructions

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Control Box Setup - PRSalpha

VERAK IP. 19 Stand Alone Cabinet with IP65 Rating.

Vertiv VR Rack 1.0 GENERAL

1510 MOTOR CONTROLLERS

Westell. Breaker Panel Technical Practice NPDRP1114

Breaker Panel Technical Practice NPDRP1114

CONTROL PANEL WIRING SPECIFICATIONS

User s Manual. ACS550-PD Stock 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

AIR TERMINALS: COPPER

DK-PS Rack. New generation DK-PS Rack for room climate control

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cable Management and Ladder Rack

MASTERLINE Ultimate Hybrid High Voltage 4/12 (MLUH HV 4/12) blunt cut at BTS side

National Light Sources Pty Ltd Electrical Accessories - Date 8th April, Coombes Drive, Penrith, NSW, 2750 Australia

ADDENDUM NO. 1 ITB-DOT BAT. You are hereby notified that the above referenced Invitation to Bid (ITB) is modified as shown below:

MBE Mounts and Adapters

Target Interface / Construction Compliance Inspection Checklist

Distribution Substation Manual (DSM) Section 6: Miscellaneous

Codian MSE 8000 Media Services Engine

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Transportation Management Console

INSTITUTE OF TESTING AND CERTIFICATION (INDIA) PVT. LTD.

Spring Test 17 due 06/14/2013

DIGILOCK DK-AT SERIES LOCK SPECIFICATION - Applies to DK-ATS, DK-ATV and DK-ATH models

Specifications, Installation, and Operating Instructions

AT&T Virtual Private Network Service (VPN) and AT&T VPN Express

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

SPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS

GPS tracker Voyager 5N (M)

MICHIGAN DEPARTMENT OF TRANSPORTATION

Total Amount Carried Forward To Bill summary Page

Site Preparation CHAPTER

Improved power supply after Fukushima and OPC in Japanese BWRs

Free-Standing Type 12 Enclosures

AT&T Virtual Private Network Service (VPN) and AT&T VPN Express

Installation Notes TII Model 341 Protector

Delta Unifence Kit Installation Instructions

ECP NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE

MPS-850 e-drum set. assembly instructions

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS

Internal Printer. Features.

LARGE S URGE-PROTECTOR S HELTER

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)

Effective Date: September 2017 Void After: September Product: Lead Free Plumbing Products File No. 6142

Data Cabling / Low Voltage Technology Specifications

Dell Networking S4810 Open Networking (ON) Getting Started Guide

Overview These instructions are presented as a guideline for installing and setting up the LX Series Breaker Control Panel.

Security at Fingertips.

3M Cross-Connect Cabinet Riser Installation Guide

7 Day Programmable Room Thermostat

UNDERGROUND CONSTRUCTION MANUAL SERVICES

INSTALLATION INSTRUCTIONS

SOLAR Basic. Operating instructions for electronic high-security locks

The University of Texas at Austin July 30, 2014 SECTION COMMUNICATIONS TERMINATION BLOCKS AND PATCH PANELS

E A54-UL 2012-AUGUST-29 XP POWER L L C SUITE E DYER RD SANTA ANA CA 92705

CERTIFICATE OF APPROVAL No CF 694 3M UK LTD

Independent Testing - For End User Confidence

NOTICE OF COMPLETION AND AUTHORIZATION TO APPLY THE UL MARK

Select 107 XLS User Instructions

itac120m Series Intelligent Hot-Pluggable Phasing Miniature Switch Modules

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

CTO Server and Network Cabinets

Bombay Stock Exchange Limited

INTRINSICALLY SAFE Ex ia PSU TYPE AC36W

Line Interactive 1000VA/1400VA/2000VA Uninterruptible Power System

Desh Polytechnic College Mirpur-11, Dhaka-1216 Class Routine: 5th Semester (Civil Technology-64)

BA684DF-P PROFIBUS PA Field mounting Fieldbus Display

SW-PM POLE MOUNT BRACKET

ENCLOSURE HEAT DISSIPATION

3 BUTTERFLY VALVE MAINTENANCE MANUAL //

Wireless 7 Day Programmable Room Thermostat

U.S. Price List and Part Selector Guide

MPS-600 e-drum set. assembly instructions

Reservation QA Desk Review Procedure

Transcription:

ELECTRICAL SAFETY INSPECTION REPORT Al Islam Textile Industries Ltd. Ramjannessa Super Market (2 nd Floor), 142, Senanibash Road, Pallabi, Mirpur12, Dhaka 1221, Bangladesh. Factory List: 1. Al Islam Textile Industries Ltd. Inspected by: Yang Report Generated by: S M Tasdeek Inspected on May 06, 2014

SUMMARY The Al Islam Textile Industries Ltd. factory is operating in a four (G+3) storied building with a shed on top. Construction of the building was completed in the year 1998. The building was approved for industrial purpose. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. An implementation schedule shall be developed by the factory to remediate each of the findings. The Specific timing of improvements, including any requested extensions due to design / installation constraints shall be submitted to the Accord for approval. Al Islam Textile Industries Ltd. Page 2 of 5

FINDINGS AND RECOMMENDATIONS Finding #: E- 1 SERVICE LINE HT cable dropping from OH line, not supported to the pole. HT cable dropping from HT pole must be firmly fixed to the pole with support and clamps. 3months DESCO pole Finding #: E- 2 SWITCH BOARD & PANELS Panel doors not connected with earth bond. Panel door(s) must be connected with earth bond connecting frame and door. Panel board Al Islam Textile Industries Ltd. Page 3 of 5

Finding #: E- 3 GENERATOR ROOM Cables terminating to generator output terminal box are laid on floor. Cable terminating at Generator output terminal box must be supported on riser and protected. Existing cables laid on floor may be installed in cable trench or on trays. 3 months Generator room Finding #: E- 4 EQUIPMENT & MACHINE Cables to machines/motor are laid on the floor Install the cables through rigid pipe (metallic) for the protection of the cable laid on floor. The pipe must be fixed/ clamped with saddle on floor at regular intervals Cable on the floor Finding #: E- 5 CABLE & CABLE SUPPORTS Cables terminating at distribution boards are not protected (and not supported), near panel. Cables terminating at distribution boards must be supported in cable tray and protected throughout its length till the panel base or top plate. 3 months Cable terminating in panel board Al Islam Textile Industries Ltd. Page 4 of 5

Finding #: E- 6 SWITCH BOARD & PANELS Cables connecting to bus bar without cable lugs. Cables connecting to bus bars must be connected firmly with cable lugs. Cable terminating to the bus bars must be fixed with proper size nuts and bolt with washers. Cable connecting to bus bar Finding #: E- 7 EQUIPMENT & MACHINE Leakage in IPS battery. Leakage in battery terminal must be checked and fixed regularly. Battery rack Finding #: E- 8 CABLE & CABLE SUPPORTS Cables are not covered in duct. Electric cables must be supported on cable duct with metal covers. Provide cover made of noncombustible material on duct for preventing any physical damage & ingress of dust and debris in future. Cable duct Al Islam Textile Industries Ltd. Page 5 of 5