TABULATION OF BIDS RECEIVED - APRIL 1, :00 PM (LOCAL TIME)

Similar documents
PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC

Allegheny Lead Safe Homes Program Contractor Training Program Application Packet

Allegheny Lead Safe Homes Program Contractor Training Program Application Form

2016 NCPSB Members and Committees Note: Terms officially end at the January NCPSB meeting following the year indicated.

2015 NCPSB Members and Committees Note: Terms end December 31 of year indicated. Board Chair Jennifer Booge

Application for Overhead Wireline Crossing or Longitudinal of Railroad Property and or Track

HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017

SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL Estimated.

Product Bulletin IJ39

Application for Underground Wireline Crossing or Longitudinal of Railroad Property and or Track

Boise Cascade Pro-Install Brand Packaging User Guide. Boise Cascade Building Materials Distribution, L.L.C.

U.S. System Summary: OHIO HUB

Chapter 3 Final Review

REQUEST FOR PROPOSAL (RFP)

Profiles & Preferences

Commercial Lines Transactions

Command Central P/N R

On Line Bid ID code You must create your On-Line Bid ID code to submit your bid.

Figure 1 Map of US Coast Guard Districts... 2 Figure 2 CGD Zip File Size... 3 Figure 3 NOAA Zip File Size By State...

Opportunity Corridor-Section 3 Stakeholders Meeting. The Kokosing DBT

Nevada Contractors Board Directory

Vantage 70 Frederick s Most Visible Location

XSP Series XSP1 LED Street/Area Luminaire Single Module Version C

Bid Package Download Notice, Bid # RFP 79001

1. The dimensions and shape of a rectangular volleyball court are shown in this picture.

Ameriflex Attn: Michele Harms / Diego Prieto 2508 Highlander Way, Suite 200 Carrollton, TX 75006

XSP Series XSP2 LED Street/Area Luminaire Double Module Version C

2014 BOND PROGRAM UPDATE

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages

THE COLONY. AT MORTON GROVE 3 bedroom / 2 Bath Condos with Single-Car Garage Priced From $179,900

The School District of Palm Beach County, Florida Construction Purchasing Department

IMPORTANT VENDOR RECALL NOTICE

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

S&R CORPORATION DBA IN NJ S&R OF MA CORP. NEUBER ENVIRONMENT AL SERVICES, INC. HUDSON VALLEY ENVIRONMENT AL, INC. 706 BROADWAY STREET

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

The School District of Palm Beach County, Florida Construction Purchasing Department

The attached information details the bids, purchases and/or services being recommended as follows:

REQUEST FOR PROPOSALS

ARLINGTON COUNTY, VIRGINIA

SERVICE LETTER EXHAUST - TRANSMITTAL OF NORDAM S SERVICE BULLETIN CIT SV 78-05, THRUST REVERSER MAINTENANCE LOCK ASSEMBLY REPLACEMENT

Nevada Contractors Board Directory

A comparison of AMoN measurements with localized, arrayed passive NH 3 samplers in Northern Utah Dr. Randal S. Martin

ADDENDUM #1. Date: 12/21/2018

Name Date Class Practice A LESSON Surface Area. Find the surface area S of each net Find the surface area S of each prism

XSP Series XSP2 LED Street/Area Luminaire Double Module Version B

Santa Cruz Strategic Partners

Assessor Report 04/01/14

FOR SALE >> COMMERCIAL LAND >> HWY 287 AT I-45 IN ENNIS, TX

Easy English Writing Style Guide

SUBCONTRACTOR PRE-QUALIFICATION FORM. Company Name: Contact Person: Address: City: State: Zip: Telephone: Fax:

Subject: Audit Report 16-50, IT Disaster Recovery, California State University, Fresno

USW District Calendar of Events

Manatee County Board of County Commissioners Wingate East Wingate Creek Southeast Tract

Laboratory Report: Adhesion

City Council Work Session

Former LEGO Manufacturing Facility. Impeccable 587,736 SF Subdividable Industrial Property. For leasing information, contact:

ITEM DESCRIPTION BIDDER UNIT BRAND/ DELIVERY WARRANTY

XSP Series XSP1 LED Street/Area Light Single Module Version B

CIO-SP3 Small Business Ramp On Solicitation Number NIHJT , Pre- Award Notice for the SDVOSB Program

A G E N D A OLD TOWN DESIGN REVIEW COMMITTEE APRIL 10, 2017

Dallas ISD Procurement Services

41965 ECORSE ROAD VAN BUREN TOWNSHIP, MICHIGAN

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

Crime Reporting in the Age of Technology

LIST OF LICENSED LABORATORIES

1. Please provide any technical or project execution concerns, given the conditions on the ground and the draft requirements

