Table of Contents. Purpose. Certification of Metering Facilities. Procedure No Version No. 1.4 Effective Date 2/14/2018. Operating Procedure

Similar documents
Table of Contents. Purpose. Meter Data Acquisition and Processing Procedure. Procedure No Version No. 1.3 Effective Date 2/14/2018

1. Responsibilities. Settlement Quality Meter Data (SQMD) Plan Submission & Approval Process (External) Operating Procedure

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

New Resource Implementation & Market Modeling

CAISO RIG Acceptance Test Procedure

Timber Products Inspection, Inc.

Reliability Coordinator Procedure PURPOSE... 1

CERTIFICATION GUIDELINES FOR MANAGEMENT SYSTEM

Areas of impact for client consideration taken from the Rules for achieving IATF recognition Third edition for ISO/TS

Request for Proposal for Technical Consulting Services

Generator Interconnection Process. Wholesale Transmission Overview

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949

DQS Inc. Management Systems Solutions Certification Requirements

Operations ISO Version: 1.2. Communication Block Diagram Requirements Effective Date: 082/07/2017. Checklist

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Administration of PEFC scheme

WP24 CFD Settlement: Required Information

Battery Program Management Document

Indonesia - SNI Certification Service Terms

PRODUCT CERTIFICATION SCHEME FOR MECHANICAL-CUSTOMIZED VEHICLES

GLOBAL MANAGEMENT CERTIFICATION SERVICES PRIVATE LIMITED PROCEDURE

Reliable Quality Assurance Pvt. Ltd.

Chain of Custody Policy. July, 2015

Stakeholder Comments Template

AWS QC17:2002. Standard for Accreditation of Welding Fabricators for AWS Certified Welding Fabricator Program

SLI Compliance ONC-ATL Testing Program Guide

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

Checklist for Submission to Utility

C-BPVCA ADMINISTRATIVE PROCEDURES DELEGATED TO ASME CONFORMITY ASSESSMENT STAFF

APPROVAL PROCESS TO BE FOLLOWED FOR PROVISIONAL ACCREDITATION OF CBs UNDER FM CERTIFICATION SCHEME

TO THE FLORIDA BUILDING COMMISSION

Portal 9.1 PeopleBook: Internal Controls Enforcer

Information for your Certification

Abu Dhabi Certification Scheme for Assistant Engineer Assessment and Surveillance Plan for Assistant Engineer

Scheme Document SD 003

Guidance of NOP Certification system Page 1/8

Missouri Housing Development Commission Certified Property Management Agent Program

Table of Contents. TOP TOP BA Data Request and Specification Guidelines. Operating Procedure

Agreements and Queue Management

CHAPTER 6 INFORMATION FOR CANDIDATES

GUIDELINES FOR CERTIFICATION OF MALAYSIAN SUSTAINABLE PALM OIL (MSPO)

PRODUCT CERTIFICATION SCHEME FOR WATER PRODUCTS

European Aviation Safety Agency

For the Certification of Operations Located in Canada to the Canadian Organic Regime (COR)

ACCREDITATION OF VR REPAIR ORGANIZATIONS

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH

Certification. Causes of Reduction of Scope of Certification

RSPO Certification Step by step

Certification Program

Small Hydro Regulatory and Permitting Requirements California

Suspension or Withdrawal of Certificates procedure

PRODUCT CERTIFICATION SCHEME FOR ORGANIC PRODUCTS

Guidelines for Organic Certification of Grower Group

GUIDE ON APPLICATION FOR ROUNDTABLE FOR SUSTAINABLE PALM OIL PRINCIPLES AND CRITERIA (RSPO P & C) INCLUDING GROUP CERTIFICATION

Agreements and Queue Management

Cell and PDAs Policy

Procedure for Issue and Withdrawal of Certificates

Certification program PCWU-3

Alberta Reliability Standards Compliance Monitoring Program. Version 1.1

Authorized Training Provider Application Process

PEFC Certification System Netherlands - Certification Procedures

Internal Audit Follow-Up Report. Multiple Use Agreements TxDOT Office of Internal Audit

Green Star Volume Certification. Process Guide

Meter Configuration and RIG Details Checklist

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. Request for Proposal. RFC Editor RFC Format CSS Design

Rules for LNE Certification of Management Systems

ISO/IEC 17065:2012 VERTICAL/FILE REVIEW ASSESSMENT

NFRC Errata and Addendum Log

PRODUCT CERTIFICATION SCHEME FOR CHILDREN TOYS

GUIDELINES FOR CERTIFICATION OF MANAGEMENT SYSTEMS

Coutts Online Application Form for PLCs and Limited Companies

Certification Description of Malaysia Sustainable Palm Oil (MSPO) Standard

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. Request for Proposal. Three Software Tools to Support the RFC Editor:

