Roads Proposed for Decommisioning

Similar documents
Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

PREMIER DATA CENTER OPPORTUNITY ±64.31 ACRES OF LAND ENGLER BLVD AND HWY 212 Chaska, MN 55318

What is a Topographic Map?

SALE LEASE CALL CENTER

APPENDIX A ASSESSMENT PROTOCOL

Reconnaissance and Surveillance Leader s Course Map Reading self study worksheet (Tenino, Washington Map)

Delineating the Stream Network and Watersheds of the Guadalupe Basin

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

Lab 2. Practice with ArcGIS

±19.92 ACRES MIXED USE ZONED LAND SENECA & N. VIRGINIA, RENO, NV 89506

Channel Conditions in the Onion Creek Watershed. Integrating High Resolution Elevation Data in Flood Forecasting

George Mason University Department of Civil, Environmental and Infrastructure Engineering. Dr. Celso Ferreira Prepared by Lora Baumgartner

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:

(TSZ) 4: 5: 6: 7: : 9: 10: 11: (2030 AM

BASIC MATHEMATICS FOR CADASTRAL MAPPING

Redboat RMP Alternative 2 Timber Harvest and Road Development Map 1

Q44 Generation Interconnection

Welcome. Metro North Transmission Project Vancouver Community Information Open House March 9, About the Metro North Transmission Project

Wireless Telecommunication Facility. Project Narrative

LIST OF AMENDMENTS TO ZONING BYLAW NO. 801, 1999

PLSS 3 MILE RULE SUBDIVISION OF. Warm Springs Indian Reservation

AutoCAD Civil 3D 2010 Education Curriculum Instructor Guide Unit 4: Environmental Design

COMMERCIAL SITE AT GENERATION PARK

MSVE CTMP - APPENDIX 3 SITE ACCESS POINTS & TRAFFIC ROUTES

±41.56 ACRES RESIDENTIAL LAND SENECA & N. VIRGINIA, RENO, NV 89506

CABLE AMPACITY PROGRAM (CYMECAP) STUDY: MANHOLE Prepared by

March 4, Billy and Amber Lyons Lyons Car Wash 8601 J.B. Baxley Rd. #40 Benton, AR RE: AFIN: Permit No.

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Automated Enforcement of High Resolution Terrain Models April 21, Brian K. Gelder, PhD Associate Scientist Iowa State University

Appendix C.6. Best Management Practices for Construction Activities

WMS 10.1 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS

WMS 9.0 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS

Appendix A Existing Surface Utilities

User Manual. For Geographical Information System. Last Updated: 1-July-2013 Document No. : - 1 Document version: - 1

2. AREAL PHOTOGRAPHS, SATELLITE IMAGES, & TOPOGRAPHIC MAPS

CHAPTER 01 Basics of Surveying

Planning: Administrative Permits Instructions

Understanding Geospatial Data Models

This guide will tell you all you need to know about the new Front Desk application which can be found on the main Peoria County GIS website.

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

Web-Distributed, Geo-temporal, Integrated Information Systems The Apache County Experience

Information Technology Community Involvement

TSR A & B - FACILITIES STUDY REPORT

City Of Niagara Falls, NY SPRING RFP Brochure Buffalo Avenue and 8411 Troy Avenue

ARLINGTON COUNTY, VIRGINIA

37 SOUTH LAKESIDE OFFICE PARK

- Freehaul: Distance with which there is a fixed price for excavating, hauling, and dumping regardless of the distance moved.

MLEP Intermediate GPS Workshop Exercise Two Using Maps

I-4 DISTRIBUTION WAREHOUSE

LD20493 From AutoCAD Civil 3D to Storm and Sanitary Analysis - Pond Design Using Volume-Grading Tools

Understanding Topographic Maps

GREEN VALLEY LAWN CARE & SNOW PLOW JOLIET, IL SITE MOWING PRICE (PER YEAR) MAINT. PRICE (PER YEAR)

Lheidli T enneh Final Agreement. Lands

P. O. Box 52025, MS POB100 Phoenix, Arizona (602) Feb 9, 2018

New Features The new CBA site features a number of improvements over the previous incarnation of the site:

NEWPORT BUSINESS PARK

Exhibit 25.A. June 2, [First Name] [Last Name] [Suffix] [Address_1] [Address_2] [City], [State] [Zip]

Treasure Map. Output. Output a single integer, which is the maximum amount of gold that you can collect.