Free or Reduced Air from Select Gateways for 1st & 2nd guest on reservation

ADVERTISING & MARKETING OPPORTUNITIES. Market your Participation and Stand Out from Your Competition

Web Entry Instructional Manual

Brooks Chimney Sweeping

ORIENTING FOR STRENGTH, SPEED OR SURFACE FINISH

MANUFACTURING LLC Please read this manual carefully before using this product. 360SLT SMARTLINK TM TPMS TABLET USER MANUAL

5/18/2012 SCOTT JACKSON 1234 EAST DR NEW BEDFORD MA Bill Russell 3447 Harbor Dr. Westridge VA

Valid June 1 - September 30, Supplement #1 2002

Ohio Maureen Capellas April Chenault-McLeod Jeffrey Cicerchi

North Marion School District Bond Projects

2018 NCPSB Members Note: Terms officially end at the January NCPSB meeting following the year indicated.

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

Discount Codes. 05/B5 Inserts - PVC INSERTS - PVC. Cold Water Only. List Prices

RFP NUMBER: BG-FY BLACK GOLD COOPERATIVE LIBRARY SYSTEM REQUEST FOR PROPOSAL (RFP) MPLS Network Posted: October 28, 2015 Due: November 25, 2015

Database Foundations. 5-1 Mapping Entities and Attributes. Copyright 2015, Oracle and/or its affiliates. All rights reserved.

CostQuest Associates, Inc.

Anaerobic-Cure Connectors

Automotive. Babysitting

OSP Methodology Glow and Trespass

CURRICULUM VITA. Kristin M. Swartz

A RESOLUTION. WHEREAS, METRO is in need of executive search services to assist in its

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Autoconnector. A Tradition of Innovation. Product Information. Major Features

Protective Coatings Specialist (PCS)

Dear Customer, Best Regards, Quality Assurance Team. Customer Channels. Thermo Fisher Scientific. 300 Industry Drive. Pittsburgh, PA 15275

PROSPECTUS ALTERATION PHILLIP BURTON FEDERAL BUILDING & U.S. COURTHOUSE SAN FRANCISCO, CA

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

SPONSOR/AFFILIATE MEMBER ROSTER 2014

National Certificate in Blaster Coating (Level 2) with optional strands in Confined Spaces; and Height and Traffic Safety

Addendum # 2. RFB #237 Alys Stephens Center Brochure Opening: 2:00 pm. The following questions were received for review.

brighton Cert no. BV-COC Printed on FSC paper utilizing fiber from responsibly managed forests

P.O. Box 4910, Syracuse, NY Fax: Agrisurance, Inc. Workers Compensation

Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads

ASBESTOS MATERIALS SURVEY

Transcription:

SUBSTANTIAL COMPLETION DATE: FINAL COMPLETION DATE: AUGUST 14, 2016 (90 DAYS) AUGUST 28, 2016 Bidder No. 1 L.C. United Painting Co., Inc. Amount of Bond: 100% 3525 Barbara Drive Surety: Westfield Insurance Co. Sterling Heights, MI 48310 P.O. Box 5001, 1 Park Circle Phone: 586-979-2855 Westfield Center, OH 44251-5001 Fax: 586-979-8053 Bidder No. 2 D&M Painting Corporation Amount of Bond: 100% 1500 Amity Ridge Road Surety: Ohio Casualty Insurance Company Washington, PA 15301 62 Maple Avenue Phone: 724-229-0440 Keene, NH 03431 Fax: 724-229-0441 Bidder No. 3 UCL, Inc. Amount of Bond: 100% 2025 Stapleton Court Surety: Great American Insurance Company Cincinnati, OH 45240 301 E. 4th Street Phone: 513-674-1666 Cincinnati, OH 45202 Fax: 513-674-9525 Bidder No. 4 Principle Industrial Services, LLC Amount of Bond: 100% 102 Jacksboro Street Surety: Old Republic Surety Company Chico, TX 76431 2000 Cliff Mine Road, Suite 450 Phone: 940-539-2647 Pittsburgh, PA 15275 Fax: 832-553-7494 P:\PR54319\Design Services\Specs\Rye Beach Tank Bid Tabs.xlsx Page 1 of 6