Educational Use Only S A M P L E S A M P L E

Council on Dairy Cattle Breeding

DISADVANTAGED BUSINESS ENTERPRISE PROGRAM. Unified Certification Program OKLAHOMA

ACCEPTABLE MEANS OF COMPLIANCE (AMC) GUIDE FOR ACCEPTANCE OF MANUALS REQUIRED BY AUA-OPS2

COMMERCIAL FURNACES CERTIFICATION PROGRAM

Policies and Procedures for CTIA Authorized Testing Laboratories

FRAMEWORK FOR CERTIFICATION OF BIOMETRIC FINGERPRINT SCANNERS. (PUBLIC)

R2 Code of Practices

Application Guide NACE INTERNATIONAL INSTITUTE. October PARK TEN PLACE HOUSTON, TEXAS USA 77084

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

EXAM PREPARATION GUIDE

PRODUCT CERTIFICATION SCHEME FOR ENERGY DRINKS

Orion Registrar, Inc. Certification Regulations Revision J Effective Date January 23, 2018

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA)

Personnel Certification Program

TCG Storage Work Group. Storage Certification Program. Program Version 1.0 Document Revision 1.22 March 16, Contact: Doug Gemmill, TCG CPM T C G

Abu Dhabi Certification Scheme for Pool Lifeguard Assessment and Surveillance Plan for Pool Lifeguard

The Open Group Certification for People. Certification Policy. for Examination-Based Programs

Request for Qualifications for Audit Services March 25, 2015

Accreditation Criteria For Conformity Assessment Bodies

Demand Response User Guide DRRS Enhancement Market Simulation. Version 1.0 August 18, 2016

2018 CANADIAN ELECTRICAL CODE UPDATE TRAINING PROVIDER PROGRAM Guidelines

EIM Entity Readiness Criteria May 6, 2015

IBD CERTIFICAÇÕES. Fair Trade Certification Step by step. Welcome to IBD!

Transcription:

No. 5710 Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/Applicability... 3 2.1 Background... 3 2.2 Scope / Applicability... 3 3. Detail... 3 3.1 Certifying Metering Facilities... 3 3.1.1 Initializing the Process... 3 3.1.2 Meter Installation Activity... 5 3.1.3 Communication Test... 6 3.1.4 Operational Test... 7 3.1.5 Meter Data Validation Activity... 7 3.2 Responsibilities for Maintaining Certificate of Compliance... 8 3.2.1 Facility Maintenance... 8 3.2.2 Certificate Revocation... 9 3.3 Installation of Additional Metering...10 3.3.1 ISO Metered Entity Election to Install Additional Metering...10 3.3.2 ISO Requirement to Install Additional Metering...10 4. 4. Supporting Information...11 Operationally Affected Parties...11 References...11 Definitions...11 Version History...12 5. Periodic Review...12 Review Criteria...12 Frequency...12 Incorporation of Changes...12 Technical Approval...13 Director Approval...13 Appendix...13 Purpose Provides guidelines throughout the Metering Certification process including the initial submission of information, site and Meter Data validation, and maintaining the certified Metering Facility. Page 1 of 13

No. 5710 1. Responsibilities ISO Energy Data Acquisition Specialists(EDAS) Team ISO Meter Data Acquisition Systems Team (MDAS) ISO Metered Entity (ISOME) ISO Authorized Inspector Validate all required metering documents according to New Resource Implementation timeline (Buckets). Establish meter communication(s). Support related testing for synchronization o If applicable, request for Hand Held Format (HHF) file(s) from the ISO Authorized Inspector in the event that the ISO is not able to communicate with the respective meter(s). EDAS shall forward applicable HHF(s) to mdas@caiso.com. Perform meter data validation and issuance of Certificate of Compliance required to achieve Commercial Operational Date (COD). Input meter configuration information into internal meter collection system based on information from the ISO Meter Configuration Worksheet. Support meter data validation and issuance of Certificate of Compliance required to achieve Commercial Operational Date (COD). Provide required documentation according to New Resource Implementation (NRI) timeliness. Ensure that the external field personnel who installs/programs any meter(s) within the Certified Meter Facility is different from the ISO Authorized Inspector who inspects the meter. Ensure meter communications are operational with the ISO. Secure Fieldwork Support from the ISO to support troubleshooting and/or testing. Ensure that their Metering Facilities continue to comply with the certification criteria referred to in the CAISO tariff and the Business Practice Manuals. Fill out the ISO Meter and Site Verification Sheet (MSVS) and forward it to the ISOME for review. Perform testing and inspection of the Meter Facility. Ensure that the meter is programmed using the readwrite password. If applicable, forward the HHF to edas@caiso.com within two (2) business days after operational testing. Page 2 of 13