Solving Problems with Similar Triangles

Subdivision Application Form

Public Works 2017 Budget Presentation. Public Works What We Do

FINAL Examination Paper (COVER PAGE) Time : 8.00 am am Reading Time : 10 Minutes

Environmental Impact Questionnaire

Roadway Alignments and Profiles

Archway Portfolio South Bend, Indiana

Review Sheet for Second Midterm Mathematics 1300, Calculus 1

Geographic Surfaces. David Tenenbaum EEOS 383 UMass Boston

DIGISENSOR CO., LTD MDS COMPASS DEPTH METER & ALTIMETER MODULE. Description. Application

Georeferencing of Scanned Aerial Imagery and Change Detection

Civil 3D Introduction

Forest Technology: Apps, Maps, Phones, and Drones

CEEN Engineering Measurements Final Exam Fall 2001 Closed Book, Calculator Required 3 Hour Time Limit

Swan Creek BMP Retrofit Database User s Manual

City of Airdrie Capital Budget & Plan

Wednesday, July 15, Author: Eldris Ferrer Gonzalez, M.Sc. Engineering CSA Group

Working with Profiles

PACIFIC CENTER Anaheim, California

FOR LEASE GATEWAY BUSINESS PARK INDUSTRIAL FLEX SPACE 3525 E POST RD, LAS VEGAS, NV

HOW TO USE THE VERMONT DAM SCREENING TOOL

Gaston County GIS. Interactive Mapping Website

As a GIS technician, your job will be to take the available data and develop suitability maps for the site.

Roundabout Design Using AutoCAD Civil 3D 2010 Intersection Tools

1000 PARK DRIVE LAWRENCE, PA OFFICE BUILDING DATA CENTER LAND

GIS BASED VEGETATION MANAGEMENT INVENTORY SYSTEM

Heavy Industrial / Corporate Office Campus

The Design of Telemetry Acquisition and Analysis Vans for Testing Construction and Mining Equipment

(801) Spanish Fork Power. 860 East 4500 South Suite 312 Salt Lake City, UT 84107

WMS 9.1 Tutorial Hydraulics and Floodplain Modeling Floodplain Delineation Learn how to us the WMS floodplain delineation tools

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage

ROCKSIDE WOODS BLVD. INDEPENDENCE, OHIO 44131

GeoRadar Division IDS Australasia

DEM Artifacts: Layering or pancake effects

Go Beyond Security. Multi Location Surveillance & Remote Operation Management...at your finger tips. Warehouse. Sales Office. Showroom.

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

Newsletter 11. Faithfully yours, Shlomi Sivan, CEO Sivan Design D.S Ltd April, Sales Phone: , Ext: 4

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

2015 HDR, all rights reserved.

5.5 Right Triangles. 1. For an acute angle A in right triangle ABC, the trigonometric functions are as follow:

1. Create a customer account.

Manitoba Hydro TSR Facility Study Meeting CapX Transmission Owners Proposal/Study Approach

Transcription:

1004111 1004 N 1004143 1004 N 1004144 1004143 N Agg 0.20 1 1 0.20 Agg 0.50 1 2 0.50 Closed w/ EB; bridge at West Cr removed; no haul planned but rd accesses deferred stand 105, 17 acres, 1991 plantation; recommend decom; replacing str crossing may be prohibitive for one stand; pvt land owner in sect25 has road use permit in place; coordinate w/ land owner Road naturally decoming itself, although no EB; no mapped or observed managed stands; recommend KV plan for decom; EB only Road naturally decoming itself, although no EB; no stands in this analysis and no stands observed along road; recommend KV plan for decom 1023117 MP 0.3 N Agg 0.38 1 2 0.38 This segment starts at MP 0.3, just north of stand 142 and goes to end of rd at 1004; no managed stands; parallels upper reach of Farmer Ck; no stream crossings; plan to decom 1024121 1024120 N 1034114 1034 N 1034121 1034 N 1034123 1034 N 1034124 1034 N Agg 0.13 1 2 0.13 2 Nat 0.48 1 2 0.48 Nat 0.19 1 2 0.19 Nat 0.22 1 2 0.22 Nat 0.83 1 2 0.83 Not planned for haul w/ this analysis; no observed or mapped managed stands along rd; no future need for management; two stream crossings w/ pipes recommended to remove crossings; not future need for management crossings; no future need for management crossings; no future need for management crossings; no future need for management 1134000 MP 2.97 N 1400111 MP 0.25 N 1400119 1400 N 1400121 MP 0.6 N 1400122 1400 N Nat 0.55 1 2 0.55 This segment starts at south end of stand 211, approx MP 2.97 and goes to end of rd at pvt bdry; not needed for future mngmt; rd is nat surface and has drained poorly in past; stable now; gentle grades; recommend KV decom Agg 0.29 1 2 0.29 Y This segment of rd starts at NF bdry (MP 0.25) and goes to end of rd at borrow pit; pit not needed; access to offsite stand 8; KV decom this segment Agg 0.25 1 2 0.25 No haul planned; no mapped stands accessed; no streams; recommend decom Agg 0.40 DE 2 0.40 This segment of rd starts at east edge of stand 311 or approx MP 0.6 and goes to end of rd; no streams; no mapped stand accessed; recommend decom Agg 0.10 DE 2 0.10 Short benign rd; no managed stands accessed; no streams; recommend decom - Inventoried Roadles Area

1400127 1400 N 1400129 1400 N 1400131 1400 N 1400132 1400131 N 1400134 1400 N 1400135 1400134 N 1400146 1400153 N Agg 0.36 1 2 0.36 Does not access mapped managed stands; no streams; would need re-opened to pull DR cmp and stabilze; evaluate on-ground needs during implementation Agg 0.21 1 1 0.21 Road barricaded w/ old style barricade; re-do barricade w/ decom; rd does not access mapped managed stands; no streams; propose decom No access to mapped managed stands; no streams; recommend KV decom Agg 0.18 1 2 0.18 No access to mapped managed stands; no streams; recommend KV decom Agg 0.30 DE 1 0.30 Agg 0.30 DE 1 0.30 Agg 0.07 1 2 0.07 Road bermed closed; no access to mapped managed stands; no streams; recommend decom Road bermed closed; no access to mapped managed stands; no streams; recommend decom No accesses to mapped, managed stands; very short brushed over rd; no on ground decom work needed; passive decom; no streams 1400166 MP 0.1 N Agg 0.20 DE 2 0.20 This segment starts at approx MP 0.1; no haul planned; possible access for further treatment of thinning in a natural stands; check w/ silv; if no trtmt, recommend decom this segment starting just past stand 295; ; no streams 1400169 1400118 N 1400170 1400127 N 1404111 1404 N 1411115 1411 N Agg 0.29 DE 2 0.29 No access to mapped stand; possible access to thinned natural stand; plan to decom if no further mngmt needs; no streams Agg 0.08 1 2 0.08 No mapped managed stands accessed; decom w/ 127 rd during implementation; no streams Agg 0.50 1 2 0.50 No access to managed stands; no streams; propose KV decom Agg 0.40 1 2 0.40 Y No streams; accesses offsite stand; propose for KV decom after South Nestucca Sale harvest of managed stand 1428134 1428 N Agg 0.47 DE 2 0.47 2 Y Accesses SAAT Unit 7, two str pipes for removal; recommend decom after South Nestucca Sale Harvest of managed stands 1428135 1428134 N Agg 0.23 DE 2 0.23 Y Accesses SAAT units 6 & 7; recommend decom after South Nestucca Sale harvest of managed stands 1428136 1428134 N Agg 0.09 DE 2 0.09 Y Accesses SAAT Unit 7, recommend decom after South Nestucca Sale Harvest of managed stands 2210124 MP 0.2 N Agg 0.26 1 2 0.26 1 This segment starts at 160 jct and goes to end of rd; not needed for access to stand 369; plan to KV decom rd; one stream cmp to remove Hydro - Inventoried Roadles Area