LABOR MATERIAL TOTAL EXTENSION Base Bid - E Exteior overcoat (white). Dry interior overcoat. Wet interior abrasive blast and Epoxy primer. Huron blue/green logos (2 sides) 1 L.C. United Painting Co., Inc. $ 200,000.00 $ 94,000.00 $ 294,000.00 $ 294,000.00 2 D&M Painting Corporation $ 117,600.00 $ 176,400.00 $ 294,000.00 $ 294,000.00 3 UCL, Inc. $ 256,620.00 $ 109,980.00 $ 366,600.00 $ 366,600.00 4 Principle Industrial Services, LLC $ 175,000.00 $ 134,000.00 $ 309,000.00 $ 309,000.00 Base Bid - Z Exteior overcoat (white). Dry interior overcoat. Wet interior abrasive blast and Zinc primer. Huron blue/green logos (2 sides) 1 L.C. United Painting Co., Inc. $ 200,000.00 $ 99,000.00 $ 299,000.00 $ 299,000.00 2 D&M Painting Corporation $ 120,000.00 $ 180,000.00 $ 300,000.00 $ 300,000.00 3 UCL, Inc. $ 265,020.00 $ 113,580.00 $ 378,600.00 $ 378,600.00 4 Principle Industrial Services, LLC $ 175,000.00 $ 137,000.00 $ 312,000.00 $ 312,000.00 Alternate 1E white stem/cone). Dry interior and Epoxy primer. 1 L.C. United Painting Co., Inc. 200,000.00 99,000.00 $ 299,000.00 $ 299,000.00 2 D&M Painting Corporation 94,800.00 142,200.00 $ 237,000.00 $ 237,000.00 3 UCL, Inc. 263,340.00 112,860.00 $ 376,200.00 $ 376,200.00 4 Principle Industrial Services, LLC 175,000.00 139,000.00 $ 314,000.00 $ 314,000.00 Alternate 1Z white stem/cone). Dry interior and Zinc primer. 1 L.C. United Painting Co., Inc. 200,000.00 104,000.00 $ 304,000.00 $ 304,000.00 2 D&M Painting Corporation 96,400.00 144,600.00 $ 241,000.00 $ 241,000.00 3 UCL, Inc. 256,340.00 109,860.00 $ 366,200.00 $ 366,200.00 4 Principle Industrial Services, LLC 175,000.00 142,000.00 $ 317,000.00 $ 317,000.00 P:\PR54319\Design Services\Specs\Rye Beach Tank Bid Tabs.xlsx Page 2 of 6

LABOR MATERIAL TOTAL EXTENSION Alternate 2E blue stem/cone). Dry interior and Epoxy primer. 1 L.C. United Painting Co., Inc. 200,000.00 108,000.00 $ 308,000.00 $ 308,000.00 2 D&M Painting Corporation 96,800.00 145,200.00 $ 242,000.00 $ 242,000.00 3 UCL, Inc. 258,440.00 110,760.00 $ 369,200.00 $ 369,200.00 4 Principle Industrial Services, LLC 175,000.00 145,000.00 $ 320,000.00 $ 320,000.00 Alternate 2Z blue stem/cone). Dry interior and Zinc primer. 1 L.C. United Painting Co., Inc. 200,000.00 112,000.00 $ 312,000.00 $ 312,000.00 2 D&M Painting Corporation 98,400.00 147,600.00 $ 246,000.00 $ 246,000.00 3 UCL, Inc. 260,540.00 111,660.00 $ 372,200.00 $ 372,200.00 4 Principle Industrial Services, LLC 175,000.00 148,000.00 $ 323,000.00 $ 323,000.00 Add Alternate 1 Huron logos (2 sides) 1 L.C. United Painting Co., Inc. 6,000.00 3,000.00 $ 9,000.00 $ 9,000.00 2 D&M Painting Corporation 7,200.00 10,800.00 $ 18,000.00 $ 18,000.00 3 UCL, Inc. 6,020.00 2,580.00 $ 8,600.00 $ 8,600.00 Add Alternate 2 Huron Great Lakes Place logos (2 sides) 1 L.C. United Painting Co., Inc. 8,000.00 4,000.00 $ 12,000.00 $ 12,000.00 2 D&M Painting Corporation 7,200.00 10,800.00 $ 18,000.00 $ 18,000.00 3 UCL, Inc. 7,000.00 3,000.00 $ 10,000.00 $ 10,000.00 P:\PR54319\Design Services\Specs\Rye Beach Tank Bid Tabs.xlsx Page 3 of 6