No. 5710 2. Scope/Applicability 2.1 Background This process is to ensure all related documentation, tests, and validations are performed resulting in the issuance of the Certificate of Compliance. The Certificate of Compliance is required to commercially participate and generate settlement statements based on Meter Data within the ISO market. 2.2 Scope / Applicability This procedure includes an overview of the ISO Meter Facility certification process and requirements for maintaining the Metering Facilities. 3. Detail 3.1 Certifying Metering Facilities 3.1.1 Initializing the Process The following actions take place to obtain a Certification of Compliance for a new or existing site: Description To obtain a Certificate of Compliance (prior to the installation of any metering equipment) it is necessary for the execution of the actions below: 1 Contact the ISO by email or phone for information and direction about how to get started. The ISO will provide support documentation, a Certification Checklist, and describe how to locate information about meter installation on the ISO webpage. Email: NewResourceImplementation@caiso.com Page 3 of 13

No. 5710 2 If New Site Then Contact the ISO by email or phone for information and direction about how to get started. The ISO will provide support documentation, a Certification Checklist, and describe how to locate information about meter installation on the ISO webpage at: http://www.caiso.com/participate/pages/resourceinterconnec tionguide/default.aspx Existing Site Contact the ISO prior to making any modifications to existing metering equipment at EDAS@caiso.com. Note: Meter replacement(s) or meter reprogram(s) will require the creation of new Device ID(s) to differentiate it from the existing metering equipment(s). 3 Provide the following metering documentation per NRI process timelines: Schematics o Three-Line Drawings o Detailed Station One-Line o Communication Block Diagram The ISO Meter Configuration Worksheet and ISO Meter and Site Verification Sheet (MSVS) can be found at: http://www.caiso.com/participate/pages/meteringtelemetry/default.asp x Transformer and Line Loss Worksheets, where applicable Distribution Compensation Factor (DCF) engineering study with letter of agreement of DCF from appropriate UDC/Distribution Company/Interconnection entity Supplemental Documentation which may be required at ISO discretion: o Map to the site o Contact personnel o System Description Overview ISO EDAS Actions 1 Ensure completeness and overall accuracy according to NRI timelines. Validate submitted meter documentation to avoid delays in meter certification. Page 4 of 13

No. 5710 2 If Documentation is missing, incomplete or inaccurate There is no questionable information Then Notify the ISO Metered Entity (ISOME) and provide details of issue(s). Go to Section 3.1.2 3.1.2 Meter Installation Activity Once the required metering documents have been approved, the meter installation process begins: 1 ISOME has meter(s) and associated equipment installed per tariff/bpm requirements and approved drawings. Note: The installed meter(s) must be listed on the Approved ISO Meter document found at: http://www.caiso.com/market/pages/meteringtelemetry/default.aspx. 2 Once the meter(s) and associated equipment are installed, the ISOME must secure an ISO Authorized Inspector (different from the vendor who installed and/or programmed the meter) and have the metering equipment validated. Note: The inspector must be from the ISO Authorized Inspectors document found at: http://www.caiso.com/market/pages/meteringtelemetry/default.aspx. 3 Submit ISO Meter Configuration Worksheet at least ten (10) business days prior to the operational testing date. This will allow ISO MDAS to set-up configuration in internal meter collection system. A successful communication test (based on the information capture within the form) is required to secure and execute the Operational Test. Note: Please note that the Site Owner is responsible for the accuracy of the information on this form. The submission must comply with the NRI time frames found at: http://www.caiso.com/participate/pages/resourceinterconnectionguide/default.aspx. Page 5 of 13

