Residual Auction Revenue Rights

Residual Auction Revenue Rights Enhancement

Workshop on PJM ARR and FTR Market 2012/2013

Published: December 15, 2017 Revised: December 15, 2017

Published: December 15, 2016 Revised: December 15, 2016

Market Settlements Auction Revenue Rights & Financial Transmission Rights. March 2011 Henry Chu

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

Data Miner 2 Release Notes Release 18.09

Energy Imbalance Market Technical Workshop. BAA Real-Time Congestion Balancing Account August 12, 2013

I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)

Table of Contents. Preface. SECTION 1 Introduction 1. SECTION 3 Operating Reserve 65. SECTION 2 Energy Market 17

Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 3.4 Last Updated: February 2015

Guide 8. TCC Automated Market System User s Guide

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 2.0 Last Updated: November 2012

Bright Ideas: Member Feedback Process

TCR RELEASE 3.1 Job Aid for Structured Testing

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Network Integration Service

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code

Regulating and pricing network access

MISO-PJM Cross-Border Planning. February 19, 2014 MISO-PJM JCM

DR Auction Setup in erpm. Capacity Market Operations March 2013

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals

ARR Registration User Manual

Balancing Programme 1

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

Frequently Asked Questions Real-Time Revenue Sufficiency Guarantee

Total Market Demand Wed Jul 26 Thu Jul 27 Fri Jul 28 Sat Jul 29 Sun Jul 30 Mon Jul 31 Tue Aug 01

Generation Interconnection Process. NEMSTF Education Session 1 January 19, 2012

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code

Open Access Transmission Tariff of Southern Companies

FNM Expansion Training Webinar

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Standard INT Dynamic Transfers

Market Trials Review Group. May 2, 2012

802 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 2, MAY Role of Distribution Factors in Congestion Revenue Rights Applications

Billing and Collection Agent Report For period ending January 31, To FCC Contract Oversight Sub-Committee. February 11, 2019

Designing Broadband Mobile Auctions Experiences from Pakistan

A TEXAS NODAL MARKET: FUNNY NAME, SERIOUS PROBLEM

Business Practice Manual for Managing Full Network Model. Version 910

GSD INTRADAY MRO OUTPUT FORMAT FOR ALL TYPES OF TRANSMISSION SYSTEMS - FILE 1018 March 13, 2012 TABLE OF CONTENTS

MSRS Roadmap. As of January 15, PJM 2019

All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July

Market Splitting Algorithm for Congestion Management in Electricity Spot Market

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Policy and regulatory framework: what are the next challenges to tackle?

Midwest ISO Year in Review Accomplishments

SEE CAO. User Documentation. User Guide for Capacity Traders

MISO PJM Joint and Common Market Cross Border Transmission Planning

_ Dear Secretary Bose: The attached. Folsom, CA

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

Strategic Reserve in Belgium Design and functioning

ICAP Automated Market User s Guide

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Midwest ISO and PJM Joint Operating Agreement (JOA) Update. Joint Stakeholder Meeting November 14, 2008

Mountain West Transmission Group. WECC MIC Update October 17, 2017

SPP Recommendation FERC Electronic Quarterly Report Data Dictionary Version 1.1

Market Coupling en regions: results and perspectives

Service Level Agreement (Broadband - Managed Services - Digital Voice - POTS)

Standard INT Dynamic Transfers

Unused Generation Capacity Study Scope. Informational Analysis

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Overture Advertiser Workbook. Chapter 6: Managing Your Account

PJM FTR. External Interface Specification. Date: February 20th, Revision 15. Transmittal No.: ALSTOM Grid Redmond, Washington USA

Contingency Modeling Enhancements Prototype Analysis with Production Cases

Workshop J. FirstEnergy Pennsylvania - Met-Ed, Penelec, Penn Power, West Penn Power: Electric Rates & Tariffs. 1:45 p.m. to 2:45 p.m.