2210130 2210 N 2210162 2210125 N Agg 0.11 1 2 0.11 Does not access mapped or observed stand; plan to KV decom; no streams Agg 0.08 1 2 0.08 Does not access mapped or observed stand; plan to KV decom 2283000 MP 3.3 N Agg 1.63 1 2 1.63 7 This segment starts at MP 3.3 (s. end of stand 413) from rd 1400 and goes to the end of rd; no access to managed stands; 7 str pipes recommended for removal; rd on bdry Hydro/Fish 2283111 2283 N Road does not exist; was not located on ground or on 1989 air photo; believe this is a mapping error and road recommendation is office exercise of removing from system/data base GIS 2283113 2283 N 2283114 2283 N 2283115 2283114 N Agg 0.25 1 2 0.25 Y Two carsonite route markers found, both for 2283113; first location is the one mapped, second road location accesses stand 309; recommend decom #1 location as a temp rd since it does not access managed stand; second location keep as 113 which accesses stand 309 and is inside Mt Hebo, mngmt of stand may be deferred due to ; possible access to pvt; not likely or confirmed Agg 0.25 1 2 0.25 No access to managed stands; propose decom; no streams No access to managed stands; propose decom; no streams; decom w/ 114 rd 2283116 2283 N 2283117 2283 N 2283119 2283 N Agg 0.03 1 2 0.03 Difficult to locate on grd; very grown over; no access to managed stand; decom w/ no ground work needed Difficult to locate on grd; very grown over; no access to managed stand; no access to pvt land due east; decom w/ no ground work needed; rd inside Mt Hebo ; possible access to pvt; not likely or confirmed Difficult to locate on grd; very grown over; no access to managed stand; decom w/ minimum work needed; KV decom w/ EB 2283122 2283121 N 2283123 2283 N Agg 0.93 DE 2 0.93 1 No haul planned; access to deferred stand 275 which is inside ; rd has two IS cmps;ok storage, remove w/ decom; some minor fill failures along rd Agg 0.23 1 2 0.23 Does not access managed stands; no streams; on boundary; propose KV decom - Inventoried Roadles Area

2285000 Hwy 22 Y Agg 4.41 1 1 1.00 5 Stored road w/ several failed bridges and road failure; geo-tech report on file; accesses approx 1 ac of pvt land; land owner has easement across NF lands; rd accesses stand 341 north of pvt land; potential to extend 1410 rd to access stand 341; issues are pvt land access needs and removal, stabilization of bridges and road fills; plan to decom last one mile of rd from section 35 pvt land bdry north to the end; ID team would like bridges removed on all portion of the road (stored and decomed); pipe count is estimated 8171113 8171 N Approx 250' long; blocked w/ single EB; doesn't access managed stand; recommed take road off system; not needed for future management; no on the ground work necessary 8172117 8172 N Agg 1.60 1 1 1.60 Road to Battle Lake; road closed in 2010 including pulling pipes; deferred treatment stand 48 is along rd 8172118 8172117 N Agg 0.40 1 1 0.40 Deferred stand 51 at end of this rd, mostly alder; this rd is off of rd 117 which was closed in 2010; no streams; saw one DR pipe that may need pulling w/ decom 8300117 8300 N Road does not access any managed stands; upper ridgetop location w/ one seep crossing; fairly stable; ends at 140% slopes; decom w/ barricade and waterbars 8300118 8300 N Agg 0.72 1 2 0.72 1 This segment of road starts at 83 junction, and goes to the east edge of stand 92; has one stream crossing; gentle grades, but doesn't access any managed lands; recommend decom w/ EB and water bars 8335000 MP 2.0 N Agg 0.78 1 2 0.78 This segment of rd begins at west end of stand 143, at hairpin corner in rd, and goes to the end of rd; there are no managed stands on this segment or the tributary 117 rd; stable flat grades on ridge location w/ no streams; plan to decom w/ barricade and water bars 8335112 Jct 113 N Agg 0.40 1 1 0.40 1 This segment starts at 113 jct and goes to end of rd; currently blocked by old style EB that should be replaced; rd sgmt has a failed stream crossing; fill 95% washed away; no managed stands along this portion of rd; plan to decom w/ pipe removals, rd stabilizing and water bars; video of washout available Hydro/Fish 8335117 8335 N Agg 0.11 1 2 0.11 No managed stands along rd; plan to KV decom w/ barricade; low priority for waterbars; flat ridgetop location 8376123 8376 N Agg 0.64 1 2 0.64 2 Road was built but no stand ever managed along road; road to nowhere; changed beginning termini to 122 from 8376 since rd 122 is needed for long-term management; 123 has two stream pipes and a few DR pipes for removal; KV decom - Inventoried Roadles Area