No. 5710 3.1.3 Communication Test ISO Metered Entity 1 Verifies the installation of the installed meter and associated equipment. Technical Specifications can be found in Attachment B within the Metering Business Practice Manual. 2 Informs the ISO of readiness for Operational Testing by scheduling an appointment via the ISO Fieldwork Appointment Request User Interface (UI) Note: Meter communications should be successful to avoid delays in meter testing. 3 ISO MDAS Actions Input meter information into internal meter collection system based information from the ISO Meter Configuration Worksheet. ISO EDAS Actions 4 Conduct communications test against the installed meter(s). 5 Ensure successful communication test between the meter and the ISO prior to Operational Testing. A fieldwork appointment is not required to check the communication to the Meter prior to the point-to-point test. Site owner(s) can simply either call EDAS or send an email to EDAS@caiso.com to verify the communication. Note: Communication testing must be successful in order to perform the Operational Test. 6 If Then Communication is Work with vendor and notify the ISO personnel unsuccessful once it has been resolved to re-test. Communication is unsuccessful the day of the Operational Test The test will be cancelled and will need to be rescheduled once communications to the meter(s) have been reestablished. Page 6 of 13

No. 5710 3.1.4 Operational Test The Operational Test is to validate the Meter Data interrogated from the ISO certified meter corresponds to a given test scenario/condition. Certified Meter Inspector, ISO EDAS, and 1 Perform Operational Test in accordance with the Meter Program Validation document found at: http://www.caiso.com/market/pages/meteringtelemetry/default.aspx Note: The ISOME ensures all necessary access to meters and Metering Facilities for inspection and testing by ISO Authorized Inspectors. 2 ISO EDAS If applicable, request for Hand Held Format (HHF) file(s) from the ISO Authorized Inspector in the event that the ISO is not able to communicate with the respective meter(s). EDAS shall forward applicable HHF(s) to mdas@caiso.com. Confirm that the meter is programmed using read-write access. Certified Meter Inspector Actions 3 Ensures that the Operational Test was performed successfully. Verifies any remaining testing and inspection. 4 Before leaving the Metering Facility, the inspector must place meter seals on all appropriate equipment. 5 Create/update and submit final MSVS to ISOME for submission to the ISO. 6 If applicable, forward the downloaded Hand Held Format (HHF) file(s) to EDAS@caiso.com at least two (2) business after the operational test. Note: The ISOME is responsible for the submission of all documentation to the ISO before Meter Data validation can occur. 7 Send the MSVS to the ISO and notify the ISO of meter passing inspection. 3.1.5 Meter Data Validation Activity ISO EDAS Actions 1 Gather meter generation data in order to perform validation. Page 7 of 13

No. 5710 2 Conduct Meter Data validation against the meter to ensure proper programming, documentation, and functionality. Note: The ISO reserves the right to perform a field audit. 3 If Then Meter validation fails Work with ISOME to resolve the issue until successful. 4 Review Final Meter Package once meter validation is successful. 5 If Final Meter Package is complete Then The ISO will issue a Certificate of Compliance and notify ISOME of Commercial Operational Data (COD). 6 If Final Meter Package is not complete Then Submit missing/corrected documentation to the ISO. Note: The ISO will not issue a Certificate of Compliance unless the Final Meter Package is complete. The required information can be found in Attachment C and 3.2.3.4 of the BPM for Metering. 3.2 Responsibilities for Maintaining Certificate of Compliance 3.2.1 Facility Maintenance If the Metering Facility is in need of maintenance, the Metered Entity is responsible for the following actions: Description Once an ISO Metered Entity has a Certificate of Compliance it is necessary to maintain the facility in accordance with the CAISO tariff and Business Practice Manual for Metering. If the Metering Facility is judged to be out of compliance by the ISO, the Certificate of Compliance may be revoked. Page 8 of 13

No. 5710 1 Inform the ISO prior to any replacements, changes, or modifications that are made to any meters or Metering Facilities of an ISO Metered Entity that has been certified. Under CAISO tariff Section 10.2.4.7, the ISO may require the recertification of the Metering Facility if desired. Emails should be sent to EDAS@caiso.com. Note: For any site maintenance that involves the removal of ISO seals, it is necessary to contact the ISO in accordance with Section 5.1.4 of the BPM for Metering and Section 10.2.13.1 of the CAISO tariff. 2 Continue to comply with the certification criterion that is found within the CAISO tariff and the Business Practice Manual for Metering. Section 10.2.4.5 in the CAISO tariff requires ISO Metering Entities to follow the criteria found in the CAISO tariff as well as Business Practice Manual Appendix C. Note: If Field Support is needed, an appointment must be scheduled in advance by using Fieldwork Appointment Request Form at: http://www.caiso.com/fieldworksupport/pages/default.aspx 3.2.2 Certificate Revocation If the ISO believes a Metered Entity to be out of compliance, the following actions may be taken: ISO EDAS Actions 1 Under Section 3.2.3.9 of the BPM for Metering, the ISO may revoke any Certificate of Compliance if there are reasonable grounds to believe that the ISO Metered Entity no longer meets the certification criteria found in the CAISO tariff and the Business Practice Manual. 2 If the ISO chooses to revoke a Certificate of Compliance and has given written notice to the relevant ISO Metered Entity stating that it does not believe that the identified Metering Facilities meet the certification criteria: The ISO will not accept Revenue Quality Meter Data (RQMD) from an ISO Metered Entity unless that RQMD is produced by a currently certified Metered Entity in accordance with Section 10.2.4.6 of the CAISO tariff. ISO Metered Entities may seek recertification of the relevant Metering Facilities in accordance with Section 10.2.4.6 of the CAISO tariff. Any appeals may be made to EDAS@caiso.com. Page 9 of 13