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

DIGITAL SUBSCRIBER LINE (DSL) SERVICE GUIDE

Equipment Installment Plans for enterprise customers

ORACLE UTILITIES OPOWER PROFESSIONAL SERVICES DESCRIPTIONS

The Auction Manager Owner s Manual. A quick guide to the tools and features available in BiddingforGood s Auction Manager.

2017 RTEP Assumptions for Western Sub-Region

Optimal transmission switching: economic efficiency and market implications

FCC Form Carrier Annual Reporting Data Collection Form

Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS.

Assessing Opportunities to Exploit Stranded Power

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Warrenton Wheeler Gainesville 230kV Reliability Project

CGM and Energy Data Architecture a TSO Perspective

REQUEST FOR PROPOSALS FOR INMATE TELEPHONE AND VIDEO VISITATION SYSTEM FOR THE COLUMBIA COUNTY JAIL. Questions from Vendors

Coordinate Interchange

Coordinate Interchange

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline

PJM Daylight Saving Scheduling Guide for Spring and Fall 2018

Accessing ACH payments

Industry Update. View of the WISP Market. January, 2018

SEARS CANADA INC. BANKRUPTCY CASE STUDY FILED ON 06/22/2017

Entergy Arkansas, Inc. Transition Plan Technical Conference #1

edart Quick Reference Guide

BritNed Nomination process. Presentation for Nomination procedure

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way

Uninstructed Deviation Penalty Charge Types 4470, and 4480

Introduction to the NYISO

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

BUYER S GUIDE TO AWS AND AZURE RESERVED INSTANCES

Oracle Managed Cloud Services for Software as a Service - Service Descriptions. February 2018

DIGITAL SUBSCRIBER LINE (DSL) SERVICE GUIDE

Transcription:

Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Market Implementation Committee November 2, 2016

Overview Auction Revenue Rights (ARRs) prorated in Stage 1B of the annual ARR allocation maybe allocated residual ARRs on a monthly basis New upgrades and monthly re-serviced outages Residual ARR paths could receive negative values based on monthly FTR clearing prices Stakeholders are interested in exploring enhancements to reduce customer exposures to negatively priced residual ARRs 2

Solution Package - Package A Proposed by Exelon and Direct Energy Can be supported by PJM Requires PJM to run another SFT proration with all negatively valued bids removed Can not be started until the monthly FTR auction is final Results will be posted upon completion of the final SFT Run May result in a delayed MSRS posting and settlement for residual ARRs only 3

Feb 2016 Analysis Compared outages to annual model vs. February 2016 Smaller outage set allowed for increased transmission capability and ARRs Several zonal pnodes cleared less than the historical generator pnodes in that zone for the FEB 2016 FTR Auction (Sink Source) calculation for residual ARR resulted in a negative value All outages modeled and auction results are publically posted on PJM.com 4

Residual ARR Credits 5

Appendix Residual ARR Packages and Educational Material

Residual ARR/FTR Relationship Residual ARRs could be positively or negatively valued based on the monthly FTR Auction clearing prices. This is the only relationship between the two markets. Incremental PJM System Capability Residual Monthly Allocation ARRs Allocated (MWs) Auction Revenue Rights Monthly FTR Auction FTRs Awarded To Bidders (MWs & Price) Auction Revenue 7

ARR Settlements Residual ARR target credits are netted daily with Annual ARR target credits within a portfolio Net negative portfolios are a liability to the holder Not reassigned if load shifts away from the LSE If sufficient FTR Auction revenues are collected for a day, ARR Credits equal ARR Targets for all ARR holders Remaining Auction Revenues from each day get included in the End-of-Month allocation of Congestion Credits to FTR Holders 8

ARR Settlements cont. It is possible PJM does not collect enough FTR Auction revenue to fulfill all ARR Targets for a day, although this has never happened Example: If Annual ARR Allocation did not model a Major Long Term Emergency outage that was included in Annual FTR (i.e. outage started after Annual ARR but before Annual FTR) If this were to happen, negative valued ARRs would be collected first to increase the proration to positive ARR Targets Unfulfilled ARR Targets would get uplifted at the end of the planning period as part of the existing uplift process 9