LABOR MATERIAL TOTAL EXTENSION Add Alternate 3 Lake Erie Shores & Islands logos (2 sides) 1 L.C. United Painting Co., Inc. 8,000.00 5,000.00 $ 13,000.00 $ 13,000.00 2 D&M Painting Corporation 7,200.00 10,800.00 $ 18,000.00 $ 18,000.00 3 UCL, Inc. 6,300.00 2,700.00 $ 9,000.00 $ 9,000.00 Add Alternate 4 Huron Great Lakes Place dark logo (1 side) and Lake Erie Shores & Islands logo (1 side) 1 L.C. United Painting Co., Inc. 8,000.00 6,000.00 $ 14,000.00 $ 14,000.00 2 D&M Painting Corporation 9,600.00 14,400.00 $ 24,000.00 $ 24,000.00 3 UCL, Inc. 8,400.00 3,600.00 $ 12,000.00 $ 12,000.00 4 Principle Industrial Services, LLC 8,000.00 8,000.00 $ 16,000.00 $ 16,000.00 Add Alternate 5 Huron white logo lettering on stem (2 sides) 1 L.C. United Painting Co., Inc. 5,000.00 2,000.00 $ 7,000.00 $ 7,000.00 2 D&M Painting Corporation 4,800.00 7,200.00 $ 12,000.00 $ 12,000.00 3 UCL, Inc. 2,100.00 900.00 $ 3,000.00 $ 3,000.00 Add Alternate 6 Exterior Roof Safety Railing 1 L.C. United Painting Co., Inc. 9,000.00 5,000.00 $ 14,000.00 $ 14,000.00 2 D&M Painting Corporation 3,640.00 5,460.00 $ 9,100.00 $ 9,100.00 3 UCL, Inc. 9,100.00 3,900.00 $ 13,000.00 $ 13,000.00 4 Principle Industrial Services, LLC 2,500.00 4,000.00 $ 6,500.00 $ 6,500.00 Add Alternate 7 Exterior surfaces abrasive blast, containment, and painting. 1 L.C. United Painting Co., Inc. 100,000.00 54,000.00 $ 154,000.00 $ 154,000.00 2 D&M Painting Corporation 72,000.00 108,000.00 $ 180,000.00 $ 180,000.00 3 UCL, Inc. 151,900.00 65,100.00 $ 217,000.00 $ 217,000.00 4 Principle Industrial Services, LLC 65,000.00 60,000.00 $ 125,000.00 $ 125,000.00 P:\PR54319\Design Services\Specs\Rye Beach Tank Bid Tabs.xlsx Page 4 of 6

LABOR MATERIAL TOTAL EXTENSION BASE BID E: Informal Total of Bid Item Base Bid - E 1 L.C. United Painting Co., Inc. $ 294,000.00 2 D&M Painting Corporation $ 294,000.00 3 UCL, Inc. $ 366,600.00 4 Principle Industrial Services, LLC $ 309,000.00 BASE BID Z: Informal Total of Bid Item Base Bid - Z 1 L.C. United Painting Co., Inc. $ 299,000.00 2 D&M Painting Corporation $ 300,000.00 3 UCL, Inc. $ 378,600.00 4 Principle Industrial Services, LLC $ 312,000.00 ALTERNATE 1E: Informal Total of Bid Item Alternate 1E 1 L.C. United Painting Co., Inc. $ 299,000.00 2 D&M Painting Corporation $ 237,000.00 3 UCL, Inc. $ 376,200.00 4 Principle Industrial Services, LLC $ 314,000.00 ALTERNATE 1Z: Informal Total of Bid Item Alternate 1Z 1 L.C. United Painting Co., Inc. $ 304,000.00 2 D&M Painting Corporation $ 241,000.00 3 UCL, Inc. $ 366,200.00 4 Principle Industrial Services, LLC $ 317,000.00 ALTERNATE 2E: Informal Total of Bid Item Alternate 2E 1 L.C. United Painting Co., Inc. $ 308,000.00 2 D&M Painting Corporation $ 242,000.00 3 UCL, Inc. $ 369,200.00 4 Principle Industrial Services, LLC $ 320,000.00 P:\PR54319\Design Services\Specs\Rye Beach Tank Bid Tabs.xlsx Page 5 of 6

LABOR MATERIAL TOTAL EXTENSION ALTERNATE 2Z: Informal Total of Bid Item Alternate 2Z 1 L.C. United Painting Co., Inc. $ 312,000.00 2 D&M Painting Corporation $ 246,000.00 3 UCL, Inc. $ 372,200.00 4 Principle Industrial Services, LLC $ 323,000.00 THE ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST AS OF MARCH 2016 IS $410,000. P:\PR54319\Design Services\Specs\Rye Beach Tank Bid Tabs.xlsx Page 6 of 6