No. 5710 3.3 Installation of Additional Metering 3.3.1 ISO Metered Entity Election to Install Additional Metering If the ISO Metered Entity chooses to install additional metering the following actions must be taken: Description If there is a desire to install any additional meters or equipment within the certified Metering Facilities it is necessary for the ISO and ISO Metered Entity to properly coordinate on the installation process in accordance with Section 10.2.14 of the CAISO tariff and Section 3.3 of the BPM for Metering. 1 Inform the ISO before any changes or modifications are made to any Metering Facilities of an ISO Metered Entity that have been certified. An ISO Metered Entity may not start installation of additional metering until the ISO has approved its proposal for installation. Depending on the changes made to the Metering Facilities, it may be necessary to re-inspect or test all, or part, of the Metering Facilities. 2 Under Section 3.3.3 of the BPM for Metering, if an ISO Metered Entity installs additional metering, such metering must, unless the ISO agrees otherwise: Be installed and maintained at the ISO Metered Entity s cost; Be located on the ISO Metered Entity s side of any primary meter; and Not interfere with the accuracy of any primary meter and, if that primary meter is directly polled by the ISO, the ISO s ability to directly poll that meter. 3.3.2 ISO Requirement to Install Additional Metering Under Section 3.3.2 of the BPM for Metering, an ISO Metered Entity that is notified by the ISO that it is required to install additional Metering Facilities must: 1 Provide the ISO written confirmation of receipt of that notice within three (3) Business Days of receiving that notice. Page 10 of 13

No. 5710 2 Submit a proposal for installation to the ISO within 45 Business Days of receiving that notice containing the following information: A description of the proposed Metering Facilities to be installed (which includes all relevant schematic drawings and one-line drawings). A proposed timetable for installation. Any other information requested by the ISO. 3 Upon ISO approval of the submitted installation proposal, the Metered Entity may begin the installation process. Note: Depending on the reason for installing additional metering, the Metering Facility may be subject to re-inspection and/or re-certification once the installation is completed. 4. Supporting Information Operationally Affected Parties References Definitions Shared on the Internet. Resources studied in the development of this procedure and that may have an effect upon some steps taken herein include but are not limited to: CAISO tariff Section 10 Business Practice Manual for Metering Sections 3.2 and 3.3 Unless the context otherwise indicates, any word or expression defined in the Master Definitions Supplement to the CAISO tariff shall have that meaning when capitalized in this Operating. The following additional term(s) are capitalized in this Operating when used as defined below: NRI New Resource Implementation Page 11 of 13

No. 5710 Version History Version Change Date 1.0 Document Implementation 11/19/13 1.1 Periodic Review No content changes. 5/23/16 Updated logo in header. 1.2 Changed Meter Engineering to EDAS and updated 7/28/16 email address. 1.3 Updated the following sections: 10/07/16 1 - Responsibilities 3.1.1 Initializing the Process 3.1.2 Installation Activity 3.1.3 Communication 3.1.4 - Operational Test 1.4 Section 3.1.1, 3: Corrected link and removed verbiage that MSVS had to be received prior to the operational test. Minor format and grammar updates. 2/14/18 5. Periodic Review Review Criteria Frequency There are no specific review criteria identified for this procedure, follow instructions in s 5510 and 5520. Review as recommended in s 5510 and 5520. Incorporation of Changes There are no specific criteria for changing this document, follow instructions in s 5510 and 5520 Page 12 of 13

No. 5710 Technical Approval Reviewed By Content Expert Date Manager, Model & Contract Implementation 2/07/18 Manager, Metering and Market Services Compliance 2/12/18 Operations s 2/12/18 Director Approval Approved By Date Director, Market Services Production 10/03/16* Director, Market Services Support 10/03/16* Appendix No references at this time. Page 13 of 13