FTR Settlements Revenue collected to fund FTR Target credits: Day-ahead congestion revenue Balancing congestion revenue (subject to change) Market-to-market payments (subject to change) FTR Auction revenue surplus After all ARR Targets are fulfilled 10

FTR Auction Revenue Surplus FTR Auction revenue and surplus values should not significantly change with the removal of counter flow ARRs SFT will clear less prevailing flow MWs to offset the removal of counter flow MWs ARR portfolio values could be different for each member, although impact to total FTR Auction surplus bucket should be minimal Possible +/- change due to ARR paths not being equal and opposite 11

Impact Summary Potential Impacts: Prevailing Flow Residual ARRs Less will clear since counter flows are removed from the SFT ARR Portfolio values could change, although total for PJM should be minimal Less Possible Impacts: Full Funding of ARR Target credits ARR Target credits have always been 100% funded No Impacts: FTR Auction clearing prices Total PJM FTR funding 12

Residual ARR Path Count 13

Cleared Residual ARR Path Count 14

Solution Package A Based on the current monthly FTR schedule, performing a second iteration of the monthly Residual ARR market will require significant administrative work in only a few days Adjusting the monthly FTR schedule will have multiple effects including: Base case set-up time for PJM Availability of FTR auction user data postings Credit timeline impacts and potential for locking credit longer than normal Potential member impacts PJM would prefer to give members option to include bid rather than zero out 15

PJM Solution Package Package B - Provide flexibility for ARR holders to remove bids prior to the simultaneous feasibility test (SFT) run each month Gives ARR holders option each month whether or not to include ARR bids for evaluation Does not require significant additional administrative work - Will not require adjusting FTR/ARR monthly market timelines 16

ARRs are allocated to Network & Firm Transmission Service Customers ARR Review ARRs entitle the holder to receive an allocation of FTR Auction revenues ARRs are reassigned on a proportional basis within a zone as load switches between LSEs within the planning period ARRs must be simultaneously feasible Residual ARRs may be available within a planning period for increased transmission capability 17

Residual ARR Overview - ARRs prorated in Stage 1B of the Annual Allocation may be allocated Residual ARRs for the following: Increased transmission capability made available by certain transmission upgrades made during the planning year that were not modeled in the Annual ARR Allocation Increased transmission capability made available for periods when Annual ARR modeled transmission outages are not out of service 18

Residual ARR Characteristics Residual ARR MWs plus previously awarded Stage 1 and Stage 2 MWs cannot exceed the Network Service Peak Load value for a particular participant Residual ARRs are effective the first month the increased transmission capability is modeled in the Monthly FTR Auction Economic value of Residual ARRs are based on the MW amount and the nodal clearing price difference between the source and sink nodes for the FTR Obligations resulting from each monthly FTR Auction the Residual ARR is effective 19

Clearing Residual ARR MWs - Market is created with prorated stage 1B requests from Annual Allocation All ARR requests from stage 1B that did not fully clear - Proration is done manually by operator until violated facilities are minimized as much as possible Constraint basis residual requests that impact violated constraints are prorated 20

Residual ARR Results Residual ARRs are valued based on the nodal clearing prices from the corresponding monthly FTR Auction Results are posted in eftr roughly same time as monthly FTR Auction Residual ARRs will shift with load within a zone Settlements calculates a daily rate billed weekly evenly throughout month 21

Monthly Vs. Annual Clearing Prices Market Residual MW Total Total Value (Annual)* Total Value (Monthly) 2014/2015 ARR 22,532.90 $ 4,894,781.83 $ 8,160,918.27 2015/2016 ARR 37,043.80 $ 8,138,975.75 $ 8,620,612.69 *Represents the total cleared Residual ARR MWs priced at the average 4-round annual clearing prices divided by 12. 22