8376125 8376 N 8376126 8376125 N 8376136 8376 N Agg 0.21 1 2 0.21 Road built; never used; no managed stands; KV decom; no pipes to remove; install EB Agg 0.17 1 1 0.17 Road built; never used; no managed stands; number doesn't show up on maps, but 126 takes off from 125 rd; KV decom; no pipes to remove Road currently closed w/ EB (changed INFRA from OPML 2 to OPML 1); no managed stands along rd; plan to KV decom 8376140 8376 N 8533116 MP 0.32 N 8533117 MP 0.294 N 8533118 8553 N Agg 0.36 1 2 0.36 Agg 0.17 1 2 0.17 Agg 0.43 1 2 0.43 Could not find road; believe it does not exist; stub rd in section 23, south of 8376, just west of 136 jct; according to maps anyway; Update INFRA; no on the ground work needed This segment of road starts at the 117 jct and goes to end of rd; no mapped or observed managed stands; plan to KV decom; no streams This segment of road starts at MP 0.29 (second temp rd left) and goes to end of rd; no mapped or observed managed stands; plan to decom; no str Natural stand along rd; no future use of nat stand mngmt per silv ; no streams; a few DR cmps; plan to decom 8533129 8553 N Nat 0.10 1 2 0.10 Short road (600') built to access rock/borrow pit; doesn't access stand 265 as map indicates; does not access any managed stand; pit not needed; plan to decom w/ EB 8533133 MP 0.4 N 8533135 8533118 N 8573114 8573 N Nat 1.00 1 1 1.00 1 Agg 0.93 DE 2 0.93 5 This segment of road starts at approx MP 0.4 or at s. edge of stand 206; road is very brushed in but has one stream pipe that should be removed; this segment does not access any managed stands and parallels Niagara Creek; old bridge is soon to fall into creek; also decom temp road w/ stream pipes on the far side of the bridge; all decom activity might be coordinated w/ fisheries planned instream placement of logs Does not access any mapped or observed managed stands; built, never used; gentle grades; grassy; EB only for decom activity No stands planned for haul w/ this analysis; rd accesses stand 049, deferrred; valley bottom rd w/ 5 stream pipes and several DR pipes recommended to remove w/ decom; OHV use is evident; rd blocked by large down log at MP 0.47 Wild/Fish/H ydro/geo/h eritage - Inventoried Roadles Area

8594114 MP 0.46 N 8594117 8594 N 8596000 MP 1.96 N This segment of rd starts at the south end of stand 210 (approx MP 0.46) and goes to the end of the rd; no managed stands along this segment; rd has slumped; has sidecast fill Agg 0.10 1 1 0.10 failure, cut bank failure and one DR cmp; rd would need re-built to remove cmp w/ decom; recommend leave for nat decom; consequence of continued failure minimal Does not access any managed stands; no streams; minimal decom work needed Agg 1.34 DE 2 1.34 1 This segment starts at MP 1.96 or just s. of stand 214, at sight of last stream cmp or just beyond where there is a decent truck turn around; no mapped managed stands, two 70's vintage thinned stands; not needed for future mngmt Hydro/Geo Totals 27.5 24.1 29 - Inventoried Roadles Area